HYDROLOGIC INVESTIGATION

PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA

REPORT

Submitted To: Lehigh Southwest Cement Company 24001 Stevens Creek Boulevard Cupertino, California 95014

Submitted By: Golder Associates Inc. 425 Lakeside Drive Sunnyvale, California 94085 Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, Washington 98052

May 2010

Project No. 063-7109

May 2010

ES-1

063-7109

EXECUTIVE SUMMARY
Golder Associates Inc. (Golder) prepared this report for Lehigh Southwest Cement Company (Lehigh) in support of permitting and reclamation efforts related to development and reclamation of the proposed South Quarry, and concurrent reclamation of the existing North Quarry, located at the Lehigh Permanente Quarry (the Site) in Santa Clara County, California. The objective of this report is to provide an overall characterization of the hydrologic conditions of the Site such that (1) the current conditions are documented and (2) potential changes to the hydrologic systems associated with future mining and reclamation efforts are evaluated. The hydrologic investigations, starting in 2008 continuing through January 2010, comprised a series of tasks directed toward an evaluation of surface water and groundwater occurrence, flow, and chemistry. The tasks included historical research, hydraulic testing (pumping and packer tests), collecting and analyzing groundwater elevation and stream flow data, and collecting and analyzing of surface water, groundwater, mine water, rock core, and wall washing samples. The results from the hydrologic investigations were used to further our understanding in developing a site conceptual model, and as the foundation of a groundwater numerical model (MODFLOW). The numerical model was developed to evaluate potential hydrogeologic changes associated with future mining and reclamation activities.

Hydrology Discussion
The following current hydrologic conditions were determined by Golder: Two separate stream drainages are present: Monte Bello Creek located approximately 700 feet from the South Quarry perimeter; and Permanente Creek situated between the existing North Quarry and South Quarry. Permanente Creek tends to be dry adjacent to the North Quarry in dry months, while surface water flows occur both upstream of and downstream from the North Quarry throughout the year. Groundwater flow is preferentially within the more permeable limestone units compared to the greenstone and graywacke. However, because the limestone units occur as large blocks, and are of limited extent, the limestone units behave as a compartmentalized, isolated hydrogeologic system and the overall groundwater system is controlled by the less permeable greenstone and graywacke units. Locally, groundwater flow is primarily to the north and northeast from a groundwater divide located beneath the ridge separating Permanente Creek from Monte Bello Creek. The average annual baseflow for water year 2009 was estimated to be 0.30 cubic feet per second (cfs) along the upper section of Permanente Creek south of the West Materials Storage Area and approximately 1 cfs approximately 500 feet downstream of the North Quarry dewatering discharge point. The average annual baseflow for Monte Bello Creek for water year 2009 was estimated to be 0.08 cfs upstream of the South Quarry and 0.14 cfs downstream of the South Quarry. The North Quarry acts as a sump and is subject to groundwater seepage into the quarry excavation. During the dry season it is estimated that the ambient groundwater seepage into the North Quarry is about 200 gpm.

hydrologic report_ final

May 2010

ES-2

063-7109

During future mining activities, the following changes are estimated based on the modeling results: The average annual groundwater inflow into the North Quarry will initially increase by approximately 60 gpm as the North Quarry is deepened to 440 ft amsl. The groundwater inflow rate in the North Quarry will subsequently decrease as the North Quarry is reclaimed (backfilled) from 440 to 990 ft amsl and the South Quarry is excavated. Since the South Quarry will be shallower, sustained groundwater inflow into the South Quarry will be up to an estimated 90 gpm, and will not occur until the base of the South Quarry is at its lowest elevation. Similar to the North Quarry, the groundwater inflow rate will decrease as the South Quarry is reclaimed (backfilled) to a minimum elevation of 1,110 ft amsl. The simultaneous development of the South Quarry, and the reclamation of the North Quarry, will have no measurable impact on groundwater discharge to Monte Bello Creek and to the upper reaches of Permanente Creek. A decrease in groundwater discharge to the middle reach of Permanente Creek (i.e., adjacent to the quarry) of 0.1 cfs (40 gpm) is estimated to occur with the deepening of the North Quarry. However, once the North Quarry is reclaimed and fully backfilled, then the middle reach of Permanente Creek will receive 0.46 cfs (206 gpm) more groundwater discharge than under current conditions. The predicted annual average post-mining water elevation in the South Quarry is below the minimum backfill elevation for the South Quarry; therefore, the development of a pit lake is not anticipated based on the available data. The estimated average annual inflow from all sources (groundwater, surface water, and precipitation) to the South Quarry at equilibrium is 26 gpm. The post-mining water level in the North Quarry will reach a maximum elevation equal to the backfill elevation of 990 ft amsl (which is the low-point surface water overflow to Permanente Creek). At equilibrium, the estimated total annual average inflow (groundwater, surface water, and precipitation) into the North Quarry is 169 gpm. These quantities are expected to discharge to Permanente Creek primarily as groundwater depending on the permeability of the materials separating the quarry from the creek. During periods of intense rainfall, and during seasonal high groundwater conditions, there is a potential that discharge from the reclaimed North Quarry to Permanente Creek may occur as surface water if appropriate water management techniques are not employed. The planned quarry expansion will have no significant impact to groundwater levels in supply wells located along Monte Bello Ridge, approximately between and one mile from the center of the South Quarry. Therefore, operation of these wells, or any other nearby wells, will not be adversely affected by the planned quarry expansion and subsequent reclamation.

Current Geochemistry Conditions


The objective of the geochemical evaluation was to establish and document current conditions for surface water and groundwater quality. Water quality conditions were characterized over a one-year period. The program entailed sampling of five groundwater wells within the proposed South Quarry, three surface water locations (two at Permanente Creek and one at Monte Bello Creek), and mine water quality from the North Quarry. Furthermore, to evaluate the environmental behavior of geologic materials present at the proposed quarry, geochemical characterization of overburden (rock and soil) and ore materials was conducted. Both laboratory and field-scale testing (wall wash sampling) were conducted to evaluate the potential for metal leaching. A separate report discusses the analysis of collected data and projected water quality.

hydrologic report_ final

May 2010

063-7109

PROFESSIONAL CERTIFICATION
HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
MAY 2010

Submitted To: Lehigh Southwest Cement Company 24001 Stevens Creek Boulevard Cupertino, California 95014

Prepared By: Golder Associates Inc. 425 Lakeside Drive Sunnyvale, California 94085 Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, Washington 98052

This report has been reviewed and approved by:

William L. Fowler, P.G., C.E.G. Associate/Senior Consultant

David Banton Principal/Practice Leader

hydrologic report_ final

May 2010

063-7109

Table of Contents
EXECUTIVE SUMMARY ........................................................................................................................ ES-1 1.0 1.1 1.2 INTRODUCTION ............................................................................................................................... 1 Objective ....................................................................................................................................... 1 Project Background ....................................................................................................................... 1 Existing Operations ............................................................................................................... 1 Proposed Project ................................................................................................................... 2

1.1.1 1.1.2 1.3 1.4 2.0 2.1 2.2

Scope of Work ............................................................................................................................... 3 Project Team ................................................................................................................................. 4 REGIONAL SETTING ....................................................................................................................... 6 Topography ................................................................................................................................... 6 Geologic Setting ............................................................................................................................ 6 Franciscan Terrane ............................................................................................................... 7 Santa Clara Formation .......................................................................................................... 7 Surficial Deposits................................................................................................................... 8 Alluvium ............................................................................................................................. 8 Colluvium........................................................................................................................... 8 Landslide Deposits ............................................................................................................ 8

2.2.1 2.2.2 2.2.3

2.2.3.1 2.2.3.2 2.2.3.3 2.3 2.4 3.0 3.1

Structural Setting ........................................................................................................................... 9 Hydrogeologic Setting ................................................................................................................... 9 DATA COLLECTION ....................................................................................................................... 10 Hydrologic data ........................................................................................................................... 10 Precipitation......................................................................................................................... 10 Stream Monitoring ............................................................................................................... 10 Well and Piezometer Installation ......................................................................................... 10 Airlift Testing........................................................................................................................ 11 Packer Tests ....................................................................................................................... 12 Pumping Tests .................................................................................................................... 12 Groundwater Level Monitoring ............................................................................................ 12 Groundwater Quality Sampling ........................................................................................... 13 Surface Water Quality Sampling ......................................................................................... 14 Wall Washing and North Quarry Sampling ......................................................................... 14 Quality Control..................................................................................................................... 15

3.1.1 3.1.2 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.3 3.3.1 3.3.2 3.3.3 3.3.4 4.0 4.1

Hydrogeologic Data ..................................................................................................................... 10

Geochemical Data ....................................................................................................................... 12

CURRENT HYDROGEOLOGIC CONDITIONS.............................................................................. 16 Site Setting .................................................................................................................................. 16 Climate ................................................................................................................................ 16 Surface Water Flow ............................................................................................................. 16 4.1.1 4.1.2

hydrologic report_ final

May 2010 4.1.3 4.1.4 4.1.5 4.2 4.2.1 4.2.2 4.2.3 4.3 4.4

ii

063-7109

Seeps and Springs .............................................................................................................. 17 Geologic Units ..................................................................................................................... 17 Geologic Structure .............................................................................................................. 17 Limestone ............................................................................................................................ 18 Greenstone.......................................................................................................................... 19 Graywacke .......................................................................................................................... 19

Hydrogeologic Units .................................................................................................................... 18

Water Level Response ................................................................................................................ 19 Hydraulic Properties .................................................................................................................... 21 Packer Test Results ............................................................................................................ 21 Constant-Rate Pumping Test .............................................................................................. 21 Pumped Well Response and Interpretation .................................................................... 22 Observation Well Responses and Interpretation ............................................................ 22 Analysis Results and Interpretation................................................................................. 22

4.4.1 4.4.2

4.4.2.1 4.4.2.2 4.4.2.3 4.5 4.5.1 4.5.2 4.6 4.6.1 4.6.2

Groundwater Flow Conditions ..................................................................................................... 24 Groundwater Levels and Flow ............................................................................................ 24 Hydraulic Gradients ............................................................................................................. 24 Approach ............................................................................................................................. 25 Hydrologic Data ................................................................................................................... 25 Precipitation..................................................................................................................... 25 Permanente Creek Flow ................................................................................................. 26 Monte Bello Creek Flow .................................................................................................. 26 North Quarry Pumping .................................................................................................... 27 Permanente Creek .......................................................................................................... 28 Monte Bello Creek ........................................................................................................... 28 North Quarry.................................................................................................................... 28

Water Balance ............................................................................................................................. 25

4.6.2.1 4.6.2.2 4.6.2.3 4.6.2.4 4.6.3 4.6.3.1 4.6.3.2 4.6.3.3 4.7 5.0 5.1 5.2

Water Balance Estimates .................................................................................................... 28

Groundwater Recharge ............................................................................................................... 29 HYDROGEOLOGICAL MODELING ............................................................................................... 30 Modeling Objectives .................................................................................................................... 30 Conceptual Model Description .................................................................................................... 30

5.2.1 Groundwater Flow ...................................................................................................................... 31 5.2.2 Recharge and Discharge ........................................................................................................... 31 5.3 Numerical Groundwater Flow Model ........................................................................................... 31 Model Code ......................................................................................................................... 31 Model Geometry .................................................................................................................. 32 Layering and Hydrostratigraphy .......................................................................................... 32 Hydraulic Properties ............................................................................................................ 32 Boundary Conditions ........................................................................................................... 32 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5

hydrologic report_ final

May 2010 5.3.6

iii

063-7109

Model Calibration ................................................................................................................ 33 Approach ......................................................................................................................... 33 Calibration Results (Current Conditions)......................................................................... 33 Approach ......................................................................................................................... 36 Simulation Results........................................................................................................... 37

5.3.6.1 5.3.6.2 5.3.7 5.3.7.1 5.3.7.2 5.4 5.4.1 5.4.2 6.0 6.1 6.2

Simulation of Quarry Development and Reclamation ......................................................... 36

Post-Mining Quarry Water Balance............................................................................................. 39 Approach ............................................................................................................................. 39 Results ................................................................................................................................ 40

GEOCHEMICAL DATA COLLECTION AND REVIEW ................................................................... 41 Objectives.................................................................................................................................... 41 Data Collection ............................................................................................................................ 41 Surface Water and Groundwater Quality Monitoring .......................................................... 41 North Quarry Mine Water Quality Monitoring Data ............................................................. 42 North Quarry Storm Water Monitoring ................................................................................ 42 Published Data - Regional Water Quality Data Compilation ............................................... 42 Geochemical Laboratory Testing ........................................................................................ 43 Geochemical Field Testing Pit Wall Washing .................................................................. 44 Quality Assurance/Quality Control Program ....................................................................... 45 Water Quality Monitoring ..................................................................................................... 45 Groundwater Quality ....................................................................................................... 45 Surface Water Quality ..................................................................................................... 46

6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.3 6.3.1

Monitoring Results ...................................................................................................................... 45 6.3.1.1 6.3.1.2

6.3.2 6.3.3 6.3.4 6.3.5

North Quarry Mine Water Quality Monitoring Data ............................................................. 47 North Quarry Storm Water Monitoring ................................................................................ 48 Regional Water Quality Data Compilation .......................................................................... 48 Geochemical Laboratory Testing ........................................................................................ 49 Acid Generation Potential ............................................................................................... 49 Sulfide Occurrence Sample Representativeness ........................................................ 49 Elemental Concentration and Metal Leaching Potential ................................................. 50

6.3.5.1 6.3.5.2 6.3.5.3 6.3.6 6.3.7 7.0

Geochemical Field Testing Pit Wall Washing .................................................................. 51 Quality Assurance/Quality Control ...................................................................................... 52

REFERENCES ................................................................................................................................ 53

List of Tables
Table 3.1 Table 3.2 Table 3.3 Table 4.1 Table 4.2 Table 4.3 Stream Monitoring Station Summary Borehole Completion Summary Analytical Parameter Summary Distribution of Rock Types within Geologic Model Rock Masses Summary of Groundwater Level Responses (October 2009 Rainstorm Event) Summary of Hydraulic Properties from Packer Testing

hydrologic report_ final

May 2010 Table 4.4 Table 4.5 Table 4.6 Table 4.7 Table 5.1 Table 5.2 Table 5.3 Table 5.4 Table 5.5 Table 5.6 Table 5.7 Table 6.1 Table 6.2 Table 6.3 Table 6.4 Table 6.5 Table 6.6 Table 6.7 Table 6.8 Table 6.9 Table 6.10 Table 6.11 Table 6.12

iv

063-7109

Summary of Hydraulic Properties from Constant-Rate Pumping Test Los Altos Hills Station (LSA) Water Balance Summary North Quarry Water Balance 2009 Modeled Annual Groundwater Budget (Current Conditions) Observed and Modeled Groundwater Discharge to Creeks Modeled Hydraulic Conductivity Values Summary of Quarry Development and Reclamation Phasing Summary of Predicted Changes in Groundwater Discharge Compared to Current Conditions Summary of Inflows in North Quarry Summary of Inflows in South Quarry Groundwater Wells Completion Details and Sulfide Occurrence Permanente Creek Storm Water Monitoring Locations Overburden and Ore Composite Samples Summary of Geochemical Analyses Wall Washing Sampling Locations Groundwater and Surface Water Quality Data Summary - Select Parameters Summary of Selected PER070 Water Quality Results Acid Base Accounting Results Overburden and Ore Composite Samples - Drill Log Descriptions Geologic Logs Summary of Pyrite Occurrence Overburden and Ore - TTLC and STLC Results Wall Washing Results

List of Figures
Figure 1.1 Figure 1.2 Figure 1.3 Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5 Figure 2.6 Figure 3.1 Figure 4.1 Figure 4.2 Figure 4.3 Figure 4.4 Figure 4.5 Figure 4.6 Figure 4.7 Figure 4.8 Figure 4.9 Figure 4.10 Figure 4.11 Figure 4.12 Figure 4.13 Figure 4.14 Figure 4.15 Figure 4.16 Figure 4.17 Figure 4.18 Figure 5.1 Figure 5.2 Figure 5.3 Regional Location Map Project Overview Final Reclamation Plan Regional Topographic Setting Local Topographic Setting Regional Geologic Map Geologic Compilation Map Geological Cross Sections Regional Geotectonic Map Monitoring Locations Groundwater Levels Relative Groundwater Changes HG-10S Drawdown and Recovery Semi-Log Plot HG-10S Drawdown and Recovery Derivative Log-Log Plot Corrected Drawdown Hydrographs for Observation Wells Theis Partial Penetration Analysis Results from AQTESOLV Theis Partial Penetration Analysis Results from AQTESOLV Distance vs. Drawdown Semi-Log Plot Groundwater Elevation Contour Map North Quarry Water Level - February to October 2010 Groundwater Elevation vs. Well Completion Elevation MS-1 Baseflow Separation Hydrograph MS-2 Baseflow Separation Hydrograph MS-3 Baseflow Separation Hydrograph MS-4 Baseflow Separation Hydrograph North Quarry Water Level and Daily Precipitation North Quarry Water Level and Pumping Rate North Quarry Inflow - Existing Condition Model Domain and Boundary Conditions Model Grid and Boundary Conditions - Quarry Area Section North-South Through North Quarry

hydrologic report_ final

May 2010 Figure 5.4 Figure 5.5 Figure 5.6 Figure 5.7 Figure 5.8 Figure 5.9 Figure 5.10 Figure 5.11 Figure 5.12 Figure 5.13 Figure 5.14 Figure 5.15 Figure 5.16 Figure 6.1 Figure 6.2 Figure 6.3 Figure 6.4 Figure 6.5 Figure 6.6 Figure 6.7 Figure 6.8 Figure 6.9 Figure 6.10 Figure 6.11 Figure 6.12 Figure 6.13 Figure 6.14 Figure 6.15 Figure 6.16 Figure 6.17 Figure 6.18 Figure 6.19 Figure 6.20 Figure 6.21 Figure 6.22 Figure 6.23 Figure 6.24 Figure 6.25 Figure 6.26 Figure 6.27 Figure 6.28 Figure 6.29 Figure 6.30 Figure 6.31 Figure 6.32

v Section West-East Through North Quarry Model Top Surface - Current Conditions Simulated Current Piezometric Heads Simulated Current Piezometric Heads Quarry Area Calibrated versus Observed heads October 2009 North-South Section Current Conditions North-South Section Phase 1 North-South Section Phase 2 North-South Section Phase 3 North-South Section Phase 4 North-South Section Phase 5 Simulated Piezometric Heads Phase 1 Simulated Piezometric Heads Phase 5 Quarry Precipitation vs. Surface Water and Wall Washing Sampling Events Storm Water Sample Locations Permanente Creek Monitoring Location PER070 (SFBRWQCB, 2007) North Quarry - Wall Washing (November 2009) Wall Washing - Graywacke (GW-01) Wall Washing - Chert Sample (CT-01) Wall Washing - Greenstone (GS-01) Wall Washing - Limestone - Medium to High Grade (MG-01) Wall Washing - Limestone - High Grade (HG-01) Wall Washing - Limestone - High and Medium/Low Grade (HMG-01) Current Water Quality - pH, TDS and Alkalinity Current Water Quality - SO4, NO3 and Cl Current Water Quality - Sb, As and Se Current Water Quality - Mn, Ni and Mo Current Water Quality - V, Zn and Fe Current Water Quality - Ca, Mg and Na Current Water Quality - Hg Groundwater and Surface Water Piper Plot Permanente Creek Storm Water Monitoring Data (January 18, 2006) Permanente Creek Storm Water Monitoring Data (February 27, 2006) Limestone Ore Sulfide-Sulfur Data Overburden (Rock) and Ore - TTLC and STLC Results Overburden (Rock and Soil) and Ore Elemental Concentrations by Rock Type Overburden (Rock and Soil) and Ore - TTLC vs. STLC Wall Washing Samples Water Quality Comparison Ca and Mg Water Quality Comparison Na and SO4 Water Quality Comparison Alkalinity and pH Water Quality Comparison Sb and As Water Quality Comparison Fe and Mm Water Quality Comparison Mo and Ni Water Quality Comparison Se and V

063-7109

List of Appendices
Appendix A Appendix B Appendix C Appendix D Table D-1 Table D-2 Appendix E Boring Logs Hydrographs Packer Test Results Groundwater and Surface Water Quality Results Water Quality Monitoring Results PER070 Water Quality Data Quality Assurance/Quality Control

hydrologic report_ final

May 2010

063-7109

1.0 1.1

INTRODUCTION Objective

Golder Associates Inc. (Golder) has prepared this report for Lehigh Southwest Cement Company (Lehigh) in support of permitting and reclamation efforts related to development and reclamation of the proposed South Quarry, and concurrent reclamation of the existing North Quarry, located at the Lehigh Permanente Quarry (the Quarry) in Santa Clara County, California. The objective of this work effort was to provide an overall characterization of the hydrologic and hydrogeologic conditions of the Quarry such that (1) the current conditions are documented and (2) potential changes to the hydrologic systems associated with future proposed mining and reclamation efforts can be evaluated. The hydrologic investigations were initiated in the fall of 2008 with field work continuing through January, 2010. The hydrologic investigations are comprised of a series of tasks directed toward an evaluation of both surface water occurrence, flow and chemistry, and hydrogeologic investigations of the occurrence, flow and chemistry of groundwater. The scope of work completed for the project is discussed in detail in Section 1.3. The background for the overall reclamation project is discussed in Section 1.2.

1.2
1.1.1

Project Background
Existing Operations

The Quarry is a limestone and aggregate mining operation in the unincorporated foothills of western Santa Clara County, approximately two miles west of the City of Cupertino (Figure 1.1). The Quarry occupies a portion of a 3,510-acre property owned by Hanson Permanente Cement, Inc., and is operated by Lehigh Southwest Cement Company (collectively, Lehigh) (Figure 1.2). The Quarry currently comprises approximately 570 acres of operational areas, which consist of surface mining excavations, overburden stockpiling, crushing and processing facilities, access roads, administrative offices and equipment storage. The Quarry also includes other predominantly undisturbed areas, either held in reserve for future mining or which buffer operations from adjacent land uses. The main operational areas of the Quarry are currently as follows: North Quarry: The North Quarry is where mineral extraction currently occurs and has historically taken place. The North Quarry features a large mining pit with elevations that currently range from approximately 750 feet to 1,750 feet above mean sea level (amsl). Limestone and greenstone mined from the North Quarry are crushed and either processed into aggregate products at Lehighs on-site Rock plant or for used for cement manufacture at Lehighs adjacent cement plant.

hydrologic report_ final

May 2010

063-7109

East Materials Storage Area (EMSA): The EMSA is located to the east of the North Quarry and is currently the primary storage site for overburden and waste rock. Elevations at the EMSA range from approximately 550 feet to 920 feet amsl. West Materials Storage Area (WMSA): The WMSA is a second overburden and waste rock storage site, located west of the North Quarry. Elevations in the WMSA range from 1,500 to 1,950 feet amsl. The WMSA is approaching the final elevation and contours described in the Quarrys existing reclamation plan. Rock Plant: The Rock Plant is located in the southeast portion of the Quarry, and processes mined material into aggregate products. The Rock Plant occupies gentle slopes from approximately 580 feet to 770 feet amsl. Mining operations take place subject to Californias Surface Mining and Reclamation Act (SMARA). SMARA mandates that surface mining operations have an approved reclamation plan that describes how mined lands will be prepared for alternative post-mining uses, and how residual hazards will be addressed. Santa Clara County acts as lead agency under SMARA. The County approved the Quarrys current reclamation plan in March 1985, covering 330 acres. A cement manufacturing plant lies adjacent to the Quarry on the east. The cement plant also is owned and operated by Lehigh. The cement plant is a separately- permitted industrial use which is not considered part of the Quarry and is not subject to SMARAs requirements.

1.1.2

Proposed Project

The proposed project is the approval of an amendment to the Quarrys reclamation plan. The proposed amendment would broaden the reclamation plan, and associated reclamation requirements, to include all areas that are currently disturbed by mining activities, and lands scheduled to be disturbed by mining over approximately the next 20 years (Figure 1.3). The amendment would incorporate 1,105 acres of Lehighs 3,510-acre ownership, and address the reclamation of mining activities over approximately the next 20 years. Under the amendment, areas disturbed by mining would be reclaimed for open space uses. The project also is the approval of a conditional use permit (CUP) for certain mining operations at the Quarry. The CUP would authorize the continuation of mineral extraction in a portion of the planned extraction area south of Permanente Creek known as the South Quarry. Rock mined at the South Quarry would be transported to existing facilities for processing. The South Quarry is included in the proposed reclamation plan amendment and would be reclaimed according to the requirements therein. The proposed reclamation plan amendment and CUP would result in the following conditions and changes at the Quarry: South Quarry: The project would approve a CUP and amend the reclamation plan to provide for concurrent mining and reclamation at the South Quarry. Operations would occur over a period of approximately 20 years, depending on market demands. The South Quarry will be mined in five phases with reclamation following mining within each

hydrologic report_ final

May 2010

063-7109

phase. Mined limestone and greenstone would be transported to existing Quarry facilities for crushing and processing. Topsoil Storage Area: The project would amend the reclamation plan to provide for the reclamation of the Topsoil Storage Area, an area located to the south of the Rock Plant. The Topsoil Storage Area would serve to temporarily store topsoil material removed from the South Quarry until such material is needed for reclamation. North Quarry: The project would amend the current reclamation plan for the North Quarry to reflect the use of the North Quarry as a permanent storage site for overburden and waste rock extracted from the South Quarry. Reclamation activities would establish final slopes and vegetation in the North Quarry consistent with the surrounding topography. Central Materials Storage Area (CMSA): The project would amend the reclamation plan to include all planned storage phases for the CMSA, located directly west of EMSA and east of the North Quarry. The proposed reclamation plan amendment would provide final grading contours and revegetation for this area. EMSA: The EMSA is expected to be built out and closed to storage prior to project approval, and reclamation would at that time be in progress. WMSA: The project would amend the current reclamation plan for the WMSA to reflect the transition of the adjacent North Quarry reclaimed fill slopes and tie in these slopes to the WMSAs east side. The project also would update the current WMSA revegetation design. Rock Plant: The project would amend the reclamation plan to provide a reclamation design for the Rock Plant.

1.3

Scope of Work

Golder conducted a detailed hydrologic and hydrogeologic investigation directed toward characterization of surface water and ground water conditions in support of the reclamation project. The general tasks conducted for the investigations are described below, more specific details on each task are provided as necessary, in the following chapters of this report: Research and compilation of published and unpublished literature pertaining to surface water and groundwater in the vicinity of the Permanente Creek and Monte Bello Creek watersheds Compilation and evaluation of site-specific geologic data from resource-related coreholes in the South Quarry for planning of subsurface investigations Compilation and evaluation of available historical information regarding pumping rates, duration, and corresponding pit water elevation measurements for the active North Quarry Installation and monitoring of streamflow monitoring stations in Permanente Creek and Monte Bello Creek Sampling and chemical analysis of surface water samples from Permanente Creek, Monte Bello Creek, and North Quarry pit water Implementation of pit wall wash samples and chemical analyses of resulting data Drilling, logging and instrumentation of nine hydrogeologic exploratory boreholes in the South Quarry area Drilling, logging and instrumentation of two exploratory boreholes in the Main Slide area in the North Quarry

hydrologic report_ final

May 2010

063-7109

Drilling, logging and instrumentation of four exploratory boreholes in the south wall of the North Quarry to evaluate groundwater conditions between Permanente Creek and the North Quarry pit Installation of fourteen vibrating wire transducers and data loggers for long term measurement of water levels/pore pressure conditions Installation and development of four groundwater wells in the South Quarry for water level measurements and water quality sampling Air lift testing of completed coreholes to provide a preliminary estimate of sustained groundwater yield Downhole hydraulic injection tests (packer tests) of borehole intervals to estimate the hydraulic conductivity of various bedrock lithologies Installation of one deep pumping well and one monitoring well for a long-term pumping test to evaluate bulk hydraulic properties near the base of the proposed South Quarry Review and analysis of the geochemistry of representative overburden materials (provided by Geocon Consultants, Inc.) as it pertains to potential influences on surface and groundwater geochemistry Data analysis of hydraulic test results Data analysis of streamflow data and preparation of rating curves for Monte Bello and Permanente Creeks Development of a conceptual hydrogeological model and related MODFLOW groundwater numerical model using available site-specific geologic and hydrogeologic data to model existing conditions and to evaluate future mining and reclamation activities Compilation of current geochemistry data for surface water and groundwater Preparation of this hydrologic report summarizing the findings, conclusions and recommendations of our investigation

1.4

Project Team

The team for the Permanente Quarry hydrology project is comprised of geologists and engineers from Golders Sunnyvale, California and Redmond, Washington offices. The primary professionals associated with this project included: William L. Fowler, P.G., C.E.G. (California) Project Manager and Lead Engineering Geologist David Banton, P.G. (Licensed Geologist/Hydrogeologist, Washington) Principal-InCharge/Lead Hydrogeologist Stephen Thomas, P.G., C.HG. (California) Senior Hydrologist/Lead Groundwater Modeler Rens Verburg, Ph.D. Lead Geochemist Cheryl Ross (Licensed Hydrogeologist, Washington) Project Geochemist George Wegmann Project Hydrogeologist Derek Holom Staff Hydrogeologist The above individuals were supported by numerous staff geologists and engineers from several Golder offices for assistance with various office tasks (e.g., data compilation and analysis, cross sections, map preparations, etc.) and field tasks (e.g., stream monitoring and sampling, well sampling, drilling and well

hydrologic report_ final

May 2010

063-7109

installations, borehole logging, data collection, etc.) performed in support of the hydrologic characterization and evaluations.

hydrologic report_ final

May 2010

063-7109

2.0 2.1

REGIONAL SETTING Topography

The Quarry is situated in the foothills of the rugged, northwest-trending Santa Cruz Mountains segment of the California Coast Ranges (Figure 2.1). The Quarry is bisected by the east-flowing Permanente Creek. Historic mining has primarily occurred north of Permanente Creek, although historic exploration work has occurred across a large portion of the property including areas south of Permanente Creek. Topography in the area consists of moderately to steeply-sloped terrain with rounded ridges and drainages (Figure 2.2). Relief at the Quarry ranges from about 2,000 feet along the higher ridge crests to less than 500 feet amsl along the eastern portions of Permanente Creek. Average overall slope angles are typically around 25. The steepest natural slopes are on the order of 40 over smaller slope heights (100 to 200 feet) and generally correspond to limestone outcrops.

2.2

Geologic Setting

The majority of the Quarry addressed by this report is underlain by complexly deformed and faulted rocks of the Franciscan Assemblage (Figure 2.3). The eastern portion of the Quarry, including portions of the Plant and the EMSA, are underlain by Plio-Pleistocene rocks of the Santa Clara Formation. Overlying the bedrock are modern alluvial deposits associated with Permanente Creek (restricted to the eastern portion of the property), and relatively shallow surficial deposits comprised of soil and colluvium. Several large, ancient landslide deposits have been mapped by various investigators along the slopes flanking Permanente Creek. The geology of the area has been mapped in various levels of detail for published maps by the following: Rogers and Armstrong (1973) Sorg and McLaughlin (1975) Vanderhurst (1981) Brabb, Graymer, and Jones (2000) In addition, site-specific mapping at various scales, and utilizing both surface outcrop and subsurface drill core data, has also been completed by various geologists including: E. Mathieson (unpublished internal mapping,1982) J. Foruria (unpublished internal mapping, 2004) R. Fousek (unpublished internal mapping, 2009) Mine Reserves Associates (Surpac 3-D Model, 2007) TerraSource Software (Surpac 3-D Model, 2009) For the purposes of this report, all the available sources in addition to supplemental mapping by Golder have been utilized to create a compilation geologic map for the Quarry (Figure 2.4). Cross sections of the South Quarry derived from the TerraSource model are included as Figure 2.5. The following provides an

hydrologic report_ final

May 2010

063-7109

overview of the primary geologic units at the Quarry. More detailed descriptions of hydraulic properties of geologic units are presented in Section 4.

2.2.1

Franciscan Terrane

The following information regarding the Franciscan rocks as exposed in the North Quarry has been excerpted from Foruria (2004) who performed detailed geologic mapping for the Quarry. Cement-grade limestone and aggregate are extracted from the intricately folded and faulted limestones and metabasalts (greenstones) in the North Quarry. These rocks are part of the Permanente Terrane of the Jurassic-Cretaceous age Franciscan Assemblage. The Franciscan Assemblage represents a This limestonesubduction zone assemblage of highly deformed, variably metamorphosed, marine sedimentary rocks with oceanic crust-related submarine basalt (greenstone), chert, and limestone. southeast. All major stratigraphic horizons within the Franciscan rocks of the North Quarry are separated by lowangle faults forming a structurally imbricated thrust stack of layered and folded rock units (Figure 2.4). The Franciscan rocks are tectonically juxtaposed against an overlying section of undated, continentallyderived graywackes, shales, and argillites. The deformed thrust stack is a gently folded, northeasttrending, southeast dipping sequence in the eastern area of the North Quarry pit and transitions southwestward to a series of en-echelon, northwest-trending, southeast-plunging, anticlinal and synclinal folds in the western area of the North Quarry. High angle, brittle faults crosscut the Franciscan rocks, dissecting the rocks along prominent north-south and northwest-southeast orientations. A major throughgoing regional fault, the northwest strand of the Berrocal fault, crosses through the western end of the quarry. Figure 2.6 shows the major faults in the Quarry vicinity. A more detailed description of the geology within the South Quarry is presented in Section 4.2. metabasalt assemblage reaches a minimum total thickness of approximately 1,100 feet and dips to the

2.2.2

Santa Clara Formation

The Santa Clara Formation overlies a portion of the Franciscan Complex rocks in the north-central portion of the property (Figure 2.4). The Santa Clara Formation is a continental fluvial and alluvial deposit that is composed of unconsolidated to slightly consolidated conglomerate, sandstone, siltstone, and claystone (Vanderhurst, 1981). The age of the Santa Clara Formation ranges from late Tertiary to Pleistocene. Uplift of the Coast Ranges during this time resulted in increased erosion of the mountains and deposition of the Santa Clara Formation. The contact between the Franciscan rocks and Santa Clara Formation is considered to be unconformable, with the Santa Clara Formation deposited on an eroded Franciscan terrain (Rogers and Armstrong, 1973). Subsequent uplift of the nearby foothills along the Monte Vista fault, which lies along the margin of the valley floor to the east of the Quarry, has resulted in deformation of the Santa Clara Formation. In

hydrologic report_ final

May 2010

063-7109

addition, faulting within the uplifted geologic terrane between the Monte Vista and Berrocal faults has juxtaposed the Santa Clara formation in fault contact with older Franciscan rocks in the western portion of the EMSA (Figures 2.3 and 2.4). To the east of the unnamed fault, the deformed Santa Clara formation overlies the Franciscan with south-southwest trending dips of up to 50 degrees (Rogers and Armstrong, 1973). As mapped by Golder, a large erosional window east of the unnamed fault in the EMSA exposes greenstone, graywacke and limestone of the Franciscan Assemblage.

2.2.3

Surficial Deposits

2.2.3.1 Alluvium
This includes modern unconsolidated alluvial deposits along the active stream channel of Permanente Creek. These deposits are comprised of a poorly-sorted mixture of cobbles, gravels, sand, silt and clay. Deposits range from a few inches thick in the upper reaches of the watershed where erosion has cut the channel down into bedrock, to tens of feet thick where the channel widens and deepens as it approaches the flatter terrain of the Santa Clara Valley.

2.2.3.2 Colluvium
Colluvial deposits exist throughout the Quarry on natural slopes including areas underlying existing older overburden fills (i.e. WMSA), in areas of proposed overburden fills (i.e., CMSA, EMSA and Topsoil Storage Area), and in the proposed South Quarry area. The natural slopes in general are overlain with approximately one to two feet of soil and colluvial materials, which thickens to several feet to perhaps tens of feet thick in the larger natural swales in the region. Where colluvial materials were encountered in exploratory activities they were described as predominantly clayey sand with gravel to clayey gravel, with some gravelly clay. Gravel size was up to 3inches. In general, at the time of the investigations, the colluvium was dry and ranged from loose to very stiff or dense. During winter rainfall months, the colluvium likely becomes saturated from ephemeral runoff and infiltration.

2.2.3.3 Landslide Deposits


Several large, ancient landslides have been mapped by various investigators in various areas of the 3,510-acre Lehigh property, and throughout the broader foothills region. These landslides are generally described as possible old landslides, generally considered to be early Holocene or possibly latePleistocene features, and are identified on the basis of geomorphic features such as eroded scarps and irregular topography. Boundaries are generally subtle and poorly defined and there is no evidence of modern activity. Along the south flank of Permanente Creek, on the hillside east of the proposed South Quarry, two large landslides are identified by Sorg and McLaughlin (1975) while Rogers and Armstrong (1973) map only one of the landslide features. The possible presence of these landslides does not affect development of the South Quarry.

hydrologic report_ final

May 2010

063-7109

2.3

Structural Setting

The San Andreas Fault zone is located approximately two miles southwest of the quarry (Figure 2.6). The Sargent-Berrocal Fault Zone (SBFZ), part of the Santa Cruz Mountains front-range thrust fault system, parallels the San Andreas to the east and forms the eastern-most structural boundary to the Permanente Terrain. Near the North and South Quarry areas, the SBFZ consists of two northwest-trending, sub-parallel faults, namely the northeastern-most Monta Vista Fault Zone and the southwestern-most Berrocal Fault Zone (Sorg and McLaughlin, 1975) (Figure 2.6). The Monta Vista Fault Zone is located approximately one mile to the northeast of the North Quarry. A strand of the Berrocal Fault Zone lies beneath the adjacent cement plant area to the south of the EMSA, and extends west to other portions of the Quarry (Mathieson, 1982; Sorg and McLaughlin, 1975).

2.4

Hydrogeologic Setting

For the purposes of this hydrologic investigation, the Quarry lies entirely within the Franciscan Terrane. As described previously, the Franciscan Terrane is a highly-chaotic assemblage of rocks, or mlange, comprised primarily of altered meta-volcanic rocks (i.e., greenstone), graywacke and meta-graywacke units separated by zones of highly sheared matrix oftentimes comprised of mudstone or shale (Blake and Jones, 1981). In the area of the Quarry, the blocks in the matrix are primarily comprised of limestone (with chert interbeds) and graywacke which are floating in the highly sheared greenstone matrix. Most major structural boundaries in the Franciscan are fault boundaries as contrasted with depositional geologic contacts. Within major blocks, i.e., a limestone block, geologic contacts can be discerned. This structure makes for complex hydrogeologic conditions with numerous boundaries and variable flow paths. The occurrence of groundwater in the Franciscan is almost exclusively within secondary openings such as joints, fractures, shear zones and faults. In general, groundwater occurs under unconfined conditions; however, the structural complexity also locally creates perched and semi-confined conditions. The hydraulic properties of the Franciscan are highly variable. Most published values for hydraulic conductivity
-5 -6 of the Franciscan are in the range of 1 x 10 to 1 x 10 cm/sec. Well yields are typically low, in the range

of a few gallons per minute (gpm) to tens of gpm and are restricted to domestic use. Specific yields are very low on the order of less than 3% (DWR Bulletin, 1975).

hydrologic report_ final

May 2010

10

063-7109

3.0 3.1
3.1.1

DATA COLLECTION Hydrologic data


Precipitation

Precipitation data for the past ten years was compiled from the Los Altos Hills Station of the California Department of Water Resources California Data Exchange Center. The station is located approximately 3.3 miles from the Quarry at a comparable elevation of 2,001 feet amsl.

3.1.2

Stream Monitoring

As depicted on Figure 3.1 and noted on Table 3.1, Golder installed four monitoring stations, MS-1, MS-2, MS-3 and MS-4 in January 2009 in the two stream drainage areas present within the South Quarry boundaries. Two stations are located along Monte Bello Creek and two are located in Permanente Creek. The locations of the stations were selected after a site reconnaissance by Golder in December 2008.

TABLE 3.1 Stream Monitoring Station Summary


Site ID
MS-1 MS-2 MS-3 MS-4

Stream Location
Upstream Permanente Creek Downstream Permanente Creek Upstream Monte Bello Creek Downstream Monte Bello Creek

Station Elevation (ft amsl)


1,330 650 1,160 993

Watershed Area (acres)

662 1,707 419 688

Each monitoring station consists of a staff gauge and a stilling well equipped with a pressure transducer programmed to record stream height (or stage) at a frequency of every half hour. In addition, cross sectional velocity measurements were made at designated areas by the stilling wells to determine discharge of the creeks and establish a relationship between gage height and discharge rate.

3.2
3.2.1

Hydrogeologic Data
Well and Piezometer Installation

A total of 11 boreholes (HG-1 through HG-11) were drilled in 2008 and 2009 as part of the hydrogeologic investigation of the South Quarry as shown on Figure 3.1. The boreholes were drilled by using either direct or duel-tube air rotary methods. The boreholes ranged in depth from 94 to 600 feet below ground surface (bgs), or 970 to 1,628 feet amsl. Five of the boreholes were completed as two-inch diameter

hydrologic report_ final

May 2010

11

063-7109

monitoring wells. Borehole HG-11 was completed as a six-inch diameter monitoring well. Vibrating wire transducers (VWT) were installed in the remaining boreholes except for boring HG-1, which could not be instrumented because of borehole instability. Borehole HG-1 was abandoned by filling with grout. The VWT installations involved attaching the VWTs and their cables to a string of PVC pipe as it was inserted into the borehole; and then fully-grouting the hole, using the PVC string as a tremie pipe. The boring completion details are summarized in Table 3.2 and shown graphically in Appendix A. Additionally, Golder installed four VWTs in boreholes GT2-7, GT4-25, GT1-4, and GEO3-34, which were previously completed as part of the geologic/geotechnical investigation of the South Quarry area.

TABLE 3.2 Borehole Completion Summary


Boring ID
GT1-4 GT2-7 GT3-4 GT4-25a HG-1a HG-2 HG-3 HG-4 HG-5 HG-6 HG-7 HG-8 HG-9 HG-10s HG-10int HG-10d HG-11

Total Depth (bgs)


268 477 513 392 590 560 460 300 400 400 300 200 200 580 580 580 600

Ground Elevation (ft amsl)


1,119 1,281 1,739 1,671 1,585 1,613 1,548 1,857 1,615 1,822 1,254 1,148 1245 1,585 1,585 1,585 1,585

Completion Type
VWT VWT VWT VWT -VWT VWT 2" MW VWT 2" MW 2" MW VWT 2" MW 2" MW VWT VWT 6" MW

Screen Depth or Interval (ft amsl)


951 1,010 1,469 1,394 -1,256 1,178 1,562-1,582 1,377 1,549-1,569 116-136 1,002 1,136-1,156 1,431-1,451 1,290 1,090 985-1,085

Lithology at Screen Location


Greenstone Limestone/Graywacke Limestone Limestone -Limestone/Graywacke Limestone/Greenstone Greenstone Greenstone Greenstone Greenstone/Graywacke Greenstone Weathered Graywacke Limestone Limestone Limestone Limestone

3.2.2

Airlift Testing

Airlift testing was usually performed after each borehole was completed as part of the development process, and to provide a preliminary estimate of well yield. The airlift test consisted of using compressed air from the air rotary rig to lift groundwater to the surface with an estimate of sustained flow over a period of 15 to 30 minutes.

hydrologic report_ final

May 2010

12

063-7109

3.2.3

Packer Tests

In November 2008, Golder completed a series of packer tests in several boreholes to estimate the hydraulic conductivity of the rock units. Fourteen (14) tests were completed in boreholes HG-2, HG-3, HG-4, HG-5, HG-8, and HG-9. Tests were conducted in boreholes HG-6 and HG-7; however, the tests could not be analyzed due to packer failure (poor borehole conditions prevented an adequate packer seal) or downhole transducer failure. Packer tests were not completed at HG-1 due to borehole instability. The packer tests consisted of a water level stabilization period after packer inflation followed by a constant rate injection test and a recovery phase. The results of the packer tests are discussed in Section 4.4.

3.2.4

Pumping Tests

In September 2009, a step-rate pumping test was conducted in borehole HG-10S followed by a 72-hour constant-rate pumping test (Figure 3.1). The pumping rate for the constant-rate test was chosen based on the results of the step-rate pumping test. The constant-rate pumping test in HG-10S began on September 28, 2009 at 9:00 AM and continued until October 1, 2009 at 9:01 AM. Borehole HG-10S was pumped at an average rate of 48 gallons per minute (gpm) for three days. The pumping rate was determined from the totalized discharge readings using an in-line flow meter. Groundwater levels were recorded in the monitoring wells using submerged INW PT2X pressure transducer dataloggers as well as manual depth to water level measurements. The water levels at monitoring points GT4-25, GT3-4, HG-2, HG-10INT, and HG-10D were recorded using grouted-in GeoSlope VWTs. Figure 3.1 depicts the monitoring locations.The results of the pumping tests are discussed in Section 4.4.

3.2.5

Groundwater Level Monitoring

Groundwater levels were measured throughout 2009 to establish current groundwater elevations and record changes in potentiometric surface over time. Water levels were measured with pressure transducer dataloggers and electric water level tapes in the monitoring wells and with Geo-Slope Miniloggers or VWT Recorders for the VWTs.

