FORM -M1 METER READINGS OF M/s ,

1. BASIC INFORMATION
Vendor Pooling Station Pooling Agreement_
0 Stage _Code 0
Code code Station Code
Billing Date of Time of
2022 Billing Month 11 02-12-2022 09:42
Year Reading Reading

2. METER MANAGEMENT DETAILS

Whether seals are Intact: YES

If No, Remarks :

Details of Billing Energy Meters


Description Unit Main Meter Check Meter Stand By Meter
Make ---- SECURE SECURE SECURE
Meter Number ---- APX01513 APX01514 APX01515
Type ---- E3M024 E3M024 E3M024
Meter CT Ratio PRI-A / SEC-A 500/1 500/1 500/1
Meter PT Ratio PRI-KV / SEC-V 132/110 132/110 132/110
Multiplication ---- 1000 1000 1000

Details of Metering CTs and PTs (Main & Check Meter)


CTs PTs
Main Check Main Check
Unit R Y B R Y B R Y B R Y B

Make ---- PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI PRAGATI

Sl.No. ---- 63229 63230 63231 63229 63230 63231 63235 63236 63237 63235 63236 63237

Class ---- 0.2S 0.2S 0.2S 0.2S 0.2S 0.2S 0.2 0.2 0.2 0.2 0.2 0.2
Burden VA 5 5 5 5 5 5 10 10 10 10 10 10

Ratio PRI-A /
500/1 500/1 500/1 500/1 500/1 500/1 132/110 132/110 132/110 132/110 132/110 132/110
Available SEC-A

Ratio PRI-A /
500/1 500/1 500/1 500/1 500/1 500/1 132/110 132/110 132/110 132/110 132/110 132/110
Adopted SEC-A

Details of Metering CTs and PTs (Stand By Meter)


CTs PTs
Unit R Y B Unit R Y B

Make ---- PRAGATI PRAGATI PRAGATI ---- PRAGATI PRAGATI PRAGATI

Sl.No. ---- 63226 63227 63228 ---- 63232 63233 63234

Class ---- 0.2S 0.2S 0.2S ---- 0.2 0.2 0.2


Burden VA 5 5 5 VA 10 10 10
Ratio Available PRI-A / PRI-KV /
500/1 500/1 500/1 132/110 132/110 132/110
SEC-A SEC-V
Ratio PRI-A / PRI-KV /
500/1 500/1 500/1 132/110 132/110 132/110
Adopted SEC-A SEC-V
FORM -M1 METER READINGS Of M/s ,

3. METER READINGS
Inter connection point
(ICP)
Meter Location INOX WIND

Meter Type Main Check Stand By

Meter Number APX01513 APX01514 APX01515

Instantaneous Parameters:
Inst_c Instantaneous
Reading Reading Reading
ode Parameters

I01 Vry 133.81 133.73 133.88

I02 Vyb 134.82 134.89 134.89

I03 Vrb 134.21 134.21 133.75

I04 Ir 15.84 15.7 15.46

I05 Iy 15.85 16.2 15.68

I06 Ib 17.54 17.68 17.58

I07 Power Factor 0.993 0.993 0.993

I08 Frequency 49.98 49.98 49.98

I09 MW 3.64 3.66 3.63

I10 MVAR 0.41 0.41 0.41

I11 MVA 3.68 3.68 3.61

I12 Vthdr 0.39 0.37 0.4

I13 Vthdy 0.29 0.29 0.28

I14 Vthdb 0.3 0.38 0.32

I15 Ithdr 2.25 1.89 2.38

I16 Ithdy 2.07 1.86 1.89

I17 Ithdb 1.95 1.53 1.72

I18 Net Wh 0.0 0.0 0.0

I19 Varh (HIgh) 11767.7 11791.9 11636.4

I20 Varh (Low) 899.3 918.4 883.7


FORM -M1 METER READINGS OF M/s ,

Energy Parameters

Flow Direction: Export Import Export Import Export Import


Energy_paramete
Energy Parameters Main Meter Check Meter Stand By Meter
r_code
E01 MWH 2071.2 285608.6 2083.7 285615.3 2056.6 285686

E02 MVAH 3242.9 286082.2 3259.5 286092.6 3179.8 286171.7

E03 MVARH (Lag) 2352.3 4326.7 2362.8 4319.2 2278.9 4394.9

E04 MVARH (Lead) 62.1 20574.3 58.7 20652.1 58.7 20495.9

Reset : Before

Main Meter Check Meter Stand By Meter

Flow Direction: Export Import Export Import Export Import


MD_Par
MD
ameter_ Date Time Reading Date Time Reading Date Time Reading Date Time Reading Date Time Reading Date Time Reading
Parameters
code
M01 MD (MW) 17-11-2022 01:00 0.0 12-11-2022 07:15 0.0 17-11-2022 00:45 0.0 12-11-2022 07:15 0.0 27-11-2022 22:45 0.0 12-11-2022 07:15 0.0