3.3

Geochemical Data

To characterize groundwater and surface water quality within the vicinity of the proposed South Quarry, sampling of surface water, groundwater, and wall washing sampling was conducted. Groundwater and surface water monitoring locations are shown in Figure 3.1. parameter list. Results are discussed in Section 6. Table 3.3 summarizes the analytical

hydrologic report_ final

May 2010

13

063-7109

TABLE 3.3 Analytical Parameter Summary


Groundwater and Surface Water Sampling 1st Round February 2009
x x

Parameter
VOCs Metals (total and dissolved) Additional Metals Vanadium Boron Low Level Mercury Hexavalent Chromium
1

2nd Round April 2009


x x

3rd Round October 2009

4th Round January 2010

Wall Washing November 2009

North Quarry January 2010

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

x x x x x

x x x

x x x x

General Chemistry Oil and Grease SVOCs Pesticides PCBs Dioxin Asbestos

Acute Whole Effluent Toxicity ( 96-hr (% survival)) Cyanide 1) 2) 3)

Metals = aluminium, antimony, arsenic, barium, beryllium, boron, cadmium, chromium, copper, iron, lead, manganese, molybdenum, nickel, selenium, silver, thallium, zinc General chemistry = calcium, magnesium, sodium, potassium, Silicon as SO2, bicarbonate, carbonate, alkalinity, chloride, fluoride, sulfate, hardness, total dissolved solids, total suspended solids, residual chlorine, ammonia, nitrate, nitrite, phosphorous, sulfide, odor, turbidity, pH, electrical conductivity Select general chemistry parameters analyzed due to limited sample volume

3.3.1

Groundwater Quality Sampling

Prior to collection of groundwater samples, the monitoring wells were developed to remove residual drilling fluid and to ensure proper hydraulic connection to the surrounding aquifer. Monitoring well HG-4 produced little water during development and subsequent sampling events. A total of four rounds of samples were collected from monitoring wells HG-4, -6, -7, and -9 over the past year in accordance with Golders standard operating procedures (SOPs). The wells were sampled at different times of the year to account for potential seasonal variations in water quality and water levels. In addition, a groundwater sample was collected from the discharge of the pump test from well HG-10s during the 72-hour pump test in September. HG-10s was also sampled as part of the fourth round of groundwater sampling.

hydrologic report_ final

May 2010

14

063-7109

For the first round sampling event, each monitoring well was purged of at least three well casing volumes, except for well HG-4 which was purged less because of limited recharge. After the first round, Golder collected the groundwater samples using the Environmental Protection Agency (EPA) low-flow recommended procedure. Field parameters were recorded with an YSI 556 water-quality meter and a LaMotte turbidity meter and included temperature, electrical conductivity, pH, dissolved oxygen, oxidation reduction potential, and turbidity. Field instruments were calibrated daily before starting sampling. Samples for dissolved metals analysis were either filtered (0.45 m filter) in the field or upon receipt by the laboratory. All samples, including field quality control samples, were labeled and packed with ice in a cooler at a temperature of 4 C or lower and sent to a California-certified laboratory for analysis.

3.3.2

Surface Water Quality Sampling

Surface water samples, SW-1, SW-2, and SW-3, were collected from three locations as shown on Figure 3-1. Sample locations SW-1 and SW-2 are from upstream and downstream Permanente Creek, respectively. Sample location SW-3 is from Monte Bello Creek. Four rounds of samples were collected throughout the year to establish current water quality conditions, and account for seasonal variations in flow and quality. Samples of the North Quarry sump, and runoff from the North Quarry western haul road were collected in January 2010 as well. The samples were collected in accordance with Golders SOPs. In addition, the EPA recommended clean hands/dirty hands sampling protocol was followed for the collection of the sample to be analyzed by EPA method 1631 (low level mercury). Field parameters (as described above) were recorded with an YSI 556 water-quality meter and a LaMotte turbidity meter. Samples for dissolved metals analysis were either filtered (0.45 m filter) in the field or upon receipt by the laboratory All samples, including field quality control samples, were labeled and packed with ice in a cooler at a temperature of 4 C or lower and sent for laboratory analysis.

3.3.3

Wall Washing and North Quarry Sampling

To evaluate metal leaching potential under field scale conditions, wall washing was performed on exposed faces within the North Quarry in November 2009. A total of six samples were collected following the standard procedure outlined in Draft Guidelines and Recommended Methods for the Prediction of Metal Leaching and Acid Rock Drainage at Mine Sites in British Columbia (Price, 1997) from different rock types and/or different exposure times. The test involved washing an approximately one-meter square area of rock face with a known volume of water. The wall washing rinsate was collected and submitted for chemical analysis. Samples were submitted for laboratory analysis. Samples for dissolved metals analysis were filtered (0.45 m filter) upon receipt by the laboratory. Field parameters were recorded with an YSI 556 water-quality meter and a LaMotte turbidity meter.

hydrologic report_ final

May 2010

15

063-7109

3.3.4

Quality Control

As part of the sampling program, Golder collected field quality control (QC) samples. One duplicate sample was collected per sampling event to verify the precision of laboratory analysis and field sampling procedures. If VOCs were being analyzed, trip blanks provided by the laboratory were submitted for VOC analysis to determine whether samples may have been compromised as a result of sample container handling or transport. Equipment blanks were collected on any non-dedicated equipment used during sampling to ensure decontamination procedures were adequate. Field blanks were collected to ensure that ambient air was not influencing the samples. All equipment and field blanks were prepared with laboratory-supplied deionized water.

hydrologic report_ final

May 2010

16

063-7109

4.0 4.1
4.1.1

CURRENT HYDROGEOLOGIC CONDITIONS Site Setting


Climate

The regional climate is Mediterranean with the majority of precipitation occurring between November and April. Average annual precipitation is about 22 inches, consistent with the intermediate altitudes of the Santa Clara Valley, and more than 50 inches in the surrounding mountains (Hanson, 2004). The climate is also yearly variable with dryer and wetter seasons from year to year. Recently, there was significantly less precipitation in 2007 and 2008 compared to the preceding and subsequent years. Section 4.6 discusses precipitation and storm water runoff in further detail.

4.1.2

Surface Water Flow

Two separate stream drainages are present within the project area, which include Permanente Creek to the north and Monte Bello Creek to the south. The drainages are divided by a northwest-southeast trending ridge with approximately 75% of the drainage of proposed South Quarry is to Permanente Creek and 25% to Monte Bello Creek. Current elevations range from 1,990 feet amsl along the ridge in the southwest corner of the South Quarry to 1,110 feet amsl in the northeast corner near Permanente Creek. Average overall slope angles are typically around 25 degrees with steeper slopes over limited sections. Monte Bello Creek is located south of the proposed South Quarry and is entrenched mainly in greenstone. Monitoring station MS-3 is located at elevation 1,160 ft and is just downstream of the North Fork of Monte Bello Creek, which is dry under baseflow conditions (Figure 3.1). Monitoring station MS-4 is located at elevation 993 feet amsl and downstream of the proposed South Quarry. Permanente Creek is situated between the existing North Quarry and proposed South Quarry and is mainly entrenched in limestone. Monitoring station MS-1 is located at elevation 1,330 feet amsl and upstream of the proposed South Quarry and existing North Quarry (Figure 3.1). Monitoring station MS-2 is located at elevation 650 ft amsl and downstream of the proposed South Quarry and existing North Quarry. MS-2 is also located downstream of the North Quarry dewatering discharge point. Permanente Creek is generally dry adjacent to the North Quarry during the dry season and flows typically year-round both upstream of and downstream from the North Quarry.

hydrologic report_ final

May 2010

17

063-7109

4.1.3

Seeps and Springs

Seepage in the existing North Quarry has been observed along the Main (1987) Failure headscarp between elevations 1,400 and 1,600 feet and from the reclaimed slope between the Main (1987) Failure and the West Materials Storage Area, above elevation 1,350 feet, during field mapping in June 2007. Golder observed an additional seep at approximately elevation 1,050 feet along the southwest portion of the existing North Quarry pit wall.

4.1.4

Geologic Units

The major lithologic units that occur in the South Quarry area include limestone, greenstone, graywacke, fault breccia, and metabasalt. These are described briefly as follows: Metabasalt is medium to dark gray and fine-grained, and commonly contains abundant milky calcite veins and scattered pyrite crystals. Vesicles are present locally and occasionally filled with calcite. Chlorite content is variable but generally low. Greenstone developed from the same parent lithologies as metabasalt but has higher chlorite content. It is greenish-gray and contains scattered pyrite crystals and opaque minerals. Vesicles, calcite-filled vesicles, and milky calcite veins occur locally. Graywacke ranges from yellowish brown to black, and is generally very fine grained to fine grained, although local conglomeratic intervals exist. Slickensides are common, and may be coated with graphite. Scattered milky calcite veins and pyrite occur locally. Limestone is light gray to medium dark gray, and fine to medium grained. Stylolites (contacts marked by irregular interlocking penetrations of the two sides) are common, and black chert nodules are usually present in concentrations of 15% or less. The limestone is locally dolomitic. Fault breccia is dark gray to black and may be clast- or matrix-supported. The matrix consists of soft, very fine fault gouge. Clasts are limestone, greenstone, graywacke, or metabasalt, or some combination thereof. This unit may be highly sheared and deformed, and well-developed slickensides are common. Milky calcite veins and scattered pyrite occur locally. The occurrence of these rock types is complex and consistent with a mlange sequence.

4.1.5

Geologic Structure

As noted in Section 2.2.1 and similar to the North Quarry, the rocks appear to occur as an imbricate thrust stack of layered, folded and faulted limestones, greenstones, and metabasalts. Contacts between these units are typically thrust faults (Figure 2.5). This thrust stack is tectonically overlain by continentallyderived graywacke. Two major structures within the South Quarry area consist of a segment of the Northwest Berrocal Fault Strand that strikes west-northwest, just north of Permanente Creek, through the south wall of the North Quarry and a west-northwest offset of the Northwest Berrocal Fault Strand further to the south, which is located along the southern South Quarry boundary and separates the limestone unit from the footwall greenstone/breccia unit. Other large scale structures across the South Quarry area include a series of steeply-dipping faults striking to the north-northeast (Figure 2.5).

hydrologic report_ final

May 2010

18

063-7109

A geological model developed by TerraSource for the Quarry grouped the five general rock types in South Quarry coreholes into the following three groups: Hanging Wall Graywacke (includes Greenstone and Conglomerate) Footwall Fault Breccia (predominately Greenstone) Limestone (all grades) Lehigh geological logging indicates the breakdown of rock types within the model rock masses listed in Table 4.1.

TABLE 4.1 Distribution of Rock Types within Geologic Model Rock Masses
Lithology Footwall Fault Breccia (Greenstone) Footage
Metabasalt Fault Breccia Graywacke Limestone Greenstone 14 1,188 24 318 1,364

Hanging Wall Graywacke

Limestone

% of Total
0.5% 40.5% 1% 11% 47%

Footage
11 572 472 25 183

% of Total
1% 45% 37% 2% 15%

Footage
0 66 56 2,927 69

% of Total
0% 2% 2% 94% 2%

The dominant thrust contact in the TerraSource model is the hanging wall contact of the footwall fault breccia (greenstone). The model indicates an overall dip to the northeast for this contact, with sections that dip about 20 in the north and south parts of the South Quarry, separated by a steeper section. From the steeper section toward the north, limestone overlies the footwall fault breccia (greenstone).

4.2

Hydrogeologic Units

The occurrence of groundwater is almost exclusively within secondary openings such as joints, fractures, shear zones and faults within the bedrock. The three main hydrogeologic units in the bedrock within the proposed South Quarry area are grouped into limestone, greenstone, and graywacke units.

4.2.1

Limestone

Three different grades of limestone are differentiated within the limestone unit. As noted on Figure 2.5, limestone occurs in blocks that range in thickness from less than 50 feet along the western portion to

hydrologic report_ final

May 2010

19

063-7109

approximately 600 feet at the center of the proposed South Quarry. Generally, the limestone unit dips gently (approximately 20 degrees) to the northeast and extends under Permanente Creek to the north where it appears continuous with limestone exposed in the south wall of the North Quarry. To the south, the limestone unit is truncated by the greenstone footwall unit, which is likely an offset of the Northwest Berrocal Fault Strand and is the dominant thrust contact identified in the TerraSource Model. The limestone is moderately fractured with a moderate permeability. Several north-northeast striking thrust faults are present throughout the limestone unit (Figure 2.5). The faults may act as boundaries which will cause the limestone unit to behave as separate, compartmentalized units. discusses the hydraulic properties in more detail. Section 4.4

4.2.2

Greenstone

The second major hydrogeologic unit at the Quarry is greenstone, including metabasalt. Based on the geological coreholes (Table 4.1), fault breccia comprises up to 40% of the greenstone unit. The fault breccia usually is highly sheered and deformed with a matrix of soft and very fine fault gouge. As noted previously, the greenstone is likely the footwall of the main thrust fault structure and is predominately present along the southern portion of the proposed South Quarry and extends south to and under Monte Bello Creek. Greenstone also underlies the limestone unit located within the proposed South Quarry and intermittently between the limestone blocks. The greenstone is highly weathered in areas and has a lower permeability compared to the limestone. Section 4.4 discusses the hydraulic properties in more detail.

4.2.3

Graywacke

Graywacke is predominately present along the eastern portion of the proposed South Quarry as part of the hanging wall associated with the Northwest Berrocal Fault Strand. Based on the geological coreholes (Table 4.1), fault breccia and greenstone comprise 60% of the graywacke unit. The graywacke is highly weathered in areas and has similar hydrogeologic properties as the greenstone unit.

4.3

Water Level Response


Groundwater levels and precipitation for the individual

Figure 4.1 is a hydrograph showing groundwater elevations in monitoring wells and piezometers from early September through October 2009. monitoring locations are included in Appendix B. Precipitation is plotted against the secondary y-axis and represents cumulative precipitation from October 1, 2008 through the end of October 2009. Precipitation data were obtained from the Los Altos Hills climate station (ID: LSA), available from the California Department of Water Resources Data Exchange Center (http://cdec.water.ca.gov/). The Los Altos Hills climate station is located approximately 3.3 miles northwest of the North Quarry at an elevation of 2,001 ft amsl.

hydrologic report_ final

May 2010

20

063-7109

A significant rainstorm event occurred between October 12, 2009 and October 14, 2009, 11 days after the pumping test ended (discussed in Section 4.4.2). A total of 4.2 inches of precipitation occurred during this 36-hour period, Table 4.2 summarizes the groundwater level responses from the rainstorm event.

TABLE 4.2 Summary of Groundwater Level Responses (October 2009 Rainstorm Event)
Well ID Lithology Completion Depth (feet bgs) 270 277 Peak Groundwater Level Rise (feet) 0.53 0.69 Elapsed Time After Beginning of Storm When Response First Observed (hours) 7.0 11.0

GT3-4 GT4-25A

Limestone Limestone

The peak groundwater level responses to the rainstorm event in these two wells occurred on October 12th. No measurable response was observed in HG-10INT or HG-10D, which are wells completed in limestone at a depth of 295 and 495 feet bgs, respectively. Response to this storm in the remaining monitoring wells (HG-4, HG-6, HG-7, HG-9, and HG-10S) cannot be verified because they were not continuously monitored during the rainstorm event. The water level responses in the two piezometers in the limestone indicate that groundwater recharge occurred as a result of the rainstorm. Assuming a storativity ranging from 3 x 10-3 to 1 x 10-2 (Section 4.4.2.4), the recharge from the rainstorm is approximately 0.02 to 0.08 inches. Relative groundwater changes recorded in the monitoring wells and vibrating-wire piezometers are plotted on Figure 4.2. The significant water level change in GT3-4 and GT4-25A between late September and early October was due to the constant-rate pumping test conducted in HG-10S on September 30 through October 1, 2009. The relative natural (antecedent) groundwater changes (i.e. seasonal groundwater level decline) before and after the pumping test are notably different for monitoring wells/piezometers completed in limestone versus graywacke and greenstone. The average rate of water level decline in the wells/piezometers completed in graywacke or greenstone (HG-4, HG-6, HG-7, and HG-9) was 0.006 feet per day, whereas the average water level decline in wells/piezometers completed in limestone or dolomitic limestone (HG-10S, GT3-4, and GT4-25A) was 0.08 feet per day. This suggests a higher diffusivity (that is, transmissivity divided by storativity) for the limestone units compared to the graywacke and greenstone. The individual hydrographs included in Appendix B show an overall water level decline. The limestone monitoring wells show a net decrease in water levels of 25 feet during the 2009 water year (OctoberSeptember), with a total decline of 40 feet from late March 2008 through October 2009. The general trend in declining water levels is likely due to the drier than average years in 2007 and 2008. Furthermore, the December 2008 Water Condition Report by the Santa Clara Valley Water District

hydrologic report_ final

May 2010

21

063-7109

reported that groundwater elevations were about 17 feet lower on average than the five year average from 2004 through 2008 (SCVWD, 2008).

4.4

Hydraulic Properties

The hydraulic properties of the hydrogeologic units at the Quarry were estimated from the packer tests conducted in several boreholes and from a constant-rate pumping test conducted in HG-10S. Tables 4.3 and 4.4 summarize the hydraulic properties estimated from the packer tests and constant-rate pumping test, respectively.

4.4.1

Packer Test Results

Table 4.3 is a summary of the hydraulic properties from the packer testing. Packer tests were carried out in the more fractured sections of the boreholes. The data collected for the packer testing is included in Appendix C. The hydrogeologic units tested included the greenstone, limestone, and graywacke. The estimated hydraulic conductivity of the greenstone ranges from 0.11 to 3.26 ft/d with a geometric mean of 0.41 ft/d. The estimated hydraulic conductivity of the limestone ranges from 0.06 to 6.30 ft/d, with a geometric mean of 0.60 ft/d. Two zones of graywacke were tested, resulting in hydraulic conductivities of 2.51 and 29.8 ft/d (weathered graywacke), with a mean of 8.64 ft/d. Overall, the hydraulic conductivities estimated for the greenstone from the packer tests are biased towards the high-end for the entire unit because the zones tested in each borehole tended to be the more fractured (and therefore, more permeable) zones. Therefore, the overall bulk hydraulic conductivity of the greenstone (fractured and unfractured sections) is expected to be lower than those indicated by these localized tests. The hydraulic conductivity of the limestone estimated from the packer testing are considered to be biased toward the low-end of the bulk hydraulic conductivity, because the more competent zones were tested due to a poor seal in the more fractured and permeable zones.

4.4.2

Constant-Rate Pumping Test

Figure 4.3 is a semi-log plot of the corrected drawdown and recovery observed in the pumping well (HG10S) during the constant-rate pumping test. Drawdown data were corrected (and plotted as corrected drawdown) taking into account the antecedent groundwater level decline, which was observed in all monitored wells/piezometers. The total drawdown in the pumping well at the end of the test was about 32 feet. Drawdown for the first 5 minutes of pumping was affected by well casing storage. The data between 5 and 200 minutes of pumping appears to be more representative of the aquifer, because the rate of drawdown stabilized (i.e. plots as a straight-line on semi-log chart). After 200 minutes, the rate of drawdown increased. The increasing rate of drawdown is interpreted to be the result of the cone of depression encountering a boundary between the limestone and lower permeability greenstone and graywacke.

hydrologic report_ final

May 2010

22

063-7109

4.4.2.1 Pumped Well Response and Interpretation


Figure 4.4 is a plot of the derivative of drawdown and recovery in the pumped well. The purpose of the derivative drawdown plot was to confirm the responses identified from the semi-log plot in Figure 4.3 and to identify any other conditions affecting the drawdown. The derivative drawdown plot validates the assertion that the response of the pumping test in the first 5 minutes of pumping was affected by storage in the well casing. From 5 to 200 minutes, the derivative of drawdown indicates that the response to pumping is affected by partial penetration, which has a negative half-slope. conditions. The water levels recovered after pumping stopped. After 6.5 days of recovery, the water level in the pumped well had recovered to within 2.5 feet of the pre-test water level. The incomplete recovery indicates that the tested limestone unit is of limited extent and receives limited recharge. In effect, the well resulted in a partial dewatering of the limestone unit of 2.5 feet after three days of pumping. After 200 minutes, the drawdown derivative sharply increases, indicating the flow is dominated by lower-permeability boundary

4.4.2.2 Observation Well Responses and Interpretation


Figure 4.5 presents semi-log plots of the drawdown observed in wells HG-10INT, GT4-25A, and GT3-4 that are all completed in the same limestone unit as test well HG-10S. The total drawdown response to pumping in the closest well (HG-10INT, located 7 feet from HG-10S) was 10.5 feet at the end of the test. HG-10INT is a vibrating wire piezometer completed in limestone at a depth of 295 feet bgs, which is almost 150 feet lower in elevation than HG-10S (see Table 3.2). GT4-25A (625 feet southeast of HG10S) and GT3-4 (850 feet west of HG-10S) are completed at similar elevations as HG-10S and had maximum drawdown during the test of 2.82 feet and 1.61 feet, respectively.

4.4.2.3 Analysis Results and Interpretation


Table 4.4 summarizes the interpreted hydraulic properties based on the results of the constant-rate pumping test. The drawdown and recovery data collected in the pumping well were first analyzed using the Cooper-Jacob (1946) straight-line method (Figure 4.3). The transmissivity (T) was estimated from the drawdown and recovery data to be 2,400 and 2,600 ft2/d, respectively. However, the derivative plot (see Figure 4.4) indicates that the drawdown was affected by partial penetration effects and no-flow boundary conditions that are not accounted for using the Cooper-Jacob method Therefore, the pumping test data were analyzed using the Theis unconfined partial penetration solution (Theis, 1935) with no-flow boundary conditions (Figures 4.6 and 4.7). The type curves for each observation well are plotted as solid red lines, where the position and shape of the type curves are based on hydraulic properties (transmissivity and storativity), the radial distance from the pumping well to each observation well, and the distances to the inferred boundary conditions. An iterative process was employed with the best fit obtained using four no-flow boundaries (at distances of 100 to 2,000 feet) to represent a block of limestone bounded by either faults or lithologic changes.

hydrologic report_ final

May 2010

23

063-7109

Based on the two analyses presented on Figures 4.6 and 4.7, the results indicate the limestone is of limited extent (i.e. analogous to a compartmentalized hydrogeologic system) with a transmissivity of 2,224 ft2/d, and an estimated storativity (S) of 2.610-3 to 9.310-3. For both analyses, the limestone block was assumed to be elongated in the northwest southeast direction (parallel to the main structural fabric). The Theis type curve match for GT3-4 (Figure 4.7) resulted in a higher estimate of storativity and more distant interpreted boundary conditions, but smaller in size than the compartment estimated for GT4-25A (about 60% smaller). No unique combination of hydraulic properties coupled with compartment geometry was found to match the Theis type curve to all three observation points, indicating a degree of heterogeneity in the hydraulic system within the limestone compartment. Figure 4.8 is a distance versus drawdown plot of the observed drawdown in HG-10INT, GT4-25A, and GT3-4 after 12 hours of pumping (i.e. before drawdown in these wells was affected by the lateral boundaries). Ideally, the drawdowns observed at various distances should plot on a straight-line if the observation wells are completed in the same hydraulic system as the pumped well.
2

The distance

drawdown plot presented in Figure 4.8 is based on a transmissivity of 2,224 ft /d and a range of storativity values from 110-4 to 110-3. The results of the distance versus drawdown plot show that the observed drawdown in GT4-25A and GT3-4 after 12 hours of pumping are consistent with the predicted drawdown using the estimated storativity from the Theis partial penetration solution (Figure 4.6 and Figure 4.7). The estimated storativity at HG-10INT (Table 4.4 and Figure 4.5) is 0.9. This value is not representative of the storativity of the limestone aquifer which would be expected to be in the range of 0.0001 to 0.001. The high storativity value appears to be related to the analysis method (Cooper Jacob, 1946) which assumes that the pumping well and the observation well are fully screened within the limestone when in fact the well partially penetrates the limestone and the observation well HG-10INT is screened in the lower part of the limestone aquifer. Figure 4.8 shows that both horizontal and vertical hydraulic connections exist between the shallow and intermediate depths within the limestone. Observation well HG-10INT responded to the pumping of the well within a drawdown range predicted by the overall hydraulic properties (transmissivity and storativity) estimated for the limestone unit. The predicted drawdown in pumping well HG-10S after 12 hours ranges from 5.23 to 6.25 feet based on
-4 -3 different storativity values of 110 to 110 (Figure 4.8); the actual observed drawdown in the pumping

well was 26.03 feet.

Therefore, the total well losses in the pumping well after 12 hours were

approximately 19.8 to 20.8 feet. Well losses are primarily caused by turbulent flow inside or immediately adjacent to the well screen. Well losses are also greater in partially penetrating than in fully penetrating wells because pumping induces vertical flow from below the screened or open interval in the well.

hydrologic report_ final

May 2010

24

063-7109

4.5
4.5.1

Groundwater Flow Conditions


Groundwater Levels and Flow
The elevations represent conditions measured in

Figure 4.9 presents the recorded groundwater elevations and interpreted groundwater level contours and flow directions near the proposed South Quarry. October 2009. The highest groundwater elevations were observed in HG-4 and HG-6 which are located on the northwest-southeast trending ridge that separates the Permanente Creek and Monte Bello Creek watersheds. In October 2009, the groundwater elevations at HG-4 and HG-6 were approximately 1,752 and 1,658 ft amsl, respectively. The lowest groundwater elevations at that time were observed in HG-8 and GT1-4 (both located near Permanente Creek), with elevations ranging from 1,038 to 1,066 ft amsl, respectively. These elevations are 90 and 50 feet higher than the nearby creek elevations, respectively. The regional-scale direction of groundwater flow is interpreted to be from west to east, flowing from the topographic high at Black Mountain toward the Santa Clara Valley. Locally, groundwater discharges to Permanente Creek, Monte Bello Creek and an unnamed creek in the eastern half of the Quarry. Groundwater also discharges to the North Quarry. Figure 4.10 shows the recent pit water level in the North Quarry, ranging between 738 and 776 ft amsl, which is between 300 and 400 feet lower than Permanente Creek. Groundwater flow through the limestone and graywacke/greenstone locally is primarily to the north and northeast from a groundwater divide located beneath the ridge separating Permanente Creek from Monte Bello Creek. Based on the pumping test evaluation, groundwater flow is preferentially within the more permeable limestone units. However because the limestone units are of limited extent (truncated by greenstone and graywacke), the overall groundwater flow system is controlled by the lower permeability of the greenstone/graywacke units.

4.5.2

Hydraulic Gradients

Figure 4.11 shows the groundwater elevation versus well completion elevation for observation wells completed in the limestone and greenstone/graywacke units. The groundwater levels in HG-10 (i.e. HG10S, HG-10INT, and HG-10D) show a steep downward vertical component of hydraulic gradient among the shallow, intermediate, and deep monitoring wells/piezometers. The vertical hydraulic gradient is the difference in water level (head) versus the difference in elevation of the two monitoring wells/piezometers. A negative vertical component of hydraulic gradient indicates an area of discharge, or upward groundwater flow; whereas a positive vertical component of hydraulic gradient indicates an area of recharge, or downward groundwater flow. The vertical component of hydraulic gradient between HG-10S and HG-10INT is about 0.45, indicating downward groundwater flow. The vertical component of hydraulic gradient between HG-10INT and HG-10D is about 1.6, indicating that the shallow and intermediate depth wells and piezometers are completed in a shallow aquifer which is hydraulically separated (perched) from a deeper aquifer.

hydrologic report_ final

May 2010

25

063-7109

The horizontal component of the hydraulic gradient ranges from 0.25 to 0.77, where the steeper hydraulic gradients are near the groundwater divide separating Monte Bello Creek from Permanente Creek. The horizontal component of the hydraulic gradient in the greenstone is steeper than the gradient observed in the limestone because the greenstone has lower hydraulic conductivity (Figure 4.11).

4.6
4.6.1

Water Balance
Approach

Water balances were developed for WY 2009 for the existing North Quarry, and Permanente and Monte Bello Creeks using a combination of field monitoring data and data obtained from public records. As well as forming part of the hydrogeologic conceptual model, these water balances were developed to act as inputs and calibration data for the numerical groundwater flow model in order to predict the future inflows to the North and proposed South Quarry and the impacts to the streamflows in Permanente Creek and Monte Bello Creek. Pit water elevations in the North Quarry were measured daily over a period from early-February 2009 to mid-October 2009. The total volume of water in the pit was calculated by the sum of the water level elevation multiplied by the surface area of the pit water on ten-foot increments, to account for the change in volume versus height. Pumping was recorded daily and was based on the total amount of time the pump was operated at full capacity (1,150 gpm). Therefore, the total daily amount of water pumped from the North Quarry was determined by the pumping rate multiplied by the operating duration. Streamflow data for Permanente Creek and Monte Bello Creek were collected from four stations, two on each stream. The stations are identified as MS-1 through MS-4, where MS-1 and MS-2 are the upstream and downstream gauges on Permanente Creek, respectively, and MS-3 and MS-4 are the upstream and downstream gauges on Monte Bello Creek, respectively. Each station had a pressure transducer and datalogger installed to measure the change in water depth in the stream. The water level, or pressure, was then converted to streamflow based on a rating-curve developed from a series of manual flow measurements collected throughout the season.

4.6.2

Hydrologic Data

4.6.2.1 Precipitation
The closest precipitation station to the Quarry is Los Altos Hills, located approximately 3.3 miles northwest of the North Quarry at an elevation of 2,001 ft amsl. Table 4.5 is a summary of the monthly average rainfall at the Los Altos station from 1999 through 2009 (water years1). The annual average rainfall over this period of time was 22.2 inches. For Water Year (WY) 2009, the precipitation was 21.9 inches. The annual variability for this station is relatively low, with minimum and maximum of 17.4 and 26.4 inches. Although the Los Altos station is not physically located within the Permanente and Monte
1

A water year is from October 1 through September 30.

hydrologic report_ final

May 2010

26

063-7109

Bello watershed, the data can be considered reasonably representative for the purpose of this water budget. Within the basins, higher elevation areas would be expected to receive more precipitation than lower-lying areas.

4.6.2.2 Permanente Creek Flow


Figures 4.12 and 4.13 are hydrographs of the streamflow in MS-1 and MS-2, respectively, from February to October 2009. MS-1 is the upstream gauge and has a drainage area of 662 acres, and MS-2 is the downstream gauge and has a total drainage area of 1,706 acres. Therefore, the watershed area for the reach between the two gauges is 1,045 acres. From February to July, the streamflow at MS-1 ranged from approximately 30 cubic feet per second (cfs) during the wet part of the season (February and March) to less than 0.1 cfs from July to October. At MS-2, the streamflow ranged from 13 cfs in February to about 2 cfs in July. The streamflow observed from mid-March to July are mostly affected by pumping from the North Quarry into Permanente Creek. The large spike and subsequent elevated streamflows observed from March 18, 2009 correlates to pumping at the North Quarry, where the average pumping rate from March to July was 2 cfs. Figures 4.12 and 4.13 also show the baseflow estimates separated from the streamflow observed in Permanente Creek at MS-1 and MS-2. Based on these hydrographs, the average annual baseflow for WY 2009 at MS-1 and MS-2 was estimated to be 0.30 cfs and 1.02 cfs, respectively. The average annual baseflow contribution to Permanente Creek between the two stations (representing a catchment area of 1,045 acres) was 0.73 cfs. Therefore, the total annual groundwater discharge to these reaches of Permanente Creek is 215 and 740 acre-feet.

4.6.2.3 Monte Bello Creek Flow


Figures 4.14 and 4.15 are hydrographs of the streamflow in MS-3 and MS-4, respectively, from February to October 2009. MS-3 is the upstream gauge and has a drainage area of 419 acres, and MS-4 is the downstream gauge with a total drainage area of 688 acres. Therefore, the watershed area for the reach between the two stream gauges is 269 acres. From February to July, the streamflow at MS-3 and MS-4 ranged from over 100 cfs to approximately 0.1 cfs. The high streamflows were observed in early February and March, after the area received over 15 inches of rainfall. Figures 4.14 and 4.15 also show the baseflow estimates separated from the streamflow observed in Monte Bello Creek at MS-3 and MS-4. Based on these hydrographs, the average annual baseflow for WY 2009 at MS-3 and MS-4 was estimated to be 0.08 cfs and 0.14 cfs, respectively. The average annual baseflow to Monte Bello Creek between the two stations (representing a watershed area of 269 acres) was 0.06 cfs. Therefore, the total annual groundwater discharge to these reaches of Monte Bello Creek is 61.5 and 104 acre-feet.

hydrologic report_ final

May 2010

27

063-7109

4.6.2.4 North Quarry Pumping


Figure 4.16 is a plot of the water level elevation in the North Quarry with the total daily precipitation measured at the Los Altos Hills climate station. Surface water runoff to the North Quarry occurs from precipitation within the watershed of the pit and varies with storm intensity. For intense storm events, runoff from precipitation will be greater, because there is less recharge and evaporation. From mid-February to mid-March 2009, nearly 13 inches of precipitation occurred, which resulted in a water level increase in the North Quarry of 39 feet (increase in water elevation from 737 feet amsl to 776 feet amsl). From mid-March to early-August, the total precipitation measured at Los Altos Hills was about 1.2 inches. During this same period of time, the average daily pumping rate from the North Quarry was about 1,100 gallons per minute (gpm), or approximately 2.45 cfs (Figure 4.17). As a result, the water level in the North Quarry declined back to an elevation of 737 feet amsl by early-August. Another significant rainstorm event occurred in mid-October 2009, with a total precipitation of 4.2 inches over a two-day period. As a result, the water level in the North Quarry increased from an elevation of 738 feet amsl to 745 feet amsl, with a total change in the volume of water of 1,738,000 cubic feet (40 acre-ft). To determine the amount of surface runoff that entered the North Quarry, a storm water coefficient was estimated based on the following formula:

Where:
RO is the surface runoff into the North Quarry [ft3/d]
2 A is the surface area of the watershed area contributing to the North Quarry [ft ]

P is the daily precipitation [ft/d] C is the storm water coefficient [dimensionless]


3 s is the change in storage, or the change in volume of the water in the North Quarry [ft /d] 3 Q is the pumping rate of water out of the North Quarry [ft /d]

It was assumed that there was no groundwater inflow to the pit during this short-term event. Based on this equation, the storm water coefficient of runoff to the North Quarry for this October rain event was estimated to be 0.3 based on a total watershed area of 375.25 acres (16,345,890 ft2), precipitation of 4.2 inches (0.35 ft), and a total change in water storage of 1,738,000 ft3 (including pumping) over a 4 day period. The total change in storage of water in the North Quarry included the sum of the change in volume of water in the pit, as well as the total amount pumped out from October 12th through October 16th to account for the lag time for surface water to runoff into the North Quarry.

hydrologic report_ final

May 2010

28

063-7109

4.6.3

Water Balance Estimates


Evapotranspiration was estimated by taking the difference between annual

The 2009 water year annual water balance summaries for Permanente Creek and Monte Bello Creek are provided in Table 4.6. precipitation and the annual total streamflow for each station. The water balance for the North Quarry from February 2009 to mid-October 2009 is provided in Table 4.7. The results of the estimated water balance for each are described below.

4.6.3.1 Permanente Creek


The annual water balance for Permanente Creek for WY 2009 is presented on Table 4.6. The total annual streamflow observed at MS-1 was 8.1 inches, of which 3.9 inches is estimated to be from baseflow and 4.2 inches is estimated to be surface runoff. At MS-2, the total annual streamflow was 6.8 inches, with 5.2 inches coming from baseflow and 1.6 inches coming from surface runoff.

4.6.3.2 Monte Bello Creek


The annual water balance for Monte Bello Creek for WY 2009 is presented on Table 4.6. The total annual streamflow observed at MS-3 and MS-4 for was 13.4 and 8.8 inches, respectively. Baseflow is estimated to be 1.8 inches at both locations; therefore, the annual surface water runoff at MS-3 and MS-4 is estimated to be 11.6 and 7.0 inches, respectively.

4.6.3.3 North Quarry


Table 4.7 is a summary of the water balance for the North Quarry from February 2009 to mid-October 2009. The primary goal of estimating the water balance for the North Quarry was to provide a calibration point for the numerical groundwater flow model in order to estimate the impacts of proposed mining of the South Quarry on Permanente Creek and Monte Bello Creek (discussed in Section 5). Using the data provided by Lehigh, the groundwater inflow into the North Quarry was estimated from the following formula:

Where: VGW is the total volume of groundwater entering the pit VPIT is the change in volume of the water in the pit VPUMPED is the volume of water pumped out of the pit VPRECIP is the volume of water from direct precipitation into the pit VEVAP is the volume of water lost to evaporation based on the surface area of the pit water VRUNOFF is the volume of water from runoff using the catchment area of the North Quarry and a runoff coefficient of 0.3

Figure 4.18 is a semi-log plot of the various components of inflow calculated from the water balance estimated for the North Quarry. Over the available period of record, the total amount of inflow into the North Quarry was 37,395,000 ft3 (858 acre-ft), with a range of flow from 210 gpm to 5,700 gpm. The total

hydrologic report_ final

May 2010

29

063-7109

surface water runoff that entered the North Quarry from February 2009 to mid-October 2009 was estimated to be 7,729,000 ft3 (177 acre-ft), with a range of inflows from 0 to over 8,800 gpm. The total estimated amount of groundwater that entered the North Quarry was 29,412,000 ft3 (675 acre-ft), with a range of inflows from about 210 gpm (5th-percentile) to 1,480 gpm (95th-percentile), and a geometric mean of 687 gpm. From early September to mid-October, the North Quarry water level remained constant at 738 feet amsl while the daily pumping rate remained steady at 211 gpm; therefore, suggesting that the ambient groundwater seepage into the North Quarry is about 0.47 cfs (211 gpm) during the dry season.

4.7

Groundwater Recharge

Groundwater recharge is estimated to range from about 2 to 4 inches based on the water balance summaries presented on Table 4.6. Recharge is expected to be greater in the limestone units rather than the greenstone/graywacke units, because the limestone is more permeable than the greenstone/graywacke. The greater recharge in the limestone is demonstrated by the observed response to recharge in piezometers completed in the limestone while those in the greenstone/graywacke did not respond (Section 4.3).

hydrologic report_ final

May 2010

30

063-7109

5.0 5.1

HYDROGEOLOGICAL MODELING Modeling Objectives

Groundwater modeling was performed to evaluate the following issues concerning the development of the South Quarry and continued mining and subsequent reclamation of the North Quarry: 1. Groundwater inflows into the North Quarry as mining in the North Quarry continues to its ultimate depth (at about 440 ft amsl); 2. Groundwater inflows into the South Quarry from Phases 1 through 5; 3. The effect that development and reclamation of the South Quarry and reclamation of the North Quarry will have on the local surface hydrology, in particular, Permanente and Monte Bello Creeks; 4. The effect of development and reclamation of the South Quarry and reclamation of the North Quarry will have on local groundwater supply wells; and 5. The distribution of pore pressures in the pit slopes of the South Quarry to verify geotechnical assumptions relative to slope stability. The numerical flow model used the United States Geologic Survey (USGS) code MODFLOW-2000 (Harbaugh et al, 2000). A cross-section flow model (orientated north-south) through the two quarries was developed using the code SEEP/W (Geo-Slope, 2001) to evaluate the pore pressure distribution within the pit slopes. The two numerical models were developed using the hydrogeologic data described in the previous sections. The key elements of this conceptual model are as follows: Hydrostratigraphy the distribution of the principal lithologies (greenstone/graywacke and limestone) both vertically and laterally. in the area

Hydraulic properties the hydraulic conductivity, transmissivity, storativity and porosity of the hydrostratigraphic units. Groundwater levels and flow the piezometric heads, flow directions and hydraulic gradients (lateral and vertical). Water balance groundwater sources (infiltration of precipitation) and sinks (discharge to the local creeks, the Santa Clara Valley and the existing North Quarry) The conceptual hydrogeologic model for the Quarry is described in further detail in the following sections.

5.2

Conceptual Model Description


The groundwater flow at the Quarry generally mimics

The hydrostratigraphy of the Quarry consists of a complex heterogeneous groundwater system within greenstone, limestone and graywacke units. surface topography, with recharge occurring at higher elevations and prominent ridges, and discharge occurring at low-lying areas, several creeks and the North Quarry.

hydrologic report_ final

May 2010

31

063-7109

5.2.1 Groundwater Flow


Figure 4.9 shows the interpreted piezometric contours in the planned South Quarry area based on measured groundwater levels in monitoring wells and piezometers during October 2009. These wells and piezometers are completed in either limestone or greenstone units. The highest heads were recorded in the three wells located along the ridgeline (between 1,560 and 1,750 ft amsl) and the lowest levels were recorded in the wells located near Permanente Creek (between 1,030 and 1,060 ft amsl). Groundwater flow is preferentially within the more permeable limestone blocks. However, because the limestone blocks are limited in extent, the overall groundwater flow system is controlled by the less permeable greenstone unit. Additionally, because of the higher permeability within the limestone blocks, the horizontal hydraulic gradient is flatter within the limestone than the greenstone. The groundwater encountered in most of the monitoring wells and geotechnical boreholes completed in the greenstone and limestone is perched over a much deeper regional groundwater system. The perched groundwater is interpreted to be separated from the deeper system by low permeability greenstone. Evidence for this deeper groundwater system was observed during the drilling of HG-11, when lost circulation of the drilling fluid occurred at an elevation of approximately 1,015 feet amsl.

5.2.2 Recharge and Discharge


Recharge to the groundwater system is by the infiltration of precipitation. The areas with flatter slopes or areas in topographic lows receive more recharge, because runoff of the rainfall is less than the runoff generated from the steeper slopes. Runoff from the steeper slopes accumulates in topographically low spots, thereby increasing infiltration. Discharge of groundwater is to surface water bodies, such as Permanente Creek and Monte Bello Creek and their tributaries where the groundwater table intersects ground surface. The areas of discharge are in the southeast and northeast area of the Quarry, where the groundwater intercepts Permanente Creek and Monte Bello Creek in the topographically low areas. The private vineyards located on the southern crest of Monte Bello ridge are believed to be irrigated using groundwater pumped from several supply wells. The exact locations, depths and water column height in these wells are unknown at this time. Figure 5-1 shows the location of the vineyards.

5.3
5.3.1

Numerical Groundwater Flow Model


Model Code

The numerical groundwater flow model uses the USGS finite-difference code MODFLOW-2000 (Harbaugh et al, 2000) to simulate flow, and is implemented using the commercial graphical user interface program GMS (version 7.0).

hydrologic report_ final

May 2010

32

063-7109

5.3.2

Model Geometry

Figure 5.1 shows the lateral extent (domain) of the MODFLOW model. The model domain coincides with the surface watershed for Permanente and Monte Bello Creeks to the west and south, and for an unnamed creek to the north. The models eastern limit coincides with the western edge of the Santa Clara Valley/Monta Vista Fault). The model occupies an area of approximately nine square miles, and is roughly centered on the North Quarry and the planned South Quarry. The model contains 370 rows and 500 columns (although not all cells are active). All model cells have dimensions of 50 feet by 50 feet in plan view (Figure 5.2).

5.3.3

Layering and Hydrostratigraphy

The model employs six layers to represent the hydrostratigraphy (Figures 5.3 and 5.4). The top surface of the model was developed based on the digital elevation model (DEM) data at a 10-meter resolution (Figure 5.5). The models base was developed as sloping from about 900 feet amsl at the western boundary to 200 feet below msl at the east. Apart from in the area of the quarries where limestone occurs, the model represents greenstone. The layering near the quarries was developed to enable the detailed lithologic interpretation of the limestone and greenstone units to be represented. For example, the north-south section through the North Quarry (Figure 5.3) illustrates how the limestone unit in that area extends to a depth of about 400 feet amsl, through layers 1 through 5, inclusive. On the same figures, the base of the limestone block at the planned South Quarry is notably shallower, and is contained solely within model layer 1.

5.3.4

Hydraulic Properties

The initial hydraulic properties assigned to the modeled units were based on the results and interpretation from the aquifer pumping test and other single-well (packer) tests reported in Section 4.4.2.3. These values were adjusted as part of the calibration task (see Section 5.3.6).

5.3.5

Boundary Conditions

Discrete boundary conditions were assigned to the model to enable groundwater to enter or leave the model in agreement with the general and local water budget described in Section 4.6. These boundary conditions are: Constant heads assigned along the up-gradient (western) and down-gradient (eastern) limits to represent groundwater inflow and outflow, respectively (Figure 5.1). Rivers head-dependent conditions simulating the movement of groundwater into or out of the main creek reaches. The creek bed elevation was set based on the top surface elevation of the model, and the creek stage (water level) was set at 2 feet above the bed elevation. Drains head-dependent conditions simulating the extraction of groundwater in the North Quarry as a seepage face along the slopes and in the base of the pit. The drain elevation was set at 2 feet below the land surface.

hydrologic report_ final

May 2010

33

063-7109

Recharge applied at the uppermost model layer, ranging from 2 inches/year in the lowlying east to 8 inches/year on the north-facing upland areas. The other lateral boundaries and the base of the model were assigned as no-flow conditions.

5.3.6

Model Calibration

5.3.6.1 Approach
The model was initially run to steady-state conditions, and an initial piezometric head result obtained. From there, the model calibration approach involved manually adjusting the key model parameters principally the hydraulic properties, and to a lesser extent, the boundary conditions and layering until the model results reasonably represented the observed data. following during 2009: Piezometric levels measured in wells and vibrating-wire piezometers completed in the limestone and greenstone units (HG-2, etc.) Estimated groundwater discharge at the North Quarry (based on the water budget) Estimated groundwater discharge (baseflow) to the monitored reaches of Permanente and Monte Bello Creeks The calibration targets consisted of the

5.3.6.2 Calibration Results (Current Conditions) 5.3.6.2.1 Piezometric Heads

Figures 5.6 and 5.7 show the simulated groundwater levels in the topmost model layer in the entire model and in the quarry areas, respectively. In general, the modeled groundwater flow is from west to east, with local discharge at the creeks and the North Quarry. Figure 5.8 plots the observed and modeled piezometric heads for the ten key monitoring wells and piezometers. In the area of the planned South Quarry, the simulated groundwater flow direction is towards the northeast (that is, discharging to Permanente Creek). The simulated heads near the planned South Quarry are generally lower than those measured in October 2009. The largest differences (or residuals) occur for the three wells near the ridge crest to the south (HG-4, HG-5 and HG-6), and the smallest differences are for the wells located near Permanente Creek. The effect of this apparent discrepancy is that the model underpredicts the groundwater elevations and local hydraulic gradient near the groundwater divide between Permanente and Monte Bello Creeks. Numerous variations of hydraulic properties and layering within a reasonable range were tested to improve the head match in this area, but the results were relatively insensitive to these changes. Also, features such as barrier faults and fault gouge layers were tested to improve the head match, but were also relatively insensitive to these variations. It is likely that complex geological structure of the greenstone and limestone units results in the groundwater in the area being more compartmentalized and heterogeneous than the model is able to simulate without suffering mathematical instability.

hydrologic report_ final

May 2010

34

063-7109

Although the largest head residuals occur in the three wells near the ridgeline, the maximum development of the southern wall of the South Quarry will not extend deep enough to intercept the measured water table in this area. Therefore, although the modeled heads are lower than measured, the model is expected to reasonably predict the groundwater seepage rate into the south wall of the South Quarry during mining, as well as predicting effects of discharge to Monte Bello Creek and Permanente Creek.

5.3.6.2.2

Water Budget

Table 5.1 summarizes the overall steady-state (annual average) water budget for the calibrated model. The largest inflow is precipitation-derived recharge (accounting for 90 percent of the total inflows), and the largest outflows are to the creeks (totaling more than 60 percent of the outflows).

hydrologic report_ final

May 2010

35

063-7109

Table 5.1 - Modeled Annual Groundwater Budget (Current Conditions)


Feature
Constant Heads Recharge North Quarry Permanente Creek upper Permanente Creek middle Permanente Creek lower Monte Bello Creek upper Monte Bello Creek middle Monte Bello Creek lower Other creeks Totals

INFLOWS
121 1,955 0 0 60 0 0 0 0 30 2,166

OUTFLOWS
305 0 500 293 290 66 63 102 156 396 2,171

NET
-184 1,955 -500 -293 -230 -63 -63 -102 -154 -366 -

Comments
-0.3 2.7 -0.7 -0.40 -0.32 -0.09 -0.09 -0.14 -0.21 -0.51 Ranging from 2 to 6 in/yr Using Drain Boundary

afy

0.20 2.7 0 0 0.08 0 0 0 0 0.04 3.0

cfs

afy

0.40 0 0.70 0.40 0.40 0.09 0.09 0.14 0.22 0.55 3.0

cfs

afy

cfs

condition Upstream from MS-1 Between MS-1 and MS-2 Downstream from MS-2 Upstream from MS-3 Between MS-3 and MS-4 Downstream from MS-4

The simulated current groundwater discharge to the North Quarry (500 AFY or 310 gpm) is within the average annual range of 200 to 600 gpm estimated based on the field measurements and water balance (Section 4.6). The simulated and observed groundwater discharge rates to the monitored Permanente and Monte Bello Creek reaches are as shown in Table 5.2. The middle reach of Permanente Creek is affected by the current North Quarry, with the creek bed (1,000 to 1,100 ft amsl) more than 250 feet higher than the base of the nearby North Quarry (750 ft amsl). The North Quarrys groundwater influence area includes part of Permanente Creek.

Table 5.2 - Observed and Modeled Groundwater Discharge to Creeks


Creek Reach
Permanente Creek upper Permanente Creek middle Monte Bello Creek upper Monte Bello Creek middle

Observed (cfs)
0.31 0.73 0.08 0.06

Simulated (cfs)
0.40 0.32 0.09 0.14

Location
Upstream from MS-1 Between MS-1 and MS-2 Upstream from MS-3 Between MS-3 and MS-4

The hydraulic properties and layering are summarized in Table 5.3.

hydrologic report_ final

May 2010

36

063-7109

Table 5.3 - Modeled Hydraulic Conductivity Values


Model Layer Limestone Kh (ft/d)
1 2 3 4 5 6 0.4 0.4 0.4 0.4 0.4 NA

Greenstone Kh (ft/d)
0.075 0.075 0.0375 0.0375 0.025 0.01

Comments

Kz (ft/d)
0.08 0.08 0.08 0.08 0.08 NA

Kz (ft/d)
0.0015 0.0015 0.00075 0.00075 0.0005 0.0004 Limestone only in N Quarry area Limestone only in N Quarry area Limestone only in N Quarry area

5.3.7

Simulation of Quarry Development and Reclamation

5.3.7.1 Approach
The calibrated (current conditions) model was used to simulate the discrete phases of the future Quarry development and reclamation. These phases consist of a series of conditions defined by the different topography at and near the Quarry area. These are shown in Figures 5.9 through 5.14. The current base of the North Quarry is at approximately 750 ft amsl (Figure 5.9). Under Phase 1, the base of the North Quarry will be deepened a further 310 feet (to elevation 440 ft amsl) while the South Quarry development starts (Figure 5.10). During subsequent phases, the South Quarry will be expanded as the North Quarry is backfilled. The North Quarry will be backfilled to an elevation of 990 ft amsl. The South Quarry will be at its deepest (elevation 925 ft amsl) in Phase 5, at which time the backfilling of the North Quarry will be essentially completed (Figure 5.14). At the conclusion of Phase 5, the South Quarry will be backfilled to a minimum elevation of 1,110 ft amsl. Table 5.4 presents the lowest pit elevation and approximate affected area for the North and South Quarries for each phase that were used to develop each discrete simulation case.

hydrologic report_ final

May 2010

37

063-7109

Table 5.4 - Summary of Quarry Development and Reclamation Phasing


Phase No. Lowest Pit Elevation (ft amsl) North
750

Approx. Model Footprint Area (acres) North


346

Comments

Current Conditions 1

South
-

South
-

Current Conditions Parts Quarry of layers 1-4 were

440

1,250

346

31

inactivated at the center of North 2 3 4 5 - Pre-SQ Backfill 5 - Post-SQ backfill 990 1,110 346 179 840 990 990 990 1,250 1,200 1,150 925 346 346 346 346 87 139 160 179

The MODFLOW model simulated the hydrologic effects of these phases by a combination of (a) revising the upper model surface at the quarry areas to equal the planned topographic surfaces, and (2) the addition of Drain boundary conditions at both the base of the pit and along the sloping areas to enable groundwater intercepting the land surface to discharge. The elevations of the Drain conditions were set at one foot below groundwater in each cell. Only for Phase 1 were the model cells at the center the North Quarry made inactive. North-south sections through the model (B-B; see Figures 5.10 5.14) illustrate the layering for each phase. For backfill, a high hydraulic conductivity (1,000 ft/day for Kh and Kv) was assigned to the new material in place of the extracted limestone. was run to steady-state, thereby representing average annual conditions. Drain conditions were set with elevations of one foot below land surface to extract groundwater that intercepts land surface. Each case

5.3.7.2 Simulation Results


Figures 5.15 and 5.16 show the simulated piezometric heads in the uppermost model layer for Phases 1 and 5. Under Phase 1, the North Quarry will continue to act as a major groundwater inflow feature whereas the South Quarry will not have been sufficiently developed to intercept groundwater beyond localized perched water. Groundwater discharge to Permanente Creek in this area will continue to be mostly from the south. By Phase 5, the North Quarry will have been fully reclaimed, and the highly-permeable pit backfill material (extending from 990 to 440 ft amsl) will continue to act as a groundwater sink (i.e., groundwater will flow

hydrologic report_ final

May 2010

38

063-7109

into the pit). The South Quarry will be at its full development depth (925 ft amsl) and will intercept some groundwater that would otherwise discharge to Permanente Creek. Table 5.5 presents the average annual changes in groundwater discharge for the North and South Quarries and the four monitored reaches of Permanente and Monte Bello Creeks.

Table 5.5 - Summary of Predicted Changes in Groundwater Discharge Compared to Current Conditions
Phase No. North Quarry South Quarry Permanente Creek upper(1)
cfs 0.40 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

Permanente Creek middle(2)


cfs 0.32 -0.09 -0.11 +0.46 +0.46 +0.18 +0.47

Monte Bello Creek upper(3)


cfs 0.09 -0.01 -0.01 -0.01 -0.01 <0.01 <0.01

Monte Bello Creek middle(4)


cfs 0.14 <0.01 <0.01 <0.01 -0.01 <0.01 <0.01

gpm Current Conditions 1 2 3 4 5 - Pre-SQ Backfill 5 - Post-SQ +61 +60 +58 +62 -236 -230 310

gpm 0 <10 <10 +11 <10 +90 +10

Backfill Notes: (1) upstream from MS-1; (2) between MS-2 and MS-1; (3) upstream from MS-3; (4) between MS-3 and MS-4. Positive changes indicate a net increase in annual average groundwater discharge to feature.

The results indicate the following: The average annual groundwater inflow into the North Quarry will increase during Phase 1 compared to current conditions by an additional 61 gpm. The inflow rate will decrease during Phases 2 through 5 as the North Quarry is reclaimed (backfilled) from 440 to 990 ft amsl. Sustained groundwater inflow will not occur into the South Quarry until Phase 5 (up to 90 gpm), when the base of the South Quarry will be at its lowest elevation. Because of the heterogeneous conditions in the quarry area, short-term (seasonal) groundwater inflow will occur as perched zones with isolated groundwater are mined out. The simultaneous development of the South Quarry and the reclamation of the North Quarry will have no measurable impact on groundwater discharge to Monte Bello Creek, and to the upper reach (above station MS-1) of Permanente Creek. The simultaneous development of the South Quarry and the reclamation of the North Quarry will result in a decrease in groundwater discharge to the middle reach (between MS-1 and MS-2) of Permanente Creek of 0.09 cfs (40 gpm) during Phase 1. This reflects

hydrologic report_ final

May 2010

39

063-7109

the effect of substantially deepening of the North Quarry. During Phase 2, this decrease in groundwater flow to this reach will be 0.11 cfs. If no groundwater inflow into the North Quarry is removed for Phases 3 and 4 (when the quarry is essentially fully backfilled), then the middle reach of Permanente Creek will receive 0.46 cfs more groundwater discharge than under current conditions. The predicted annual average post-mining water elevation in the South Quarry is approximately 1,105 ft amsl. This is approximately 5 feet below the backfill elevation and the low-point surface water overflow elevation of approximately 1,110 ft amsl. Therefore, there will be no direct surface water runoff from the post-mining South Quarry to Permanente Creek. However, there will be groundwater discharge from the South Quarry to Permanente Creek. The average annual groundwater discharge from the flooded South Quarry is estimated to be approximately 10 gpm. The post-mining water balance is discussed in Section 5.4. Groundwater will continue to flow into the North Quarry under post-mining conditions, albeit at a lower rate than under current conditions. The water level in the North Quarry will reach a maximum elevation equal to the backfill elevation of 990 ft amsl. The postmining water balance is discussed further in Section 5.4. The modeling results also predict that the planned Quarry expansion will have no significant impact on groundwater levels in the supply wells located along Monte Bello Ridge, located approximately between and one mile from the center of the South Quarry. Therefore, operation of these wells will not be adversely affected by the planned expansion and reclamation.

5.4
5.4.1

Post-Mining Quarry Water Balance


Approach

The results of the groundwater (MODFLOW) modeling and analytical water budget were used to determine the water budget for the two quarries under post-mining (reclaimed) conditions. The main assumptions for this are described below. The total amount of backfill placed in and water flowing into each quarry was calculated on monthly increments. For the North Quarry, it was assumed that 4 years was required to backfill the quarry to an elevation of 990 ft amsl. For the South Quarry, it was assumed that one year was required to backfill the quarry to an elevation of 1,110 ft amsl. During filling, the water table elevation within each quarry was calculated based on the total cumulative amount of water in the quarry compared to the total cumulative backfill volume, assuming a backfill porosity of 30 percent. The net total water entering each quarry was calculated based on the monthly precipitation, surface water runoff, and groundwater inflow. The assumptions used for the water balance are as follows: Precipitation - Water entering each quarry from direct precipitation was equal to the 1999-2009 monthly average precipitation observed at the Los Altos Hills station. The monthly precipitation inflow rate was equal to the product of the monthly precipitation and the surface area of the backfill or flooded portion of the quarry from the previous month. Surface Water - Water entering each quarry as surface water runoff was based on the surface capture area, monthly precipitation and a surface water runoff coefficient of 0.1. The runoff coefficient was provided by Chang Consultants (Chang, 2010), and is based

hydrologic report_ final

May 2010

40

063-7109

on soil type B for shrub land. The monthly surface capture area of the pit decreased as the surface area of the flooded quarry/backfill area increased. North Quarry 90% of the runoff within the surface water capture area will be diverted to a sedimentation basin and routed to Permanente Creek before it reaches the backfill of the North Quarry. South Quarry - most of the surface runoff within the footprint of the South Quarry will be diverted away from the South Quarry. Therefore, surface runoff will occur from only the very interior 26.4 acres of the South Quarry. Groundwater Inflow - Groundwater entering each quarry was based on the results of the MODFLOW model. The groundwater inflow to the North Quarry ranged from 371 gpm (end of Phase 1) to 80 gpm (Phase 5, post-backfill). Groundwater inflow to the South Quarry ranged from 90 gpm (end of Phase 5, pre-backfill) to less than 10 gpm (Phase 5, post-backfill). The water balance assumed that groundwater inflow declined over time as the quarries backfill filled with water. The groundwater inflow to the North Quarry decreased from 371 gpm at the start of reclamation to 80 gpm when the height of the water table reached elevation of 990 ft amsl. For the South Quarry, the groundwater inflow decreased from 90 to 10 gpm over the filling period. Evaporation - Evaporation was not accounted for as the water elevations in the reclaimed North and South Quarries are equal to or below the elevations of the backfill.

5.4.2

Results

Tables 5.6 and 5.7 summarize the results of the estimated post-mining monthly water balance when the water levels have reached equilibrium for the North and South Quarry, respectively. The estimated time to flood the North Quarry backfill is approximately 14 years; for the South Quarry, the estimated time is approximately 6 years. For the South Quarry, the estimated total average annual inflow at equilibrium is 26 gpm. For the North Quarry, the estimated total average annual inflow at equilibrium is 169 gpm. At equilibrium, these quantities are expected to discharge to Permanente Creek primarily as groundwater depending on the permeability of the materials separating the quarry from the creek. During periods of intense rainfall, and during seasonal high groundwater conditions, there is a potential that discharge from the reclaimed North Quarry to Permanente Creek may occur as surface water if appropriate water management techniques are not employed.

hydrologic report_ final

May 2010

41

063-7109

6.0 6.1

GEOCHEMICAL DATA COLLECTION AND REVIEW Objectives

The objective of the geochemical evaluation was to establish and document current conditions for surface water and groundwater quality. A separate report will provide the analysis of projected water quality after implementation of the project and recommendations for water-quality management. Water quality conditions of the Quarry were characterized over a one-year period. To evaluate the environmental behavior of geologic materials present at the proposed South Quarry, geochemical characterization of overburden (rock and soil) and ore materials was conducted. Both laboratory and field-scale testing was conducted to evaluate the potential for metal leaching. sampling was also conducted at the North Quarry. Mine water quality

6.2
6.2.1

Data Collection
Surface Water and Groundwater Quality Monitoring

As discussed in Sections 3.3.1 and 3.3.2, to characterize current groundwater and surface water quality within the vicinity of the proposed South Quarry, surface water and groundwater sampling was conducted. Groundwater and surface water monitoring locations are shown in Figure 3.1. Surface water samples were collected from two locations on Permanente Creek (SW-1 and SW-2) and one location on Monte Bello Creek (SW-3). SW-1 is located upstream of the North Quarry; however, this monitoring location is downstream of the West Material Storage Area (WMSA) created during development of the North Quarry and therefore subject to potential influences associated with this operation. downgradient of the North Quarry sump discharge location. Groundwater sampling was conducted at five monitoring wells located within the footprint of the proposed South Quarry: HG-4, HG-6, HG-7, HG-9 and HG-10S. Monitoring well details, including observations on sulfide occurrence, are provided in Table 6.1. Four of the five wells are completed within the greenstone or graywacke/greenstone units. Well HG-10S is completed in the limestone unit. Four rounds of water quality monitoring were conducted: February 2009; April 2009; September/October 2009 and January 2010. Storm water from the North Quarry was being discharged to Permanente Creek during the first three sampling events. During the final sampling event in January 2010, there was no storm water discharge to Permanente Creek. Climatic conditions affect surface water quality. During dry periods, stream baseflow is maintained by groundwater discharge. During wet periods, streamflow represents a combination of surface runoff and groundwater discharge. Precipitation data for the Los Altos Hills station over the period of water quality monitoring are shown in Figure 6.1. The September 2009 sampling event occurred following an extended dry period. Surface water sampling in January 2010 was conducted on three separate days. Stations SW-2 is located

hydrologic report_ final

May 2010

42

063-7109

SW-3, SW-1 and SW-2 were sampled on January 14th, 19th, and 20th, respectively. On January 19th and 20th, greater than 2 inches of precipitation was recorded at the Los Altos Hills station on each day.

6.2.2

North Quarry Mine Water Quality Monitoring Data

The following North Quarry samples were collected on January 13, 2010: North Quarry (NQ) - A water sample collected from the southern portion of the North Quarry. The estimated depth of water in the North Quarry at the time of sampling was approximately 10 feet. Storage Area Runoff (SP) A runoff sample collected from the haul road located downgradient of the WMSA. This water ultimately discharges into the North Quarry. This sample is assumed to be representative of WMSA runoff.

6.2.3

North Quarry Storm Water Monitoring

Storm water monitoring is an operational requirement for the North Quarry. Considerable rainfall (more than 0.5 inches) is required to generate runoff at the Quarry (URS, 2008). The storm water monitoring program includes collection of a number of samples along Permanente Creek, both upstream and adjacent to the North Quarry. Storm water monitoring locations are shown in Figure 6.2. Creek monitoring locations are identified by CR in the name. Descriptions for selected monitoring stations are listed in Table 6.2. The background Permanente Creek storm water monitoring station (SL-BG-CR) is located approximately 1,400 feet upstream of SW-1. Station SL-14-CR is located approximately 270 feet downstream of SW-2. Storm water monitoring samples are analyzed for pH, temperature and conductivity in the field. Laboratory analysis includes total suspended solids (TSS), oil and grease, chemical oxygen demand, pH and conductivity. An estimate of stream flow rate (assumed to be a visual estimation reported in cubic feet/sec) is also recorded. Data from two monitored storm events in 2006 (January 18, 2006 and February 27, 2006) are presented in this report.

6.2.4

Published Data - Regional Water Quality Data Compilation

Additional water quality data for Permanente Creek were obtained from the San Francisco Bay Regional Water Quality Control Board (SFBRWQCB, 2007). Between 2000 and 2003, watershed monitoring was conducted in nine watersheds, including the Stevens Creek/Permanente Creek watershed, over a range of climatic conditions. The goals of this monitoring included documentation of ambient water quality conditions in potentially clean and polluted areas and identification of specific water quality problems preventing the realization of beneficial uses of water in targeted watersheds. Watershed data were compared with water quality thresholds for assigned beneficial uses and analyzed for spatial and temporal trends and linkages with land use (SFBRWQCB, 2007). As part of this study, station PER070 (location shown in Figure 6.3) was sampled in June 2002, April 2002 and January 2003. PER070 is located about one mile downstream of the Permanente Facility on

hydrologic report_ final

May 2010 Permanente Creek. conditions: Dry June 2002 Spring April 2002 Wet January 2003

43

063-7109

Sample collection was intended to be representative of the following climatic

Sampling did not occur during storm events. Samples were collected in well-mixed stream sections by uncapping, filling and recapping the container just below the water surface. Samples collected for dissolved metals analyses were collected into a clean syringe and syringe-filtered into the sample container. Sample analysis included organics, total and dissolved organic carbon (TOC and DOC), total and dissolved metals, nutrients and conventional parameters (SFBRWQCB, 2007).

6.2.5

Geochemical Laboratory Testing

The Quarry stratigraphy consists of alternating series of limestone and metabasalt (greenstone) units separated by low-angle faults. These units are overlain by continentally-derived graywackes, shales, and argillites (Foruria, 2004). Geologic conditions within the vicinity of the proposed South Quarry were characterized by Geocon Consultants, Inc. (Geocon) for the purposes of geochemical testing of representative geologic rock units. Geocons evaluation of both the surficial and subsurface geologic conditions included the following: a literature review; geologic reconnaissance of the North Quarry; review of boring logs and core sample photographs for 48 borings drilled within and adjacent to the proposed South Quarry; review of select core samples from 13 of the 48 borings; and, outcrop reconnaissance within the vicinity of the South Quarry. Geocon identified the following major rock types within the South Quarry exploration area (Geocon Consultants, Inc., 2009a): Graywacke: Generally medium to dark grey quartzose graywacke comprising grains of quartz, chert, feldspar, and feldsapthic lithic fragments. Crystalline calcite appears to be present as secondary fillings. Limestone and Dolomitic Limestone: Very light grey to medium dark grey with common white to very light grey veining. The limestone has a fine crystalline texture. Geocons report (2009) made no mention of the occurrence of sulfides within the limestone; however, weathered faces and the faces of open fractures were described as grayish yellow to pale yellowish orange. Foruria (2004) noted that the black limestones, deposited in an anoxic environment, often possess trace amounts of diagenetic pyrite, locally ranging up to 2%. Pyrite also occurs in trace amounts within the light grey micritic limestone units. Fault Breccia Highly fractured and sheared rock that includes a mixture of the following identifiable lithologies: graywacke, limestone, dolomitic limestone, greenstone, metabasalt and chert. Greenstone Generally dark greenish grey to dusky yellow green chloritic meta-basalt. Metabasalt Generally medium to dark grey fine crystalline rock. Dominant minerals include feldspars, hornblende and quartz.

hydrologic report_ final

May 2010

44

063-7109

Chert White to very light grey to grayish pink very fine crystalline rock. The chert is typically interbedded with or occurs as inclusions in the limestone and dolomitic limestone. For the purposes of overburden characterization, Geocon noted that the metabasalt and greenstone could be combined into a single rock type and that the chert could be combined with the limestone (Geocon Consultants, Inc., 2009). Geocon prepared six composite rock samples, representative of each of the six major rock types listed above, for geochemical characterization (Geocon Consultants, Inc., 2009b). The number of samples collected for each composite sample was based on the observed variability within a rock type (i.e., more samples were collected for the rock types with the most variability) (Table 6.3). An overburden soil sample was also submitted for analysis (sample ID CS-01). Geochemical analysis included the following (Table 6.4): Acid base accounting Elemental analysis Static leach testing Samples were submitted to a California-certified laboratory for analysis. The California modified Waste Extraction Test (WET) was used to characterize the metal leaching potential of the rock and soil samples. The WET test is a 48-hour leach test conducted on a crushed rock sample (minus 2 mm) using a 10 to 1 liquid to solid ratio. The test lixiviant was deionized water. For nonacid generating material, defined as having a ratio of neutralization potential (NP) to acid generation potential (AGP) of greater than 3:1, deionized water may be used in place of the standard sodium citrate lixiviant.

6.2.6

Geochemical Field Testing Pit Wall Washing

To evaluate metal leaching potential under field scale conditions, wall washing was performed on exposed faces within the North Quarry (Figure 6.4). At six sampling locations, field scale leach tests (wall washing) were conducted following the standard procedure outlined in Draft Guidelines and Recommended Methods for the Prediction of Metal Leaching and Acid Rock Drainage at Minesites in British Columbia (Price, 1997). Sample location selection targeted the major rock types and a range of weathering conditions (i.e., fresh faces versus faces following an extended period of exposure). Sample locations are listed in Table 6.5 (site photographs of sample locations shown in Figures 6.5 to 6.10). The test involves washing an approximately one-meter square area of rock face with a known volume of water. The wall washing rinsate is collected and submitted for chemical analysis. Metal leaching rates are calculated on an area basis by multiplying the leachate concentration (mg/L) by the wash volume (L). At each location, between three and five liters of water was applied to an area of 0.6 to 0.8 m2. Due to

hydrologic report_ final

May 2010

45

063-7109

loss of water to the wall face (adsorption), approximately 1.5 liters of rinsate was collected at each site. Samples were submitted for laboratory analysis. Samples for dissolved metals analysis were filtered (0.45 m filter) upon receipt by the laboratory. Field measurement of pH, electrical conductivity, temperature, dissolved oxygen and oxidation reduction potential (ORP) was conducted. Wall washing was performed on November 24, 2009. Four days prior to testing, 0.2 inches of rainfall was recorded in the area (Los Altos Hills precipitation record for November 20, 2009). This event was too small to generate sufficient runoff for collection of water samples. Prior to the November 20, 2009 rainfall event, the area had experienced a five-week period without rainfall (Figure 6.1). The most recent prior event recorded 3.9 inches in this area on October 13, 2009 (Los Altos Hills precipitation records). The results of the wall washing tests are therefore representative of conditions that reflect approximately a one-month period of weathering. .

6.2.7

Quality Assurance/Quality Control Program

The QA/QC program for sample collection included the following: (1) collection and analysis of field duplicate water samples; (2) collection and analysis of equipment blank and field blank samples; and, (3) calculation of charge balance errors. Components of the QA/QC program are described in Appendix E.

6.3
6.3.1

Monitoring Results
Water Quality Monitoring

A complete summary of water quality results is presented in Appendix D (Table D-1). For comparison, this table includes the following water quality criteria: Basin Plan Water Quality Criteria (California Regional Water Quality Control Board San Francisco Bay Region, 2007) Environmental Protection Agency (EPA) Region 9 drinking water maximum contaminant levels (MCLs) (EPA Region IX, 2007) Water quality results for selected parameters are shown in Figures 6.11 to 6.17. A Piper plot of surface water and groundwater quality results from the first three rounds of monitoring is shown in Figure 6.18. Compositional diagrams, such as Piper plots, facilitate the identification of water types. (chloride, sulfate and bicarbonate) in milliequivalents per liter (meq/L). Piper plots present the relative concentrations of major cations (calcium, magnesium and sodium) and anions

6.3.1.1 Groundwater Quality


Groundwater quality results for selected parameters are presented in Table 6.6 (see Table D-1 for comprehensive results). Major ion chemistry at most groundwater wells (i.e., HG-6, HG-7, HG-9 and HG10S) is similar and classified as Ca-Mg-HCO3 or Mg-Ca-HCO3 type (Figure 6.18). The pH values for samples from these four wells ranged from 7.3 to 8.5 s.u. Total dissolved solids (TDS) concentrations ranged from 340 to 550 mg/L (Figure 6.11).

hydrologic report_ final

May 2010

46

063-7109

Groundwater quality at well HG-4 is distinct from the other wells. This well consistently reported the highest groundwater pH values, ranging from 8.0 to 8.6 (Figure 6.11). Unlike the other groundwater wells, sodium and sulfate are the dominant cation and anion at this well, respectively. The TDS concentration at this well, which ranged from 880 to 1,500 mg/L, was elevated relative to the other groundwater wells (Figure 6.11). Groundwater quality at this well exhibited greater temporal variability than the other wells. For example, between February 2009 and January 2010, chloride concentrations decreased by a factor of two (from 51 to 25 mg/L) (Figure 6.12). Groundwater quality at HG-4 may be indicative of older groundwater at this location relative to the other wells. The observed differences in groundwater quality may also be attributed to contamination from drilling fluids or grout that is still being flushed from the well. The latter would explain the elevated pH and decline in TDS and chloride. Groundwater quality results for selected parameters are summarized below: Dissolved Metals - The following dissolved metals were consistently below detectable limits in groundwater samples, or when detected, were present at low concentrations ( 1 g/L): antimony (Sb), beryllium (Be), cadmium (Cd), lead (Pb), mercury (Hg), silver (Ag) and thallium (Tl). With the exception of well HG-10S, dissolved arsenic was detected in all groundwater samples, ranging from less than a microgram per liter (< 1 g/L) to nine micrograms per liter (9 g/L) (Figure 6.13). Dissolved molybdenum, nickel and zinc groundwater concentrations ranged from less than a microgram per liter (< 1 g/L) to tens of micrograms per liter (10s g/L) (Figures 6.14 and 6.15). Maximum dissolved molybdenum (45 g/L) and nickel (24 g/L) were both measured at well HG-4. With the exception of HG-4, dissolved selenium concentrations were less than a microgram per liter (< 1 g/L). HG-4 selenium concentrations ranged from less than a microgram per liter to 4 g/L. Dissolved Iron and Manganese Dissolved manganese concentrations in groundwater samples ranged from less than a microgram per liter to 0.3 mg/L. Well HG-7 reported the highest dissolved manganese concentrations (up to 0.33 mg/L) (Figure 6.14). Peak dissolved iron concentrations were also measured at this well (up to 0.33 mg/L) (Figure 6.15). Nutrients Nutrient concentrations in groundwater samples were generally low. Ammonia and phosphorus concentrations ranged from below detectable limits to 0.3 mg/L-N and 0.6 mg/L, respectively. With the exception of well HG-9, nitrate concentrations were below 0.1 mg/L-N. Nitrate concentrations at HG-9 range from 0.7 to 1.3 mg/L-N (Figure 6.12).

6.3.1.2 Surface Water Quality


Surface water quality results for selected parameters are presented in Table 6.6 (see Table D-1 for comprehensive results). The major ion chemical signature of the Monte Bello Creek (SW-3) surface water sample is similar to groundwater (i.e., Ca-Mg-HCO3). For the Permanente Creek samples (SW-1 and SW-2), similar to SW-3, calcium is the dominant cation; however, sulfate is the dominant anion (Figure 6.18). Between SW-1 and SW-2, the concentration of calcium, relative to magnesium, increases.

hydrologic report_ final

May 2010

47

063-7109

The pHs of all surface water samples ranged from 7.1 to 8.4 (Figure 6.11). The TDS concentration of Monte Bello Creek was relatively stable, ranging from 340 mg/L to 360 mg/L during the four sampling events. TDS concentrations were higher in Permanente Creek, ranging from 350 to 1,800 mg/L. Monitoring stations SW-1 and SW-2 reported a significant decline in TDS in January 2010. During the monitoring period, TDS at the upstream Permanente Creek monitoring location (SW-1) exhibited greater variability than TDS at the downstream monitoring location (SW-2) (Figure 6.11). The observed TDS concentration trends are primarily attributed to sulfate (Figure 6.12). Sulfate concentrations at SW-1 ranged from 110 to 1,100 mg/L. Sulfate concentrations at SW-2 were relatively stable during the first three monitoring events, ranging from 550 to 600 mg/L. In January 2010, sulfate at SW-2 declined to 160 mg/L. Sulfate concentrations in Monte Bello Creek remained below 30 mg/L. Surface water quality results for selected parameters are summarized below: Dissolved Metals - The following dissolved metals were consistently below detectable limits in surface water samples, or when detected, were present at low concentrations ( 2 g/L): Be, Cd, chromium (Cr), Pb, Hg, Ag and Tl. Dissolved arsenic (As) and antimony (Sb) concentrations were also below detectable limits or low ( 1 g/L) at SW-1 and SW3. These constituents were detected at part per billion levels (up to 6 g/L) at SW-2 (Figure 6.13). For both constituents, peak concentrations were measured at SW-2 in February 2009 and the lowest concentrations were measured in January 2010. Dissolved selenium (Se), nickel (Ni), molybdenum (Mo), manganese (Mn) and vanadium (V) concentrations are lower at SW-1 and SW-3 than SW-2 (Figures 6.13 to 6.15). Dissolved manganese concentrations are lower in surface water than groundwater (maximum measured concentration of 4 g/L at SW-2). Permanente Creek Dissolved Metal Trends - The following metals (dissolved phase) consistently demonstrate an increasing trend between SW-1 and SW-2: Sb, As, Mn, Hg, Mo, Ni, Se, and V. Nutrients Nitrate concentrations are low in Monte Bello Creek (<0.1 mg/L-N). Nitrate concentrations at SW-1 ranged from 0.8 to 5.6 mg/L. Nitrate concentrations typically decreased between SW-1 and SW-2 (Figure 6.12). Ammonia (<0.2 mg/L-N) and phosphorus (<0.6 mg/L) concentrations were low in all surface water samples.

6.3.2

North Quarry Mine Water Quality Monitoring Data

Water quality results for the North Quarry and WMSA runoff are presented in Appendix D (Table D-1). Water quality results for selected parameters are shown in Figures 6.11 to 6.17. Inflows to the North Quarry include direct precipitation, groundwater, and surface runoff. Surface runoff to the North Quarry includes both runoff from undisturbed areas and runoff from disturbed areas and mine facilities (e.g., WMSA runoff, runoff that contacts the quarry walls and quarry road runoff). The North Quarry was sampled on January 13, 2010. The Los Altos Hills station recorded 0.24 inches of precipitation on this date and 0.43 inches of precipitation on the previous day. Based on results for a single sampling event during a rainfall event, North Quarry water quality is characterized as follows: Water Type - The major ion signature of the North Quarry sample was similar to SW-2. Sulfate and calcium were the dominant major ions, reporting concentrations of 550 mg/L

hydrologic report_ final

May 2010

48

063-7109

and 210 mg/L, respectively. The pH and TDS of the North Quarry sample were 7.9 and 790 mg/L, respectively. Dissolved Metals The following metals were below detectable limits in the North Quarry sample: Al, Be, Cr, Fe, Pb and Ag. Many metals reported concentrations similar to those measured at SW-2 during the first three sampling events. Metals that were detected in the North Quarry sample include: Sb (8.2 g/L); As (4.5 g/L); Cu (1.5 g/L); Mn (21 g/L), Hg (0.01 g/L), Mo (540 g/L), Ni (160 g/L), Se (82 g/L) and V (400 g/L). Nutrients - The nitrate concentration of the North Quarry sample was 0.7 mg/L-N. Total phosphorus and ammonia concentrations were below detectable limits. The WMSA runoff sample, also collected on January 13, 2010, provides water quality data on one of the inflows to the North Quarry. The TDS of this sample (900 mg/L) was slightly higher than the TDS of the North Quarry sample. The sulfate concentration (550 mg/L) was equivalent to the North Quarry sample. The runoff sample reported 7.6 mg/L-N. The trace metals detected in the North Quarry sample were also typically present in the runoff sample. Metal concentrations in the runoff sample were typically lower than those measured in the North Quarry sample.

6.3.3

North Quarry Storm Water Monitoring

Permanente Creek storm water monitoring data from 2006 are shown in Figures 6.19 and 6.20. The storm water monitoring program includes measurement of conductivity in both the field and the laboratory. Data from the two storm events indicate a general increasing trend in Permanente Creek conductivity from upstream to downstream across the Quarry. Permanente Creek conductivity (lab measured) increases from approximately 400 S/cm (SL-BG-CR) to approximately 900 S/cm (SL-14-CR). The data indicate an increase in conductivity within the reach of Permanente Creek adjacent to the WMSA. The January 2006 field conductivity data also suggest an increase in conductivity along the reach of Permanente Creek adjacent to the North Quarry.

6.3.4

Regional Water Quality Data Compilation


Results for selected constituents are presented in

San Francisco Bay Regional Water Quality Control Board data for Station PER070 are provided in Appendix D (Table D-2) (SFBRWQCB, 2007). Table 6.7. Water quality results for PER070 show temporal variability. Dissolved selenium concentrations ranged from approximately 6 to 19 g/L, with the wet season sample reporting the highest concentration. Seasonal water quality trends for PER070 were different than the other monitored watersheds. The SFBRWQCB report noted that In general, ambient concentrations of contaminants were highest during the dry season, which may be due to dilution during wet weather. (SFBRWQCB, 2007). For site PER070, specific conductance and TDS were highest during the wet sampling event. Many metals (i.e., Cd, Ni, Zn, Cr, Hg and Se) reported the highest concentrations in the wet season sample. Sulfate and

hydrologic report_ final

May 2010

49

063-7109

nitrate concentrations were also highest in the wet season sample. The wet season pH value (7.5) was slightly lower than the other two sampling events (~8.2).

6.3.5

Geochemical Laboratory Testing

6.3.5.1 Acid Generation Potential


Acid base accounting (ABA) analysis is performed to assess the acid rock drainage (ARD) potential of a material (Table 6.4). ABA analysis results are presented in Table 6.8. Based on the ABA analysis results, all samples are classified as having no acid generation potential (Price, 2009). The paste pH values of all rock samples were alkaline, ranging from 8.0 to 8.6. The overburden soil sample yielded a paste pH value of 7.3. Neutralization potential (NP) values ranged from 62 to 867 kg CaCO3/t for the rock samples. The metabasalt sample reported a higher NP than the limestone sample (644 kg CaCO3/t). The overburden soil sample yielded the lowest NP value of 23 kg CaCO3/t. The sulfide contents of the rock samples ranged from below detectable limits (<0.01 wt. %) for the greenstone and metabasalt samples to 0.92 wt. % for the fault breccia sample. The sulfide concentration of the graywacke, limestone and chert samples were similar (approximately 0.10 wt. %). Acid potential, calculated from sulfide sulfur for the rock samples, ranged from <0.3 to 29 kg CaCO3/t. The total sulfur content of the overburden soil sample was low (0.01 wt. %). Sulfur speciation was not performed on this sample. A common approach for assigning an ARD potential to a material, using ABA results, is to apply the neutralization potential ratio (NPR = NP/AP where AP is acid potential). The actual threshold value for a particular solid is material specific and depends on many factors. An NPR value greater than two (2) is an accepted guideline for a determination of no ARD potential (Price, 2009). California has adopted a threshold NPR guideline value of three (3) for a determination of low ARD potential (RWQCB, 2008). All samples reported NPR values of three or greater potential. and are therefore classified as having no ARD

6.3.5.2 Sulfide Occurrence Sample Representativeness


One composite limestone sample was submitted for ABA analysis. data. The limestone sample, which reported a sulfide content of 0.10 wt. %, appears to be representative of average conditions. Sulfide data for 850 ore samples from the South Quarry are shown in Figure 6.21. Sulfide concentrations range from below detectable limits to 4.7 wt. %, with an average concentration of 0.09 wt. %. Samples with sulfide concentrations greater than 1 wt. % are generally restricted to depths of approximately 400 to 700 feet below ground surface (bgs). The borehole logs suggest that pyrite may not be visually identifiable, even when present at concentrations greater than 1 wt. %. For example, the To evaluate if this sample is representative of typical sulfide occurrence, the ABA analysis result was compared to additional sulfide

hydrologic report_ final

May 2010

50

063-7109

sample that reported the highest sulfide concentration of 4.7 wt. % was collected from borehole Geo 431A-08 between 534 and 547 feet. The borehole log did not identify pyrite across this interval (borehole descriptions provided below): FAULT BRECCIA: 534.0 - 540.8 feet; medium light gray; matrix supported; dolomitic limestone. DOLOMITIC LIMESTONE: 540.8 - 558.0 feet; medium light gray; finely- to mediumcrystalline; scattered milky calcite; no visible pyrite; weak reaction to 10% HCl; scattered clasts of greenstone; poor recovery, core broken. Borehole log geologic descriptions for the intervals corresponding to geochemical sample selection are presented in Table 6.9. With the exception of the chert sample, pyrite is present in association with all rock types. Although sulfide was below detectable limits in the greenstone and graywacke samples, the geologic logs indicate that pyrite is present in these units. The apparent discrepancy between the geologic logs and the sulfide analysis results is likely attributed to sample heterogeneity and the size of the sample used for sulfide analysis (i.e., a few grams). Many of the logs describe pyrite occurrence as scattered. Therefore, a single sample cannot adequately represent the range of sulfur conditions throughout the geologic unit. References to pyrite in the geologic logs are summarized in Table 6.10. With the exception of chert, pyrite occurs in association with all rock types. Pyrite is observed near surface (i.e., at depths of less than 50 feet in a number of borehole logs) and at depth. Pyrite occurrence is most often described as scattered. In boreholes GEO 4-24A-08 (173 to 197 feet bgs) and GEO 4-28A-08 (281.3 to 289.8 feet bgs), pyrite cubes up to approximately 5 mm across were observed in the fault breccia and metabasalt, respectively. Framboidal pyrite was observed in borehole GEO 4-26A-08 (680.1 to 698.0 feet) at the limestone/fault breccia contact.

6.3.5.3 Elemental Concentration and Metal Leaching Potential


Elemental analysis (CAM 17 TTLC) results are presented in Table 6.11. For comparison, this table includes average crustal abundance concentrations and regulatory limits for hazardous waste classification. The trace-metal content of each rock type was evaluated to identify potential metals of concern, although an elevated concentration of a particular element does not necessary imply that this element will be mobilized in concentrations that may lead to environmental impacts. The antimony, arsenic, selenium and nickel concentrations of the rock samples are elevated in comparison to average crustal abundance concentrations (Figure 6.22). occur at similar concentrations in most rock types. WET test leach test results are also shown in Table 6.11. The results of leach tests tend to be sensitive to the methodology used (e.g., solid to solution ratio, nature of the lixiviant, grain size reduction). Therefore, although leach tests provide an estimation of which metals are most likely to leach from a Nickel, chromium and antimony concentrations are elevated in the greenstone in comparison to the other rock types (Figure 6.23). Arsenic and selenium

hydrologic report_ final

May 2010

51

063-7109

particular material, leachate metal concentrations will exhibit variability related to the specific test methodology used and may not be representative of field scale conditions. Actual surface water runoff and seepage quality will be affected by site-specific conditions (e.g. climate, hydrology and degree of exposure). Therefore, although the WET test results provide an indication of potential constituents of concern, they may not be indicative of future site concentrations. Static leach test methods (e.g., the WET test) do not simulate kinetic processes, such as sulfide oxidation, that can enhance metal leaching. The WET test leachate pHs ranged from 7.6 to 8.4. Leach test results are therefore representative of metal leaching under moderately alkaline conditions. Constituents that are typically mobile under neutral to alkaline pH conditions were detected in the leachates (e.g., Sb, As, Mo and Ni). Leachate antimony, arsenic and nickel concentrations ranged from microgram per liter levels (g/L) to almost 10 g/L (Table 6.11 and Figure 6.24). Antimony and arsenic leachate concentrations did not demonstrate a positive correlation with solid phase concentration. For these constituents, leachate concentrations generally declined as solid phase concentration increased (Figure 6.24). Molybdenum leachate concentrations ranged from a few micrograms per liter to tens of micrograms per liter. Nickel and molybdenum leaching generally increased as solid phase concentration increased (Figure 6.24). The greenstone sample reported the highest leachate nickel concentration. Selenium was only detected in the limestone sample leachate (6 g/L). Mercury was only detected in the limestone and overburden soil sample leachates (0.21 g/L and 0.19 g/L, respectively). Leachate sulfate concentrations ranged from 1.3 to 29 mg/L. Figures 6.26 through 6.32 compare the results of site water quality sampling (i.e., groundwater, surface water, mine water) with laboratory and field scale leach test results for selected constituents.