M02 MD (MVA) 17-11-2022 01:00 0.44 12-11-2022 07:15 30.96 17-11-2022 00:45 0.44 12-11-2022 07:15 31 27-11-2022 22:45 0.44 12-11-2022 07:15 30.92

M03 CMD (MVA) 196.08 2207.28 196.44 2207.68 195.52 2210.48

M04 Reset count 75 75 77

Reset : After

Main Meter Check Meter Stand By Meter

Flow Direction: Export Import Export Import Export Import


MD_Par
MD
ameter_ Date Time Reading Date Time Reading Date Time Reading Date Time Reading Date Time Reading Date Time Reading
Parameters
code
M01 MD (MW) 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:41 0.0 02-12-2022 09:41 0.0

M02 MD (MVA) 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:42 0.0 02-12-2022 09:41 0.0 02-12-2022 09:41 0.0

M03 CMD (MVA) 196.52 2238.24 196.88 2238.68 195.96 2241.4

M04 Reset count 76 76 78


ANNEXURE-III
STATEMENT OF BILLING PARAMETERS FOR THE BILLING MONTH OF NOVEMBER-2022
Name & Location of the Plant :
M/s ,
Capacity of the plant :
Location of Metering :
INOX WIND
Fuel : null PPA/PWPA/PPWA/OA: PPA
Date of Reading : 02-12-2022 Time of Reading: 09:42 Billed on: MAIN

Description Import to APTRANSCO Export from APTRANSCO


Main Check Stand By Main Check Stand By
Meter Meter Meter Meter Meter Meter

MWH Final Reading on Dt: 02-12-2022 285608.6 285615.3 285686 2071.2 2083.7 2056.6

MWH Initial Reading on Dt: 02-11-2022 283206.4 283212.3 283282.8 2032 2044.4 2017.9

Difference in MWH (A) 2402.2 2403 2403.2 39.2 39.3 38.7

MVAH Final Reading on Dt: 02-12-2022 286082.2 286092.6 286171.7 3242.9 3259.5 3179.8

MVAH Initial Reading on Dt: 02-11-2022 283672.3 283682.1 283760.8 3178.5 3194.9 3117

Difference in MVAH (B) 2409.9 2410.5 2410.9 64.4 64.6 62.8

MVARH (Lag) Final Reading on Dt: 02-12-2022 4326.7 4319.2 4394.9 2352.3 2362.8 2278.9

MVARH (Lag) Initial Reading on Dt: 02-11-2022 4227.6 4220.5 4293.5 2302.4 2312.8 2230.7

Difference in MVARH (Lag) (C) 99.1 98.7 101.4 49.9 50 48.2

MVARH (Lead) Final Reading on Dt: 02-12-2022 20574.3 20652.1 20495.9 62.1 58.7 58.7

MVARH (Lead) Initial Reading on Dt: 02-11-2022 20558.3 20635.9 20480.5 62 58.6 58.7

Difference in MVARH (Lead) (D) 16 16.2 15.4 0.1 0.1 0.0

Multiplication Factor (E) 1000 1000 1000 1000 1000 1000

Billing Energy in KWH (A x E) 2402200 2403000 2403200 39200 39300 38700

Billing Energy in KVAH (B x E) 2409900 2410500 2410900 64400 64600 62800

Reactive Energy in KVARH (C x E) 99100 98700 101400 49900 50000 48200

Maximum Demand (MD) Reading (F) 30.96 31 30.92 0.44 0.44 0.44

Multiplication Factor (G) 1000 1000 1000 1000 1000 1000

Billing MD in KVA (F x G) 30960 31000 30920 440 440 440


FORM - M3 MONTHLY BILLING REPORT

1. MWh

Main Meter Number Check Meter Number Standby Meter Number


Description Date APX01513 APX01514 APX01515
Import Export Import Export Import Export

(A) MWh Final Reading 02-12-2022 285608.6 2071.2 285615.3 2083.7 285686 2056.6
(B) MWh Initial Reading 02-11-2022 283206.4 2032 283212.3 2044.4 283282.8 2017.9
(A1) =
Difference in MWh 2402.2 39.2 2403 39.3 2403.2 38.7
(A) - (B)

(I) Multiplication Factor 1000 1000 1000 1000 1000 1000


(A1) x (I) Billing Energy in kWh 2402200 39200 2403000 39300 2403200 38700

2. MVAh

Main Meter Number Check Meter Number Standby Meter Number


Description Date APX01513 APX01514 APX01515
Import Export Import Export Import Export