6.3.6

Geochemical Field Testing Pit Wall Washing

Wall washing results are presented in Table 6.12. The wall washing samples were turbid and often colored (Figure 6.25). Leachate total suspended solids (TSS) concentrations ranged from 530 mg/L to 68,000 mg/L. Total dissolved solids concentrations ranged from 61 to 110 mg/L. Leachate field measured pH values ranged from 6.9 to 9.0. Wall washing test results are therefore representative of metal leaching under circum-neutral to moderately alkaline conditions. Dissolved antimony (up to 0.6 g/L) and selenium (up to 49 g/L) were detected in all limestone leachate samples. These constituents were below detectable limits in the graywacke, chert and greenstone leachate samples. Total recoverable selenium concentrations in the limestone leachates ranged from 60 to 230 g/L. Using the TSS data for these three samples, the solid phase selenium concentration is calculated to range from approximately 2 mg/kg to 430 mg/kg (high grade limestone sample). Dissolved nickel (0.9 to 10 g/L) and molybdenum (0.4 to 98 g/L) were detected in all leachates. Similar to selenium, the high grade limestone sample reported the highest dissolved nickel and molybdenum concentrations. Dissolved arsenic was detected in all leachates, at concentrations ranging from 12 g/L to 33 g/L. Dissolved arsenic concentrations in the limestone leachates were relatively consistent at approximately

hydrologic report_ final

May 2010

52

063-7109

20 g/L. Dissolved aluminum (0.06 to 1.8 mg/), iron (0.01 to 1.4 mg/L) and manganese (1.2 to 19 g/L) were present in all wall washing leachates. Sulfate concentrations in the limestone leachates (15 to 100 mg/L) were elevated relative to sulfate concentrations in the graywacke, chert and greenstone leachates (3 to 5 mg/L). limestone sample reported the highest sulfate concentration (100 mg/L). Leachate nitrate concentrations ranged from 0.3 to 12 mg/L-N. The three locations that reported nitrate concentrations greater than 1 mg/L were sites that have been exposed for one year or less. The two oldest sites (exposed for greater than 5 years), reported low nitrate concentrations (0.3 mg/L-N). Ammonia concentrations were less than 0.2 mg/L in four of the six samples. The chert (CT-01) and greenstone (GS-01) leachates reported ammonia concentrations of 0.8 and 4.9 mg/L-N, respectively. Both these locations have been exposed for less than one month. The Quarry uses ammonium nitrate /fuel oil (ANFO) as a blasting agent. Leaching of blasting residuals is a likely source of nitrate and ammonia in wall wash leachates. The high grade

6.3.7

Quality Assurance/Quality Control

Results of the QA/QC program are presented in Appendix E. Results of this analysis indicated that the data are of acceptable quality for their intended purpose.

hydrologic report_ final

May 2010

53

063-7109

7.0

REFERENCES

Brabb, E.E., Graymer, R.W. and Jones D.L.. 2000. Geologic Map and Map Database of the Palo Alto 30' x 60' Quadrangle, California. U.S. Geological Survey Miscellaneous Field Studies Map MF-2332 ,U.S. Department of the Interior, U.S. Geological Survey. Blake, M.C., Jr. and Jones, D.L.. 1981. The Franciscan Assemblage and Related Rocks in Northern California: A Reinterpretation. In The Geotectonic Development of California, W.G. Ernst, Editor. California Regional Water Quality Control Board San Francisco Bay Region, 2007. San Francisco Bay Basin (Region 2) Water Quality Control Plan (Basin Plan). Cooper Jacob, 1946. A Generalized Graphical Method for Evaluating Formation Constants and Summarizing Well-field History. Transactions, American Geophysical Union 27:526-34, 1946. Department of Water Resources, 1975. Bulletin No. 118-1, Evaluation of Ground Water Resources: South San Francisco Bay, Volume III: Northern Santa Clara County Area, December 1975. Environmental Protection Agency (EPA), see U.S. Environmental Protection Agency. EnviroMINE, Inc., 2007. Hanson Permanente Cement, Permanente Quarry, California, Mine ID # 91-430004, Application for Reclamation Plan Amendment, March 2007. Foruria, J., 2004. Geology of the Permanente Limestone and Aggregate Quarry, Santa Clara County, California: Report prepared for Hanson Permanente Cement, September 24, 2004. Geo-Slope, 2001. Seep/W Software Ver. 4.24 Users Guide. Geo-Slope International Ltd.,Calgary, Canada. Geocon Consultants, Inc., 2009a. Draft - Permanente Quarry - Cupertino, Santa Clara County, California Pit 4 Quarry Exploration Project Rock-Type Categorization, September 14, 2009. Geocon Consultants, Inc., 2009b. Draft - Permanente Quarry - Cupertino, Santa Clara County, California Pit 4 Quarry Exploration Project Representative Rock-Type Sample Collection, October 2, 2009. Golder Associates Inc., 2007. Geotechnical Recommendations for Updated Mine Reclamation Plan Amendment, Hanson Permanente Quarry, Cupertino, California: Report prepared for EnviroMine Inc., January 4, 2007. Golder Associates Inc., 2008. Slope Stability Evaluation for Compliance with SMARA, West Materials Storage Area, Permanente Quarry, Santa Clara County, California, Report prepared for Hanson Aggregates, November 2008. Golder Associates Inc., 2009. Slope Stability Evaluation for Compliance with SMARA, East Materials Storage Area, Permanente Quarry, California, April 2009. Golder Associates Inc., 2009. Keyway Construction Drawing (Letter Transmittal and attached Drawing), East Materials Storage Area, Permanente Quarry, California. July 27, 2009. Golder Associates Inc., 2010. Slope Stability Evaluation for Compliance with SMARA, Revised Grading Plan Update, East Materials Storage Area, Permanente Quarry, California, February 2010. Golder Associates, 2010 (in progress). Geotechnical evaluations and Design Recommendations, Permanente Quarry Reclamation Plan Update, Santa Clara County, California.

hydrologic report_ final

May 2010

54

063-7109

Hanson, R.T., Li, Zhen, and Faunt, C.C., 2004, Documentation of the Santa Clara Valley regional groundwater/surface-water flow model, Santa Clara County, California: U.S. Geological Survey Scientific Investigation Report 2004-5231. Harbaugh, A.W., Banta, E.R., Hill, M.C., and McDonald, M.G., 2000. MODFLOW-2000, the U.S. Geological Survey modular ground-water model -- User guide to modularization concepts and the Ground-Water Flow Process: U.S. Geological Survey Open-File Report 00-92, 121 p. Mathieson, E. L., 1982. Geology of the Permanente Property, Kaiser Corporation, Permanente, California, unpublished Kaiser Permanente Cement Company report, 34 p. Parkhurst, D.L., and C.A.J. Appelo, 1999. Users Guide to PHREEQC (Version 2) - A Computer Program for Speciation, Batch-Reaction, One-Dimensional Transport, and Inverse Geochemical Calculations, U.S. Geological Survey Water-Resources Investigations Report 99-4259, Denver, CO, 1999. Price, W.A., 2009. Prediction Manual for Drainage Chemistry from Sulphidic Geologic Materials. MEND Report 1.20.1, December 2009. Price, W.A., 1997. Draft Guidelines and Recommended Methods for the Prediction of Metal Leaching and Acid Rock Drainage at Minesites in British Columbia, 1997. Reclamation Section, Energy and Minerals Division, April 1997. Regional Water Quality Control Board (RWQCB), 2008, Tech Note: Mine Waste Characterization, Characterization of Solid Mining Waste, June, 2008. Rogers, T.H. and Armstrong, C.F., 1973. Environmental Geologic Analysis of the Monte Bello Ridge Mountain Study Area, Santa Clara County, California, California Division of Mines and Geology Preliminary Report 17. San Francisco Bay Regional Water Quality Control Board (SFBRWQCB), 2007. Water quality monitoring and bioassessment in nine San Francisco Bay Region watersheds: Walker Creek, Lagunitas Creek, San Leandro Creek, Wildcat Creek/San Pablo Creek, Suisun Creek, Arroyo Las Positas, Pescadero Creek/Butano Creek, San Gregorio Creek, and Stevens Creek/Permanente Creek. Oakland, CA: Surface Water Ambient Monitoring Program, San Francisco Bay Regional Water Quality Control Board. Santa Clara Valley Water District (SCVWD), 2008. Groundwater Management December 2008 Groundwater Condition Report, December 2008. Smith, Kathleen S., 1999. Metal Sorption on Mineral Surfaces: An Overview with Examples Relating to Mineral Deposits. In G.S. Plumlee and M.J. Logsdon (Eds.), The Environmental Geochemistry of Mineral Deposits, Reviews in Economic Geology Volume 6A, pp. 161-182. Sorg, D.H., and McLaughlin, R.J., 1975. Geologic Map of the Sargent-Berrocal Fault Zone between Los Gatos and Los Altos Hills, Santa Clara County, California: U.S. Geological Survey Miscellaneous Field Studies Map MF-643, scale 1:24,000. Theis, C.V., 1935. The lowering of the piezometer surface and the rate and discharge of a well using ground-water storage. Transactions, American Geophysical Union 16:519-24. URS, 2008. Final Report Storm Water Pollution Prevention Plan and 2008 Annual Storm Water Report. Prepared for Hanson Permanente Cement Company, Inc., June 2008. U.S. Environmental Protection Agency (USEPA), 2004. US EPA Contract Laboratory Program National Functional Guidelines for Inorganic Data Review Final. EPA 540-R-04-004, October 2004.

hydrologic report_ final

May 2010

55

063-7109

U.S. Environmental Protection Agency (USEPA) Region IX, 2007. Drinking Water Standards and Health Advisories Table. June 2007. Vanderhurst, W., 1981. The Santa Clara Formation and Orogenesis of Monte Bello Ridge, 114 p. Wakabayashi, J., 1999. The Franciscan Complex, San Francisco Bay Area: a record of subduction complex processes, in Geologic field trips in northern California: California Division of Mines and Geology Special Publication, vol. 119, p 1-21.

hydrologic report_ final

TABLES

May 2010

063-7109-500.4

TABLE 4.3 Summary of Hydraulic Properties from Packer Testing


Top (ft bgs) 121.7 0.7 Bottom (ft bgs) Interval Length (ft) Lithology Test Interval Transmissivity (ft2/d) Transmissivity (ft2/d) Hydraulic Conductivity (ft/d) Hydraulic Conductivity (ft/d)

Point ID

HG-2 312.1 2.0

HG-3 7.6 9.4 103.8 834.7 0.08 1.1 29.8 0.09

32.6 15.6 1.6 71.9 128.1 3.4 180.6

HG-4

HG-5

HG-8 66 94 28 834.7

505.35 463.9 421.9 379.9 400 358.9 295.89 274 211.89 337.9 253.9 149 86 7.6 6.1 3.3 9.4 94.4 29.81

554 492.6 450.6 408.6 453 387.6 324.56 296.6 240.56 366.5 283.6 178 115

48.65 28.7 28.7 28.7 53 28.7 28.67 22.6 28.67 28.6 29.7 29 29

0.67 0.54 0.06 2.51 2.42 0.12 6.30 <0.2 0.27 0.21 0.11 0.33 3.26

HG-9

Limestone Limestone Limestone Graywacke Greenstone Greenstone Limestone Greenstone Greenstone Greenstone Greenstone Greenstone Greenstone Weathered Graywacke

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Tables\Tables - Section 4_021910.xlsx

May 2010

063-7109-500.4

TABLE 4.4 Summary of Hydraulic Properties from Constant-Rate Pumping Test


Point ID Radius from Center of Pumping Well (feet) 0.1 0.1 0.1 7.0 625 625 850 850 Transmissivity (feet2/day) 2392 2584 2224 1,847 2,074 2224 2,059 2224 Storativity (dimensionless) ------0.887 0.0010 0.0026 0.0028 0.0093 Hydraulic Conductivity* (feet/day) 6.0 6.5 5.6 4.6 5.2 5.6 5.1 5.6 Analytical Solution

HG-10S HG-10INT GT4-25A GT3-4


Note:

Cooper-Jacob Straight Line (Drawdown) Cooper-Jacob Straight Line (Recovery) Theis Partial Penetration (AQTESOLV) Cooper-Jacob Straight Line (Drawdown) Cooper-Jacob Straight Line (Drawdown) Theis Partial Penetration (AQTESOLV) Cooper-Jacob Straight Line (Drawdown) Theis Partial Penetration (AQTESOLV)

* Hydraulic conductivity based on aquifer thickness of 400 feet from AQTESOLV analysis

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Tables\Tables - Section 4_021910.xlsx

May 2010

063-7109-500.4

TABLE 4.5 Los Altos Hills Station (LSA)


Nov 3.98 2.26 0.76 9.15 3.83 2.28 1.14 0.41 2.43 2.92 Dec 1.04 0.32 0.28 6.7 9.84 6.33 6.96 4.48 2.27 4.25 Jan 4.56 6.84 5.17 1.24 0.55 2.29 4.88 3.65 1.12 3.37 Precipitation in INCHES Feb Mar 5.65 3.11 10.54 1.99 7 2.01 1.59 1.84 2.75 1.28 5.83 0.53 4 3.24 2.51 7.77 10.4 4.32 5.59 2.90 Apr 0.7 1.26 0.73 0.43 5.49 0.03 2 4.18 0.28 1.68 May 0.02 0.54 0 0.85 0.58 0.08 1.26 0.59 0.25 0.46 Jun 0.16 0.18 0 0 0 0 0.32 0 0.04 0.08 Jul 0 0 0 0 0 0 0 0.03 0 0.00 Aug 0 0.01 0 0 0 0 0 0 0.1 0.01 Sep 0.19 0.06 0.12 0 0 0 0.05 0 0.12 0.06 Annual 20.02 24.23 19.78 22.01 24.32 17.42 26.4 23.71 21.88 22.20

WY 1999 2000 2001 2002 2003 2004 2005 2006 2009 Average

Oct 0.61 0.23 3.71 0.21 0 0.05 2.55 0.09 0.55 0.89

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Tables\Tables - Section 4_021910.xlsx

May 2010

063-7109-500.4

TABLE 4.6 Water Year 2009 Annual Water Balance Summary


Drainage Area Precipitation Evapotranspiration Runoff Baseflow Total Streamflow* Annual Average Runoff Annual Average Baseflow Units sq ft inches inches inches inches inches cfs gpm cfs gpm cfs gpm Permanente Creek MS-1 MS-2 28,845,896 74,349,225 21.9 13.8 4.2 3.9 8.1 0.32 143 0.30 133 0.62 276 21.9 15.0 1.6 5.2 6.8 0.32 144 1.02 459 1.34 603 Monte Bello Creek MS-3 MS-4 18,243,154 29,957,284 21.9 8.5 11.6 1.8 13.4 0.56 251 0.08 38 0.64 289 21.9 13.1 7.0 1.8 8.8 0.55 247 0.14 64 0.69 312

Annual Average Total Streamflow Note: * Total streamflow is the sum of runoff and baseflow.

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Tables\Tables - Section 4_021910.xlsx

May 2010

063-7109-500.4

TABLE 4.7 North Quarry Water Balance 2009

North Quarry

Precipitation

February 120,782 2.8 39.2 24,632 0.6 8.0 78,143 1.8 13.1 99,301 2.3 17.2 109,417 2.5 18.3 109,702 2.5 19.0 68,139 1.6 11.4 5,640 0.1 5.9 18,151 0.4 5.0 18,077 0.4 4.7 531,201 12.2 13.0

March 97,727 2.2 16.4

April 6,815 0.2 1.2

May 6,085 0.1 1.0

June 894 0.0 0.2

July 0 0.0 0.0

August 0 0.0 0.0

September 215 0.0 0.1

October 33,867 0.8 8.8

Total 266,384 6.1 6.5

Evaporation

Surface Runoff

Groundwater Inflow 1,003 863 950 709 566 714 236

1,298 Notes: gpm is the average flow rate in gallons per minute.

Units cu ft acre-ft gpm (ave) cu ft acre-ft gpm (ave) cu ft acre-ft gpm (ave) cu ft acre-ft gpm (ave) 1,787,546 41.0 300 5,983,579 137.4 585 115,859 2.7 20 4,983,218 114.4 103,446 2.4 17 5,670,036 130.2 16,551 0.4 3 4,095,389 94.0 0 0.0 0 3,374,523 77.5 0 0.0 0 686,736 15.8 12,414 0.3 3 863,506 19.8 1,862,027 42.7 484 2,251,850 51.7 7,729,481 177.4 189 31,906,266 732.5 778

3,831,638 88.0 1,244 3,997,430 91.8

February includes 16 days data; August includes 5 days of data; September includes 19 days of data; and October includes 20 days of data.

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Tables\Tables - Section 4_021910.xlsx

TABLE 5.6 (pg 1 of 4) Summary of Inflows in North Quarry


Month 1/1/2023 2/1/2023 3/1/2023 4/1/2023 5/1/2023 6/1/2023 7/1/2023 8/1/2023 9/1/2023 10/1/2023 11/1/2023 12/1/2023 1/1/2024 2/1/2024 3/1/2024 4/1/2024 5/1/2024 6/1/2024 7/1/2024 8/1/2024 9/1/2024 10/1/2024 11/1/2024 12/1/2024 1/1/2025 2/1/2025 3/1/2025 4/1/2025 5/1/2025 6/1/2025 7/1/2025 8/1/2025 9/1/2025 10/1/2025 11/1/2025 12/1/2025 1/1/2026 2/1/2026 3/1/2026 4/1/2026 5/1/2026 6/1/2026 7/1/2026 8/1/2026 9/1/2026 10/1/2026 11/1/2026 12/1/2026 1/1/2027 2/1/2027 3/1/2027 4/1/2027 5/1/2027 6/1/2027 7/1/2027 Precipitation (gpm) 8 18 11 7 3 1 0 0 0 7 25 38 31 60 36 21 6 1 0 0 1 12 41 60 48 81 42 25 7 1 0 0 1 16 53 78 63 105 55 32 9 2 0 0 1 18 60 87 71 120 64 37 10 2 0 Surface Runoff (gpm) 5 8 4 2 1 0 0 0 0 1 4 6 4 7 4 2 1 0 0 0 0 1 4 5 4 7 4 2 1 0 0 0 0 1 4 5 4 7 3 2 1 0 0 0 0 1 3 5 4 7 3 2 1 0 0 Groundwater Inflow (gpm) 371 352 337 323 315 310 302 297 292 286 281 276 270 268 263 260 257 255 249 247 244 241 239 236 233 231 228 226 223 220 218 215 215 212 210 210 207 204 202 199 199 196 194 194 191 191 188 188 186 183 181 181 178 178 175 Total Pit Inflow (gpm) 384 378 351 333 319 311 302 297 292 295 310 319 306 335 302 283 264 256 249 247 245 255 283 301 286 318 274 252 230 221 218 215 216 229 266 292 274 316 260 233 209 198 194 194 192 210 252 281 261 310 248 219 189 180 175

TABLE 5.6 (pg 2 of 4) Summary of Inflows in North Quarry


Month 8/1/2027 9/1/2027 10/1/2027 11/1/2027 12/1/2027 1/1/2028 2/1/2028 3/1/2028 4/1/2028 5/1/2028 6/1/2028 7/1/2028 8/1/2028 9/1/2028 10/1/2028 11/1/2028 12/1/2028 1/1/2029 2/1/2029 3/1/2029 4/1/2029 5/1/2029 6/1/2029 7/1/2029 8/1/2029 9/1/2029 10/1/2029 11/1/2029 12/1/2029 1/1/2030 2/1/2030 3/1/2030 4/1/2030 5/1/2030 6/1/2030 7/1/2030 8/1/2030 9/1/2030 10/1/2030 11/1/2030 12/1/2030 1/1/2031 2/1/2031 3/1/2031 4/1/2031 5/1/2031 6/1/2031 7/1/2031 8/1/2031 9/1/2031 10/1/2031 11/1/2031 12/1/2031 1/1/2032 2/1/2032 Precipitation (gpm) 0 1 20 67 97 78 130 68 41 11 2 0 0 2 23 76 112 89 149 78 45 13 2 0 0 2 25 81 120 95 159 83 50 14 2 0 0 2 28 90 134 106 179 93 55 15 3 0 0 2 29 97 143 113 188 Surface Runoff (gpm) 0 0 1 3 5 4 6 3 2 1 0 0 0 0 1 3 5 4 6 3 2 1 0 0 0 0 1 3 5 4 6 3 2 1 0 0 0 0 1 3 5 4 6 3 2 0 0 0 0 0 1 3 4 4 6 Groundwater Inflow (gpm) 175 173 173 170 170 167 167 165 162 162 162 159 159 159 157 157 154 154 151 151 149 149 146 146 146 146 143 143 141 141 138 138 136 136 136 136 133 133 133 133 130 130 128 128 125 125 125 125 122 122 122 122 120 120 120 Total Pit Inflow (gpm) 176 174 194 240 272 249 303 236 205 174 164 159 160 161 181 236 271 247 307 232 196 162 148 146 146 148 169 228 265 239 304 224 187 150 138 136 133 135 161 226 269 240 313 224 181 141 128 125 123 124 153 222 267 236 313

TABLE 5.6 (pg 3 of 4) Summary of Inflows in North Quarry


Month 3/1/2032 4/1/2032 5/1/2032 6/1/2032 7/1/2032 8/1/2032 9/1/2032 10/1/2032 11/1/2032 12/1/2032 1/1/2033 2/1/2033 3/1/2033 4/1/2033 5/1/2033 6/1/2033 7/1/2033 8/1/2033 9/1/2033 10/1/2033 11/1/2033 12/1/2033 1/1/2034 2/1/2034 3/1/2034 4/1/2034 5/1/2034 6/1/2034 7/1/2034 8/1/2034 9/1/2034 10/1/2034 11/1/2034 12/1/2034 1/1/2035 2/1/2035 3/1/2035 4/1/2035 5/1/2035 6/1/2035 7/1/2035 8/1/2035 9/1/2035 10/1/2035 11/1/2035 12/1/2035 1/1/2036 2/1/2036 3/1/2036 4/1/2036 5/1/2036 6/1/2036 7/1/2036 8/1/2036 9/1/2036 Precipitation (gpm) 99 57 16 3 0 0 2 31 103 150 119 205 107 64 18 3 0 0 2 35 114 166 134 223 116 68 19 3 0 0 2 37 120 175 139 234 121 70 20 3 0 1 3 38 124 184 146 242 128 74 20 3 0 1 3 Surface Runoff (gpm) 3 2 0 0 0 0 0 1 3 4 3 6 3 2 0 0 0 0 0 1 3 4 3 6 3 2 0 0 0 0 0 1 3 4 3 5 3 2 0 0 0 0 0 1 3 4 3 5 3 2 0 0 0 0 0 Groundwater Inflow (gpm) 117 117 114 114 114 114 114 112 112 112 112 109 109 106 106 106 106 106 104 104 104 104 101 101 101 99 99 99 99 99 99 96 96 96 96 93 93 93 91 91 91 91 91 91 91 88 88 88 85 85 85 85 83 83 83 Total Pit Inflow (gpm) 219 176 131 117 115 115 117 144 218 266 234 320 219 172 125 110 107 107 106 139 220 274 239 329 220 168 118 102 99 99 101 133 219 275 238 332 217 165 111 94 91 91 93 129 217 276 237 335 216 161 106 89 83 83 85

TABLE 5.6 (pg 4 of 4) Summary of Inflows in North Quarry


Month 10/1/2036 11/1/2036 12/1/2036 1/1/2037 2/1/2037 3/1/2037 4/1/2037 5/1/2037 6/1/2037 7/1/2037 8/1/2037 9/1/2037 10/1/2037 11/1/2037 12/1/2037 1/1/2038 2/1/2038 3/1/2038 4/1/2038 5/1/2038 6/1/2038 7/1/2038 8/1/2038 9/1/2038 10/1/2038 11/1/2038 12/1/2038 1/1/2039 2/1/2039 3/1/2039 4/1/2039 5/1/2039 6/1/2039 7/1/2039 8/1/2039 9/1/2039 Precipitation (gpm) 40 133 193 158 263 136 79 22 4 0 1 3 42 137 200 158 263 136 79 22 4 0 1 3 42 137 200 158 263 136 79 22 4 0 1 3 Surface Runoff (gpm) 1 3 4 3 5 3 2 0 0 0 0 0 1 3 4 3 5 3 2 0 0 0 0 0 1 3 4 3 5 3 2 0 0 0 0 0 Groundwater Inflow (gpm) 83 83 83 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 Total Pit Inflow (gpm) 124 218 280 241 348 219 160 102 84 80 81 83 123 220 284 241 348 219 160 102 84 80 81 83 123 220 284 241 348 219 160 102 84 80 81 83 169 gpm

Annual Average Total Steady-State Inflow to North Quarry:

TABLE 5.7 (pg 1 of 2) Summary of Inflows in South Quarry


Month 1/1/2035 2/1/2035 3/1/2035 4/1/2035 5/1/2035 6/1/2035 7/1/2035 8/1/2035 9/1/2035 10/1/2035 11/1/2035 12/1/2035 1/1/2036 2/1/2036 3/1/2036 4/1/2036 5/1/2036 6/1/2036 7/1/2036 8/1/2036 9/1/2036 10/1/2036 11/1/2036 12/1/2036 1/1/2037 2/1/2037 3/1/2037 4/1/2037 5/1/2037 6/1/2037 7/1/2037 8/1/2037 9/1/2037 10/1/2037 11/1/2037 12/1/2037 1/1/2038 2/1/2038 3/1/2038 4/1/2038 5/1/2038 6/1/2038 7/1/2038 8/1/2038 9/1/2038 10/1/2038 11/1/2038 12/1/2038 1/1/2039 2/1/2039 3/1/2039 4/1/2039 5/1/2039 6/1/2039 7/1/2039 8/1/2039 9/1/2039 10/1/2039 11/1/2039 12/1/2039 1/1/2040 2/1/2040 3/1/2040 4/1/2040 5/1/2040 6/1/2040 Precipitation (gpm) 3 7 5 3 1 0 0 0 0 3 11 17 14 24 13 8 2 0 0 0 0 5 17 25 20 34 18 11 3 1 0 0 0 6 19 28 22 38 20 12 3 1 0 0 0 6 21 30 24 41 21 12 4 1 0 0 0 7 22 32 25 42 22 13 4 1 Surface Runoff (gpm) 5 8 4 2 1 0 0 0 0 1 3 5 4 6 3 2 1 0 0 0 0 1 3 4 3 5 3 2 0 0 0 0 0 1 3 4 3 5 3 1 0 0 0 0 0 1 3 4 3 5 2 1 0 0 0 0 0 1 2 3 3 5 2 1 0 0 Groundwater Inflow (gpm) 90 79 72 67 63 58 56 53 51 49 49 47 44 42 40 37 37 35 35 35 33 33 33 31 31 28 28 26 26 24 24 24 24 24 21 21 21 19 19 17 17 17 17 17 17 15 15 15 15 12 12 12 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Total Pit Inflow (gpm) 98 94 81 73 64 58 56 53 51 53 64 69 62 73 56 47 40 36 35 35 33 39 52 60 54 68 49 38 29 24 24 24 24 30 43 53 47 62 41 30 20 17 17 17 17 22 38 49 42 58 36 26 14 11 10 10 11 17 34 46 38 57 34 24 14 11

TABLE 5.7 (pg 2 of 2) Summary of Inflows in South Quarry


Month 7/1/2040 8/1/2040 9/1/2040 10/1/2040 11/1/2040 12/1/2040 1/1/2041 2/1/2041 3/1/2041 4/1/2041 5/1/2041 6/1/2041 7/1/2041 8/1/2041 9/1/2041 10/1/2041 11/1/2041 12/1/2041 1/1/2042 2/1/2042 3/1/2042 4/1/2042 5/1/2042 6/1/2042 7/1/2042 8/1/2042 9/1/2042 Precipitation (gpm) 0 0 0 7 22 32 25 42 22 13 4 1 0 0 0 7 22 32 25 42 22 13 4 1 0 0 0 Surface Runoff (gpm) 0 0 0 1 2 3 3 5 2 1 0 0 0 0 0 1 2 3 3 5 2 1 0 0 0 0 0 Groundwater Inflow (gpm) 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Total Pit Inflow (gpm) 10 10 11 17 34 46 38 57 34 24 14 11 10 10 11 17 34 46 38 57 34 24 14 11 10 10 11 26 gpm

Annual Average Total Steady-State Inflow to South Quarry:

May 2010

063-7109.500

TABLE 6.1 Groundwater Wells Completion Details and Sulfide Occurrence

Well
1,857 1,822 1,254 1,245 1,585 89 - 109 134 - 154 1,136 1,156 1,431 - 1,451 Weathered Graywacke Limestone 1,140 1,495 116 - 136 116 - 136 1,174 275 - 295 253 - 273 1,562 - 1,582 1,549 1,569 Greenstone Greenstone Greenstone /Graywacke 1,600 not noted on log

Ground Elevation (ft amsl) Screen Interval Geologic Unit


scattered pyrite (50 - 80 ft bgs) not noted on log not noted on log

Screen Interval (ft bgs)

Screen Interval (ft amsl)

Groundwater Elevation (ft amsl)

Sulfide Occurrence

HG-4 HG-6

HG-7

HG-9 HG-10S

(some) scattered pyrite (20 to 200 ft bgs) not noted on log

Geochem Tables

May 2010

063-7109.500

TABLE 6.2 Permanente Creek Stormwater Monitoring Locations

Station Name
SL-BG-CR SL-1-CR SL-4-CR SL-5-CR SL-5A-CR SL-11-CR Upstream of Ore Feeder and the Primary Crusher Downstream of Ponds 4A & 4B Inlet to Pond 13 Background - Upstream Permanente Creek Adjacent to West Material Stockpile Area (WMSA) Downstream of WMSA before concrete footing

Description

Geochem Tables

May2010 0637109.500

TABLE 6.3 Overburden (Waste Rock) and Ore Composite Samples

Sample ID

Sample Number

Boring Number

Approximate Sample Depth (feet)

General Rock Type

Composite 5

Metabasalt

4-20A-08-49 4-23B-08-322 GT1-4-08-80 4-20A-08-343 4-20A-08-348 4-24A-08-76

4-20A-08 4-23B-08 GT1-4-08 4-20A-08 4-20A-08 4-24A-08

49 322 80 343 348 76

Metabasalt Metabasalt Metabasalt Metabasalt Metabasalt Metabasalt

Composite 3

Fault Breccia

GT1-2-08-224 4-20A-08-345 4-28A-08-115

GT1-2-08 4-20A-08 4-28A-08

224 345 115

Undifferentiated Fault Breccia Undifferentiated Fault Breccia Undifferentiated Fault Breccia

Composite 4

Greenstone

4-27A-08-153 4-24A-08-74 4-20A-08-429

4-27A-08 4-24A-08 4-20A-08

153 74 429

Greenstone Greenstone Greenstone

Composite 1

Graywacke

4-23B-08-245 4-20A-08-94

4-23B-08 4-20A-08

245 94

Graywacke Graywacke

Composite 2

Limestone and Dolomitic Limestone

4-20A-08-437 4-27B-08-420 4-34A-08-153 GT3-4-08-353 GT1-2-08-213

4-20A-08 4-27B-08 4-34A-08 GT3-4-08 GT1-2-08

437 420 153 353 213

Limestone Limestone Limestone Limestone Chert

GT1-2-08-213

Chert

Source: Geocon Consultants, Inc.

May 2010

063-7109.500

TABLE 6.4 Summary of Geochemical Analyses

Analysis

Method

Analytes

Acid Base Accounting

Static Leach Test

Elemental Analysis

paste pH sulfur speciation - total, sulfate, pyritic and non-extractable EPA 600/2-78-054 neutralization potential (NP) metals - Sb, As, Ba, Be, Cd, Cr, Co, Cu, Pb, Hg, Mn, Mo, Ni, Se, Ag, Tl, V, Zn major ions - Ca, Mg, K, Na, Cl, SO 4 pH Modified WET alkalinity electrical conductivity Test (STLC) Total Concentrations (TTLC) metals - Sb, As, Ba, Be, Cd, Cr, Co, Cu, Pb, Hg, Mo, Ni, Se, Ag, Tl, V, Zn

G:\Projects\063-7109 (Permanente Quarry)\hydrogeology\Report\Tables\ Geochem Tables

May 2010

063-7109.500

TABLE 6.5 Wall Washing Sampling Locations

Sample ID Lithology
> 5 years < 1 month fresh face 3.0 5.0 < 1 month fresh face 2 months south wall, bench 900 4.1 southwest corner of bench 900 southwest corner of bench 900 1.5 1.5 access road by office 3.5 1.7

Approximate Exposure Time Age of Face Location

Water Applied (L)

Water Collected (L)

Sample Area (m2)


0.69 0.79 0.80

GW-01

CT-01

GS-01

MG-01

1.5

0.77

HG-01

> 5 years

east wall, bench 850

3.5

1.5

0.76

HMG-01 -

1 year

south Wall, bench 950 -

3.7 -

1.5 -

0.69 -

FB-01

GRAYWACKE - light brown, highly weathered, fine-grained, no sulfides visible CHERT - reddish brown, some greenstone present, gouge zone, no sulfides visible GREENSTONE - dark greenish gray, very soft, slickenslides evident, gouge zone, no sulfides visible LIMESTONE - medium to high grade, light to dark gray, some oxidation present, no sulfides visible LIMESTONE - high grade, dark gray, interlayered with chert (gray), no sulfides visible, no evidence of oxidation LIMESTONE - light to dark gray, mixture of high and medium/low grade, oxidation present and silt/dust covering Equipment blank collected in field of spray bottle

G:\Projects\063-7109 (Permanente Quarry)\hydrogeology\Report\Tables\Geochem Tables

May2010 0637109.500

TABLE 6.6 Groundwater and Surface Water Quality Data Summary - Select Parameters

Average Concentrations Water Type TDS (mg/L)


1,220 470 537 470 370 1,110 903 353 23 <0.1 468 1.2 2.6 <0.7 578 3.6 0.7 0.9 3 0.6 13 30 36 30 <0.1 <0.1 0.9 <0.1 1 3 1 <0.5 45 323 7 43 605 <0.1 6 85 38 3 1 3 11 4 441 10

(a)

Monitor Location SO4 As (D) (g/L) (g/L) (g/L) Mn (D) Mo (D) (mg/L) (mg/L-N) NO3 Fall 2009
Na-SO4-HCO3 8.0 - 8.6 7.9 - 8.0 7.3 - 7.4 7.4 - 8.0 7.5 - 8.5 7.1 - 8.1 7.5 - 8.3 8.2 - 8.4 Mg-Ca-HCO3 Mg-Ca-HCO3 Ca-Mg-HCO3 Ca-Mg-HCO3 Ca-Mg-SO4 Ca-Mg-SO4-HCO3 Ca-Mg-HCO3

No. of Sampling Events pH (s.u.)


9 1 3 2 6 3 63 1

Ni (D) (g/L)

Se (D) (g/L)
1.4 <0.4 <0.4 0.6 1.6 7 62 0.4

Groundwater

HG-4

HG-6 HG-7 HG-9 HG-10S

4 3 4 2

Surface Water

SW-1

SW-2

SW-3

(a)

Average concentrations presented. Non-detect concentrations assumed equal to the detection limit in calculation of average.

(D) - dissolved phase

May 2010

063-7109.500

TABLE 6.7 Summary of Selected PER070 Water Quality Results


TDS (mg/L)
720 724 850

Date
Jun-02 Apr-02 Jan-03

Season
Dry Spring Wet

pH (s.u.)
8.2 8.3 7.5

SO4 (mg/L)
336 326 379

NO3 (mg/L-N)
1.5 2.1

Se (D) (g/L)
5.8 5.1 18.8

Ni (D) (g/L)
1.6 7.9 30.9

Source: SFBRWQCB, 2007

[File]

May2010 0637109.500
TABLE 6.8 Acid Base Accounting Results

CS-01

Composite # 1

Composite # 2

Sample Identification GT1-2-08-213 Composite # 3 Composite # 4

Composite # 5

Parameter
s.u. wt. % wt. % wt. % wt. % kg CaCO3/t kg CaCO3/t kg CaCO3/t 7.34 0.01 23 <0.3 23 >77 8.00 0.32 0.08 0.12 0.12 62 3.8 58 17 8.39 0.18 <0.01 0.10 0.13 644 3.1 641 206 8.17 0.51 0.35 0.07 0.07 94 2.2 92 43 8.14 1.41 0.07 0.92 0.42 112 29 83 4 8.63 0.02 0.01 <0.01 0.01 205 <0.3 205 >656

Unit

Overburden Soil Graywacke Chert Fault Breccia Greenstone

Limestone and Dolomitic Limestone

Metabasalt
8.55 0.12 0.01 <0.01 0.17 867 <0.3 867 >2,774

Paste pH Sulfur - Total Sulfur - Sulfate Sulfur - Sulfide Sulfur - Non-Extractable Neutralization Potential (NP) Acid Potential (AP) NNP (NP - AP) NPR (NP/AP)

G:\Projects\063-7109 (Permanente Quarry)\hydrogeology\Report\Tables\ Geochem Tables

May 2010

063-7109.500

TABLE 6.9 Overburden (Waste Rock) and Ore Composite Samples - Drill Log Descriptions

Sample ID Drill Log Description

Sample Number

Boring Number

Approximate Sample Depth (Feet) General Rock Type Total S Sulfide S (%) (%)
49 Metabasalt
METABASALT: 35.6-55.0 feet; medium dark gray to dark gray to greenish gray; very fine-grained; scattered layers of greenstone up to 0.5 feet thick, abundant milky quartz veins with some calcite; core is highly fractured; some poorly-developed slickensides.

4-20A-08-49

4-20A-08

4-23B-08-322 Metabasalt

4-23B-08

322

METABASALT: 257.5-384.0 feet; medium dark gray to dark gray to greenish gray; bands of greenstone to 1.0 feet thick; bands of vesicular metabasalt with milky calcite-filled vesicles up to 2.0 feet thick; abundant milky calcite; scattered pyrite; some poorly-developed slickensides; scattered bands of brownish gray limestone to 0.3 feet thick; bands of soft fault gouge up to 3.0 feet thick; some heavily sheared bands up to 3.0 feet thick; a few scattered bands of iron-rich metabasalt to 0.4 feet thick.

Composite 5 GT1-4-08-80 Metabasalt GT1-4-08 80

Metabasalt

METABASALT: 71.2-127.4 feet; medium dark gray to dark gray with thin bands of grayish green greenstone; very fine-grained; abundant calcite veins and calcite filled vugs (vesicles?); numerous zones of fault breccia up to 1.0 foot thick - fault breccia consists of soft, clayey, very fine-grained fault gouge with clasts of metabasalt and some greenstone up to 2.0 inches across; some white to light gray chert.

0.12

<0.01

4-20A-08-343 Metabasalt Metabasalt Metabasalt 4-20A-08-348 4-24A-08-76 4-24A-08 76 4-20A-08 348

4-20A-08

343

FAULT BRECCIA: 325.4-345.6 feet; brownish gray to reddish brown to greenish gray; generally matrix supported with clasts up to 2.0 feet of hematite-rich metabasalt and greenstone; some well-developed slickensides; numerous milky calcite veins; some pyrite. METABASALT: 345.6-354.4 feet; medium dark gray to dark gray; highly sheared; thin bands of fault gouge up to 0.3 feet thick; some sheared greenstone. METABASALT: 75.1-88.6 feet; medium dark gray to pale reddish brown; reddish brown intervals are hematite-rich metabasalt; abundant milky calcite veins; thin (up to 4 inches) bands of fault gouge; some slickensides, trace pyrite.

GT1-2-08-224 4-20A-08-345 4-20A-08 345

GT1-2-08

224

Undifferentiated Fault FAULT BRECCIA: 221.4-225.8 feet; dark gray with grayish yellow greenstone. Breccia
FAULT BRECCIA: 325.4-345.6 feet; brownish gray to reddish brown to greenish gray; generally matrix

Composite 3 4-28A-08-115 4-28A-08 115

Fault Breccia

Undifferentiated Fault supported with clasts up to 2.0 feet of hematite-rich metabasalt and greenstone; some well-developed Breccia slickensides; numerous milky calcite veins; some pyrite.

1.41

0.92

Undifferentiated Fault composed of soft, clayey, very fine-grained fault gouge with clasts up to 1.0 inches across of metabasalt, Breccia greenstone, and some greywacke.

FAULT BRECCIA: 101.0-136.8 feet; medium gray to medium dark gray; matrix supported, matrix

4-27A-08-153 Greenstone

4-27A-08

153

Composite 4 4-24A-08-74 Greenstone 4-24A-08 74

Greenstone

0.02

<0.01

4-20A-08-429 Greenstone

4-20A-08

429

FAULT BRECCIA: 146.2-199.0 feet; medium dark gray to dark gray; matrix supported, matrix composed of soft, clayey fault gouge, clasts up to 1.0 inches across of metabasalt, some hematite-rich metabasalt, and some greenstone; some clasts of milky calcite. FAULT BRECCIA: 30.0-75.1 feet; dark yellowish orange to pale yellowish brown to medium gray to moderate greenish yellow; matrix supported, matrix composed of soft, clayey fault gouge with clasts up to 4 inches across of metabasalt, greywacke and greenstone with greenstone dominate from 73.4-75.1 feet; some very scattered milky calcite veins; some poorly- to well-developed slickensides; trace amounts of pyrite. GREENSTONE: 414.0-433.6 feet; greenish gray; highly fractured; numerous milky calcite veins; highly fractured; bands of fault gouge up to 1.0 feet thick; well-developed slickensides; some pyrite; highly fractured.

4-23B-08-245 Graywacke

4-23B-08

245

GRAYWACKE: 216.3-250.8 feet; medium gray to medium dark gray; very fine-grained; greenstone and metabasalt rock fragments to 2.0 mm; scattered pyrite; some milky calcite; a few bands of brownish gray limestone to 1.0 feet thick; a few poorly developed slickensides; core broken below 244.0 feet.

Composite 1 4-20A-08-94 4-20A-08 94

Graywacke Graywacke

GRAYWACKE: 79.0-104.0 feet; medium dark gray to dark gray with thin bands of greenish gray greenstone to 0.4 feet thick; numerous well developed slickensides coated with graphite; some milky calcite with minor quartz veining; highly fractured and sheared; core very broken; many fractures coated with moderate yellowish brown clay.

0.32

0.12

4-20A-08-437

4-20A-08

437

Limestone

LIMESTONE: 433.6-443.2 feet; medium gray; micritic; some forams and microfossils; scattered black chert, chert content estimated at 1-3%; calcite veins, a few slickensides.

4-27B-08-420

4-27B-08

420

Limestone

Composite 2

Limestone and Dolomitic Limestone 4-34A-08-153 GT3-4-08-353 Chert GT1-2-08-213 4-34A-08 GT3-4-08 GT1-2-08

LIMESTONE: 406.1-466.9 feet; light gray to medium gray; micritic; numerous stylolites; numerous thin bands of black limestone; a few forams and other microfossils; no visible pyrite; very scattered milky calcite; scattered black chert nodules, chert content estimated at 3-5%; a few thin (<6 inches) bands of fault gouge; a few brecciated bands; strong reaction to 10% HCl.

0.18

0.10

153 353 213

Limestone Limestone Chert

LIMESTONE: 153.7-174.2 feet; light gray; micritic; very abundant stylolites; some forams; no visible pyrite; bands of soft, clayey fault gouge to 0.3 feet thick; some thin fractures lined with light gray clay; some milky calcite veining; some dark gray to black chert nodules, chert content estimated at 5-8%; strong reaction to 10% HCl. LIMESTONE: 340.1-355.9 feet; brecciated and broken. CHERT: 212.8-221.4 feet; white, brecciated; some dolomitic limestone and medium gray chert clasts.

GT1-2-08-213

0.51

0.07

May2010

0637109.500

TABLE 6.10 Geologic Logs - Summary of Pyrite Occurrence

Log
GEO 2-1A-08 GEO 2-4A-07 GEO 2-4AA-07 GEO 2-6A-07 GEO 2-6B-07 GEO 2-10A-08 GEO 4-16A-08 GEO 4-18A-08

Pyrite Occurrence in Log Notes


None None None None None None LIMESTONE (256.0-361.7 feet) - scattered pyrite in fractures LIMESTONE (457.0 - 494.2 feet) - very scattered pyrite None METABASALT (281.6 - 303.0 feet) - some scattered pyrite FAULT BRECCIA (303.0 - 325.4 feet) - some scattered pyrite FAULT BRECCIA (325.4 - 345.6 feet) - some pyrite METABASALT (364.0 - 376.0 feet) - some pyrite GREENSTONE (414.0 - 433.6) - some pyrite GREENSTONE (142.9 - 198.2 feet) - scattered pyrite FAULT BRECCIA (50.0-105.5 feet) - scattered pyrite METABASALT (105.5-116.2 feet) - scattered pyrite FAULT BRECCIA (116.2-163.9 feet) - scattered pyrite METABASALT (163.9-184.5 feet) - scattered pyrite FAULT BRECCIA (184.5-198.4 feet) - scattered pyrite METABASALT (198.4-238.4) - scattered pyrite FAULT BRECCIA (238.4-263.7 feet) - scattered pyrite METABASALT (263.7-285.6 feet) - scattered pyrite FAULT BRECCIA (296.4-317.5 feet) - scattered pyrite METABASALT (317.5-323.4 feet) - scattered pyrite METABASALT (330.1-342.2 feet) - scattered pyrite METABASALT (353.5-384.5 feet) - scattered pyrite FAULT BRECCIA (384.5-393.4 feet) - scattered pyrite METABASALT (393.4-479.3 feet) - scattered pyrite FAULT BRECCIA (479.3-496.0) - scattered pyrite FAULT BRECCIA (77.0-119.0 feet) - scattered pyrite GRAYWACKE (119.0-140.0 feet) - scattered pyrite FAULT BRECCIA (140.0-146.8 feet) - scattered pyrite GREENSTONE ( 146.8-216.3 feet) - scattered pyrite GRAYWACKE (216.3-250.8 feet) - scattered pyrite METABASALT (257.5-384.0 feet) - scattered pyrite FAULT BRECCIA (384.0-392.1 feet) - scattered pyrite GRAYWACKE (392.1-432.2 feet) - scattered pyrite GRAYWACKE (440.3-499.0 feet) - scattered pyrite. FAULT BRECCIA (30.0-75.1) - trace amounts of pyrite METABASALT (75.1-88.6 feet) - trace pyrite FAULT BRECCIA (92.3-115.3 feet) - scattered pyrite METABASALT (115.3-137.4 feet) - some pyrite FAULT BRECCIA (137.4-151.7 feet) - scattered pyrite METABASALT (151.7-172.9 feet) - some scattered pyrite FAULT BRECCIA (172.9-197.2 feet) - scattered pyrite cubes to 5 mm across METABASALT (197.2-304.0 feet) - scattered pyrite METABASALT (312.0-320.2 feet) - scattered milky calcite veining and pyrite FAULT BRECCIA (320.0-362.2 feet) - scattered pyrite METABASALT (362.2-397.9 feet) - scattered pyrite FAULT BRECCIA (397.9-406.6 feet) - scattered pyrite FAULT BRECCIA (412.8-468.1 feet) - scattered pyrite FAULT BRECCIA (468.1-481.7 feet) - scattered pyrite GREENSTONE (486.7-500.2 feet) - scattered pyrite.

GEO 4-20A-08 GEO 4-22A-08

GEO 4-23A-08

GEO 4-23B-08

GEO 4-24A-08

February2010

0637109.500

GEO 4-26A-08 GEO 4-27A-08

GEO 4-27B-08 GEO 4-28A-08

GEO 4-31A-08

GEO 4-31B-08

GEO 4-34A-08

GEO 4-35A-08

GEO 4-38A-08

FAULT BRECCIA (148.3-177.8 feet) - some pyrite GREENSTONE (177.8-186.8 feet) - some pyrite FAULT BRECCIA (186.8-214.4 feet) - some pyrite METABASALT (214.4-269.0 feet) - some pyrite FAULT BRECCIA (269.0-288.2 feet) - scattered pyrite FAULT BRECCIA (288.2-308.7 feet) - scattered pyrite FAULT BRECCIA (315.3-340.4 feet) - scattered pyrite METABASALT (340.4-352.3 feet) - scattered pyrite METABASALT (360.7-387.0 feet) - scattered pyrite METABASALT (393.2-418.8 feet) - scattered pyrite METABASALT (418.8-434.1 feet) - some pyrite GREENSTONE (434.1-459.8 feet) - scattered pyrite GREENSTONE (459.8-468.6 feet) - some pyrite FAULT BRECCIA (680.1-698.0 feet) - framboidal pyrite at limestone/fault breccia contact, scattered pyrite elsewhere. METABASALT: 232.8-248.0 feet - trace pyrite FAULT BRECCIA: 248.0-308.9 feet - scattered pyrite FAULT BRECCIA: 84.0-155.3 feet - scattered pyrite METABASALT: 167.4-191.6 feet - scattered pyrite GRAYWACKE: 195.0-230.0 feet - scattered pyrite FAULT BRECCIA: 230.0-261.5 feet - scattered pyrite METABASALT: 261.5-306.5 feet - scattered pyrite METABASALT: 316.0-329.6 feet - scattered pyrite FAULT BRECCIA: 349.8-368.0 feet - scattered pyrite METABASALT: 368.0-406.1 - scattered pyrite METABASALT: 281.3-289.8 feet - some pyrite cubes to 1/4 inch GREENSTONE: 20.0-159.0 feet - scattered FAULT BRECCIA: 159.0-175.0 feet - scattered GREENSTONE: 175.0-199.6 feet - scattered FAULT BRECCIA: 199.6-246.7 feet - scattered GREENSTONE: 256.2-268.0 feet - scattered FAULT BRECCIA: 558.0-593.5 feet - some scattered METABASALT: 36.0-120.0 feet - scattered pyrite FAULT BRECCIA: 120.0-174.4 feet - scattered pyrite GREENSTONE: 174.4-183.1 feet - scattered pyrite FAULT BRECCIA: 183.1-222.0 feet - scattered pyrite GREENSTONE: 222.0-266.4 feet - scattered pyrite FAULT BRECCIA: 266.4-284.2 feet - scattered pyrite GREENSTONE: 284.2-293.1 feet - scattered pyrite FAULT BRECCIA: 293.1-338.6 feet - scattered pyrite GREENSTONE: 338.6-350.0 feet - scattered pyrite WEATHERED FAULT BRECCIA: 14.0-39.4 feet - some oxidized pyrite FAULT BRECCIA: 80.0-111.0 feet - scattered pyrite METABASALT: 111.0-133.4 feet - some scattered pyrite FAULT BRECCIA: 133.4-153.7 feet - scattered pyrite WEATHERED METABASALT: 19.0-62.0 feet - scattered pyrite and oxidized pyrite FAULT BRECCIA: 62.0-172.2 feet - scattered pyrite GREENSTONE: 172.2-247.0 feet - scattered pyrite METABASALT: 247.0-286.6 feet - scattered pyrite FAULT BRECCIA: 286.6-463.0 feet - scattered pyrite FAULT BRECCIA: 40.0-119.8 feet - scattered pyrite GRAYWACKE: 119.8-224.0 feet - scattered pyrite FAULT BRECCIA: 224.0-241.5 feet - scattered pyrite GRAYWACKE: 241.5-338.5 feet - scattered pyrite GRAYWACKE: 343.8-444.7 feet - scattered pyrite GRAYWACKE: 456.0-535.3 feet - scattered pyrite FAULT BRECCIA: 535.3-543.8 feet - scattered pyrite GRAYWACKE: 543.8-581.0 feet - scattered pyrite FAULT BRECCIA: 581.0-651.0 feet - some scattered pyrite

February2010
GRAYWACKE: 80.0-91.0 feet - scattered pyrite METABASALT: 155.7-186.5 feet - scattered pyrite FAULT BRECCIA: 186.5-210.9 feet - scattered pyrite GRAYWACKE: 210.9-394.4 feet - scattered pyrite METABASALT: 394.4-424.0 feet - scattered pyrite FAULT BRECCIA: 424.0-440.6 feet - scattered pyrite GRAYWACKE: 440.6-554.4 feet - scattered pyrite FAULT BRECCIA: 554.4-619.0 feet - scattered pyrite None FAULT BRECCIA: 50.0-86.0 feet - scattered pyrite FAULT BRECCIA: 534.8-572.0 feet - scattered pyrite None None None None FAULT BRECCIA: 112.5-123.0 feet - scattered pyrite GRAYWACKE: 129.0-146.8 feet - some scattered pyrite FAULT BRECCIA: 146.8-207.0 feet - scattered pyrite METABASALT: 223.6-235.6 feet - scattered pyrite FAULT BRECCIA: 235.6-269.0 feet - scattered pyrite FAULT BRECCIA: 273.3-348.5 feet - scattered pyrite None None None DOLOMITIC LIMESTONE: 357.6-367.8 feet - scattered METABASALT: 375.4-427.0 feet some pyrite filled fractures GRAYWACKE: 435.4-449.0 feet - abundant pyrite GRAYWACKE: 456.0-463.0 feet - pyrite GREENSTONE: 520.8-527.2 feet - some pyrite LIMESTONE: 534.0-549.0 feet - some scattered pyrite None None GRAYWACKE: 300.9-310.6 feet - pyrite None FAULT BRECCIA: 128.5-166.3 feet - scattered pyrite METABASALT: 166.3-217.6 feet - scattered pyrite FAULT BRECCIA: 217.6-252.7 feet - scattered pyrite METABASALT: 252.7-276.4 feet - scattered pyrite FAULT BRECCIA: 276.4-293.0 feet - scattered pyrite METABASALT: 293.0-356.4 feet - scattered pyrite FAULT BRECCIA: 356.4-374.4 feet - scattered pyrite METABASALT: 374.4-421.4 feet - scattered pyrite METABASALT: 425.9-441.4 feet - scattered pyrite METABASALT: 457.7-498.0 feet - scattered pyrite WEATHERED GREENSTONE: 116.3-144.5 feet - scattered pyrite WEATHERED GREENSTONE: 151.0-190.4 feet - scattered pyrite GREENSTONE: 195.2-221.4 feet - scattered pyrite FAULT BRECCIA: 221.4-247.6 feet - scattered pyrite FAULT BRECCIA: 247.6-304.5 feet - scattered pyrite GREENSTONE: 304.5-320.5 feet - scattered pyrite FAULT BRECCIA: 320.5-374.5 feet - scattered pyrite GREENSTONE: 374.5-383.9 feet - scattered pyrite METABASALT: 395.8-426.9 feet - scattered pyrite METABASALT: 429.4-500.0 feet - scattered pyrite METABASALT: 198.7-286.0 feet - scattered pyrite FAULT BRECCIA: 286.0-363.0 feet- some scattered pyrite METABASALT: 363.0-384.8 feet - scattered pyrite FAULT BRECCIA: 384.8-401.8 feet - scattered pyrite LIMESTONE: 401.8-454.4 feet - some scattered pyrite LIMESTONE: 569.4-593.0 feet - scattered pyrite DOLOMITIC LIMESTONE: 598.7-622.0 feet - scattered pyrite FAULT BRECCIA: 622.0-640.0 feet - scattered pyrite METABASALT: 673.2-713.0 feet - scattered pyrite

0637109.500

GEO 4-38B-08 GEO 4-40A-08 GEO 4-41B-08 GT 1-1-08 GT 1-2-08 GT 1-3-08 GT 1-4-08

GT 2-1A-08 GT 2-7-07 GT 3-2A-08 GT 3-3A-08

GT 3-3B-08 GT 3-4-08 GT 3-4A-08 GT 4-25A-08 GT 4-25B-08

GT 4-29A-08

GT 4-29B-08

GT 4-30A-08

February2010

0637109.500
FAULT BRECCIA: 128.3-174.9 feet - some scattered pyrite FAULT BRECCIA: 174.9-186.5 feet - scattered pyrite FAULT BRECCIA: 186.5-223.0 feet - scattered pyrite FAULT BRECCIA: 228.5-299.4 feet - scattered pyrite METABASALT: 299.4-337.7 feet - scattered pyrite FAULT BRECCIA: 337.5-363.0 feet - scattered pyrite METABASALT: 363.0-461.8 feet - scattered pyrite FAULT BRECCIA: 461.8-487.0 feet - scattered pyrite FAULT BRECCIA: 487.0-526.6 feet - scattered pyrite FAULT BRECCIA: 530.9-569.5 feet - scattered pyrite METABASALT: 569.5-584.6 feet - scattered pyrite FAULT BRECCIA: 584.6-613.0 feet - scattered pyrite METABASALT: 613.0-623.0 feet - scattered pyrite FAULT BRECCIA: 623.0-639.0 feet - scattered pyrite METABASALT: 639.0-683.0 feet - scattered pyrite FAULT BRECCIA: 73.0-161.8 feet - scattered pyrite GREENSTONE: 161.8-178.8 feet - scattered pyrite FAULT BRECCIA: 178.8-253.5 feet - scattered pyrite GREENSTONE: 253.5-269.3 feet - scattered pyrite FAULT BRECCIA: 269.3-392.5 feet - scattered pyrite GREENSTONE: 392.5-495.3 feet - scattered pyrite FAULT BRECCIA: 495.3-516.5 feet - scattered pyrite FAULT BRECCIA: 559.0-577.0 feet - scattered pyrite METABASALT: 577.0-599.4 feet - scattered pyrite FAULT BRECCIA: 599.4-614.4 feet - scattered pyrite FAULT BRECCIA: 621.8-654.3 feet - scattered pyrite METABASALT: 654.4-700.0 feet - scattered pyrite FAULT BRECCIA: 95.0-133.0 feet - scattered pyrite GREENSTONE: 133.0-138.6 feet - scattered pyrite FAULT BRECCIA: 138.6-217.5 feet - scattered pyrite GREENSTONE: 217.5-236.8 feet - scattered pyrite FAULT BRECCIA: 236.8-260.5 feet - scattered pyrite GREENSTONE: 260.5-302.8 feet - scattered pyrite FAULT BRECCIA: 302.8-323.2 feet - scattered pyrite GREENSTONE: 323.2-435.3 feet - scattered pyrite FAULT BRECCIA: 435.3-469.3 feet - scattered pyrite GREENSTONE: 476.0-698.0 feet - scattered pyrite GRAYWACKE: 360.0-420.0 feet - scattered pyrite GREENSTONE: 50.0-300.0 feet - scattered pyrite GREENSTONE: 30.0-400.0 feet - scattered pyrite WEATHERED GRAYWACKE: 20.0-120.0 feet - some scattered pyrite GREENSTONE: 120.0-200.0 feet - scattered pyrite None None LIMESTONE: 161.4-208.6 feet - scattered wide pyrite veins up to 1/2 inch in width, pyrite estimated at <1.0% LIMESTONE: 385.0-542.0 feet - scattered pyrite LIMESTONE: 180.3-304.7 feet - a few scattered grains of pyrite are present but pyrite total is <0.1% LIMESTONE: 304.7-366.0 feet - some scattered pyrite, pyrite <0.1% many fractures and joint surfaces coated with grayish orange clay LIMESTONE: 395.4-625.0 feet - very scattered grains of pyrite, pyrite content <0.1% None None

GT 4-30B-08

GT 4-33A-08

GT 4-33B-08 HG 2 HG 4 HG 5 HG 9 P2-03-07 P2-7-07 P2-11-07 P2-11A-07

P2-11B-07 RH 1-1-08 RH 1-2-08

May2010 0637109.500

TABLE 6.11 Overburden and Ore - TTLC and STLC Results

CS-01

Composite 1

Composite 2

GT1-2-08-213

Composite 3

Composite 4

Composite 5

Top Soil Detection Limit


B,H

Graywacke Result Q
(b)

Limestone and Dolomitic Limestone Chert Result Q


(b)

Fault Breccia Result Q


(b)

Greenstone Result Q
(b)

Metabasalt Result Q
(b)

Parameter

Unit

PQL

Result Result Q

Q (b)

(b)

J J J J

B J J B J J J J B J B J J B J B,J J J J

B J

J J J J J J

J J J

pH Electrical Conductivity (@ 25 oC) Total Alkalinity Antimony Aluminum Arsenic Barium Beryllium Boron Cadmium Calcium Chloride Chromium Cobalt Copper Iron Lead Magnesium Manganese Mercury Molybdenum Nickel Potassium Selenium Silver Sodium Sulfate Thallium Vanadium Zinc Dissolved Non-Volatile Organic Carbon J B J J
(a) (a)

Sb Al As Ba Be B Cd Ca Cl Cr Co Cu Fe Pb Mg Mn Hg Mo Ni K Se Ag Na SO4 Tl V Zn

s.u. umhos/cm mg/L as CaCO3 mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L J

0.05 1 4.1 0.00017 0.038 0.00052 0.00012 0.00018 0.0097 0.00013 0.016 0.059 0.00055 0.000033 0.00068 0.0093 0.000054 0.029 0.00011/0.0025 (c) 0.000016 0.00013 0.00015 0.074 0.00038 0.000065 0.12 0.21 0.00011 0.0012 0.0019 0.31

0.05 1 4.1 0.002 1 0.002 0.001 0.001 0.1 0.001 0.1 0.5 0.003 0.001 0.002 0.5 0.001 0.05 0.001/0.1 (c) 0.01 0.001 0.002 1 0.002 0.001 0.5 1 0.001 0.003 0.005 5

7.63 140 70 0.00029 0.1 <0.00052 0.012 <0.00018 0.049 <0.00013 17 2.3 0.00098 0.00012 0.0025 0.16 0.000071 5.5 0.0034 0.00019 0.00085 0.002 5.5 <0.00038 <0.000065 2.6 1.3 <0.00011 0.0019 0.0093 8

8.11 160 37 0.0072 0.003 0.059 <0.00018 <0.00013 18 1.6 <0.00055 0.00029 0.0013 0.0012 4.3 0.0052 <0.000016 0.011 0.0017 3.7 <0.00038 <0.000065 8.8 22 <0.00011 0.0015 0.022 -

8.16 130 42 0.0015 0.0013 0.22 <0.00018 <0.00013 16 1.1 <0.00055 0.00015 <0.00068 0.00011 4.2 0.0025 0.00021 0.027 0.0017 2.8 0.006 <0.000065 4 12 <0.00011 <0.0012 0.0081 -

8.27 190 49 0.0032 0.0012 0.17 <0.00018 <0.00013 14 1.4 <0.00055 0.00025 0.0012 0.00012 14 0.0012 <0.000016 0.012 0.0032 2 <0.00038 <0.000065 2.7 29 <0.00011 <0.0012 0.037 -

8.24 160 56 0.0058 0.0062 0.12 <0.00018 <0.00013 13 1.3 <0.00055 0.00013 <0.00068 <0.000054 6.8 0.0075 <0.000016 0.0073 0.002 3.9 <0.00038 <0.000065 7.9 16 <0.00011 0.012 0.011 -

8.29 160 76 0.00098 0.0027 0.037 <0.00018 <0.00013 17 2 0.0019 0.00034 <0.00068 <0.000054 8.3 0.003 <0.000016 0.0023 0.0081 0.96 <0.00038 <0.000065 5.9 3 <0.00011 0.018 0.011 -

8.36 130 46 0.0085 0.0073 0.12 <0.00018 <0.00013 11 1.3 <0.00055 0.0001 <0.00068 0.000092 5.4 0.0031 <0.000016 0.028 0.00089 4.1 0.00058 <0.000065 6.6 8.8 <0.00011 0.0049 0.01 -

J J

J B,J

J B,J

J B,J

J B

J J J J

J B

J J

Antimony Arsenic Barium Beryllium Cadmium Chromium Cobalt Copper Lead Mercury Molybdenum Nickel Selenium Silver Thallium Vanadium Zinc 3.7 <0.71 77 0.068 0.12 120 29 63 3.4 0.078 <0.18 73 3.3 <0.086 <0.94 120 51 B B B <1.7 5.1 60 0.17 0.071 95 20 50 9.7 0.033 0.22 120 10 <0.086 <0.94 64 250 6.5 8.4 800 0.3 0.068 29 21 56 6.8 0.15 2.3 120 8.5 0.63 <0.94 15 67

Sb As Ba Be Cd Cr Co Cu Pb Hg Mo Ni Se Ag Tl V Zn

mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg

1.7 0.71 (a) 0.13 (a) 0.026 (a) 0.033 (a) 0.045 (a) 0.18 (a) 0.13 (a) 0.59 (a) 0.014 0.18 (a) 0.12 (a) 0.76 (a) 0.086 (a) 0.94 (a) 0.062 (a) 0.25 (a) 5 1 (a) 0.5 (a) 0.5 (a) 0.5 (a) 0.5 (a) 2.5 (a) 1 (a) 2.5 (a) 0.16 2.5 (a) 0.5 (a) 1 (a) 0.5 (a) 5 (a) 0.5 (a) 2.5 (a)

5.3 5.7 560 0.11 0.15 6.6 8.4 27 2 <0.014 0.74 220 2.4 <0.086 <0.94 5.9 150

J J B B

4.2 2.4 180 <0.026 <0.033 260 34 56 8.3 0.053 <0.18 250 15 0.13 0.97 75 75

<17 <7.1 46 <0.26 <0.33 400 93 45 <5.9 <0.014 <1.8 1200 15 <0.86 <9.4 53 64

<1.7 4.8 110 0.032 <0.033 110 26 62 11 <0.014 1 100 13 0.16 <0.94 70 71

Notes: PQL - practical quantitation limit (a) Composite 4 sample detection limit or PQL is 10x higher (raised due to matrix interference). (b) Laboratory qualifiers: B - constituent detected in method blank J - estimated value H - holding time exceeded (c) Higher MDL and PQL for CS-01 sample.

May2010 0637109.500

TABLE 6.12 Wall Washing Results

Age
s.u. S/cm C mg/L 7.87 137 16.43 7.42 -32.7 6.94 283 18.6 6.57 70.0 7.53 42 13.78 7.95 11.4 7.53 78 17.35 8.03 92.8 7.32 46 11.91 16.5 25.1

Limestone High Grade HG-01 11/24/2009 > 5 years Q Graywacke GW-01 11/24/2009 > 5 years Q Q Q Q Q
8.95 94 18.36 7.4 73.7

Limestone med to high MG-01 11/24/2009 2 months Chert CT-01 11/24/2009 < 1 month Greenstone GS-01 11/24/2009 < 1 month

Limestone high and med/low HMG-01 11/24/2009 1 year

FB-01 11/24/2009 Q

Field Parameters

pH Specific Conductance Temperature Dissolved Oxygen ORP

Lab Parameters

J+

B J J

Aluminum Antimony Arsenic Hexavalent Chromium Barium Beryllium Boron Cadmium Chromium Copper Iron Lead Manganese Molybdenum Nickel Selenium Silicon as SiO 2 Silver Thallium Vanadium Zinc Calcium Magnesium Sodium Potassium Total Recoverable Aluminum Total Recoverable Antimony Total Recoverable Arsenic Total Recoverable Barium Total Recoverable Beryllium Total Recoverable Boron Total Recoverable Cadmium Total Recoverable Chromium Total Recoverable Copper

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L 220 0.56 J 20 0.75 J 79 <0.18 19 J 0.2 J 0.81 J 2.1 130 0.063 J 19 98 9.9 49 1900 <0.065 <0.11 44 23 46 1.7 1.6 0.43 J, J+ 40000 7.7 J 88 7900 B <4.0 36 J 45 490 420 1800 0.43 J 33 <0.70 150 <0.18 28 J <0.13 <0.55 2.1 720 0.29 J 8.6 2.6 1.7 J, J+ <0.38 10000 <0.065 0.22 J 2.9 J 7.5 J+ 7.8 6.1 4.2 1.2 77000 <4.0 80 2800 B 6.7 J 33 J 14 J 120 160 59 <0.17 21 <0.70 83 <0.18 14 J <0.13 <0.55 <0.68 11 J <0.054 2.6 6.7 0.91 J, J+ 14 810 <0.065 <0.11 <1.2 3.6 J, J+ 31 2.2 1.2 0.21 J, J+ 28000 6.8 J 81 B 13000 <4.0 86 J 6.6 J 63 370 1400 <0.17 16 0.9 520 <0.18 52 <0.13 3.6 <0.68 1400 <0.054 7.9 1.4 5.9 <0.38 12000 <0.065 <0.11 7.3 6.6 17 6.6 6.1 1.8 960000 <4.0 <22 12000 36 160 5.7 7000 2000

220 0.18 J 22 <0.70 180 <0.18 24 J <0.13 <0.55 0.86 J 160 0.065 J 1.2 14 4.9 0.7 J 3700 <0.065 <0.11 6.3 16 J+ 34 2.6 2.3 0.85 J, J+ 1800000 <20 290 140000 B 92 J 650 J 680 4500 17000

650 <0.17 12 <0.70 660 <0.18 52 J <0.13 2.6 J 1.1 J 970 <0.054 11 0.37 J 3.5 <0.38 8000 <0.065 <0.11 39 5.8 J+ 21 3.1 7.3 0.86 J, J+ 990000 <4.0 <22 23000 B 30 230 5.1 J 7100 3100

<38 <0.17 <0.52 <0.70 1.2 <0.18 <9.7 <0.13 <0.55 <0.68 <9.3 <0.054 <0.11 <0.13 0.18 <0.38 <65 <0.065 <0.11 <1.2 2 0.14 <0.029 <0.12 0.099 <38 <0.20 <1.1 0.69 <0.20 <12 <0.11 <0.64 <0.66

B,J

May2010 0637109.500

TABLE 6.12 Wall Washing Results

Age
B B B B J B J J J J

Limestone High Grade HG-01 11/24/2009 > 5 years Q Graywacke GW-01 11/24/2009 > 5 years Q Q Q Q Q
J B

Limestone med to high MG-01 11/24/2009 2 months Chert CT-01 11/24/2009 < 1 month Greenstone GS-01 11/24/2009 < 1 month

Limestone high and med/low HMG-01 11/24/2009 1 year

FB-01 11/24/2009 Q
B,J

J J J

Total Recoverable Iron Total Recoverable Lead Total Recoverable Manganese Total Recoverable Mercury Total Recoverable Molybdenum Total Recoverable Nickel Total Recoverable Selenium Total Recoverable Silver Total Recoverable Thallium Total Recoverable Vanadium Total Recoverable Zinc Total Recoverable Calcium Total Recoverable Magnesium Total Recoverable Sodium Total Recoverable Potassium J J

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L 83000 25 2000 <0.016 320 1300 230 5.4 4.3 960 3300 1000 67 3.6 4.1 100000 130 3000 0.032 16 210 <11 2 <2.2 230 460 180 44 4.2 13 69000 43 7200 <0.016 23 1100 60 3.4 <2.2 220 700 3100 68 3.9 4 1100000 27 22000 <0.016 <4.6 9300 <11 <1.8 <2.2 <100 2800 2300 1600 5.4 14 2400000 1300 56000 0.032 <23 150000 160 <8.8 57 2100 390000 33000 1700 8.5 64

940000 15 44000 <0.016 <4.6 5800 <11 <1.8 <2.2 <52 2100 1500 1700 5.6 4.2

<30 <0.19 0.63 <0.016 <0.23 0.84 <0.54 <0.088 <0.11 <2.6 4.6 0.18 <0.038 <0.070 <0.092

Bicarbonate Carbonate Total Alkalinity (as CaCO 3) Chloride Fluoride Nitrate as N Sulfate Hardness (as CaCO 3) 25 <2.5 20 0.95 0.34 0.28 100 120 H H H 50 <2.5 41 1.3 1.3 0.31 4.9 45 24 <2.5 20 0.97 0.46 1.4 61 86

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L

68 <2.5 56 1.3 2.4 0.49 2.6 69 H

41 <2.5 33 1.4 0.86 12 15 96 H

57 <2.5 47 0.44 1.2 6.7 3.3 64

<5.0 <2.5 <4.1 <0.059 <0.010 <0.026 <0.21 0.43 H

J H

pH Electrical Conductivity @ 25 C Total Dissolved Solids @ 180 C Total Suspended Solids (Glass Fiber) Turbidity Residual Chlorine Ammonia as N Nitrite as N Total Phosphorus H J J H J

H J

H J

pH Units umhos/cm mg/L mg/L NT Units mg/L mg/L mg/L mg/L

8.06 259 110 540 850 <0.10 0.038 0.012 4.1

7.89 101 61 3400 1600 <0.20 0.22 0.015 2.2

7.95 199 65 4800 2500 <0.10 0.025 <0.0081 3.7

8.16 135 67 35000 28000 <0.50 0.84 0.049 91

8.09 222 91 68000 44000 <0.10 0.16 <0.0081 140

8.24 160 100 50000 23000 <0.50 4.9 0.12 100

5.81 2.2 <6.7 <4.0 0.31 <0.10 <0.025 <0.0081 <0.016

Notes: Q - Laboratory qualifiers B - constituent detected in method blank J - estimated value H - holding time exceeded J+ - qualitifed as biased high due to detection in field blank.

FIGURES


SAN FRANCISCO BAY

LEHIGH PROPERTY BOUNDARY

C
San Jose

A L IF O R N

SITE

IA

PA C I F I C OCEAN
0 50 100
G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\SiteLocationMap.mxd

Los Angeles

Miles

REFERENCES
PROJECT

2.5

5 Miles

10

15

Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 feet Aerial background: http://services.arcgisonline.com/arcgis/services 1) ESRI_ShadedRelief_World_2D 2) 13_Imagery_Prime_World_2D

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

REGIONAL LOCATION MAP


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW BF 063-7109 1/28/2010 1/28/2010 1/28/2010 1/28/2010 FILE No. SCALE: AS SHOWN REV. 0

FIGURE 1.1

RECLAM ATIO

NDARY N PLAN BO U

WEST MATERIALS STORAGE AREA (WMSA) NORTH QUARRY CENTRAL MATERIALS STORAGE AREA (CMSA) EAST MATERIALS STORAGE AREA (EMSA) ALUMINUM PLANT CEMENT PLANT
R PE M EN AN TE C E RE K

CITY OF CUPERTINO

SOUTH QUARRY

AGG PLANT TOPSOIL STORAGE AREA

M O NT EB EL LO

CR E

EK
PROJECT

LEGEND
0 600 1,200 Feet 2,400

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

Disturbance Area Boundary

REFERENCES

PROJECT OVERVIEW
PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/1/2012 2/1/2012 2/1/2012 2/1/2012 FILE No. SCALE: AS SHOWN REV. 0

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\RP_Project_Overview.mxd

Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 feet Aerial background: http://services.arcgisonline.com/arcgis/services (13_Imagery_Prime_World_2D)

FIGURE 1.2

WEST MATERIALS STORAGE AREA (WMSA)

NORTH QUARRY CENTRAL MATERIALS STORAGE AREA (CMSA) EAST MATERIALS STORAGE AREA (EMSA)

SOUTH QUARRY TOPSOIL STORAGE AREA

LEGEND

PROJECT

Reclamation Plan Boundary Lehigh Property Boundary 0 500 1,000 Feet 1,500 2,000

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

REFERENCES

FINAL RECLAMATION PLAN


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/8/2010 2/8/2010 2/8/2010 2/8/2010 FILE No. SCALE: AS SHOWN REV. 0

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\RP_WC_ultimate

From Enviromine (2010). Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet

FIGURE 1.3

( !

( !

El Granada

ALAMEDACOUNTY SANTACLARACOUNTY

( ! ( !

Atherton
SAN FRANCISCO B AY

Half Moon Bay

( !

Woodside
( !

West Menlo Park

( ! ( ! ( !

Ladera Los Altos Hills

SAN MATEO COUNTY


Portola Valley

Sky Londa

( !

SAN TA CLARA VAL L E Y


San Jose

( !

Los Trancos Woods

San Gregorio Monta Vista


( ! ( ! ( !

( !

PA C I F I C OCEAN
Cupertino

Redwood Terrace

( !

La Honda

( !

S A N T A

( !

Loma Mar

( !

Pescadero

SANTA CRUZ COUNTY


Boulder Creek

R U Z M
( !

Monte Sereno

O U N T A IN S
( !

Lexington Hills

( !

LEGEND
( !

PROJECT

Facility boundary
TITLE

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA

REFERENCES

5 Miles
( ! ( !

10

REGIONAL TOPOGRAPHIC SETTING


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/8/2010 2/8/2010 2/8/2010 2/8/2010 FILE No. SCALE: AS SHOWN REV. 0

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\RP_regional_relief

ESRI:World_Shaded_Relief (http://services.arcgisonline.com/arcgis/services) Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet

FIGURE 2.1
( !

15 00

00 16

00 12

15 00

10 00

16 00
1000
1000

00 11
1200
0 110
0 110

00 10
0 120

00 11

160 0

120 0

160 0
1100
120 0

150 0

1300

11 00
0 110
100 0

11 00

150 0

14 00
12 00
0 110

1400

11 00

10 00

1500

00 14
1000
100 0

1500

170 0

130 0
110 0

120 0

110 0 0 110

10 00

17 00

16 00

140 0

00 14

18 00

13 00
130 0 130 0

15 00
1200

0 100

1300

1200
140 0

150 0

1400

00 13

00 12

150 0
130 0

11 00

AN

1600

1500

EN

TE

160 0

14 00

1600

170 0

17 00

150 0

15 00
150 0

12 00

1400

140 0

00 13
10 00

18 00

18 00
160 0

15 00

1600

EE

160 0

1100

11 00

19 00
1400
1200

19 00

17 00
170 0

20 00

180 0

0 170
18 00

0 170
1500

12 00
120 0

20 00
0 180

100 0

210 0

20 00
170 0

180 0
180 0

11 00

00 21
170 0
150 0

19 00

0 180
180 0
160 0

1000

18 00

210 0

200 0

1100
120 0

00 13

2100
0 170

21 00

0 140

220 0

22 00

230 0

19 00
150 0
160 0

2300

00 21
150 0
0 160

20 00

M160 O0 NT
00 17
17 00

180 0

16 00

130 0

100 0

00 19
120 0

15 00

1400

00 13
00 11
110 0

00 13
110 0

00 14

100 0

140 0

00 14
0 110

130 0

00 20

R PE

00 10

C R

240 0

210 0

00 25
150 0

180 0

K
130 0
150 0

14 00
150 0

150 0

0 200

190 0

1500

150 0

15 00

14 00

130 0

1200

130 0

16 00

1300

1300

Miles

170 0

16 00
170 0

1300

LEGEND

180 0

REFERENCES
Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet

110 0

14 00

PROJECT

Facility boundary South Quarry 0

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

500 Feet

1,000

1,500

LOCAL TOPOGRAPHIC SETTING


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/8/2010 2/8/2010 2/8/2010 2/8/2010 FILE No. SCALE: AS SHOWN REV. 0

110 0

1200

130 0

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\H_well_map

0 200
00 13

00 16

00 19
00 14
00 18

00 17

E BE LL O CR
160 0

100 0

00 18

2400
0 150

140 0

120 0
1300

110 0

230 0

22 00

20 00

EE
00 14
00 16

0 190

Area of Large Map


130 0
00 16
1400

0 240
150 0
140 0

130 0

100 0

00 15
00 15
120 0

110 0

00 16
0 140

15 00

00 14

13 00

00 12
120 0

00 11
100 0

0 100

13 00
120 0

00 14

1400

00 15

150 0
160 0
15 00

150 0

0 110 00 10

00 13

00 14

0.5

12 00

110 0

1500
00 14

00 14
00 11
00 14

FIGURE 2.2

LEHIGH PROPERTY BOUNDARY

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\RP_RegionalLocationMap.mxd

SAN FRANCISCO BAY


0 0.5 Miles
PROJECT

REFERENCES
US Geological Survey, Geologic Map and Map Database of the Palo Alto 30' x 60' Quadrangle, California; Brabb, E.E., R.W.Graymer, and D.L., Jones, 2000. MF Studies Map MF2332. (http://pubs.usgs.gov/mf/2000/mf-2332/mf2332m.pdf)

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATA SANTA CLARA COUNTY, CALIFORNIA
TITLE

REGIONAL GEOLOGIC MAP


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 1/28/2010 1/28/2010 1/28/2010 1/28/2010 FILE No. SCALE: AS SHOWN REV. 0

FIGURE 2.3

Kvfs Kg sz sz QTsc

QTsc sz QTsc

Ks

Kg ls Kls Kls ls Kg Kg Kls Kv QTsc Ks QTsc Kls Ks sz sz Kg

Ks/Kg

Kls Kls Ks Ks/Kg

Kg Kls sz sz/Kv

QTsc

sz

INDEX MAP SHOWING SOURCES OF DATA

sz

Ks/Kg

1 3

Kv

QTsc

INSERT OVERSIZE 1 of 1
sz sz

0 Feet

250 500

1,000

sz Kls sz

See Notes for the key to data sources.

PROJECT

LEGEND

NOTES

Ks REFERENCES
Topography (2007, 2008, 2009 composite; Chang Consultants (2010). Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet
TITLE

Rock Type (Surpac Model):

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA

Geologic contact, certain Geologic contact, approximate Geologic contact, concealed Landslide

GEOLOGIC COMPILATION MAP


PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM WLF XXX 063-7109 10/27/2008 10/27/2008 10/27/2008 10/27/2008 FILE No. SCALE: AS SHOWN REV. 0

Map Document: 00_Hanson_BASEMAP_SEPT2009.mxd / Modified 9/18/2009 2:49:53 PM / Plotted 11/11/2009 11:39:31 AM by DMason

Fault breccia/metabasalt (sz/Kv) Graywacke (Ks) Graywacke/greenstone (Ks/Kg) Greenstone (Kg) Greenstone/metabasalt (Kg) Limestone (Kls)

Rock Type (Fouria, simplified): Landslide (ls) Greenstone; all types Limestone; all types Metabasalts Alteration

1) Modified after Rogers, T.H. and Armstrong, C.F., CDMG Preliminary Report 17 (1973) and Fouria, J. Geology of the Pemanente Limestone and Agrregate Quarry (2004). 2) Fouria, J. Geology of the Pemanente Limestone and Agrregate Quarry (2004). 3) Modified after Rogers, T.H. and Armstrong, C.F (1973). 4) Gemcom SURPAC results of geologic model. 5) Modified after Rogers, T.H. and Armstrong, C.F (1973).

FIGURE 2.4

A'

SECTION A-A'

B'

SECTION LOCATIONS

LEGEND

NOTES

SECTION B-B'

B'

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA

GEOLOGICAL CROSS SECTIONS A-A' AND B-B'

FIGURE 2.5

Palo Alto

S A N TA C L A R A S A N TA C L A R A COUNTY COUNTY

Mountain View

Be

Sunnyvale
rro ca l fau lt

Sa

An dr ea s

SITE
fa ul tz

M on

ta

Cupertino
Vi s ta -S

on e

ha nn on

fa

Be rro

S A N M AT E O S A N M AT E O COUNTY COUNTY
G:\Projects\063-7109 (Hanson Permanente Quarry\GIS\Hanson_geotectonic_map_20Mar2009.mxd

ul t

zo ne

l ca fa ul t

0
Legend
Stream Fault (surface expression): Certain Concealed Inferred Thrust (teeth in dip direction) Dashed where approx., querried where uncertain; dotted where concealed.
TITLE REV. DATE DES PROJECT

1
Sa n

2 Miles

REVISION DESCRIPTION

PROPOSED RECLAMATION PLAN EAST MATERIALS STORAGE AREA HANSON PERMANENTE CEMENT, CALIFORNIA REGIONAL GEOTECTONIC SETTING
PROJECT No. DESIGN DLM DLM WLF WLF 063-7109 3/13/2009 3/13/2009 3/25/2009 3/25/2009 FILE No. SCALE: AS SHOWN REV. 0

s ea dr An

GIS

CHK

RVW

ul fa

tz

e on

Fault source: Brabb, et. al. (2000) Faults discussed in text have heavier line weight.

GIS CHECK
Sunnyvale, CA

REVIEW

FIGURE 3

1599.8
114 0 .4 113 7 .8 114 8 .7 119 6 .5 10 94 .5 1116 .4 110 5 .6 114 2 .8 118 2 .7 118 3 .9 117 7 .5 116 4 .0 118 4 .6 12 03 .7 12 10 .9 12 13 .6 12 32 .7 90 3 .4 88 4 .8 73 9 .2 75 0 .8 71 2.8 75 2 .5 69 3 .4 64 2 .2 68 7 .8 64 9 .6 60 5 .7 58 4 .1 53 5 .1 53 4 .8 53 4 .5 55 6 .2 52 1.0 53 4 .3 55 6 .2 55 7 .9 65 3 .7 60 9 .2 60 8 .5 64 5 .7 59 5 .0 63 5 .9 57 4 .0 59 1.6 63 8 .7 57 5 .8 57 3 .0 56 8 .0 56 4 .4 56 6 .8 55 7 .4 CB 57 0 .9 55 9 .5 56 2 .1 56 9 .4 55 6 .7 57 1.0 57 0 .1 57 3 .9 57 1.3 56 8 .6 55 6 .1 56 5 .7 55 7 .0 53 4 .7 55 6 .3 55 5 .9 51 4.9 69 3 .3 64 6 .0 68 4 .1 68 4 .7 55 5 .3 51 2.7 69 0 .8 67 6 .3 WL 70 6 .8 10 57 .6 68 7 .7 73 3 .7 68 5 .9 55 5 .5 12 05 .5 68 5 .9 69 2 .9 68 5 .0 70 1.3 113 5 .2 12 24 .3 10 91 .5 113 8 .2 118 0 .2 12 35 .0 113 5 .2

12 96 .3

15

60

1589.1
90

15 26 .3

13 93 .1

12 86 .7 71 2.8

119 3 .8

11

90
10 64 .4 76 7 .2 64 2 .7

10 46 .3 69 5 .0

69 1.8 69 8 .9

70 5 .5

11

15 20
114 2 .0 118 6 .8

15 90

114

15 65 .2

15 55 .9

15 44 .4 118 3 .3 12 13 .2 112 5 .8 113 5 .7 10 97 .6 10 96 .9 10 97 .9 10 61 .5 10 42 .2 10 53 .2 10 34 .0 10 17 .8 10 37 .3

15 51 .2

90

13 92 .3

114 2 .0

10

15 40
10 54 .4 76 4 .2 73 1.8 72 9 .3 71 5.3 69 6 .0 64 2 .0 57 3 .1 57 3 .1 59 68 6 .9 65 6 .8 72 3 .7 69 4 .1 71 6.1 69 4 .3 57 5 .7 66 1.8 68 5 .9 68 7 .0 66 2 .2 85 0 .2 70 5 .8 65 9 .0 69 5 .8 65 6 .9 66 0 .8 66 6 .8 57 6 .7 57 3 .8 56 9 .4 57 8 .6 57 9 .4 59 2 .3 59 9 .3 59 9 .7 60 3 .5 60 3 .9 58 6 .8 58 5 .1 58 5 .0 57 4 .3 57 3 .4 57 3 .4 57 3 .9 59 7 .8 57 3 .8 56 5 .3 57 0 .3 66 8 .1 65 8 .5 66 7 .8 68 4 .5 67 8 .6 10 43 .3 77 3 .6 98 1.5 81 4.4 66 5 .9 66 6 .0 77 2 .3 69 5 .4 69 6 .2 68 8 .6 60 3 .0 60 1.9 60 1.0 67 3 .9 66 9 .1 66 8 .6 59 1.5 72 9 .3 69 1.6 59 9 .6 88 0 .4 97 2 .8 96 0 .2 72 6 .3 87 6 .0 77 2 .4 81 2.3 59 8 .4 66 6 .6 59 8 .5 66 5 .7 66 1.7 66 7 .7 65 7 .7 66 0 .8 65 9 .6 64 0 .0 66 2 .1 65 9 .7 66 4 .6 57 3 .2 71 5.4 69 4 .6

15 29 .8

15 26 .1

13 23 .3

12 94 .0

119 3 .3

12 96 .5 117 6 .6 116 6 .6 114 5 .7

# *
64 0
84
113 4 .0 115 6 .1

14 80
0

15 79 .2

14 84 .5

15

14
90
113 6 .9 113 8 .0 1113 .0 10 78 .6 10 66 .8 10 83 .6 10 01 .2 110 2 .8 10 91 .1 10 93 .5 110 6 .3 110 3 .7 10 45 .2 10 28 .8 10 18 .810 36 .9 10 60 .8 10 54 .5 94 8 .6 85 2 .7 95 2 .8 10 76 .5 10 35 .6 99 9 .1 10 42 .410 40 10 41 .7 10 38 .9 99 7 .8 99 4 .6 10 33 .9 10 39 .8 10 02 .3 10 32 .5 10 38 .1 10 85 .2 10 00 .2 99 9 .8 10 84 .0 10 84 .1 10 79 .0
10 40

40
1118 .5 10 77 .5 10 68 .9 10 43 .4 10 53 .5 10 44 .2 93 5 .6 10 93 .7
69

14
114 0
10
10 84 .9 10 63 .6 10 66 .1 110 3 .4 94 9 .9 92 7 .5 10 86 .8 10 24 .7 96 6 .8 10 55 .9 96 3 .4 96 7 .8
0

SW-1
10
10 95 .5

20
110 8 .0 10 89 .3 10 13 .3 92 3 .3 75 5 .0 73 5 .7 55 6 .6 72 6 .8 72 5 .3 71 7.8

14
40

Dense Trees
10 40
114 6 .7 10 61 .3 116 7 .8 10 99 .4 10 68 .3 10 64 .9 10 32 .5

14 60
79
10 91 .6

00

14 40

15 88 .6

15 86 .7

15 16 .3

14 87 .3

12 94 .8

12 84 .4

119 7 .9 114 0 .9 112 5 .2 116 4 .4

118 7 .3 10 94 .7 10 57 .3 91 4.4 74 7 .5 76 5 .0 72 5 .7

99
89
72 8 .8

15 00
114 2 .4 118 3 .4 10 96 .0 10 60 .6

10 95 .8 10 33 .0

14 07 .2

12 92 .1 118 9 .5

113 8 .8

94

90 6 .0

13
10 90
0
72 7 .8 72 7 .0

80

14

00

51 8.9

51 7.2

90

13

18 80
119 5 .6 11
9 0

19 00
118 1.6 113 9 .1 10 30 .1 10 33 .1 10 30 .4 10 71 .2 10 45 .4 99 4 .2 98 6 .9 119 7 .0 114 8 .1 99 7 .8
10 90

15 00
113 7 .1 113 7 .6 10 40 .8 10 63 .9 114 9 .1

14 60 14 80
11 40
113 8 .2 10 77 .4 10 56 .1 10 81 .3 113 5 .2 10 61 .3 10 94 .0

" )
74 0
54
10 90
10 74 .0 10 78 .1

13

40

14 20

15 88 .5

15 87 .7

15 16 .6

14 89 .5

13 01 .5

13 07 .8

12 75 .5

51 9.3 51 9.3 52 2 .9 52 3 .4 52 2 .0

51 7.2

19 20
10 90
110 5 .0 93 .2 10 10 99 .4

90

19

60

15 60
119 3 .7 12 52 .2 10 39 .3 10 40

40

15

19

80

15 80

MS-1
55 6 .1 55 5 .6 55 5 .3 55 3 .7 12 15 .0 12 04 .1 115 5 .2 114 5 .7

15

60

15 89 .9

15

15 17 .7

14 92 .7

14 90

19 40

15 40

1009 1587. 83

245 1587. 80

15 89 .9

13 17 .2

12 90 .7

12 65 .1

15 88 .6

Dense Trees

13

Ro

90

20

20

16 20

16 00

14 40

20 00

15 94 .6

Un

pa

ve

15 22 .9

12 99 .1

12 93 .2 12 90 .5 12 92 .8

12 55 .7

53 1.0 52 5 .6 52 7 .2 52 6 .0 52 7 .9 52 4 .1

40

20

90

12

15 20

16 60

20
94 0
10 65 .7 93 9 .4 10 29 .1 10 23 .1 10 29 .4 10 25 .6 10 45 .2 10 39 .0 10 39 .7 84 8 .9 98 7 .2 10 45 .6 10 55 .1 10 05 .3 10 03 .2