(C) MVAh Final Reading 02-12-2022 286082.2 3242.9 286092.6 3259.5 286171.7 3179.8
(D) MVAh Initial Reading 02-11-2022 283672.3 3178.5 283682.1 3194.9 283760.8 3117
(B1) =
Difference in MVAh 2409.9 64.4 2410.5 64.6 2410.9 62.8
(C) - (D)

(I) Multiplication Factor 1000 1000 1000 1000 1000 1000


(B1) x (I) Billing Energy in kVAh 2409900 64400 2410500 64600 2410900 62800

3. MVARh (LAG)

Main Meter Number Check Meter Number Standby Meter Number


Description Date APX01513 APX01514 APX01515
Import Export Import Export Import Export

MVARh (lag)
(E) 02-12-2022 4326.7 2352.3 4319.2 2362.8 4394.9 2278.9
Final Reading
MVARh (lag)
(F) 02-11-2022 4227.6 2302.4 4220.5 2312.8 4293.5 2230.7
Initial Reading
(C1) = Difference in
99.1 49.9 98.7 50 101.4 48.2
(E) - (F) MVARh (lag)
(I) Multiplication Factor 1000 1000 1000 1000 1000 1000
Billing Energy
(C1) x (I) 99100 49900 98700 50000 101400 48200
in kVARh (lag)
4. MVARh (LEAD)

Main Meter Number Check Meter Number Standby Meter Number


Description Date APX01513 APX01514 APX01515
Import Export Import Export Import Export

MVARh (lead)
(G) 02-12-2022 20574.3 62.1 20652.1 58.7 20495.9 58.7
Final Reading
MVARh (lead)
(H) 02-11-2022 20558.3 62 20635.9 58.6 20480.5 58.7
Initial Reading
(D1) = Difference in
16 0.1 16.2 0.1 15.4 0.0
(G) - (H) MVARh (lead)
(I) Multiplication Factor 1000 1000 1000 1000 1000 1000
Billing Energy in
(D1) x (I) 16000 100 16200 100 15400 0.0
kVARh (lead)

5. MAXIMUM DEMAND

Main Meter Number Check Meter Number Standby Meter Number


Description Date APX01513 APX01514 APX01515
Import Export Import Export Import Export

(J) Maximum Demand (MD) 02-12-2022 30.96 0.44 31 0.44 30.92 0.44
(I) Multiplication Factor 1000 1000 1000 1000 1000 1000
(J) X (I) Billing MD in kVA 30960 440 31000 440 30920 440

Note : Maximum Demand (MD) Calculation method is given below

Cumulative Maximum Demand (CMD) Reading


(M)
after Reset in Previous JMR
Cumulative Maximum Demand (CMD) Reading
(N)
before Reset in Present JMR
Cumulative Maximum Demand (CMD) Reading
(P)
after Reset in Present JMR
Current Month MD to be billed = M02,
(J) if (P - M) = M02
Else, Max { (N-M), (P-N) }
TRANSMISSION LOSS CALCULATION FOR THE MONTH OF NOVEMBER-2022PERIOD : 02-11-2022 TO 02-12-2022
33/132KV INOX WIND POOLING
33 KV Individual Metering Point
Cumulative Generation of individual Wind SUBSTATION
SlNo.
Farm for the Month of NOVEMBER-2022 Main Check Standby Main Check Standby
(KWh) (KWh) (KWh) (KWh) (KWh) (KWh)

1PTC Energy Ltd - KDP1 1138800.00 2402200.00

2PTC Energy Ltd - KDP1 1290200.00

Total Generation 2429000.00 2402200.00

Total % of Line Loss : 1.10


Note :
The formula mentioned in the PPA Guidelines on Power Evacuation from Wind Power Project in Andhra Pradesh Clause
3(ii), has been used to calculate transmission losses.

FORMULA:
Delivered Energy to be billed for an individual project = X1-(X1*Z%)
Where
X1 is the reading of the energy meter installed at the Project Site. Z is the percentage line loss incurred in the 33 KV line
between the Project and Pooling(Recieving) Station and shall be:

(X1 + X2 + X3 + X4 +_ _ _ _) - Y
Z = --------------------------------------------- x 100
(X1 + X2 + X3 + X4 +_ _ _ _)

Where Y is the reading of the common meter installed on EHT side of the Pooling SS and X1,X2,X3,X4 etc. are the reading of the energy
meters installed at the various individual Wind projects connected to the Pooling Station.

DELIVERED ENERGY (After deducting the line losses)

33 KV individual meter point


Line Loss
SlNo. Total Energy Delivered from Individual wind farms
(KWh) Main Check Standby
(KWh) (KWh) (KWh)

1PTC Energy Ltd - KDP1 12564.78 1126235.22

2PTC Energy Ltd - KDP1 14235.22 1275964.78

Total Delivered Energy 26800.00 2402200.00