15 26 .7

15 26 .2

14 97 .1

13

40

16 40

ad

14 95 .0

12 92 .9

13 02 .5

13 03 .1

12 92 .7

12 63 .4

53 1.9 55 6 .2 52 9 .5 52 7 .6 55 4 .4 53 3 .1

15 00

60

5-6

17 00

168 0

15 04 .8

99 0
10 40
110 5 .9

20

17

80

17

20

15 05 .3

GROUN D O B S CU RE D B Y DEN S E TR EE S

17 60

40

53 0 .4 55 7 .5 53 4 .7 53 2 .6

21

00

17

80

! /
89 0
55 8 .8 WL 85 1.8 81 9.0 84 8 .4 86 0 .5 72 1.1 96 1.9 87 2 .3 89 5 .1 10 06 .4 72 3 .3 96 0 .8 82 3 .0

53 7 .0

3-5

13

14
12 20

00

80

14 80

14 60

14

60

14

40

14

20

14

00

0 124 12 60 12 80

13

13

80

13 00 0 132

60

40

20

00

20

60

20
99 0

20

00

40

40

20

80

60

14 40

13

60

Dense Trees

GT1-4
Dense Trees
12 20
11 20
80 3 .7 80 8 .6
12 00

55 6 .5

55 4 .5

53 8 .4 53 4 .0 53 3 .7

55 5 .2 PILE 57 2 .5 58 4 .4 PILE 55 2 .8 55 4 .3 55 0 .7 53 5 .3 53 8 .8 55 6 .9 55 4 .4 55 3 .7

13
11 80

40

80

80

17

16

17

17

13 40 60 13

16

16

20

16

15

80

40

16

60

17

80

19

00

60

19

14 00

14

14

14

14 40 14 60 14 80

40

18
13 00

80
12 80
12 00

Dense Trees
12 60
94 0
12 40

13 80
690
64 0
73 7 .0

14

14

19

13

00

20

00
0

15

15

15

142 0

40

40

15

20

60

13
59

40
66 8 .9 66 9 .1

14 20

13

13

00

12

20

13

12

60

12

80

13

00

13

20

20

1400

13

40

13

60

80

13 40

18

20

18
13 20

60
114 0
114 0
80 3 .0 80 6 .4 80 4 .0 80 5 .9 80 0 .9 80 2 .3 79 7 .8 80 9 .9
84 0

13

00

13 60

15

15

18

21 40

00

18

17
13 20

80

13 20

1537.9
13 40
118 0

130 0
80 8 .9 80 5 .4 80 2 .2 99 0 .2 99 6 .4 WL 74 4 .6 96 3 .7 73 3 .6 73 6 .0 87 3 .4

116 0

80 4 .4

89 0
96 2 .6 68 3 .0

13 00

12
13 60

80
12 00

Dense Trees
72 0

116 0
86 1.9

62 0

! /
79 0

61 5.1

59 8 .7

550.5 552.7
55 0

551.2

55 0

13 40

20

00

59 4 .5

64 0

66 0

13 80

1220
118
00

132 0

12 80

! /
14 00

14 20
10
10

Dense Trees
10

ER

13 60
60
14 80

13 40
20

13

00

HG-7 ! P
12 40
12
78 5 .1

HG-8
C onvey or Water L evel 733.9' 745.2
66 0

74 0

706.6 C onvey or 651.0

652.0

Pipe
62

550.8 Pile
0 64 0

14 40 14 60

12 60

20

13

40

14 80

14 00
12
15 20

15 00

14 20

13 00

114 0

40

15 00
92 0

15 40
13 20
0

HG-2
40

Dense Trees
90 0
90

86 0 88 0

Dense Trees
82 0
0 80

78 0

76 0

74 0

Pipe
70 0

71 1.2 Pipe 68 0 71 1.5

652.9 C onvey or Pipes 633.1

552.2 555.5 552.3 567.0 Pile 568.6 Dense Trees 556.9 709.4
56

60

13

14 40

15 60

15 20

14 60

15 80

AN

15 40

14 80
16 20

15 00

Dense Trees
16 40

13

60

16 00

13 40
12

116 0

84 0

92 0
94 0

13 60

80

13

15 60
00

15 20

16 60
13 80

! /
13 80
12 80

11 80
96 0
90 0

C onvey or 738.4 71 0.9

C onvey or

14 00
14 20
14 40

13
13 20

00
10 00
88 0

98 0

15 40
14 20

15 80

15 60

12

Dense Trees
10 20
0
82 0
0
0 86

16 80
86

14 00

78

00

84 0
80 0

14

14 60

80

66

TE N E

10 40

60

16
0

58

60

170 0
60

17

17

40

15

80

19 20

17

17
0

1600
72

GT3-4
15

80 0

15

80

HG-11
15 20

74

0 156
70
10
70

110 0

82

00

18

19 60

19 80

EE

18
20

18
16

18

20

20

20

20

80

60

40

18

60

40

20

18

18

19

00

80

18

40

164 0
16 20
78 0
16 40
14 00

HG-1
0

16 00
12 00
11 40

118 0
820

11 20
80 0

76 0
74 0

72

70 0

20
116 0

00

15

40

00

!! PP !! /P
0

15 80
13 80
00

114 0

11

Dense Trees

798.7
78 0

74

40

60
80
0
16

Dense Trees
68
112 0

Dense Trees

84

798.3

76 0

00

15 80

HG-10M
76

15

60

15

40

10 80

74

80

798.4
80 0

78 0

673.8
205 807. 52

693.3 807.8
0

Dense Trees 665.7


68 0
66 0

! /
HG-10S
16 60
14 20

84 0

20

12 60

10 60

82

17
0

15 60
40

808.4

80

Pile

78

00

16 80
60
10

621.8

17

15 40

13

76 0

80

20

800.8

58

16

15

740

16 60

60
12 40

709.6

693.9

72 0

60

14

15 20

00
15 00

70

15

68

40

16 40

16

40

00

71 0.3

66

14

15

80
0 0

68

64

1480
0
78

62

20

14

0 122

561.6
0

Pile
0

64

Dense Trees
60

16 20

16

20
88

14 80

84 0

82

Dense Trees

70

16 00
14

14

805.8

694.6

62

13 40

16 00

15 80

144 0

558.6
0

60

801.8

55 0

55

13 80

HG-3
00
10

12 80
12
2
84 0

11

20

11 0

10 80

79 7 .8

82 0

80 0

76 0

580.4

550.7 571.0

571.7

71 7.7
94 0

667.1

21

00

18

60

18

21

20

80

16
16 80
17 00

16
74
72 0

20
12 20

00

19

16

19

20

16
0 168

60

40
16 60
70
14 40
257 10053 679. 93 680. 03

16 20

76

0
0
0

720

70 0

625.4
68 0

16 40
14 60

C onvey or
68 0

578.3

594.8

19
17 20

40

17

80

00

16 60
14 80
116 0
68 0
15 00
15 20

631.5
66 0

19
17 40
506 1858. 86

60
17 00

17
17 60

19

80

17

20

17
17 80
18 00

40

Dense Trees
17 20

16 11 80

80

12 40

17

00

! /
639.2

GT4-25A
! HG-9 P
12 60

60

17
12 00
78
76

20
72

20

18

17 80
ad

! P HG-4
Dense Trees
12
15 60

17

40

00

17

60

17 40

15 40

Dense Trees Dense Trees


20

74

20

20

19

19
80
13
Un pa ve d Ro

20

20
40

20

40

20

00

19

40

20
17 60

18

20
00

17

80

18 20

80

Dense Trees
13

Dense Trees
20

18

18

40

18

00

18 40
13
18 60
17 80

15 80

12

SW-2
80
0
0

70
0

66

66

640

620

60

82

0
66 0

#" *)
MS-2
Dense Trees
68 0

Dense Trees

60 0

62

Dense Trees 61 8.6 670.1 671.6


68 0 Piles

84 0

72

20 6 0
80

20 6 0

19
14
18 00
17 80

20 8
00

21 00

0
14
17
40

20 8 0

19

00

Dense Trees
18 20

16 40

19

20

12 00
118 0

92

90

60

10

80

21

20

21
16 60
15 60
60

40
17 60
00

20
80

2040
20
10 80
17 60
112 0

20

0
80
16

0
178 0
18

17 00

18 00
60
15 40
10 60

182 0
10

ve d

Ro a d

17

40

15 20

11

11

20

512 1870. 98

20

Un pa

17

2
10

17 40 17 20

10

21 40

10

18

17

20

15 00

40

60

17 00

20

18 40
80
00

21

19

116 0

98

21 20

00

40

60

18 60
14

! HG-6 P
16 00

16 60
20
14

18 40
114 0

168 0

14 60

96 0
98 0 10 00

94 0

673.9 Dense Trees C onvey or


72 0
74 0

643.4
70

634.9 652.7
0

628.7 636.3 644.8 659.2 C onvey or


76
80 0
78 0

66

68

18
13

652.9

80

86 0 88 0

20 4

18

60

18

20

18
13
18

40
40

Dense Trees
60

656.4

61 4.3

621.5
62 0

61 8.6 61 8.1

20

18 00

16 20

Dense Trees

70

74

76

78

80

82
64 0

84

86

0
10 20

66 0

642.8
0 78 0

658.7 C onvey or 672.4 675.6 Piles


68 0

658.2
66 0 68 0

1816.7 1785.6
10 60
110 0

10 40

22

20 2 0

19

00

18

40

17

68 0

12 60

86 0

80

21 00

78

Dense Trees
20

20

21 60

Dense Trees
00
17
13 20

21 20

21 00

00

17
15 20

60

1821 .5
13
12 20
12 40
12 60

70

683.2
86 0
90 0
72 0

13

70

21 80

00

14 60

14 80

15 00

21 80

226
80

22

22
16 60

22
16 40

0
15 20

40

20
15 40

00
15 60

80

23

00

21 40

19

23
16
16 80

40
60
17 20

23

20

21

20

20

19

60

M O
13

80

Dense Trees
16
17 40
13 60

17
17 80

94

80

00

16

80

17 60

686.6
96

78

21

22 8 0
20

19

40

16

15

16 00
00

60
13 20

19

20

16 20

76 0

21

21

40

22 4 0

22 6 0
00

21

60

19

00

18

80

18

60

16
40

16 40
20

17

20

18 00

80

Dense Trees

13 00

Dense Trees

92

74 0

21

20

22 2 0
Ro a d

21 66.9
00
14

Un pa ve
16 60

d Ro a d

Un pa ve d

16
14

16 60

16 40

16

20

16

00

80

12 80

Dense Trees

692.3

72

21

22 0 0

16 80
40

17

15

15

60

60

21 40

40

154 0

664.9

78

98
10
10 00

0
70

Pylon
0
0

807.6

22 8 0

23

Dense Trees
16
16
15 80

74

18

78

20
14 00

80

00

60
10 11 00 80
30057 1330. 86

23 2 0

00

17

10

777.3
0

79

80

13 80

80

40

23

0 166

40

83 0

820

10

81

20

23 0 0

60

21

00
15 00
16

40

801.9
20

76

20

23 4 0

24 0 0

24 0 0

24
15
14 20

6
Ro a d
14 80

0
16 40
16 60

EL
15
16 80
16 60
15 20

00

1683.7
ve d

Un pa

12

12

12
60

20

12

00

74

23 8 0

112 0 114 0 116 0 11 80

770.3

40

! /
14 40

72 0

30043 781.39

Dense Trees 782.9


74

75

24

23 6 0

24 2

2086.6

60 15 40

76

NT EB
HG-5
16 20

77

Piles

73

1314.3

72

40

779.9
78
78 0

24 2 0

21
14
16

20
16 00
14 60

2021.7 Dense Trees


16 40
20

60

24 4 0

21

60

24 8 0

15

25 2 0
15 40

15 20

80

40

19
14 20

20

Dense Trees
15 20
15
40 15
3-8

80 14 00

3-7

15 00

25

21

60

20

40

80

40

00

23

23

20

00
14
15 80

Un pa

3-6

23
40

22

80

18

15 60

40

15 40

22

00

80

156 0

! /
12

21
15 80
16 00

60

24 6 0

21

40

60

20

40

LO CR EE
60

Dense Trees
13 00

76 0

74 0

783.6
78 0
80 0

76

74

ve d

25 00

2503.4

22

22

20

20

82 0
84 0

Ro a

22

80

20

20

19

00

12 80

GT2-7
12
13 00
12 90

1268.6

80 0

782.8

74 0

12

60
86 0

46 843. 53

76 0 78 0

18

60

Un

80

21 40

80

88

Piles
0
0
0

689.9
0

76 0

pa

21 20

20 8 0

Dense Trees
17

12

12 00

87 0

ve

17

118 0

86

68

659.2
76 0

Dense Trees
82

18 40

20

20

20

24 80

90

25 2 0

25

00

Dense Trees
13 80
14
60
15 40

19

60

18 20

K
15 00

80

12

12 60 70

12

50

12

50

88 0

1489.6

98

96

25 4 0

10

20

15 20

24 6 0
14 80
3-9

2545.2
13 40

24 4 0
15 00
13 20

1940
14 60

18 00

13

Dense Trees

13 10

17 80

13 20
13 30
00

10
3-1 0

40
10
10 80

10

10

0
20
60

94 0

92 0 90 0

80 0
82 0

00

72

84
110 0

24 2 0

19 20

17 60
14
15

0 152

0 86
112 0

68

20

00

19 00

17 40

Dense Trees
134 0
11 40

13 00

18 80

15
15 00

15 00

15
15 20

40

88
11 60

3-1 1 4-2

18 60

17 20
00

12 80
13

20

1292.9
13
13

118 0

92

90

14 80

14 80
15 00

1527.6
14

94

12 00
80
12 20

0
60
13

Dense Trees
00

64

00

13 40

16

20

20

96 0

14 00
80 14
14 40
14 20

15

16

00

14 20

Dense Trees

14
15

1304.1
60

98 0

13 00

Dense Trees
14 60

12 60

14 40

14

60
14

2-8

1300.9
14 20

12 40

1299.9
40

13

1306.1

00

12 80

12 60

Pylon

62

12 80

1118.8
40
13 20

80
82 0

15
15 60

94 0

80
13 80

78

76
0

74
0

14

60

14

15 00

80

60

13 20

14 00
40
80

15

15

20

13 00

60

1297.9
80
15

1110

15 20
13 40

13 60

15

15

40

Dense Trees

14
15

80
00

1285.5

14

60

14

20

40

14

14

14

15

20

00

40

80

15

60

14

14

40

80

13

15

16

13

20

12 80
40

15

60

40

12 40
14 20

13

13

13

13 00
13 20
12 00
13 40

12 20

15

60

1620.1
15

00

15 60

12 60

12 60

14

80

00

12 80

13

20

14
12

40

15

13 80
60
13 40

13 00

16

00

40
15 60

12 80
15

1105.7
12
80

00

11

0
10 80

1587.8

12 60
12 40

11

80 11 60
10 40
10

10 60

118 0

13 20 13 00 12 80

14

00

12 20

98

10

20

00

! (
13 60

15 40

15 60

20

11

Ro a

Dense Trees
14 60

15 00

11

10

00 80

14

ve d

# * ) "
14 40

14 80
12 00

80

13 00 12 80 12 60 12 40 12 20

14 80

10

60

96

Un pa

94

118 0

150 0

Dense Trees
14 60

14

60

10

40

10

20

92

10

00

98

92

90

154 0
15 20
14 40

86

15 20

30143 2170. 09

30145 2162. 70

15 60
15 80

15 40

Dense Trees
13
14

20

60

12 20
00

12
80

11

11 60
40 11

112 0

84

116 0 114 0

14
15 00
20 14
14 80

88

40

828.2
83

91 6.2
0

110 0

142 0

880.8 827.7
14
00 14

900.1 989.1
82
78

66 0

76
00

74

827.4
13
14 60

80
0

16 00
14 40

13

164 0

15

13

! P
14

60

# * ) "
00
80
40 80

15

40

! / ! ! ! ! / / P/ ! ! P P ! !! / // ! P
13
12

! P
00

14 60
11
11
80

80

826.4 Dense Trees


13 80
13 60
13 40
14

30056 990. 81

86

0
84

72

70

68 0

16 20

13 00

16 80

20
10

12 20

14
13 20
80

12 40

16
16 40

00

12 60

16

15

12 80

16 60
80
80

15 60

15

20

00

40

14

40

14

11
14 80
60

11
40
14 20

11

112 0

C onvey ors 903.3


90 0

990.4 900.6 899.6


98 0
96 0 94 0 92 0

897.6

98

96
0

94

92

! /
17 00
17 20

13 00

902.1
60

900.4
14
0 128

! /
16 60
16 80
17 00

13
00

113 0
14

898.9
80
60
12 40
13

Pylon

17 40
17 60
17 80

12 60

60

134 0

897.4 894.9
13 20

1220
118 0

14 40

1140
0 112
10 80
10 60

72

70
94 0

68

15

11

20

94

20

Dense Trees
0

66

14 20

13

40

00

" )
14 40
14

64

13

60

13
20

80

11

00

14 00
14

13

15

20

1202.4
15

11

62

13 80

MS-3

15 40

12

20

0 120

0
98

18 00

17 20

20
114 0
110
108 0 10 60
10 40

114 0

110 0

) "
18 20
18 40
18

1200
116 0
112 0

14

892.9
14
13
0

00
13

893.9
10 40

74
87

892.2
80
11

0
50

0
100 0

) "
17 40
60

13

60

10 20

Dense Trees
40

1149.6

806.1
86 0
98 0

892.4 890.7
13
10 20
13

76

18 80

94

# *
19 00
17 60
19 20
14 40

Dense Trees

96

20
00

14 20

92

803.6
90
80

14 00

88 0 86 0 84 0

82

12

85 0

C onvey or

78

888.2

0
80 0

Dense Trees

12

82
13 80

0 178

14 60
14 80
15 00

12
12

96

40
20

13 60

84 0
13 40

88 0

MS-4
10

20

18 20

20

00

20
15 40 15 60

15 20

12

00

13 00

18 40

" )
10

11

12 80

20 40

12 60

797.7
12 40 12 20
82

833.4
0

833.4 832.4
11
10
00

94

19

86 0

886.2 830.4
13 20

60

92 0

0
84 0

18 00

800.4

83 0

84 0

Pylon
88 0

86 0
88 0

830.9
6
20

830.9
0
11
40

92

86
12 00
118 0
81 0

18 60

0
20 60

0.5
15 80
20 80
16 00
16 20

1
21 00

92 0

90 0

Un pa ve d

80

20

20 6 0

80

Dense Trees

82

Dense Trees
80
84

84 0

60

Ro

67 0

74 0

78

0
72 0

23 80

20 8 0

66 0

76

20 4 0
00

116 0

84

82
0

659.2

ad

23 60

657.1

0
72 0
70 0
68 0

23 40
18

20 6 0

20 2 0

74

84

23 20
17 80

20

114 0

82

72 0

40

86 0

C onvey ors

704.7 72

0
70 0
68 0
66 0

23 00

22

80

20 4 0

20 0 0

80 0

687.3

70

60

19 80

66 0

22

40

20

20
17

668.7 669.2 C onvey or

685.8

60

19

40

18

702.9

54
68 0

15 20

13 04 .3

40

52 9 .1

13

80

60

12

15

80

15

40

14

80

14

60

14

40

19

19

20

20

20

60

80

00

21

13

00

17 40 17 60

80 0

12 60

10

60

78 0

124 0

96

10

10 80

86

17 20

12 20

823.0
82 0

78 0

Miles
17 00
80 16
16 60

10

80

81 4.8
0

84 0

21

14

80

14

20

00

20

14

14

60

80

13

13

20

60

13

80

15

20

88
86

0
0

14

80

17

72 0

20

17

40

19

15

20

17

80

LEGEND

20
17

15

60

Pylon

00

15

80

16

00

18

80

19

00

19

60

19

80

13
14
80

17

20

00

20

17

20

17

17

17

60

80

18

00

18

40

20

24

24

24
40

23

20

23

00
14 20
14

6
13 20

0
13
13

70 0
66 0

50

72 0

70

84 0
86 0
88 0

0
68 0

66 0

90 0
92 0

64 0

94 0

10 20

10 00
0

96
96 0

12

13
12

14

20
60
40

90 0

88 0
0 90

20
00

10

70 0

88 0

86 0
84 0

82 0

Dense Trees

98 0

19 40
16 40
60

19 80

Ro a d

10

40
10 60

116

84

80

114
11 0 0
2 0 11

12 00

11

80

11

11
60

0
40
11
11

80

84

20

82 0
112 0

92

00

110 0

79 0

81 4.8 81 3.8
98
82 0

90

21 20
18

80 0

88 0

40

10 60

1280
13 00
13 20

10

20

10 40

77 0

81 2.6
94 0
10 00
10 20

78 0

30111 2186. 39

18 80

18 60

18 40

20

1780
18 00
18 20

SW-3
13 40
13 60

980 Dense Trees

10 00
96 0

77
98 0
84 0

0
96 0
94 0
92 0
76 0

760

86

0
84 0
82 0
80 0

80 0

19 40

19 20
18 40

19 00

Dense Trees

# *

94 0

REFERENCES
Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet

PROJECT

92 0

82 0

78

Dense Trees
0

78

! P

Groundwater monitor well

! Hydrogeology borehole (
0

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

! / Borehole with transducer


500 1,000 Feet 1,500

# *

MONITORING LOCATIONS
PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/8/2010 2/8/2010 2/8/2010 2/8/2010 FILE No. SCALE: AS SHOWN REV. 0

Surface water sample location " Surface water station ) Facility boundary

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\H_well_map

FIGURE 3.1

1800

1700

1600

1500

1400

Groundwater Elevation (ft amsl)

1300

1200

1100

1000 9/10
Pumping Test End GT4-25A HG-7 MW

8/31

9/20

9/30

10/10

10/20

10/30

Pumping Test Start HG-10 D VWT HG-6 MW

Date

HG-10 S PW GT3-4 HG-9 MW

HG-10 INT VWT HG-4 MW

Title Project Name Client Name

Groundwater Levels
Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.1

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

-1

Relative Water Level Change (feet)

7 9/26 10/1 10/6 10/11 10/16 10/21 10/26

9/16

9/21

Date

HG-10 S PW
Title Project Name Client Name

HG-10 INT VWT

HG-10 D VWT

GT4-25A

GT3-4

HG-4 MW

HG-6 MW

HG-7 MW

HG-9 MW Drawn
DH

Relative Groundwater Changes


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Checked

SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.2

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

Recovery

10 Pumping Rate (Q) = 48 gpm Drawdown per log cycle: 0.7 ft Transmissivity (T) = 2600 ft^2/day

Cooper-Jacob Straight-Line Method Analysis Period: 10 to 100 t/t'

15

Drawdown (feet)

20

25
Drawdown

Cooper-Jacob Straight-Line Method

Analysis Period: 100 to 200 minutes

30

Pumping Rate (Q) = 48 gpm

Drawdown per log cycle: 0.7 ft

Transmissivity (T) = 2400 ft^2/day

35 1 10 100 1,000 10,000

t (minutes) and t/t' (dimensionless)


Title Project Name Client Name

HG-10S Drawdown and Recovery Semi-Log Plot


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.3

Section 4 - ALL FIGURES_040710dh.xlsx

100

Pumping rate adjustment

10
Boundary Dominated Flow

Wellbore Storage

1 1

2
Break in slope at approximately 5 minutes of pumping Partial Penetration

Drawdown (feet)

0.1

HG-10s PW - Corrected Drawdown

HG-10s PW - Derivative Drawdown

HG-10s PW - Derivative Recovery

0.01 0 1 10 100 1,000 10,000

Elapsed pumping time (minutes)


Title Project Name Client Name

HG-10S Drawdown and Recovery Derivative Log-Log Plot


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.4

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

0 0.0
Drawdown corrected for groundwater level trend

2 0.5 1.0 1.5 2.0


Uncorrected drawdown Drawdown corrected for groundwater level trend

8
Uncorrected drawdown

Drawdown (feet)

Drawdown (feet) 2.5

10

12

14
3.5 100 1000 Elapsed Time (minutes)
Legend

HG-10int VWT 7 feet from HG-10S PW

3.0

GT4-25a 625 feet from HG-10S PW

10

10000

10

100

1000

10000

Elapsed Time (minutes)

0.0

0.5
Drawdown corrected for groundwater level trend Uncorrected drawdown

Cooper-Jacob Straight-Line Analysis HG-10INT VWT GT3-4 GT4-25A


Cooper-Jacob Straight-Line Analysis Results HG-10INT VWT T = 1,847 ft2/d S = 0.9 GT3-4 T = 2,059 ft2/d S = 3 x10-3

Drawdown (feet)

1.0

1.5

GT3-4 850 feet from HG-10S PW

2.0 100 1000 Elapsed Time (minutes)


Title Project Name Client Name

10

10000

GT4-25A T = 2,074 ft2/d S = 1 x10-3 Drawn Checked


DH

Corrected Drawdown Hydrographs for Observation Wells


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.5

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

100

10

Drawdown (feet)

0.1

Parameters Solution: Theis (partial penetration) T = 2,224 feet2/day S = 2.6 x 10-3 b = 400 feet
625 feet from HG-10s PW

HG-10s PW

850 feet from HG-10s PW

GT4-25a - Observed Drawdown

GT3-4 - Observed Drawdwon

Type Curve
1 10 100 1,000 10,000

0.01

Elapsed pumping time (minutes)


Title Project Name Client Name

Theis Partial Penetration Analysis Results from AQTESOLV


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.6

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

100

10

Drawdown (feet)

0.1

Parameters Solution: Theis (partial penetration) T = 2,224 feet2/day S = 9.3 x 10-3 b = 400 feet
625 feet from HG-10s PW

HG-10s PW

850 feet from HG-10s PW

GT4-25a - Observed Drawdown

GT3-4 - Observed Drawdwon

Type Curve
1 10 100 1,000 10,000

0.01

Elapsed pumping time (minutes)


Title Project Name Client Name

Theis Partial Penetration Analysis Results from AQTESOLV


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.7

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

10 S = 1.0 E-4 S = 1.0 E-3 S = 5.0 E-3 HG-10INT GT4-25A


Predicted drawdown at the pumping well (HG-10S); actual drawdown = 26.03 feet after 12 hours.

8 GT3-4

Drawdown (feet)

Parameters: T = 2,224 ft2/d Q = 9,200 ft3/d (48 gpm) t = 0.5 days

0 1.0 10.0 100.0 1,000.0

0.1

Distance (feet)
Title Project Name Client Name

Distance vs. Drawdown Semi-Log Plot


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH

MPK

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.8

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

Title Project Name Client Name

Groundwater Elevation Contour Map


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

GW DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.9

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

790

780

770

760

750

Water Level Elevation (feet amsl)

740

730

720 4/1/2009 5/1/2009 6/1/2009 7/1/2009 Date Water Level


Title Project Name Client Name

2/1/2009

3/1/2009

8/1/2009

9/1/2009

10/1/2009

11/1/2009

North Quarry Water Level - February to October 2010


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.10

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

2,000

1,800 HG-4

1,600 HG-10S GT3-4 GT4-25A HG-10INT

HG-6

1,400

HG-7

1,200 HG-9 HG-10D HG-8

Groundwater Elevation (feet amsl)

1,000

Greenstone/Graywacke Water Levels

Limestone Water levels

Static groundwater elevation measured on September 28, 2009 at 8:00 AM 1,500 1,400 1,300 1,200 1,100 1,000 900

800

1,700

1,600

Bottom Elevation of Completion Interval (feet amsl)


Title Project Name Client Name

Groundwater Elevation vs. Well Completion Elevation


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

DH SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.11

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

100
Measured Streamflow Predicted Streamflow Estimated Baseflow

10

Discharge (cfs)

0.1

0.01

0.001 Nov-08 Jan-09 Mar-09 May-09 Jul-09 Sep-09 Nov-09

Jul-08

Sep-08

Title Project Name Client Name

MS-1 Baseflow Separation Hydrograph


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

JP/DH SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.12

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

100
Predicted Streamflow Modeled Baseflow

Measured Streamflow

10

Discharge (cfs)

0.1

0.01

0.001 Nov-08 Jan-09 Mar-09 May-09 Jul-09 Sep-09 Nov-09

Jul-08

Sep-08

Title Project Name Client Name

MS-2 Baseflow Separation Hydrograph


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

JP/DH

SDT

063-7109-500 May 2010

Reviewed FIGURE

DB

4.13

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

10000
Predicted Streamflow Modeled Baseflow

Measured Streamflow

1000

100

10

Discharge (cfs)

0.1

0.01

0.001 Nov-08 Jan-09 Mar-09 May-09 Jul-09 Sep-09 Nov-09

Jul-08

Sep-08

Title Project Name Client Name

MS-3 Baseflow Separation Hydrograph


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

JP/DH

SDT

063-7109-500 May 2010

Reviewed FIGURE

DB

4.14

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

1000
Predicted Streamflow Modeled Baseflow

Measured Streamflow

100

10

Discharge (cfs)

0.1

0.01

0.001 Nov-08 Jan-09 Mar-09 May-09 Jul-09 Sep-09 Nov-09

Jul-08

Sep-08

Title Project Name Client Name

MS-4 Baseflow Separation Hydrograph


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

JP/DH

SDT

063-7109-500 May 2010

Reviewed FIGURE

DB

4.15

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

790

4.50

4.00

780 3.50

770 3.00

760

2.50

750

2.00

Water Level Elevation (feet amsl)

740 1.00

730 0.50

720
4/1/2009 5/1/2009 6/1/2009 7/1/2009 Date 8/1/2009 9/1/2009 10/1/2009

0.00
11/1/2009

2/1/2009

3/1/2009

Precipitation

Water Level
Drawn Checked
Project No. Date

Title Project Name Client Name

North Quarry Water Level and Daily Precipitation


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109-500 May 2010

SDT Reviewed DB

FIGURE

4.16

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

Daily Precipitation (inches) 1.50


DH

790

1,400

780

1,200

770

1,000

760

800

Water Level Elevation (feet amsl)

740

400

730

200

720 4/1/2009 5/1/2009 6/1/2009 7/1/2009 Date Pumping Rate


Title Project Name Client Name

0 8/1/2009 9/1/2009 10/1/2009 11/1/2009

2/1/2009

3/1/2009

Water Level
Drawn DH

North Quarry Water Level and Pumping Rate


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Checked

SDT

063-7109-500 May 2010

Reviewed

DB

FIGURE

4.17

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

Pumping Rate (gpm) 600

750

10,000

780

770

1,000 760

Groundwater inflow of approximately 1,000 gpm Groundwater inflow of approximately 210 gpm

750

100 740

Total North Quarry Inflow (gpm)

730

720

1 4/2/09 5/2/09 6/1/09 Date 7/1/09 7/31/09 8/30/09 9/29/09


North Quarry Water Elevation Surface Runoff (gpm) Precipitation (gpm) Pan Evaporation (gpm)

710 10/29/09

2/1/09

3/3/09

Title Project Name Client Name

North Quarry Inflow - Existing Condition


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

063-7109-500 May 2010

Reviewed

FIGURE

4.18

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Phase 6\Redmond 111609\Hydrogeologic Report\Figures\Supporting Files\Section 4 - ALL FIGURES_040710dh.xlsx

North Quarry Water Elevation (ft amsl)


DH SDT DB

10

River condition
Constant Constant head Head

B A A A

Constant head Limestone Unit Drain condition

Section Line (see Figs 5.3 and 5.4)

Greenstone Unit River condition

Constant Head

Constant head

N
Title Project Name Client Name

4000 feet

Approx location of private wells along Monte Bello ridge Model Domain and Boundary Conditions
Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.1

Section 5_MODFLOW_plots_041210.xlsx

Greenstone Unit North Quarry (Drains at 750 ft amsl) Limestone Unit

2,000 feet
Title Project Name Client Name

N
Model Grid and Boundary Conditions - Quarry Area
Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.2

Section 5_MODFLOW_plots_041210.xlsx

Monte Bello Cr.

Permanente Cr.

North Quarry

4,000 feet Vertical exaggeration = 2.5


Title Project Name Client Name

Unnamed Creek

B South

B' North

Section North-South Through North Quarry


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.3

Section 5_MODFLOW_plots_041210.xlsx

Permanente Cr.

North Quarry

A West A' East


Permanente Creek
Vertical exaggeration = 2.5
Title Project Name Client Name

4,000 feet

Section West-East Through North Quarry


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.4

Section 5_MODFLOW_plots_041210.xlsx

1,600 Topographic elevation (ft amsl) 4000 feet


Title Project Name Client Name

N
Model Top Surface - Current Conditions
Drawn Checked
SDT

DH

Hydrologic Investigation Permanente Quarry Reclamation Plan Update

Project No. Date

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.5

Section 5_MODFLOW_plots_041210.xlsx

North Quarry

1,200
Piezometric Level (ft amsl)
Title Project Name Client Name

N
Simulated Current Piezometric Heads
Project No.

6,000 feet
Drawn Checked
SDT

DH

Hydrologic Investigation Permanente Quarry Reclamation Plan Update

063-7109-500
Date

Reviewed

DB

May 2010

FIGURE

5.6

Section 5_MODFLOW_plots_041210.xlsx

North Quarry (Drains)

1,200 Piezometric Level (ft amsl)

1,600 feet

N
Title Project Name Client Name

Simulated Current Piezometric Heads Quarry Area


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.7

Section 5_MODFLOW_plots_041210.xlsx

1,800

1,600

Simulated Head (ft amsl)

1,400

1,200

1,000 1100 1200 1300 1400 1500 1600 1700 1800

1000

Observed Head (ft amsl)


Title Project Name Client Name

Calibrated versus Observed heads October 2009


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.8

Section 5_MODFLOW_plots_041210.xlsx

South North
Permanente Cr.

Planned South Quarry

North Quarry

Vertical exaggeration = 2.5


Title Project Name Client Name

1,000 feet

North-South Section Current Conditions


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.9

Section 5_MODFLOW_plots_041210.xlsx

South North
Permanente Cr. North Quarry

South Quarry

Vertical exaggeration = 2.5


Title Project Name Client Name

1,000 feet North-South Section Phase 1


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.10

Section 5_MODFLOW_plots_041210.xlsx

South North
Permanente Cr. North Quarry (backfilled)

South Quarry

Vertical exaggeration = 2.5


Title Project Name Client Name

1,000 feet North-South Section Phase 2


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.11

Section 5_MODFLOW_plots_041210.xlsx

South North
North Quarry (backfilled) Permanente Cr.
1,000 feet
Title Project Name Client Name

South Quarry

Vertical exaggeration = 2.5 North-South Section Phase 3


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.12

Section 5_MODFLOW_plots_041210.xlsx

South
North Permanente Cr. South Quarry North Quarry

Vertical exaggeration = 2.5


Title Project Name Client Name

1,000 feet North-South Section Phase 4


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.13

Section 5_MODFLOW_plots_041210.xlsx

South
Permanente Cr. South Quarry

North North Quarry (backfilled)

Vertical exaggeration = 2.5


Title Project Name Client Name

1,000 feet North-South Section Phase 5


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.14

Section 5_MODFLOW_plots_041210.xlsx

1,200
Piezometric Level (ft amsl) Dry cells

North Quarry

South Quarry

N
Title Project Name Client Name

2,400 feet
Drawn
SDT

Simulated Piezometric Heads Phase 1


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Checked

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.15

Section 5_MODFLOW_plots_041210.xlsx

1,200

North Quarry
Dry cells

Piezometric Level (ft amsl)

South Quarry

N
Title Project Name Client Name

2,400 feet

Simulated Piezometric Heads Phase 5


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

SDT

DH

063-7109-500 May 2010

Reviewed

DB

FIGURE

5.16

Section 5_MODFLOW_plots_041210.xlsx

35 30 25 20 15 10 5 0 8-Oct-09 16-Jul-09 26-Feb-09 23-Apr-09 18-Jun-09 10-Sep-09 5-Nov-09 3-Dec-09 26-Mar-09 21-May-09 13-Aug-09 31-Dec-09 WW - Nov 09 Nov-09 Month Dec-09 Jan-10
Drawn Checked
Project No. Date

1-Jan-09

Cumulative Precipitation (inches)

29-Jan-09

Date SW - Feb-09 SW - Apr-09 SW - Sep-09 SW - Jan-10

Cumulative Annual Precipitation WW - Wall Washing

SW - Surface Water Monitoring

12

10

2 Mar-09 Apr-09 May-09 Jun-09 Jul-09 Aug-09 Sep-09 Oct-09

Monthly Precipitation (inches)

Jan-09

Feb-09

Title Project Name Client Name

Site Precipitation vs. Surface Water and Wall Washing Sampling Events
Hydrologic Investigation 063-7109.500 May 2010

CR FV Reviewed DB

Lehigh Southwest Cement Company

FIGURE

6.1

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Rainfall.xlsx

18 70 .7 12 47 .5

60

GR O UN D 13 33 .2 12 46 .3 11 4 5. 1 13 31 . 5 11 4 5. 4
79

18

O B S C U R ED 12 46 .0 11 4 4. 1 11 4 0 13 1 1. 8 11 9 0. 1 12 46 .1 13 1 0. 3
0

18 40

DEN S E T R EE S

BY

15

90

12 40

11 9 0
11 4 3. 7 11 4 3. 5 11 9 1. 7 13 82 .9 14 91 . 4 627 . 5 555 . 9 11 9 1. 3 DEN S E T R EE S 11 9 0. 4 11 9 1. 1 13 83 .8 GR O UN D O B S C U R ED BY

11 8 9. 3 12 46 .7

13 83 .7

14 89 .6

640

59
GR O UN D O B S C U R ED DEN S E T R EE S BY 443 . 0 DEN S E T R EE S

0
61 5. 4

441 . 5

18 40

18 90 .6

16

40

14
12 58 .8 11 9 5. 6
64

9
14 22 .9

0
89 0

11 11 4 3. 8 4 3. 4

690
74 0

18 40

18 45 .3

12 55 .5
0

40

10

18 49 .8 11 9 2. 8 10 39 .5 994 . 6 998 . 5 992 . 7 999 . 9 10 36 .4 990 . 6 12 41 . 5 14 00 .7 14 75 .5 GR O UN D O B S C U R ED DEN S E T R EE S BY 694 . 0 554 . 5 552 . 5 12 43 .6 GR O UN D O B S C U R ED DEN S E T R EE S BY
10 40
740

480

18 44 .1 11 9 7. 7 14 76 .0

18 43 .7

17 93 .7

18 48 .7

18 42 .8 18 44 .7

18 38 .7

18 40 .5

17 92 .9

17 91 . 5

17 41 . 9

13 40
840
696 . 8 758 . 5 748 . 5 696 . 1 757 . 3 698 . 3 701 . 0 DEN S E T R EE S 868 . 8 863 . 5 855 . 7 786 . 2 652 . 1 61 2. 9 556 . 9 560 . 7 558 . 2 559 . 5 863 . 7 855 . 1 821 . 7 841 . 2 845 . 0 842 . 2 571 . 4 593 . 6 559 . 6 557 . 4 640 . 4 PI LE 823 . 3 654 . 5 854 . 0
890
640

11 9 5. 2

790

71 6. 0

490

18 43 .8

17 94 .1

13 45 .7 553 . 9

990
552 . 7

470

18 43 .7
13 90

18 44 .0

18 44 .8 11 9 3. 0 993 . 0 554 . 8 DEN S E T R EE S

12 01 . 5 11 3 9. 7 DEN S E T R EE S BY

GR O UN D O B S C U R ED

447 .6
460

18 45 .1 14 05 .2 10 36 .8 BY O B S C U R ED 14 75 .0 GR O UN D

18 58 .7 13 63 .7 11 9 4. 7

18 46 .5 15 74 .8 15 76 .4
0

10 41 . 0

94

89 0
554 . 1

450

15 78 .3 13 60 .4 10 39 .1 10 32 .7

13 34 .1 11 9 6. 7

11 4 4. 8

690
59

18 47 .4 14 1 7. 7 71 8. 1 10 38 .5

11 4 1. 9 12 46 .0 71 8. 7

10 40
540

13 1 1. 5

990

18 46 .8 10 38 .2 10 35 .5

18 49 .2

16

90

490

14
13 68 .2 11 4 2. 8

40
14 24 .5 13 82 .3 11 4 4. 8

13 34 .3 11 9 5. 1

11 4 4. 5 11 4 5. 2

10 90
84 0

445 .9

483 .0

14 40

497 .3 462 .9 464 .8 Pylo n


480

18 47 .8

18 05 .6

18 42 .5

17 90 .4

17 42 .1

12 90

14 74 .9

18 38 .7

17 41 . 7 997 . 3 12 43 .3 13 91 . 5 14 73 .4 14 73 .5 14 74 .1 14 24 .9 13 87 .4 10 64 .2 885 . 8 10 39 .7 883 . 8 867 . 4 870 . 3 865 .7 823 . 2 870 . 8 10 36 .6 10 65 .0 10 23 .1 889 . 8 887 . 1 892 . 5 909 . 2 901 . 9 900 . 8 827 . 3 752 . 8 774 . 1 555 . 7 625 . 1 774 . 4 675 . 3
540

18 39 .3 14 32 .7 14 25 .6 14 26 .1 559 . 1 556 . 0 555 . 0 694 . 9 14 48 .8 14 29 .1 556 . 7 555 . 0 14 25 .3 11 2 7. 9 10 35 .8 12 37 .5 13 1 2. 9 14 41 . 2 13 46 .8 14 41 . 7


40

17 89 .2

17 40 .5 10 04 .7

16 90 .5 14 28 .3

10 36 .1 12 42 .3 14 33 .0

14 37 .7

13 90
13 40

12 90
551 . 7

11 90
695 . 3

11 4 0
690

10 90

SL-27-PD
) "
WL 465 .5

12 40

18
13 35 .1

40

17 99 .9

18 44 .4

18 1 6. 0 12 38 .0 14 74 .6 14 74 .8 14 77 .0
12

18 1 6. 6

17 98 .0 698 . 1 606 . 1 557 . 9

18

40

17 88 .5

16 90 .6

462 .8 467 .7 469 .9

465 .3 467 .5

463 .1
500

461.5 480

17 89 .3

17 38 .4

16 91 . 5

17 97 .6 10 1 6. 3 14 46 .2 874 . 6 874 . 7 872 . 1 845 . 5 784 . 3 867 . 5 821 . 9 785 . 1 675 . 8 680 . 8 554 . 3 10 68 .9 776 . 4 T OP O F T A NK 885 . 0 908 . 7

PER M A N EN T E
463 . 6 470 . 1

RD .

SL-26-PD
) "
475 . 6 478 . 2 51 1 .9

17 97 .3 13 1 3. 4

17 91 . 2

16 91 . 8

18 1 3. 5

17 92 .7

17 92 .7

17

90

16 95 .1

14 40

18 74 .8
13 90
10 26 .1

18 16.9
13 40

18 60
12 90
13 36 .2 12 38 .4 14 95 .8 15 00 .4 14 06 .7 13 35 .0 13 27 .2 13 33 .7 13 33 .0 13 02 .8 10 32 .4 883 . 9 874 . 9 885 . 9 874 . 6 897 . 1 904 . 6 889 . 3 820 . 9 81 5. 8 776 . 8
0 59

18 40
12
13 68 .6 12 90 .1 872 . 7 904 . 0 758 . 6 833 . 6 698 . 8 61 4. 4 PI LE 558 . 6 557 . 1 520 . 4 847 . 3 845 . 9 755 . 6 838 . 6 12 72 .9 10 42 .7 13 87 .0

18

20

16 62 .9 12 72 .4 10 34 .9 13 43 .8 13 87 .8 13 36 .5 869 . 6 12 80 .3

12

18
10 38 .5 12 38 .0 14 1 5. 0 14 77 .0

16

13 36 .4

90

40
14 88 .5

17 51 . 8 12 41 . 4

17 55 .2 12 37 .8 14 41 . 0 14 77 .4 13 87 .9

17
13 1 3. 9 14 77 .2 10 73 .7 14 74 .6

40
13 43 .9

16

40

12 37 .1 14 75 .1

16 84 .8

16 26 .1

472 . 5

510.6 511.8 510.9 511.9


51 1 .7 51 2. 5

90

40

18 00

18 40

17
13 44 .2 12 71 . 8 10 50 .5 12 38 .4 12 40 .4 13 42 .1 13 67 .2 14 04 .7 14 05 .8 13 87 .5 13 66 .0 12 36 .3 12 71 . 4 13 34 .6 12 71 . 2 12 72 .0 12 71 . 7 12 72 .0 12 71 . 9 12 72 .2 12 72 .0 12 72 .1 12 72 .0 13 08 .6 11 5 2. 9 11 5 3. 6 907 . 2 863 . 1 843 . 3
79 0
89 0

17

40

15 39 .8 12 1 4. 1 11 2 4. 4

14 35 .0

13 1 2. 8

12 38 .5

13 48 .1

17 80
13 88 .3 13 67 .9 12 73 .8 10 34 .2 13 65 .7 13 46 .5 12 70 .9 10 54 .5 11 2 4. 6 12 38 .2 10 65 .1 12 37 .4 11 2 7. 0 12 94 .2 895 . 6 908 . 9 883 . 5 14 05 .1
990

5-4

18 20

17
12 38 .8 13 88 .6 14 05 .2 884 . 0 892 . 3 908 . 3 899 . 1 821 . 3 81 8. 6 901 . 1 905 . 4 824 . 8 900 . 3 873 . 5

20
90
10 44 .8

14 84 .2 14 91 . 3

17 20

17 00

18 00

15 24 .0 12 78 .3 12 77 .8 12 24 .9 12 47 .9

13 43 .1

16
0
12 36 .8 891 . 0 885 . 4 81 7. 7 736 . 9 686 . 3 595 . 9 591 . 0 573 . 2 594 . 5 575 . 5 PI LE 577 . 4 559 . 1 559 . 0 561 . 7 557 . 4 773 . 5 851 . 0 740 . 3 807 . 8 805 . 3 724 . 4 691 . 5 723 . 2 692 . 1 690 . 6 625 . 1 675 . 2 561 . 5 691 . 0 690 . 4 81 4. 9 738 . 3 725 . 5 688 . 1 695 . 1 729 . 1 557 . 8 887 . 7 892 . 5 858 . 2 865 . 4 872 . 6 874 . 4 887 . 6 881 . 1 786 . 5 793 . 6 765 . 3 692 . 1 796 . 2 865 . 2 878 . 0 880 . 8 873 . 6 879 . 4 883 . 9

16
9 11
0

60
940
885 . 0 881 . 4 883 . 0 .7 880 . 2 892

16 60
10 76 .4 12 35 .6 13 39 .0 13 35 .7 11 2 9. 0 13 35 .2 13 1 9. 2 13 1 8. 1 12 71 . 9 12 72 .1 12 26 .0 12 26 .7
12

16 80

17 80
13 43 .2 13 87 .2

17 60

18

00

12

40

12 1 9. 7 884 . 8 883 . 9

620

5-5

12 74 .2

600

18 14.9

15 1 8. 6

51 1 .7 525 . 7 51 0. 8 484 . 6 51 0. 2 534 . 7 DEN S E T R EE S 488 . 1

580

17 40

15 24 .7

15 1 4. 7 15 09 .9

12 20 .4

10 40

51 8. 1

51 6. 1

51 1 .2

560

17 60

51 3. 4

540

15 1 0. 8

14 97 .4

11 2 3. 4

14 06 .2

SL-25-CR
DEN S E T R EE S

52

60

) " ) "

18 20

18

00

17

80

16 87 .9

15 90

15 42 .4

15 41 . 6

15 20 .9

15 09 .4

14

Den se Tree s

640

17

80

40
12 34 .9
11 4

17

16
11 2 8. 9 12 34 .1 10 97 .1 12 31 . 9 13 26 .0 13 1 7. 9 12 72 .6 12 72 .9 11 4 8. 7 12 71 . 1 12 72 .3 12 72 .1 12 71 . 6 71 . 9 12 12 71 . 6 12 71 . 7 12 71 . 5 12 71 . 8 91 1 .9 12 72 .4 11 6 0. 2 907 . 1 13 08 .9 12 71 . 2 13 00 .8 12 71 . 6 13 42 .8 13 32 .3 13 21 . 6 873 . 1 556 . 8 552 . 2 91 6. 0 879 . 6 13 25 .3 12 71 . 4 12 71 . 5 12 71 . 9 12 66 .7 904 . 3 91 1 .3 91 9. 9 91 7. 8 868 . 2

40

17 40

17

60

17 35 .0

15 24 .4

15 21 . 1

15 34 .2

15 1 3. 1

17

40

15 23 .9

15 1 1. 7

20

17

20

15 65 .1

15 64 .4

16 00
10 90
12 32 .9 12 33 .3 12 34 .8 11 0 1. 8

15 80

17

00

17 20

15 77 .8

15

60

15

40

16 80

17 00

17

20

15 58 .1

14

90

13 55 .4

14

40

13 44 .4

541 . 0

492 . 7 491 . 7 546 . 4 495 . 0 493 . 4

489 . 4

49

17 30

15 22 .1

15 1 0. 9

13 49 .3

13 55 .8

SL-24-PD
549 . 9 499 . 3 552 . 3 549 . 7 552 . 4 551 . 4 552 . 9 503 . 9 503 . 6 553 . 4 506 . 1 501 . 9

51 0. 1

40

16

16

14 80

16

10

40

17 03 .2
40
12 90
12 36 .3 11 0 1. 5
90

15 00

17

00

15

15 20

60

15 15 78 .7 82 .3

15 53 .9

13

90

13 64 .6

51 0. 7

13 42 .1

54
51 0. 2 509 . 6 495 . 9

16

80

13 98 .6 12 84 .1 13 34 .2 12 73 .0 12 71 . 6 12 71 . 7 11 5 2. 5 858 . 6 762 . 7 692 . 6 691 . 8 678 . 9 584 . 4 560 . 7 649 . 0 642 . 4 764 . 0
740

13 75 .7

13 34 .7

84

15

00
12 71 . 9 767 . 9

17

11 9 0

) "
69
11 0 2. 2 11 1 5. 9 882 . 7

14 80
11 4 2. 5 12 1 6. 0 11 2 6. 6 11 7 5. 5 12 56 .9 692 . 7 691 . 5 559 . 7 12 53 .7 12 48 .3 12 68 .1 794 . 2 10 1 0. 2 864 . 0 864 . 8 797 . 5 702 . 1 706 . 2
69 0

15 00
11 4 5. 7 12 52 .9 12 71 . 5 696 . 5 10 08 .7 10 28 .3 694 . 2 799 . 8 690 . 4 71 1 .2 642 . 7 643 . 5 701 . 3 642 . 7 687 . 1 685 . 0 685 . 9 684 . 1 684 . 7 642 . 2 687 . 8 649 . 6 605 . 7 584 . 1 535 . 1 534 . 3 534 . 8 534 . 5 574 . 0 591 . 6 638 . 7 575 . 8 573 . 0 571 . 0 571 . 3 570 . 1 566 . 8 568 . 6 557 . 0 568 . 0 564 . 4 565 . 7 556 . 7 556 . 1 534 . 7 556 . 2 521 . 0 556 . 2 557 . 9 653 . 7 609 . 2 608 . 5 645 . 7 595 . 0 635 . 9 575 . 7 661 . 8 685 . 9 664 . 6 662 . 2 687 . 0 850 . 2 705 . 8 852 . 7 695 . 8 662 . 1 660 . 8 666 . 8 667 . 8 573 . 8 578 . 6 597 . 8 665 . 7 598 . 5 665 . 9 599 . 6 599 . 3 599 . 7 603 . 5 603 . 9 603 . 0 601 . 9 586 . 8 585 . 1 574 . 3 555 . 2 585 . 0 PI LE 552 . 8 572 . 5 535 . 3 592 . 3 598 . 4 579 . 4 667 . 7 576 . 7 573 . 8 570 . 3 569 . 4 569 . 4 684 . 5 658 . 5 668 . 1 640 . 0 656 . 9 659 . 6 573 . 9 659 . 0 659 . 7 573 . 2 693 . 3 646 . 0 676 . 3 690 . 8 687 . 7 698 . 9 691 . 8 705 . 5 693 . 7 692 . 9 692 . 4 696 . 2 61 2. 0 559 . 9 856 . 6 850 . 3 12 53 .2 793 . 4 12 70 .8 12 71 . 6 12 70 .2 10 05 .4 12 65 .9 12 71 . 6 12 71 . 9 12 71 . 5 765 . 8 760 . 4

15 20

14

14

15
12 73 .0 12 72 .8

15
11 0 4. 5 11 5 2. 3 859 . 9 774 . 3 767 . 7 PI LE 13 37 .5 12 72 .5 71 . 2 12 12 71 . 9 768 . 1 11 4 5. 4 767 . 4 10 64 .1 793 . 7 790 765 . 8 885 . 7 692 . 1 581 . 5 676 . 1

80

00

20

16 60

16

40

16 20 .1

13 96 .7

11 0 7. 1

64

15
12 73 .2 12 12 71 . 3 71 . 9 865 . 6 11 4 5. 3 12 72 .4 842 . 2 692 . 0

40

16 80

16 1 1. 9 12 71 . 1 12 71 . 9

14 06 .8

11 4 0

12 72 .2

13 07 .0

788 . 0

60
887 . 6 798 . 2

12 78 .8

12 71 . 5 11 5 5. 3

14 60
0

15

80

00

15 1 4. 3

13 95 .9

13 84 .6

60

16

20

16

60

51 1 .1 498 . 1

51 3. 4 533 . 5 500 . 5 51 6. 0

660

15 40

60

16

20

SL-BG-CR
11 4 3. 7 10 87 .6 12 04 .6 12 55 .4 12 45 .3 10 52 .4 11 5 4. 1 10 48 .9 872 . 9 695 . 3 767 . 2 71 2. 8 733 . 7 750 . 8 71 2. 8 752 . 5 694 . 6 71 5. 3 696 . 0 642 . 0 573 . 1 686 . 9 656 . 8 693 . 4 WL 706 . 8 692 . 9 685 . 9 903 . 4 884 . 8 739 . 2 695 . 0 864 . 7 698 . 4 10 66 .2 10 64 .4 10 57 .6 10 46 .3 10 64 .6 10 62 .1 690 . 1 12 54 .3 12 63 .2 12 34 .5 12 35 .0 12 57 .7 12 53 .5 12 59 .6 12 54 .0 555 . 5 10 88 .5 11 4 2. 2 11 3 8. 2 11 8 0. 2 12 24 .3 12 03 .7 12 1 0. 9 12 1 3. 6 12 32 .7 12 05 .5 11 4 2. 8 11 4 8. 7 11 9 6. 5 11 1 6. 4 11 0 5. 6 11 8 2. 7 11 8 3. 9 11 6 4. 0 11 7 7. 5 11 8 4. 6 11 3 5. 2 11 3 2. 7 11 9 5. 7 11 3 3. 4 12 54 .9 12 54 .4 10 89 .0

15 60

16

00

15 78 .5

68

15

0
502 . 9 51 6. 7 505 . 1 555 . 0 554 . 5 508 . 0 508 . 0 51 8. 9 534 . 3 507 . 8 555 . 5 555 . 3 51 2. 7 556 . 3 555 . 9 51 4. 9 51 4. 7 51 8. 9 51 7. 2 51 2. 3 51 0. 4 509 . 9 521 . 1 GR O UN D O B S C U R ED DEN S E T R EE S BY 532 . 9 573 . 8

15 80

15 80

16

15 78 .6

90

20

15

16 20
12 40
11 90
12 40

16

13 91 . 2

00

16 40

15 98 .2

11 9 2. 9

11 4 6. 2

15

16 60

80

15 99 .8

12 96 .3

U n

12 96 .5

16 00

16

15 21 . 0

11 4 3. 1

14

40

5-9

16 05 .3

12 96 .4

70

14

15 80 .3

16 1 5. 3

90

15 23 .3

13 94 .0

12 42 .4

11 9 0. 8

40

16 80
90

15

60

15 89 .1

15 26 .3

13 93 .1

12 86 .7

11 9 3. 8

11 4 0. 4

11 3 5. 2

10 91 . 5

72

74

17 00
10

11

17 40
10 42 .2 10 61 . 5 10 53 .2 10 34 .0 764 . 2 11 8 9. 5 11 3 5. 7

11 4

15 90

17 60
0
10 97 .6

15 20
11 4 2. 0 10 96 .9 11 8 6. 8

15 65 .2

15 55 .9 11 8 3. 3 10 97 .9 10 95 .8

15 44 .4 12 1 3. 2 11 2 5. 8 10 1 7. 8 10 37 .3

15 51 . 2

90

17 20
10 54 .4 731 . 8 729 . 3

SW-1
64 0

15 40

15 29 .8

13 23 .3

15 26 .1

11 9 3. 3

11 3 7. 8

13 92 .3

12 94 .0

11 4 2. 0

10 94 .5

522 . 1

748 .1 741.5
523 . 7 597 . 7

750 .5 750 .3

Pylo n

12 96 .5

89

17 80
11 8 3. 4

15 00

11 4 2. 4

79

18 20

40

18 40
11 4 6. 7 11 6 7. 8
10

Den se Tree s
10
10 61 . 3 10 95 .5 11 0 8. 0 10 89 .3 10 1 3. 3 949 . 9 923 . 3 755 . 0 735 . 7 726 . 8 10 99 .4 10 68 .3 10 32 .5 694 . 1 71 6. 1 694 . 3 10 64 .9

14 60

15 88 .6

15 86 .7
90

12 94 .8 747 . 5

12 84 .4

11 9 7. 9

18 60
11 3 6. 9 11 3 8. 0 11 1 3. 0 10 78 .6 10 93 .7 10 86 .8 963 . 4 966 . 8 935 . 6 10 99 .4 11 0 2. 8 10 91 . 1 10 93 .5 10 54 .5 948 . 6 10 45 .2 10 28 .8 678 . 6 10 43 .3 661 . 7 666 . 6 666 . 0 772 . 3 695 . 4 726 . 3 696 . 2 688 . 6 601 . 0 673 . 9 669 . 1 876 . 0 723 . 3 721 . 1 668 . 9 669 . 1 772 . 4 668 . 6 591 . 5 729 . 3 691 . 6 657 . 7 660 . 8 952 . 8 10 24 .7 10 55 .9 967 . 8 927 . 5 10 66 .8 10 84 .1 10 79 .0 10 83 .6 10 01 . 2 10 76 .5 10 35 .6 999 . 1 10 42 .4 10 40 10 41 . 7 10 60 .8
10 40

14
11 3 5. 2 11 3 7. 1 11 3 7. 6 10 77 .5 10 77 .4 10 66 .1 11 0 3. 4 10 56 .1 10 81 . 3 10 61 . 3 10 94 .0

14
11 1 8. 5
11 4 0

14
10 84 .9 10 63 .6

40

20

14

00

14 40

15 1 6. 3

14 87 .3

10

10
0

11 4 0. 9

90

40
740
0
725 . 3 71 7. 8 727 . 8 727 . 0

11 2 5. 2 10 91 . 6 91 4. 4 723 . 7

11 8 7. 3

11 6 4. 4

10 94 .7

# *
94 0
906 . 0

14 80
84 0
10 57 .3 765 . 0 725 . 7 728 . 8 71 5. 4

18 00
11 5 6. 1

15 79 .2

14 84 .5 11 3 4. 0

11 7 6. 6

11 6 6. 6 11 4 5. 7

10 96 .0

10 60 .6 10 33 .0

80

14 07 .2

12 92 .1

11 3 8. 8

13

9
59 573 . 1

742 .3

14

00

51 7. 2 51 9. 3 51 9. 3

740
527 . 6 597 . 7

746 . 3

15

90

13

13

60
69

80

13

18 80

14

80

) "
11 4 9. 1

40

14 20

11

15 87 .7

19 20

15 40
10 40 .8 10 63 .9 10 84 .0

1 09 0

245

90

14 90

19 40

60
10 30 .1 10 39 .3 10 71 . 2 10 02 .3 10 33 .9 10 39 .8 10 38 .9 11 0 6. 3 11 0 3. 7 10 32 .5 10 38 .1 10 85 .2 10 00 .2 999 . 8 10 40

15 60

15

15

19

1 87.8 3 5

1 87.8 0 5

12 90 .7

12 65 .1

11 8 1. 6 10 74 .0

10 90

522 . 9 556 . 1 523 . 4 522 . 0

54

10 43 .4

54

13 04 .3 10 78 .1

556 . 6

15 20
10 90
11 0 5. 0 93 .2 10

40

10 68 .9

19 00

15 00

15 88 .5

15 1 6. 6

14 89 .5

13 01 . 5

13 07 .8

12 75 .5

12

11 9 5. 6 11

Pylo n
747 . 6 GR O UN D 529 . 1

11 3 8. 2

O B S C U R ED DEN S E T R EE S

BY

15

40

19

15

80

60
10 33 .1 10 30 .4 10 45 .4 994 . 2 997 . 8 994 . 6 11 0 5. 9 10 65 .7 939 . 4 10 29 .1 10 23 .1 10 25 .6 10 45 .2 10 39 .0 10 39 .7 972 . 8 960 . 2 81 2. 3 987 . 2 880 . 4 10 45 .6 81 4. 4 981 . 5 773 . 6 10 29 .4 10 55 .1 10 1 8. 8 10 36 .9

15 89 .9

15 89 .9

15 1 7. 7

14 92 .7

13 1 7. 2

11 3 9. 1

10 40
10 44 .2

10 53 .5

14 40

200

SL-1-CR
11 4 8. 1 986 . 9
990

15 80

15 88 .6

15 94 .6

20

0
10 90

16 00

Un

90

20

16 20

pa

Den se Tree s

ve

15 22 .9

12 99 .1

12 90 .5

12 92 .8

12 93 .2

12 55 .7

12 92 .9

11 9 3. 7

531 . 0 555 . 6 525 . 6 557 . 4 555 . 3 527 . 2 524 . 1

59

0
640

703 . 6
690

680

660
640
69
526 . 0 CB 570 .9 553 . 7 527 . 9 559 . 5 556 . 2 529 . 5 531 . 9 527 . 6 533 . 1

Ro

13

13

40
12 04 .1 11 5 5. 2 11 4 5. 7 997 . 8

40

20

16 40

ad

14 95 .0

13 02 .5

13 03 .1

12 92 .7

12 52 .2

11 9 7. 0

12 63 .4

DEN S E T R EE S

620
60 0

15

40

90

15 20

12

20
940

5-6

16 80

16 60

15 26 .7

15 26 .2

14 97 .1

20
890

17

17 00

15 04 .8

GR O UN D

80

17

20

15 05 .3

DEN S E T R EE S

O B S C U R ED

BY

12 1 5. 0

565 . 3

SL-23-CR
562 . 1 554 . 4 557 . 5 534 . 7 573 . 4 573 . 4 573 . 9 558 . 8 556 . 5 554 . 5 534 . 0 533 . 7

) "
530 . 4 532 . 6 538 . 4 537 . 0

15 00

740 . 7

71 3. 2

14

80

21

00

17
10 05 .3

17 60

40

SL-4A2-RD SL-4A1-RD
) "
10 03 .2 WL 851 .8 848 . 9 81 9. 0 10 06 .4 960 . 8
990

Den se Tree s

14

60

14

40

80

732 . 6 707 . 9 736 . 8

3-5

) " ) "
848 . 4 823 . 0 860 . 5 961 . 9 872 . 3 895 . 1
940

0
600

580

14

13

00

80

14 80

14

60

14 60

14

40

14

20

14

00

12 40

12 60 12 80

13

13

80

13

60

Den se Tree s

12

20

) " SL-5A-CR
11 2 0

590

19

19

13 00 13 20

80

60

13 40

00

20

40

40

20

40

20

13

60

14 40

40

640

20

20

20

60

13

80

00

60

20

80

17

17

16

17

17

21

12

16

16

16

16

15

40

Den se Tree s
11 8 0
12 20

80

60

19

20

19

40

14 00

15

14

15

14

15

40

14

60

14

14

18

80

Den se Tree s
808 . 6

14

13 80

14

14

19

13

80

00

20

00

15

14 20

40
12 00

00

60

13

40

14 20

13

20

13

00

13

20

14 00

12

12

80

13

13

20

660
71 3. 7

20

13

13

40

Den se Tree s

60

60

80

40

21

14

00

80

14

13

60

20

80

59

00

18

20

18
12 00
0
11 4 0

60
11 4

13
803 . 7

00

13 60

15

12

12
690
64 0
620

15

21

21 20

20
11 6 0
804 . 4 996 . 4 990 . 2 WL 744 . 6 963 . 7 733 . 6 683 . 0 962 . 6 736 . 0 737 . 0 808 . 9 873 . 4
890

00

13

13 20

00

80

60

12

40

584 . 4

00

20

PI LE

554 . 3

538 . 8 550 . 7 594 . 5 556 . 9 598 . 7 554 . 4 553 . 7

14

721 . 1
720
640

3-9

14

60

680

13

80

13

70
550

Den se Tree s 551.2 550 .5 615.1 552 .7


55 0

40

13

20

60

13

18

21 40

00

13 40
803 . 0

SL-5-CR
11 8 0
11 6 0
805 . 4 806 . 4 861 . 9 804 . 0 802 . 2 805 . 9 809 . 9
840

15

80

18

17
72 0

80

13 20

13 00

66

0
68

15 37 .9
12 00

70

740
72 0

20

13 00 800 . 9

13 20

12

80

Den se Tree s 12 20
11 8 0

13 40

) SL-4-CR "
Den se Tree s
10
10
12 60

760

66

640

62

60

13 60
802 . 3 797 . 8

13 80

780
74 0

13 20

12 80

14 00

12 40

790

14 20
10

13 60

13 40

13
12 80

00

14 40
20

12
00

00
20
11

14 60

10

20

13

40

12

14 20

15 00

15 40

Den se Tree s
9 2

13 20
0

900
0

90
82 0
0 80

78 0

Pi pe

711.2

70

Pi pe 680 711.5

40

13

60

14 40

15 60

15 20
13 40

14 60

15 80

12

11 6 0

84 0

Conveyor Conveyor

552 .2

62

Den se Tree s
76 0

652 .9

66

15 20

880

11 4 0

68

64

14 80
13 00

14 00

74

15 00

550

0
940

860

66

55

13 80

14 80

12

SL-13A-RD )) "" ) SL-13B-PD SL-11-CR " ) " SL-13-PD ) " SL-12-PD


11
0

840

745 .2

0 64 0

797 . 8

785 . 1

Conveyor Wate r Level 73 3.9'

706 .6

652 .0 Pi pe Conveyor 651.0


62

550 .8 580 .4 Pi le

800

766 .9 550 .7 571.0


298 47 807. 06 807. 60

760

571.7

809 .4

802 .9

Pylo n 76 787 .4

10

40

60

820

800

717.7

740

72

70

88
86

0
0

15 40
13 80
13 80
11 8 0

14 80

15 00
14 00
13
90

Den se Tree s
960
980
88 0
0

13
12
00
10 00

60
13 60

16 00

920
940

620

16 20

80

Conveyor 738 .4

Pi pes 710.9

633 .1

16 40

552 .3 567 .0 Pi le

555 .5 Den se Tree s 568 .6


78 0
62 0

640

80

R PE

15 60

15 20
14 00

13

16 60

770 .2 709 .4
56

660

15 80
12
14 40

15 60
10 20

Den se Tree s
00
14 20

15 40

16

80

14 20

556 .9
66

64

13
8 4 0
82 0

20
86 0

680

801.8

700

00

14

62

86

70

66

60

AN

74

800

80

58

17

17

40

15

760

00
72 0

15 80
720

15
74

15
10 80

40
0

780

840

17 00

20

12 60

10 60

82

17

15 60
0

40

808 .4

Pi le

78

16 80

17

00

15

15

10

621.8
0

60

15 40

20

760

80

13

800 .8

58

20

740

16

60
15

12 40

709 .6

693 .9

16 60

720

60

14

15 20

15 00

70

16

15

00

68

10 40

76

16 40

40

40

710.3

66

16

14

00
0

15

68

64

80

14 80
0
0
78

62

20

14

12 20

Pi le
0

64

16

Den se Tree s
88
60

82

16 20

20

14 80

16 00

14

14
840

Den se Tree s
80

805 .8

13 40

16 00

14 40
14 60

558 .6
0

60

15 80

800

68 0

694 .6

Den se Tree s 561.6

720
740

760

70

14

780
0

60

798 .4

852 .6
80 0
80

17

60

673 .8 798 .3
205 807. 52

800

17

19 20

80

17
10

16 00
70
15

820

40

80

17

6
80

15 60

11 0 0

70

82

18

21
16 20

00

60
13 80
11 6 0
11 2 0
11 8 0
0 0

18
15 80

15

18

18
16 00

TE EN

18

20

20

20

20

0
16 60

0
16 40

18

60

40

820
800
780

760

72

700

20

00

40

00

11 4 0

11

798 .7

74

Den se Tree s
0
68 0
16
11 2 0

Den se Tree s Den se Tree s

19
84

15

693 .3

Den se Tree s
780

) "
807 .8 665 .7
0

840
860
680

40

19

17

80

60

80

21

18

20

16

20

40
16 80
257 1 053 0 679. 93 680. 03

16 20
12 20

16 40

14 20

Conveyor

74

0
72

700
0

625 .4
76

578 .3
680

594 .8

90

00

19

19
17 80

80
17 60
17 20

17

17

40

60

17

20

17 40

17

80

17

40

506

15 20

12 60

11 8 0

1 58.8 6 8

20

EK RE C

18

00

17

60

18 00
17 40
78

15 40

Den se Tree s
76

12 00
74

Den se Tree s
12
15 60

19

20

19

19

40
13 20
18 40

18
80
13

20

17

80

18

00

Un

pa

ve

Ro

ad

18 20

17 60
00
15 80

12 20
0

Den se Tree s
82

80

72 0

70 0

68 0

860

915.5 917.4
66 0
880

640

620

60

911.6 Den se Tree s Den se Tree s


660

# *
Den se Tree s

) "

600

) " ) )) " ""


Den se Tree s 670 .1 656 .4
680

62

618.6 621.5 614.3 671.6


68 0
70

911.9 618.6
620

900

Den se Tree s
17
13

40

18

84

920

20

20
40
0

204

20
13 60
18 00

20

0
18 60

80
16 00

Den se Tree s Den se Tree s


880
90 0
13 8 0

18

68

206 0

19

72

206 0

208

208 0
14
18 60

19
16 60

00

18

00

20

17

80
18
0 98

Den se Tree s
00
18 20
12 00

16 40
14
92
0

652 .9 Pi les
0

21 00
14 40
00
18 40

21 20
20

21

00
40

19

920

19
17 00
60

40
14 80
40
10

17
16 80

60

14 6 0
11 6 0
0
80
10

11 8 0

94

643 .4 673 .9

634 .9 652 .7 636 .3 Den se Tree s


72 0

628 .7

66

900

70

18
16 20

60

18

20 86

18

18

40

80

924 .1 618.1 922 .6


920
74 0
76 0

80

18

20

SL-17-PD
78

80

82

84

86

88

Un pav e d

Ro ad

940

944 .4

Den se Tree s
920

960
980 10 00

6
20
10
0
18 20

21 40
10

0
18

SW-2 SL-14-CR
800
780

21
11
10

20

51 2

17 20
15 20

15 00

20

1 70.9 8 8

17 40 17 20

21

40

20

17 00

204 0
17 60
15 60

16
17 80

18
17

Un pav e d Ro ad
17 60
11

17 40
15 40
10 20
2

11 4
0

Conveyor
74 0

640

644 .8

80

00
80

659 .2 Conveyor
76
78

642 .8
0
0

658 .7
660

900

800

88

16

18 00

60

18 16.7
40
20
10 80

17 85 .6
10 60

10
10 60

672 .4

Conveyor

658 .2
660 680

880
860
840

86

840

820

22

00

860

720

17

680

12 60

860

78

pa

Den se Tree s
00
17 00

21 20

15 20

683 .2
0

740

20
13
17 60
12 20

21 60

21 00

18 21.5
13 20
13

70

Un

76

13

00

21

14 60

14 80

60

19

15 00

21 80

226

22

22
15 40
16
60
17 40

22

40

2
80

0
17 60

23
15 60

23
15
16

40
20
16 80

23

00

21 40

19

20

21

20

19

60

16 40

M O
60
16 60
Un pav ed

80

Den se Tree s

17

17 80

94
96

0
0

686 .6

78

21
15

80

228 0

19

40

16

20

16 00
00

20

16 20

13 20

760

21

40
18 00

224 0

226 0

21

60

19

00

18

80

18

60

16

40

17

20
80

Den se Tree s

13 00

Den se Tree s

92

74

20

2166 .9
00
14
16
16
16 60

40

692 .3

21

222 0
Ro ad

Un pav ed

Ro ad

16

16

20
12 80

16

00

Den se Tree s
0

72

21
80

16 80

220 0

17
15

60
12 60

0
9 0

21 40

40
40

15
13

860

72

70

21 80

15 40

664 .9

12 40

78

720

84

86

21 40

88

760

74

80

Pi les
0

689 .9
0

40
17

12 00

870

Den se Tree s
0
82

12

78

24

21 20

208 0

Den se Tree s

ve

0
20

84

242

Den se Tree s
17
11 8 0

86

68

659 .2
76 0
80

21 00

Den se Tree s
0

80

20

206 0

80

Den se Tree s

82

Den se Tree s
0

80

240

840

Ro

740

78

208 0

670

76

238

204 0

11 6 0

660

82

84

659 .2

ad

236

657 .1

0
18 00

206 0
0

232

23

84

202 0
18

74

234

20

17 80
11 4 0

82

00

22

80

60

70

40

204 0

200 0

19 80

660

22
17

20
11 0 0 11 2 0

17 60

800

668 .7 669 .2 Conveyor


0

685 .8
68 0

20

202 0
60

19

60

19

40

18

SL-15-CR
Pi les

675 .6

702 .9 Conveyor s 687 .3 704 .7 72


0
82 0

880

80

0
78

900
0

900

76

88

920

Den se Tree s

20

80

0
16 40

830

80

74

18

76

234 0

60

74

21

LO
15 20

16

21
16 20

) " ) " ) " ) "


15
14 20

40

Den se Tree s

16 40

244 0

40

20

20
14

40

740

Den se Tree s
60
13 00

783 .6
760

15

15 60

# * ) "
60

248 0

) "
16 00
15 80

252 0
14

80

00

23

23

20
15

00

Un pav

0
40
80

15 20

3-6

23

22
15

25

8
15
40

22

18

80

CR
14 60

15 60
16
40

ed

00

250 3.4
00

22

22

20

12 80

Ro ad

80

12

21

20

20

19

00

12 68 .6

780
800
820
840
46

782 .8

62

Den se Tree s

246 0

60

800

76

66

202 1.7
14

16 60

20

78

60

242 0

21

780

40

68

14

80

16

13 14.3

72

779 .9
0

70

240 0

16 83 .7

ed

Ro ad

12

12

40

782 .9
20

73

EB EL
15 00
16 20

72

24

00

60

Un pav

12

74

16

74

64

660

11 6 0 11 8 0 00
12

74

238 0

770 .3

76

68

720

80

75

24

781 .39

Den se Tree s

70

68

740
72
12

720

) "
14

60

843. 53

760

660
0
70

21

15 00

25

40

19
20

18

60

Den se Tree s
0

60

258

20

60

20

25
3-8

) " ) " ) )) " ""


15 20

Den se Tree s
14 0
40

80

40

3-7

860
12
12 90
12

780
12

640
68 0

) " ) " )) ""


15 60
0

18 40

EE
13
15

20

25

60

18 20

20

90

252 0
13 60

248

80
15 40

14

14 89 .6

13 00

254 0
15 20

10

20

254 5.2
13 40

244 0

17 80
15 00
13 20
14 60
15 20

3-1 0

84

10
13 30

242 0

) " )) "" )) "" ) "


14 80
3-9

14 80

94

15

00

12 00

Den se Tree s
14
12 20

Den se Tree s
14 60
14 40

14

0
14

2-8

13 00 .9
14 20

12 40

12 99 .9
40

13

16

20
14 20

00

13 40

960

20

15

16
14 00

00
80

Den se Tree s
80
14 40
14 20

14
15

13 04 .1
60
40

980

12 60

13 06 .1

00

12

80

12 60

Pylo n

62

12 80

0
2-9

60

13 20

62

14 80

15 27 .6

80

64
00

64

00

15

20
13

12 92 .9
13
13

11 8 0

4-3

18 60

17 20
00

12 80
15

20

11 6

92

90

66

18 80

15

15 00

15

40

20

20

00

19 00

17 40
40
13 00

40

13 40

11

11 2

Den se Tree s
15

88

3-1 1 4-2

68

) " # *
14

00

19 20

17 60

11 0

10 80

86

68

60

70

62

60

72

19 40

13 20

10

40

246 0

18 00

Den se Tree s

10
13 1 0

10

20

00

820

72

74

K
15 00

98

19

Den se Tree s

80

12 60 70

50

12

50

96

940

920

900

880

800

620

72

15

16

3004 3

236 0

0
40

11 4
1 30.8 6 3

242

208 6.6

76

15

3005 7

11 2

60

00

77

74

240 0

15

14 00

11

80

Pi les
0

78

40

20

80

10

760

20

80
0 0

60

232 0

16

13 80

10

777 .3
0

79

80
00

17

780

17

23

16 60

40

820

81

10

800

Den se Tree s

230 0

21

NT
17 20
13 60

20

820

23

60

00

10

10 00

840

228 0

14
80

16

16

60

Pylo n
98
70

807 .6
0
0

80

801.9

Den se Tree s
74
80

1118.8
13 20

78

76
82 0
0

600
72 0
0

0
84

580
7 0

13 60
13 40

15

15
15
15 20
80

14

60
40

Den se Tree s
15 00
14

860

660

60

60

14

13 20
40
0

14 00

15

15

13 00

60

12 97 .9
20

11 1 0

15

80
00

12 85 .5
14

940

15

13 80

620
0
68 0

560
0

14

80

15

40

13 00
12 80

15
0 6

40

14
2

20

14

40

14

00

13
60

80

14

14

920

15

12

00

40

15

80

12 60

15

14

14

40

15

80

15

13

16

12 80
40
20

00

13

60

12 40
12 20

16 20 .1
15
14 20

15

12 60

14

16

60

12
15 60

110 5.7
80
12 00

64
640

11

0
59

560

58
0

40

60

15

11
80
11

8
6

0
0

10

80

570

54

10 60

13

13

13

13 00
13 20

15 87 .8
14 00

12 60

10 40
12 40

66
94 0

12 00

13 40

10

11 8 0
12 80

13 20 13 00

12 20

98

10
0

20
00

600
620
68 0

56
580

13 60

15

40

15 60

12
15 40

20

60

12 00

0
10
10 20

14 00
13 60
80

13

15

20

11

12 02 .4
14

6
14
20

0 11
15
00
0

62

13 80

62

20

11

14 20
13 20
00 13
14 40

40

64

13

64

840

17

17
15 00

90

19

Den se Tree s
00

00

860

60

20

880

ad

70

Ro

14

pav

12 00

12 40 12 20

14 80

60

ed

80

80

0
Den se Tree s
14
14
12

72

0.5
60
80 12 60
15 00

1
11 8 0

15 00

11

0
92 0

68

15

11

94

66

Un

15 40
14 60

94

Den se Tree s

14

90

86

15 20
15 40

14
15 20

88

301 43

21 70.0 9

301 45

84

60

13

40

16 40
16 60

15 20
40

13

13 00

12 80

16 80
20
17 00
17 20

12 40

12 20

16

13 40

14
14
13 20

12 60

21

19

842 .4
0

40

80

842 .6
66

15

20
11 4 0

60

667 .1

Pylo n
740

00

720

88

15

18

19

00

80

80

18
16 20
12 00

40
14 00

21

18

60

720
0

) "
70 0
680
66 0

SL-20-RD
631.5

740

16

16

905 .2
760
Un pav

ed

Ro

ad

16

19
17 20
11 6
16 80
14 80

20
17 00
14 60

16

60

16 40

19

40

17

80

16 60
12 40

14 40

780
800

00

16 60

SL-22B-CR SL-22A-CR SL-19-PD SL-16B-RD SL-16A-RD ) "


639 .2

) "

820

910.6
840

17

16

80

18

80

19

00

19

20

90 0

19

80

14
20

40

17

20

00

17

20

17

40

17

60

80

18

18

00

20

24

24

24

23

20

23

00

70 0
68 0
66 0
64 0

70 0

14
14
13 80

66 0

50

60

13 60

21 62.7 0

15 60
13 6 0
12 20

Den se Tree s
12 00
0 8 11

13 40

58 0

13 00

880
900

58 0
56 0

54 0

14 40
00

00
98 0

96 0

20

Den se Tree s

54

66

74

60

58

56

94

00 80 10 60 10 40 10 20 10 00 10 0 98
40

0
96 0

828 .2
83

11 6 0
40

11

11 2 0

11 6 0 11 4 0

916.2
0

760

680
660

11 0 0

14

40
20 14

15 00

14 20

880 .8 827 .7
14 80

900 .1 989 .1
00 14
13
76
74

Den se Tree s
72 0
70 0

680
0
0

780

70
78 0

12

13

13

13

12

13

12

14

Miles
15 80
80

20

14

00

40

20
60
80

827 .4
8 0

80
82 0
3005 6

40

00

0
84
90

14 4

16 00

14
0

60

826 .4
14
11

990. 81

86
0

72

0
88 0

14

800
0
90

16 20

80

00
0

14 60

Den se Tree s
0
13 80

15
11

94

2 0

00

16 00

15 80

15 60

15

13 60

14

40

14

60

11

11

11
80

Conveyor s
10 80
14
11 2 0

903 .3
4
80
10

900 .6
900

897 .6 899 .6
0
14 2 0

990 .4

98

96

740

82

0
760

70 0

16 40

960 940 920

13 00
60

900 .4
14 0 0

902 .1
12 80

16

60

13
14 60

LEGEND

17 40

80

11 3 0
13
13

898 .9
60
13 40

Pylo n
980

780
800

REFERENCES
Spatial Reference: NAD 1983 StatePlane California III FIPS 0403 Feet

PROJECT
20

820

# Surface water sample location *

HYDROLOGIC INVESTIGATION PERMANENTE QUARRY RECLAMATION PLAN UPDATE SANTA CLARA COUNTY, CALIFORNIA
TITLE

) "

STORM WATER SAMPLE LOCATIONS


0 500 1,000 Feet 1,500
PROJECT No. DESIGN GIS CHECK REVIEW DLM DLM GW WLF 063-7109 2/8/2010 2/8/2010 2/8/2010 2/8/2010 FILE No. SCALE: AS SHOWN REV. 0

(Golder, 2009) Storm water sample location (URS Corporation, June 2008) Facility boundary

G:\GIS\Sites\Lehigh_Permanente_Quarry\mxd\H_well_map

FIGURE 6.2

Privileged and Confidential Attorney Client Work Product Prepared in Anticipation of Litigation
Title

Source: SFBRWQCB, 2007


Drawn Checked Reviewed

CR RV BF

Permanente Creek Monitoring Location - PER070 (SFBRWQCB)


Project Name

Hydrologic Investigation Permanente Quarry Rec Plan Update

Project No.

063-7109.500
Date

Client Name

FIGURE
May 2010

6.3

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\ Geochem Figs.xlsx

Title Project Name Client Name

North Quarry - Wall Washing (November 2009)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.4

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Graywacke (GW-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.5

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Chert Sample (CT-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.6

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Greenstone (GS-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.7

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Limestone - Medium to High Grade (MG-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.8

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Limestone - High Grade (HG-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.9

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Title Project Name Client Name

Wall Washing - Limestone - High and Medium/Low Grade (HMG-01)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.10

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

pH (s.u.)
Feb. 2009 Apr. 2009

pH (s.u.)

Sept.-Oct. 2009

6 HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

x x
NQ SP

Dec. 2009 Jan. 2010

HG-4

HG-6

TDS (mg/L)

2000

NQ North Quarry

1500

1000

500

Concentration (mg/L)

0 HG-7 HG-9 HG-10 SW-1

x
SW-2

x x
SW-3 NQ SP

SP West Material Storage Area Runoff

HG-4

HG-6

Alkalinity (mg/L)

500

250

Concentration (mg/L)

0 HG-7 HG-9

x
HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn Checked
Project No. Date

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - pH, TDS and Alkalinity


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

CR FV Reviewed DB/RV

FIGURE

6.11

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Sulfate (mg/L)
Feb. 2009 Apr. 2009

1,200

800

400

Sept.-Oct. 2009

Concentration (mg/L)

0 HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

x x
NQ SP

Dec. 2009 Jan. 2010

HG-4

HG-6

Nitrate (mg/L-N)

NQ North Quarry

Concentration (mg/L-N)

0 HG-7 HG-9 HG-10 SW-1

x
SW-2

x x
SW-3 NQ SP

SP West Material Storage Area Runoff

HG-4

HG-6

Chloride (mg/L)

60

40

20

Concentration (mg/L)

0 HG-7 HG-9

x
HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn CR Checked
Project No. Date

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - SO4, NO3 and Cl


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

FV Reviewed DB/RV

FIGURE

6.12

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Antimony (g/L)
Feb. 2009 Apr. 2009 Sept.-Oct. 2009

Concentration (ug/L)

10 8 6 4 2 0

x
HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

x x
NQ SP

Dec. 2009 Jan. 2010

HG-4

HG-6

Arsenic (g/L)

NQ North Quarry SP West Material Storage Area Runoff

Concentration (ug/L)

10 8 6 4 2 0

x
HG-7 HG-9 HG-10 SW-1 SW-2

x x
SW-3 NQ SP

HG-4

HG-6

Selenium (g/L)

Concentration (ug/L)

100 80 60 40 20 0

x
HG-7 HG-9 HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn CR Checked
Project No. Date

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - Sb, As and Se


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

FV Reviewed DB/RV

FIGURE

6.13

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Manganese (g/L)
Feb. 2009 Apr. 2009

1000

100

10

x
HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

x x
NQ SP

Sept.-Oct. 2009 Dec. 2009 Jan. 2010

Concentration (ug/L)

HG-4

HG-6

Molybdenum (g/L)

NQ North Quarry

1000

100

10

SP West Material Storage Area Runoff

Concentration (ug/L)

1 HG-7 HG-9 HG-10 SW-1

x x
SW-2 SW-3 NQ SP

HG-4

HG-6

Nickel (g/L)

1000

100

10

Concentration (ug/L)

1 HG-7 HG-9

x
HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn CR Checked
Project No. Date

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - Mn, Ni and Mo


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

FV Reviewed DB/RV

FIGURE

6.14

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Vanadium (g/L)
Feb. 2009 Apr. 2009

1000

100

10

Concentration (ug/L)

1 HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

NA

NA

NA x NA NA NA
NQ SP

x x

NA

Sept.-Oct. 2009 Dec. 2009 Jan. 2010

HG-4

HG-6

Zinc (g/L)

1000

NQ North Quarry

100

10

Concentration (ug/L)

1 HG-7 HG-9 HG-10 SW-1

x x
SW-2 SW-3 NQ SP

SP West Material Storage Area Runoff

HG-4

HG-6

NA - sample not analyzed for this parameter

Iron (g/L)

400

300

200

100

x
HG-7 HG-9 HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn CR Checked
Project No. Date

Concentration (ug/L)

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - V, Zn and Fe


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

FV Reviewed DB/RV

FIGURE

6.15

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Calcium (mg/L)
Feb. 2009 Apr. 2009 Sept.-Oct. 2009 Dec. 2009 Jan. 2010

400

300

200

100

x
HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

x x
NQ SP

Concentration (mg/L)

HG-4

HG-6

Magnesium (mg/L)

NQ North Quarry

150

100

50

SP West Material Storage Area Runoff

Concentration (mg/L)

0 HG-7 HG-9 HG-10 SW-1

x x
SW-2 SW-3 NQ SP

HG-4

HG-6

Sodium (mg/L)

1000

100

10

Concentration (mg/L)

1 HG-7 HG-9

x
HG-10

x x
SW-1 SW-2 SW-3 Non-detect values shown at the detection limit. NQ SP "x" - no sample collected.
Drawn CR Checked
Project No. Date

HG-4

HG-6

Title Project Name Client Name

Current Water Quality - Ca, Mg and Na


Hydrologic Investigation Permanente Quarry Reclamation Plan Update 063-7109.500 May 2010

FV Reviewed DB/RV

FIGURE

6.16

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Mercury (ug/L)
Feb. 2009 Apr. 2009 Sept.-Oct. 2009 Dec. 2009 Jan. 2010

0.1

0.01

NA x
HG-7 HG-9 HG-10 SW-1 SW-2 SW-3

0.001

x x
NQ SP

Concentration (ug/L)

0.0001

HG-4

HG-6

NQ North Quarry SP West Material Storage Area Runoff NA - sample not analyzed for this parameter

Non-detect values shown at the detection limit.


Title Project Name Client Name

"x" - no sample collected.

Current Water Quality - Hg


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.17

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Quality Eval (Feb 2010).xlsx

Water quality results for sampling rounds 1 to 3 included in Piper Plot.

Title Project Name Client Name

Groundwater and Surface Water Piper Plot


Hydrologic Investigation Permanente Quarry Rec Plan Update
Project No. Date

Drawn Checked

CR RV

063-7109.500 May 2010

Reviewed

BF

FIGURE

6.18

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Geochem Figs.xlsx

West Material Storage Area North Quarry


10 Field Conductivity (uS/cm) Lab Conductivity (uS/cm) Field pH

1,200

1,000

800

Conductivity (uS/cm)

400

200

0 SL-1-CR Storm Water Monitor Location SL-4-CR SL-5-CR SL-5A-CR SL-11-CR SL-14-CR

SL-BG-CR

Non-detect values shown at the detection limit.


Title Project Name Client Name

pH (s.u.)

600

Permanente Creek - Storm Water Monitoring Data (January 18, 2006)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.19

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Stormwater Data.xlsx

West Material Storage Area North Quarry


10 Field Conductivity (uS/cm) Lab Conductivity (uS/cm) Field pH

1,200

1,000

800

Conductivity (uS/cm)

400

200

0 SL-1-CR Storm Water Monitor Location SL-4-CR SL-5-CR SL-5A-CR SL-11-CR SL-14-CR

SL-BG-CR

Non-detect values shown at the detection limit.


Title Project Name Client Name

pH (s.u.)

600

Permanente Creek - Storm Water Monitoring Data (February 27, 2006)


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.20

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Stormwater Data.xlsx

100

No. of Samples 850 Maximum 4.7% Minimum <0.01% Average 0.09%

200

300

400

500

Histogram
1000 100 10 1 100%

Depth (feet bgs)

600

700

80%
60% 40% 20% 0.1 Sulfide-Sulfur (%) Sulfide-Sulfur (%) 1 10 0%

800

1000

0.01

Non-detect values shown at the detection limit.

Title Project Name Client Name

Frequency

900

Limestone Ore Sulfide-Sulfur Data


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.21

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Pyrite Occurance_.xlsx

10000 TTLC Result Crustal Abundance Standard Detection Limit Standard PQL
Maximum Average Minimum

1000

100

10

Concentration (mg/kg)

0.1

0.01 Ba Be Cd Cr Co Cu Pb Hg Mo Ni Se Ag Tl V Zn STLC Result

Sb

As

0.1

Standard Detection Limit Standard PQL


Maximum Average Minimum

0.01

Concentration (mg/L)

0.001

0.0001

0.00001 Ba Be B Cd Cr Co Cu Fe Pb Hg Mo Ni Se Ag Tl V Zn

Sb

Al

As

Non-detect for all samples

Non-detect values shown at the detection limit and assumed equal to the detection limit in average calculations. Standard detection limit and practical quantitation limit (PQL) raised for some analytes in one of the six samples analyzed (TTLC analysis).
Title Project Name Client Name

Overburden (Rock) and Ore - TTLC and STLC Results


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.22

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Waste Rock Data.xlsx

Nickel (mg/kg)
600 0 500 250 0 20 10 0 20 10 0 20 10 0 Overburden - Top Soil Graywacke Limestone and Dolomitic Limestone Chert Fault Breccia Greenstone Metabasalt

1,200

Chromium (mg/kg)

Antimony (mg/kg)

Arsenic (mg/kg)

Selenium (mg/kg)

Non-detect values shown at the detection limit.


Title Project Name Client Name

Overburden (Rock and Soil) and Ore - Elemental Composition


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.23

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Waste Rock Data.xlsx

Antimony
10 8 3

Arsenic Molybdenum

20

16

12
4 1 2 0 0 STLC Concentration (mg/L) 0.005 0.01 0 0 0.01

TTLC Concentration (mg/kg)

TTLC Concentration (mg/kg)

0 0.01

0.005

TTLC Concentration (mg/kg)

0.02 STLC Concentration (mg/L) Graywacke Limestone and Dolomitic Limestone Chert Fault Breccia

0.03

STLC Concentration (mg/L)

Nickel
16 12 8 4 0 0 0.002 0.004 0.006 0.008

Selenium

1600

1200

800

400

Greenstone
Metabasalt Overburden - Soil

TTLC Concentration (mg/kg)

0.005

0.01

STLC Concentration (mg/L)

TTLC Concentration (mg/kg)

STLC Concentration (mg/L) Non-detect values shown at the detection limit.

Title Project Name Client Name

Overburden (Rock and Soil) and Ore - TTLC vs. STLC


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.24

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Waste Rock Data.xlsx

4 3 1 2

Title Project Name Client Name

Wall Washing - Samples


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

DB/RV

FIGURE

6.25

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Wall Washing.xlsx

Calcium (mg/L)

400

300

200

100

Concentration (mg/L)

0 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Magnesium (mg/L)

160

120

80

40

Concentration (mg/L)

0 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Ca and Mg


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.26

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Sodium (mg/L)

400

200

Concentration (mg/L)

0 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Sulfate (mg/L)

10,000

1,000

100

10

Concentration (mg/L)

1 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Na and SO4


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.27

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Alkalinity (mg/L)

600

400

200

Concentration (mg/L)

0 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

pH (s.u.)

9.0

pH (s.u.)

8.0

7.0

6.0

5.0 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Alkalinity and pH


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.28

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Antimony (mg/L)

0.0090

0.0060

0.0030

Concentration (mg/L)

0.0000 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Arsenic (mg/L)

0.1

0.01

0.001

Concentration (mg/L)

0.0001 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Sb and As


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.29

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Iron (mg/L)

10

0.1

0.01

Concentration (mg/L)

0.001 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Manganese (mg/L)

0.1

0.01

Concentration (mg/L)

0.001

0.0001 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Fe and Mn


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.30

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Molybdenum (mg/L)

0.1

0.01

Concentration (mg/L)

0.001

0.0001 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Nickel (mg/L)

0.20

0.15

0.10

0.05

Concentration (mg/L)

0.00 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Mo and Ni


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

RV/DB

FIGURE

6.31

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\5_Final Revisions (May 21 2010)\Water Types.xlsx

Selenium (mg/L)

0.10

0.08

0.06

0.04

0.02
SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

Concentration (mg/L)

0.00

GW-All

Vanadium (mg/L)

0.1

Concentration (mg/L)

0.01

0.001 SW-3 SW-1 SW-2 North Quarry Storage Area Runoff Wall Wash - Wall Wash WET WET - Other Limestone Other Limestone

GW-All

Title Project Name Client Name

Water Quality Comparison - Se and V


Hydrologic Investigation Permanente Quarry Reclamation Plan Update
Project No. Date

Drawn Checked

CR FV

063-7109.500 May 2010

Reviewed

FIGURE

6.32

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report (Feb 20 2010)\Water Types

APPENDIX A BORING LOGS

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1585 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY

BORING NUMBER HG-1A


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

10/26/08 10/27/08 -------------

Santa Clara, CA

CASING TYPE/DIAMETER

---Ian Thomsen

Air rotary drilling to 580 feet using a 6'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580

Clayey mud OVERBURDEN.

60.0 loose limestone/greenstone/chert GRAVEL. Water at 73.4 feet. 100.0 GREYWACKE.

220.0 GREYWACKE/GREENSTONE. GREYWACKE. 240.0

400.0 Brecciated greywacke GOUGE. Very muddy.

495.0 Fracture, cherty LIMESTONE with greywacke producing 200gpm of water.

580.0 Bottom of borehole at 580.0 feet.

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1613 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 10/29/08

BORING NUMBER HG-2


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

11/6/08 -------------

Santa Clara, CA

CASING TYPE/DIAMETER

---Jill Dekoekkoek

Air rotary drilling to 560 feet using a 6'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

GRAB

GRAB

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560

OVERBURDEN. 25.0 Very Dark-Medium Brown Cherty LIMESTONE with reaction to HCl.

VWT Very Dark GREYWACKE with some light brown limestone.

365.0

490.0 LIMESTONE with chert.

560.0 Bottom of borehole at 560.0 feet.

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1548 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/8/08

BORING NUMBER HG-3


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

11/9/08 -------------

Santa Clara, CA

CASING TYPE/DIAMETER

---Jill Dekoekkoek

Air rotary drilling to 460 feet using a 5.25'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB
TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

GRAB

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460

OVERBURDEN. 20.0 Medium-dark grey LIMESTONE with some chert and trace greenstone/greywacke

150.0 Brecciated FAULT GOUGE with calcite veining in the medium grey limestone.

200.0 Dark brown to dark grey LIMESTONE and greywacke. Very low sample recovery.

VWT

420.0 GREENSTONE with trace chert, limestone, and calcite.

460.0 Bottom of borehole at 460.0 feet.

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1857 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/10/08 11/12/08

WELL NUMBER HG-4


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

Santa Clara, CA

CASING TYPE/DIAMETER

Schedule 80 pvc / 2 inches

slotted screen / 0.020 #3 sand 5% bentonite

1859.5 ft. MSL Jill Dekoekkoek

Air rotary drilling to 300 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

GRAB

OVERBURDEN. 10 20 30 40 50 55.0 GREENSTONE. Dark greenish brown BASALT. 24.0

GRAB

60 70 80 90 100

GRAB

110 120 130 140 150 5% bentonite grout 2'' sch. 80 pvc

GRAB

160 170 180 190 200

GRAB
TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

210 220 230 240 Water at 240 feet.

GRAB

250 260 270 280 290 300 300.0 Bottom of borehole at 300.0 feet. Bentonite #3 sand filter pack 0.020'' slotted screen

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1615 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/20/08

BORING NUMBER HG-5


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

11/20/08 -------------

Santa Clara, CA

CASING TYPE/DIAMETER

---Jill Dekoekkoek

Air rotary drilling to 400 feet using a 6.25'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

GRAB

10 20 30 40 50

OVERBURDEN. 25.0 GREENSTONE producing ~1/16-1/32 gpm of water after a 1/2 hour air evacuation.

GRAB

60 70 80 90 100

GRAB

110 120 130 140 150

GRAB

160 170 180 190 200

GRAB

210 220 230 240 250 VWT

GRAB

260 270 280

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

290 300 GRAB 310 320 330 340 350 GRAB 360 370 380 390 400 Bottom of borehole at 400.0 feet. 400.0

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1822 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/13/08 11/18/08

WELL NUMBER HG-6


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

Santa Clara, CA

CASING TYPE/DIAMETER

Schedule 80 pvc / 2 inches

slotted screen / 0.020 #3 sand 5% bentonite

1825 ft. MSL Jill Dekoekkoek

Air rotary drilling to 400 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

GRAB

10 20 30 40 50

OVERBURDEN. 25.0 Weathered BASALT. 45.0 GREENSTONE gouge with trace calcite.

GRAB

60 70 80 90 100

GRAB

110 120 130 140 150 5% bentonite grout 2'' sch. 80 pvc

GRAB

160 170 180 190 200

GRAB

210 220 230 240 250 Bentonite #3 sand filter pack 0.020'' slotted screen

GRAB

260 270 280 290 300

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

310 320 330 340 350 collapse/slough

GRAB

360 370 380 390 400 Bottom of borehole at 400.0 feet. 400.0

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1254 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/21/08 11/22/08

WELL NUMBER HG-7


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

Santa Clara, CA

CASING TYPE/DIAMETER

Schedule 80 pvc / 2 inches

slotted screen / 0.020 #3 sand 5% bentonite

1257 ft. MSL Jill Dekoekkoek

Air rotary drilling to 300 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

GRAB

OVERBURDEN. 10 20 30 40 50 40.0 BASALT. 60.0 Purple GREENSTONE/GREYWACKE. Bentonite #3 sand filter pack 5% bentonite grout 2'' sch. 80 pvc

GRAB

60 70 80 90 100

Water at 80 feet.

GRAB

110 120 130 140 150 0.020'' slotted screen

GRAB

160 170 180 190 200 200.0 GREYWACKE with trace calcite. collapse/slough

GRAB
TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

210 220 230 240 250

GRAB

260 270 280 290 300 300.0 Bottom of borehole at 300.0 feet.

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1148 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/23/08

BORING NUMBER HG-8


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

11/23/08 -------------

Santa Clara, CA

CASING TYPE/DIAMETER

---Jill Dekoekkoek

Air rotary drilling to 200 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

OVERBURDEN. GRAB 10 20 30 40 50 GRAB 60 70 80 90 100 GRAB 110 120 130 140


TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

40.0 GREENSTONE with greywacke and trace calcite. Producing 2-4gpm of water during evacuation immediately after drilling.

Water at 120 feet.

150 GRAB 160 170 180 190 200

VWT

200.0 Bottom of borehole at 200.0 feet.

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1245 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 11/24/08 11/24/08

WELL NUMBER HG-9


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

Santa Clara, CA

CASING TYPE/DIAMETER

Schedule 80 pvc / 2 inches

slotted screen / 0.020 #3 sand 5% bentonite

1248 ft. MSL Jill Dekoekkoek

Air rotary drilling to 200 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

OVERBURDEN. GRAB 10 20 30 40 50 GRAB 60 70 80 Bentonite 90 100 GRAB 110 120 130 140
TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

25.0 Oxidized GREENSTONE, greywacke and trace calcite producing water at 200gpm. 5% bentonite grout 2'' sch. 80 pvc

Water at 100 feet.

#3 sand filter pack 0.020'' slotted screen

150 GRAB collapse/slough 160 170 180 190 200 200.0 Bottom of borehole at 200.0 feet.

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1585 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 8/6/09

WELL NUMBER HG-10S


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS JL/GW

10/11/09 Schedule 80 pvc / 2 inches slotted screen / 0.020 #3 sand 5% bentonite

Santa Clara, CA

CASING TYPE/DIAMETER

1587.5 ft. MSL

Air rotary drilling to 580 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

GRAB

GRAB

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580

OVERBURDEN with limestone gravel fragments.

85.0 loose GRAVEL containing limestone and trace greenstone/greywacke. Produces 20gpm, very soft. 120.0 LIMESTONE with trace greenstone. 160.0 GREYWACKE with trace greenstone. Very soft, possibly collapsing in this interval.

5% bentonite/cement grout 2'' sch. 80 pvc Bentonite chips #3 sand filter pack 0.020'' slotted screen

220.0 GREENSTONE/GREYWACKE GOUGE. Soft, clayey fault gouge.

310.0 GREYWACKE with trace greenstone and limestone. Increased competence with depth.

slough/collapse

510.0 LIMESTONE. Well indurated, low-grade limestone with very little circulation.

580.0 Bottom of borehole at 580.0 feet.

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1585 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE

BORING NUMBER HG-10M D


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS

8/6/09 10/11/09 ---------5% bentonite

Santa Clara, CA

CASING TYPE/DIAMETER

GROUT TYPE/QUANTITY

---JL/GW

Air rotary drilling to 580 feet using a 6.75'' drill bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

GRAB

GRAB

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580

See Log for HG-10S

VWT 10int

VWT 10d

580.0 Bottom of borehole at 580.0 feet.

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

L o g o

L o g o

Golder Associates 425 Lakeside Drive Sunnyvale, CA 94085 Telephone: (408) 220-9223 Fax: 0637109.300 phase 2 Lehigh Permanente Air Rotary 1585 ft. MSL DATE STARTED DATE COMPLETED SCREEN TYPE/SLOT GRAVEL PACK TYPE GROUT TYPE/QUANTITY 9/4/09 9/15/09

WELL NUMBER HG-11


PAGE 1 OF 1

PROJECT NUMBER PROJECT NAME LOCATION DRILLING METHOD GROUND ELEVATION TOP OF CASING LOGGED BY REMARKS JL/GW

Santa Clara, CA

CASING TYPE/DIAMETER

Schedule 80 pvc / 6 inches

slotted screen / 0.020 #6 sand 5% bentonite

1587.5 ft. MSL

Air rotary drilling from 0-200 feet using 18'' drill bit, from 200-600 using a 14'' bit.

Water Level

SAMPLING METHOD

VWT Depth

LITHOLOGIC DESCRIPTION

CONTACT DEPTH

GRAPHIC LOG

DEPTH (ft. BGL)

WELL DIAGRAM

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB

GRAB
TEMPLATE HG1-11.GPJ LOG A EWNN01.GDT 5/20/10

GRAB

GRAB

GRAB

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600

OVERBURDEN. Gravel with fractured pieces of limestone.

80.0 Grey LIMESTONE with trace greenstone.

5% bentonite/cement grout

160.0 GREYWACKE with trace greenstone. 190.0 GREENSTONE 220.0 GREYWACKE. Competence increases with depth.

Bentonite chips

6'' sch. 80 pvc

300.0 CHERT and QUARTZ gouge. Soft. GREYWACKE. Heavily fractured, 80% mud, 20% fine-grained gravel. 315.0

#6 sand filter pack

480.0 GREYWACKE, LIMESTONE, and GREENSTONE mixture of rock types. CHERTY LIMESTONE. Well indurated. 500.0

Loss of circulation. Fracture zone.

565.0

0.020'' slotted screen

600.0 Bottom of borehole at 600.0 feet.

APPENDIX B HYDROGRAPHS

1500

27.0

Start step-rate pumping test Start constant-rate pumping test

1490

Recovery from constant-rate pumping test

26.0

1480

25.0

Temporary pumping for water supply during drilling of HG-11 24.0

1470

Groundwater Elevation (ft amsl)

1460

HG-10 S PW Groundwater Trend Cumulative Precipitation (inches)


Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

23.0

1440 9/24 9/29 10/4

21.0

9/14

9/19

Date

10/9

10/14

10/19

10/24

10/29

Title Project Name Client Name

HG-10 S PW Hydrograph
Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.1

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


22.0

1450

1475 Lose circulation in HG-11 at approximately 1,015 feet amsl during drilling

26.5

1465
Continue development of HG-10 S PW by bailing and surging Begin airlifting HG-10 S PW Inject 2,000 gallons of water in HG-10 S PW for a falling-head test Start step-rate pumping test in HG-10 S PW Start constant-rate pumping test in HG-10 S PW Recovery from constant-rate pumping test

Natural water level decline

26.0
25.5 25.0 24.5 24.0 23.5

1455

1445

1435

1425

1415

Groundwater Elevation (ft amsl)

1405

HG-10 INT VWT

23.0
22.5 22.0
Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

Groundwater Trend

1385

1375 9/9 9/19 9/29 10/9 10/19 10/29

21.5

8/30

Date
Title Project Name Client Name

HG-10 INT VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.2

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\

Cumulative Precipitation from October 2008 (inches)

1395

Cumulative Precipitation (inches)

1550 HG-10 D VWT

26.5

1500
Cumulative Precipitation (inches)
Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

26
25.5 25 24.5 24 23.5

1450

1400

1350

1300

1250

Groundwater Elevation (ft amsl)

1200

23
22.5 22 21.5 9/9 9/19 9/29 10/9 10/19 10/29

1100

1050

8/30

Date
Title Project Name Client Name

HG-10 D VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.3

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)

1150

Transducer elevation = 1,090 feet amsl

1435 Natural water level decline Start of step-rate pumping test in HG-10 S PW End of step-rate pumping test in HG-10 S PW Start of constant-rate pumping test in HG-10 S PW

26.5

1434

26.0
25.5 25.0 24.5 24.0 23.5

1433

1432

1431

1430

1429

Groundwater Elevation (ft amsl)

1428
End of constant-rate pumping test in HG-10 S PW

23.0
22.5 22.0
Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

GT4-25A

1426

1425 9/9 9/19

21.5 9/29 10/9 10/19 10/29

8/30

Date
Title Project Name Client Name

GT4-25a VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.4

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Testt

Cumulative Precipitation from October 2008 (inches)

1427

Groundwater Trend

Cumulative Precipitation (inches)

1470

30

1465
25

1460

1455

20

1450 15

1445

1440

GT4-25A

Groundwater Elevation (ft amsl)

1435

10

Groundwater Trend

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1425 0 6/1/08 9/9/08 12/18/08 3/28/09 7/6/09 10/14/09 1/22/10

1420

2/22/08

Date
Title Project Name Client Name

GT4-25a VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.5

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


5

1430

Cumulative Precipitation (inches)

1481.5 Natural water level decline Start of step-rate pumping test in HG-10 S PW End of step-rate pumping test in HG-10 S PW Start of constant-rate pumping test in HG-10 S PW 25.0 26.0

27.0

1480.5

1479.5

1478.5

1477.5 24.0 End of constant-rate pumping test in HG-10 S PW

1476.5

Groundwater Elevation (ft amsl)

1475.5

GT3-4

23.0

1474.5

Cumulative Precipitation (inches)

22.0

1473.5

1472.5 9/9 9/19

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

21.0 9/29 10/9 10/19 10/29

8/30

Date
Title Project Name Client Name

GT3-4 VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.6

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation (inches)

Groundwater Trend

1515

30

1510 25

1505

1500

20

1495 15

1490

Groundwater Elevation (ft amsl)

1485

GT3-4

10

Groundwater Trend

1480

Cumulative Precipitation (inches)

1475
Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1470 6/1/08 9/9/08 12/18/08

0 3/28/09 7/6/09 10/14/09 1/22/10

2/22/08

Date
Title Project Name Client Name

GT3-4 VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.7

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


5

1738.0

27

1737.8

Natural water level decline

26

1737.6 25

1737.4 24

1737.2

Groundwater Elevation (ft amsl)

23

1737.0

HG-4 MW

Groundwater Trend

1736.8

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1736.6 9/14 9/24 10/4 10/14 10/24

21

9/4

Date
Title Project Name Client Name

HG-4 MW Hydrograph
Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.8

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


22

Cumulative Precipitation (inches)

27

1659.1

1658.9

26

1658.7

Natural water level decline


25

1658.5 24

1658.3

1658.1

23

Groundwater Elevation (ft amsl)

HG-6 MW

1657.9

Groundwater Trend

1657.7

Cumulative Precipitation (inches)

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1657.5 9/14 9/24 10/4 10/14 10/24

21

9/4

Date
Title Project Name Client Name

HG-6 MW Hydrograph
Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.10

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


22

1560.0

27

1555.0

26

1550.0

25

1545.0

24

Groundwater Elevation (ft amsl)

1540.0

23

HG-5 VWT

Cumulative Precipitation (inches)

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1530.0 12/18 2/6 3/28 5/17 7/6 8/25 10/14

21 12/3

9/9

10/29

Date
Title Project Name Client Name

HG-5 VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.9

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


22

1535.0

1204.6

27

1204.5
26

1204.4 Natural water level decline

1204.3

25

1204.2 24

1204.1

1204.0

HG-7 MW

Groundwater Elevation (ft amsl)

1203.9

23

Groundwater Trend

Cumulative Precipitation (inches)

1203.7
Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1203.6 9/14 9/24 10/4 10/14 10/24

21

9/4

Date
Title Project Name Client Name

HG-7 MW Hydrograph
Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.11

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation from October 2008 (inches)


22

1203.8

1034.0

30.0

1033.5

25.0

20.0

1033.0 15.0

1032.5

Groundwater Elevation (ft amsl)

10.0

Cumulative Precipitation (inches)


Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1031.5 2/20/09 4/11/09 5/31/09 7/20/09 9/8/09 10/28/09

0.0

1/1/09

Date
Title Project Name Client Name

HG-8 VWT Hydrograph


Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.12

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test\

Cumulative Precipitation since August 2008 (inches)


5.0

1032.0 HG-8 VWT

1176.8

27.0

1176.7
Natural water level decline 26.0

1176.6

1176.5

25.0

1176.4 24.0

1176.3

1176.2

Groundwater Elevation (ft amsl)

1176.1

HG-9 MW

23.0

Groundwater Trend

1175.9 21.0 9/14 9/24 10/4 10/14 10/24

Climate station ID: LSA near Los Altos Hill. Data obtained from http://cdec.water.ca.gov

1175.8

9/4

Date
Title Project Name Client Name

HG-9 MW Hydrograph
Hydrologic Investigation Lehigh Permanente
Project No. Date

Drawn Checked

DH GW

063-7109-500 March 2, 2010

Reviewed

DB

FIGURE

C.13

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Ext_500\Pumping Test

Cumulative Precipitation from October 2008 (inches)


22.0

1176.0

Cumulative Precipitation (inches)

APPENDIX C PACKER TEST RESULTS

TECHNICAL MEMORANDUM
Date: 3/27/2009 To: Bill Fowler From: Rick Booth cc: George Wegmann RE: PACKER TEST RESULTS, LEHIGH HANSON PERMANENTE QUARRY, CUPERTINO, CA In October and November 2008, a total of nine (9) boreholes were drilled in order to characterize the geology and hydrogeology of the project area. The borings were drilled to depths ranging from Project No.: 0637109 Company: Golder Associates

approximately 200 to 500 feet below grade and the cuttings were logged by a Golder geologist. The hydraulic conductivity of the bedrock encountered in borehole was tested using a downhole straddle packer set up. After the completion of the packer tests, four (4) monitoring wells were constructed in four of the boreholes for long term groundwater level and water quality monitoring. Vibrating wire transducers (VWT) were installed in the remaining boreholes except for boring HG-1, which could not be instrumented because of borehole instability. Borehole HG-1 was abandoned by filling with grout. The VWT

installations involved attaching the VWTs and their cables to a string of PVC pipe as it was inserted into the borehole; and then fully-grouting the hole, using the PVC string as a tremmie pipe. A total of fourteen (14) tests were analyzed from boreholes HG-2, HG-3, HG-4, HG-5, HG-8, and HG-9. Tests were conducted in boreholes HG-6 and HG-7; however, the tests could not be analyzed due to packer failure (poor borehole conditions prevented an adequate packer seal) or downhole transducer failure when the tubing could not be filled to surface. Every test consisted of a stabilization period after packer inflation followed by a constant rate injection test and a recovery phase.

Interval transmissivity was estimated using HydroBench. HydroBench is a pressure transient interpretation package developed by Golder Associates using the methodology of the Bourdet derivative (Bourdet et al. 1983), coupled with a library of analytical and reservoir models. The software allows the simultaneous analysis of different hydrogeological test phases such as Constant Rate Injection Tests, Slug and Pulse Tests. The derivative of pressure (i.e., rate of pressure change) with respect to the natural logarithm of time that has shown to significantly improve the diagnostic and quantitative analysis of slug and constant-rate pumping tests (Spane and Wurstner, 1993).

Hydraulic conductivity was computed by dividing the simulated interval transmissivity by the interval length. This implies the entire test interval length contributes equally to the test transmissivity and does not account for the scenario of a highly conductive feature in a relatively low permeable matrix. This scenario can be interpreted from long duration interference tests, which was not part of this scope of work.

3/27/09 B. Fowler Ptest TM

TECHNICAL MEMORANDUM

Skin effect was encountered in most tests. Skin effect is due to a zone surrounding the borehole that has a lower permeability than the formation at large. This acts as a skin around the wellbore, causing a lower apparent transmissivity than the formation represents. This apparent lower transmissivity is The steady state

reflected in the steady state approximation derived from the Theim equation.

approximation, as shown on Table 1, is consistently up to -order of magnitude lower than the transmissivity simulated in HydroBench. HydroBench accounts for the skin effect and removes it from the simulation.

Hydraulic conductivity ranged from 1E-04 m/sec in borehole HG-9 from 66 to 94 feet below ground surface (ft bgs) to 2E-07 m/sec in borehole HG-2 from 421.9 to 450.6 ft bgs. The mean hydraulic conductivity of all tests is 1E-05 m/sec. The HydroBench pressure and derivative curve matches are attached as Figures 1-14. A summary of test results is presented in Table 1.

References Bourdet, D., Whittle, T.M. Douglas, A.A., Pirard, Y.M., 1983; A new set of type curves simplifies well test analysis. World Oil, May 1983. Pp. 95 106 Spane, Wurstner, 1993. DERIV: A Computer Program for Calculating Pressure Derivatives for Use in Hydraulic Test Analysis. Ground Water, September, 1993. Attachments Table 1: Summary of Test Results Figures 1 14: HydroBench Pressure and Derivative Curves

3/27/09 B. Fowler Ptest TM

Table1 SummaryofTestResults LehighPermanente Quarry Cupertino,CA March2009

Test Number PackerSetup Test Type

Top (ftbgs)

Bottom (ftbgs)

Interval Length (ft)

Hydraulic Conductivity2 (m/sec)

TheimSteadyStateApprox.3 ConstantFlow Transmissivity Rate dP (gpm) (psi) (m2/sec)

HG1a

HG2

HG3

HG4

HG5

1 2 3 4 1 2 3 1 2 1 2

505.35 463.9 421.9 379.9 400 358.9 295.89 274 211.89 337.9 253.9

554 492.6 450.6 408.6 453 387.6 324.56 296.6 240.56 366.5 283.6

48.65 28.7 28.7 28.7 53 28.7 28.67 22.6 28.67 28.6 29.7

SinglePacker DoublePacker DoublePacker DoublePacker SinglePacker DoublePacker DoublePacker SinglePacker DoublePacker DoublePacker DoublePacker

CRI CRI CRI CRI CRI CRI CRI CRI CRI CRI CRI

2.E06 2.E06 2.E07 9.E06 9.E06 4.E07 2.E05 <7.E07 9.E07 8.E07 4.E07

22.5 16.5 2.4 27.0 14.0 9.0 15.0 <2 1.8 2.5 0.8

76 243 215 82 8 197 17 75 48 60 52

2.E05 5.E06 8.E07 2.E05 1.E04 3.E06 6.E05 <2.E6 3.E06 3.E06 1.E06

HG6 HG7 178 115 94 29 29 28 DoublePacker DoublePacker DoublePacker CRI CRI CRI

HG8

HG9

1 2 1

149 86 66

Transmissivity Analysis 1 (m2/sec) Match NoTests Recovery 4.E05 Recovery 2.E05 Injection 2.E06 Recovery 8.E05 Injection 1.E04 Recovery 4.E06 Injection 2.E04 Injection <5.E06 Injection 8.E06 Injection 7.E06 Injection 4.E06 NoTests NoTests Injection 1.E05 Injection 1.E04 Injection 9.E04 1.E06 1.E05 1.E04 5.0 21.0 21.4 56 49 6

6.E06 3.E05 2.E04

ftbgs CRI gpm dP 1 2 3

feetbelowgroundsurface ConstantRateInjection GallonsPerMinute Changeinpressureinducedduringthetest. AnalysisMatchreferstotheportionofthepressurecurvethatwasusedtofittheHydroBenchsimulation. Conductivitycalculatedbymultiplyingthetransmissivitybytheintervallength TheimSteadyStateEquation:T=Q*ln(Ri/Rew)/2(PI)H,whereQ=flowrate,Ri=boreholeradius,Rew=radiusofinfluence(assumed10meters),H=dP

HG2 Test1(505.35to554feet)
Pressure psi 1.E+02 HG-2 / Run 1 / REC: LogLog Plot

1.E+01

1.E+00

1.E-01

1.E-02

1.E-03 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi

HG-2 / Run 1 / REC: SemiLog Plot

70.0

60.0

50.0

40.0

30.0

20.0

10.0 1.E-04 1.E-03 1.E-02 1.E-01 hrs Time

================================= StaticPressure:7.69psi Transm. Storativ. Radius FlowDim. Shell1: 3.509e05m/s 1.041e05 m 2.5580 C(WBS) Skin CRI: 4.625e08m/Pa 9.8944 REC: 4.625e08m/Pa 9.8944

HG2 Test2(463.9to492.6feet)
Pressure psi 1.E+03 HG-2 / Test 2 / REC: LogLog Plot

1.E+02

1.E+01

1.E+00 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 1.E+03

HG-2 / Test 2 / REC: LogLog Plot

1.E+02

1.E+01

1.E+00 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

StaticPressure:14.17psi Transm. Storativ. Radius FlowDim. Shell1: 1.680e05m/s 1e4 m 2.0000 C(WBS) Skin CRI: 2.870e08m/Pa 9.7315 REC: 6.692e08m/Pa 9.7315

HG2 Test3(421.9to450.6feet)
Pressure psi 1.E+03 HG-2 / Test 3 / CRI: LogLog Plot

1.E+02

1.E+01

1.E+00

1.E-01 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi

HG-2 / Test 3 / CRI: SemiLog Plot

225.0 200.0 175.0 150.0 125.0 100.0 75.0 50.0 25.0 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

================================= StaticPressure:12.49psi Transm. Storativ. Radius FlowDim. Shell1: 1.717e06m/s 1.000e04 m 2.0000 C(WBS) Skin CRI: 1.330e08m/Pa 6.6485 REC: 9.800e09m/Pa 6.6485

HG2 Test4(379.9to408.6feet)
Pressure psi 1.E+02 HG-2 / Test 4 / REC: LogLog Plot

1.E+01

1.E+00 1.E-03 1.E-02 1.E-01 hrs Time

Pressure psi 85.0 80.0 75.0 70.0 65.0 60.0 55.0 50.0 45.0 40.0 35.0 30.0 25.0 20.0 1.E-03

HG-2 / Test 4 / REC: SemiLog Plot

1.E-02

Pressure psi 170.0 160.0 150.0 140.0 130.0 120.0 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 0.00 0.03 0.05 0.08

HG-2 / Test 4 / Test Pressures

1.E-01 hrs Time

0.10

0.13

0.15

0.18

0.20

0.23

0.25

hrs Time

HG2 Test4(379.9to408.6feet) ================================= StaticPressure:16.71psi Transm. Storativ. Radius FlowDim. Shell1: 7.732e05m/s 1e4 m 2.0000 C(WBS) Skin CRI: 2.214e8m/Pa 9.9976 REC: 7.159e08m/Pa 9.9976

HG3 Test1(400to453feet)
Pressure psi 1.E+02 HG-3 / Test 1 / CRI2: LogLog Plot

1.E+01

1.E+00

1.E-01

1.E-02 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 22.0

HG-3 / Test 1 / CRI2: SemiLog Plot

21.0

20.0

19.0

18.0

17.0

16.0

1.E-03

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:12.38psi Transm. Storativ. Radius FlowDim. Shell1: 1.377e04m/s 1.000e04 m 2.0000 C(WBS) Skin CRI2: 4.406e07m/Pa 0.2314 REC2: 1.000e11m/Pa 0.2314

HG3 Test2(358.9to387.6feet)
Pressure psi 1.E+03 HG-3 / Test 2 / CRI: LogLog Plot

1.E+02

1.E+01

1.E+00

1.E-01

1.E-02

1.E-03 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 190.0 180.0 170.0 160.0 150.0 140.0 130.0 120.0 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 1.E-03

HG-3 / Test 2 / CRI: SemiLog Plot

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:0.80psi Transm. Storativ. Radius FlowDim. Shell1: 3.667e06m/s 1.000e05 m 2.0000 C(WBS) Skin CRI: 5.117e08m/Pa 1.6058

HG3 Test3(295.89to324.56feet)
Pressure psi 1.E+03 HG-3 / Test 3 / CRI: LogLog Plot

1.E+02

1.E+01

1.E+00

1.E-01

1.E-02 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 70.0 65.0 60.0 55.0 50.0 45.0 40.0 35.0 30.0 25.0 20.0 15.0 1.E-03

HG-3 / Test 3 / CRI: SemiLog Plot

1.E-02

1.E-01

1.E+00 hrs Time

StaticPressure:12.40psi Transm. Storativ. Radius FlowDim. Shell1: 1.942e04m/s 1e4 m 2.0000 C(WBS) Skin CRI: 2.726e06m/Pa 10.0000 REC: 2.798e07m/Pa 10.0000

HG4 Test1(274to296.6feet)
Pressure psi 1.E+03 HG-4 / Test 1 / CRI: LogLog Plot

1.E+02

1.E+01

1.E+00

1.E-01

1.E-02

1.E-03 1.E-03 1.E-02 1.E-01 1.E+00 1.E+01 hrs Time

Pressure psi 210.0 200.0 190.0 180.0 170.0 160.0 150.0 140.0 130.0 120.0 110.0 100.0 90.0

HG-4 / Test 1 / CRI: SemiLog Plot

1.E-03

1.E-02

1.E-01

1.E+00

1.E+01 hrs Time

================================= StaticPressure:82.67psi Transm. Storativ. Radius FlowDim. Shell1: 4.861e06m/s 1e4 m 2.3435 C(WBS) Skin CRI: 1.760e07m/Pa 9.9931 REC: 3.370e09m/Pa 9.9931

HG4 Test2(211.89to240.56feet)
Pressure psi 1.E+02 HG-3 / Test 2 / CRI: LogLog Plot

1.E+01

1.E+00

1.E-01

1.E-02

1.E-03 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 170.0 165.0 160.0 155.0 150.0 145.0 140.0 135.0 130.0 125.0 120.0 115.0 110.0 1.E-03

HG-3 / Test 2 / CRI: SemiLog Plot

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:102.81psi Transm. Storativ. Radius FlowDim. Shell1: 8.195e06m/s 1.000e04 m 2.0000 C(WBS) Skin CRI: 9.637e09m/Pa 7.1146 REC1: 4.313e08m/Pa 7.1146

HG5 Test1(337.9to366.5feet)
Pressure psi 1.E+02 HG-5 / Test 1 / RI: LogLog Plot

1.E+01

1.E+00

1.E-01

1.E-02

1.E-03 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi

HG-5 / Test 1 / RI: SemiLog Plot

200.0

190.0

180.0

170.0

160.0

150.0

140.0 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

================================= StaticPressure:137.5psi Transm. Storativ. Radius FlowDim. Shell1: 6.659e06m/s 8.914e04 m 2.3030 C(WBS) Skin RI: 2.848e08m/Pa 9.6946 REC: 9.309e07m/Pa 9.6946

HG5 Test2(253.9to283.6feet)
Pressure psi 1.E+02 HG-5 / Test 2 / RI: LogLog Plot

1.E+01

1.E+00

1.E-01

1.E-02 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 170.0 165.0 160.0 155.0 150.0 145.0 140.0 135.0 130.0 125.0 120.0 115.0 1.E-03

HG-5 / Test 2 / RI: SemiLog Plot

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:107.28psi Transm. Storativ. Radius FlowDim. Shell1: 3.543e06m/s 1.125e05 m 1.8516 C(WBS) Skin RI: 7.500e09m/Pa 10.0000 REC: 9.687e07m/Pa 10.0000

HG8 Test1(149to178feet)
Pressure psi 1.E+03 HG-8 / Test 1 / CRI: LogLog Plot

1.E+02

1.E+01

1.E+00

1.E-01

1.E-02 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0

HG-8 / Test 1 / CRI: SemiLog Plot

1.E-03

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:18.4psi Transm. Storativ. Radius FlowDim. Shell1: 1.015e05m/s 1.072e04 m 2.2641 C(WBS) Skin CRI: 2.907e08m/Pa 4.7653 REC: 1.818e07m/Pa 4.7653

HG8 Test2(86to115feet)
Pressure psi 1.E+02 HG-8 / Test 2 / REC1: LogLog Plot

1.E+01

1.E+00 1.E-03 1.E-02 1.E-01 hrs Time

Pressure psi 65.0 62.5 60.0 57.5 55.0 52.5 50.0 47.5 45.0 42.5 40.0

HG-8 / Test 2 / REC1: SemiLog Plot

1.E-03

1.E-02

1.E-01 hrs Time

================================= StaticPressure:20.25psi Transm. Storativ. Radius FlowDim. Shell1: 1.015e04m/s 9.372e05 m 2 C(WBS) Skin CRI: 1.570e07m/Pa 9.9999 REC1: 1.834e07m/Pa 9.9999 REC2: 9.974e07m/Pa 9.9999

HG9 Test1(66to94feet)
Pressure psi 1.E+01 HG-9 / Test 1 / CRI: LogLog Plot

1.E+00

1.E-01

1.E-02

1.E-03

1.E-04 1.E-03 1.E-02 1.E-01 1.E+00 hrs Time

Pressure psi 58.5 58.0 57.5 57.0 56.5 56.0 55.5 55.0 54.5 54.0

HG-9 / Test 1 / CRI: SemiLog Plot

1.E-03

1.E-02

1.E-01

1.E+00 hrs Time

================================= StaticPressure:52.57psi Transm. Storativ. Radius FlowDim. Shell1: 8.974e04m/s 1.813e04 m 2.0000 C(WBS) Skin REC: 8.512e11m/Pa 10.0000 CRI: 4.978e07m/Pa 10.0000

APPENDIX D GROUNDWATER AND SURFACE WATER QUALITY RESULTS

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 1 of 9

HG-4 9-Feb-09

HG-4 14-Apr-09

HG-4 26-Oct-09

HG-4 4-Jan-10

HG-6 9-Feb-09

HG-6 14-Apr-09

HG-6 29-Oct-09

HG-6 4-Jan-10

HG-7 15-Apr-09

HG-7 27-Oct-09

HG-7 DUP 27-Oct-09

HG-7 29-Dec-09

HG-9 9-Feb-09

HG-9 15-Apr-09

Dissolved Metals

Aluminum (Al) Antimony (Sb) <38 <0.17 J B B J J+ J,J+ J <0.13 0.013 J <0.13 <0.13 J J <38 <0.23 <38 <0.23 <38 <0.17 <38 <0.17 <38 0.62 <38 <0.17 <38 <0.17 <38 0.27

g/L g/L

<38 0.43

<38 <0.23

<38 0.17

<38 0.47

J J,J+ J,J+ J

<38 0.67

J+ B

J B

Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) <0.13 0.014 J 0.017 J <0.13

g/L g/L g/L g/L 8.7 7.4 <0.18 260 2.6 120 0.052 2.0 130 <0.046 60 B,J,J+ 0.62 240 <0.18 46 0.62 250 <0.18 64 4.2 120 <0.046 27 B,J,J+ 2.2 120 <0.18 <9.7 2.4 120 <0.18 <9.7

2.8 39 0.064 -

J,J+

3.5 21 0.061 250

J B

9.4 14 <0.18 270

2 110 <0.18 21 <0.13

1.1 30 0.064 0.053

1.5 J 22 <0.046 21 B,J,J+ J 0.040 J

Cadmium (Cd)

g/L

0.2

0.052

<0.13

Chromium (Cr) Hexavalent Chromium (Cr VI)

g/L g/L B J J <0.55 <0.70 <0.64 <0.7 3.2 <0.7 <0.55 <0.70 <0.55 <0.70 0.94 <0.7 2.1 <0.70

<0.64 <0.7

4.0 <0.7

20 <0.70

1.4 <0.70

<0.55 <0.70

0.68 1.4

J J

1.9 <0.7

Copper (Cu) 16 J <7.2 21 J,J+ 46 J 34 J 330 310

g/L 0.8 J 0.58 J 0.93 J,J+ <0.68 <0.68 0.43 J,J+ <0.68

3.6

3.1

7.7

<0.68 310

<0.68 290

4.0 <7.2

0.67 <7.2

J,J+

Iron (Fe)

g/L

<7.2

33

J,J+

13

Lead (Pb) <0.054 19 46 58 33 41 320 <0.019 0.12 J,J+ <0.054 <0.054 0.038 B,J,J+

g/L

0.28

0.26

0.76

<0.054 330

<0.054 320

<0.054 320

<0.019 17

0.038 B,J,J+ 6.7

Manganese (Mn)

g/L

120

90

110

Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) B B,J B <0.23 <0.38 <0.38 2.1 0.54 J 0.47 J J+ J+ 1.3 3.9 <0.23 J 0.86

g/L g/L g/L 0.0106 33 <0.016 0.00631 3.6 <0.016 0.00234 2.5 0.00064 1.3 0.00068 2.5

<0.016 0.0126 31

<0.016 0.0226 43

0.0135 45

<0.016 0.0677 0.74 B,J,J+ 3.1 <0.23

0.0235 0.62 1.7 <0.38

J,J+ J

0.0221 0.54 1.7 <0.38 J J,J+

J,J+ J

0.0135 0.81 2.6 <0.38 J

J,J+

<0.016 0.0244 3.7 2.9 0.9 J

<0.016 0.00384 3.2 2.6 0.73

Nickel (Ni)

g/L

3.8

7.7

24

Selenium (Se)

g/L

0.27

B,J

0.32

1.1

Silver (Ag) Thallium (Tl) Vanadium (V) <0.065 <0.11 <1.2 B J <0.028 0.1 B J <0.028 <0.054 <0.065 <0.11 <1.2

g/L g/L g/L

<0.028 0.088 -

B J

<0.028 0.20 -

J,J+

<0.065 0.23 11

<0.065 <0.11 <1.2

<0.028 0.17 -

0.81 <0.11 <1.2 B,J

0.42 <0.11 <1.2

<0.065 <0.11 <1.2 J

<0.028 <0.054 J+

<0.028 0.19 -

J,J+

g/L

B,J+

B B B

Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Metals

mg/L mg/L mg/L mg/L mg/L

19 100 21 340 9.6 37

4.8 73 13 370 8.8 33

32 21 3.8 300 7.1 35

<1.9 14 2.4 260 6.3 33

3.2 B,J,J+ 37 70 B 18 B 2 59

5.2 38 75 17 1.7 61

2.4 39 77 17 1 67

<1.9 37 72 17 1.1 62

1.3 110 42 21 0.93 25

J,J+

<1.9 110 43 21 0.93 26

3 110 45 21 0.91 26

<1.9 100 41 20 0.94 23

19 88 29 31 3.2 18

8.7 100 31 21 2.4 22

J B

J B J J J B

J J J J J J J J J,J+

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) 0.12 J 0.15 J

g/L g/L g/L g/L g/L g/L 3,500 <0.20 11 13 <0.20 270 2,900 0.3 2.5 180 <0.060 -

6,100 1.1 2.6 250 0.064 -

B J,J+

1,800 <0.23 3.7 27 <0.060 260

4,800 <0.20 8.4 21 <0.20 280

2,900 <0.23 2.6 140 <0.060 71 0.077

230 <0.20 <1.1 270 <0.20 60 J <0.11

75 <0.20 <1.1 250 <0.20 66 <0.11

39,000 0.56 15 490 1.0 220 0.75

36,000 0.47 9.7 330 0.81 12 J 0.28

47,000 0.44 11 350 0.94 17 J 0.35

17,000 0.48 5 250 0.36 28 J 0.16

1,500 0.76 1.1 59 0.1 J 0.17

750 <0.23 1.5 28 <0.060 110 J 0.075

J B B J

Total Recoverable Cadmium (Cd)

g/L

0.49

0.077

0.17

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 2 of 9

Q J+

Total Recoverable Chromium (Cr)

g/L

HG-4 9-Feb-09 45

HG-4 14-Apr-09 14

J+

HG-4 26-Oct-09 86

HG-4 4-Jan-10 30

HG-6 9-Feb-09 22

HG-6 14-Apr-09 14

HG-6 29-Oct-09 <0.64

HG-6 4-Jan-10 <0.64

HG-7 15-Apr-09 430

HG-7 27-Oct-09 320

HG-7 DUP 27-Oct-09 360

HG-7 29-Dec-09 130

HG-9 9-Feb-09 6.5

HG-9 15-Apr-09 <1.6

Total Recoverable Copper (Cu) 6,400 B 5,800 5,500 460 160 84,000 53,000 69,000 22,000

g/L 7.7 12 4.8 J+ 1.3 J <0.66 51 35 36 14

28

4.1

J+

19

12 3,200

4.1 1,900

J+

Total Recoverable Iron (Fe)

g/L

12,000

3,400

9,800

Total Recoverable Lead (Pb) 1.3 73 B B,J+ B J <0.54 <0.088 <0.11 <2.6 B,J B 0.26 0.14 J J 0.14 0.12 91 0.90 J <0.54 J J J,J+ <0.54 <0.088 <0.11 <2.6 J+ B,J+ J B 160 100 B 44 42 B 1,300 B 1,100 1,200 J B 0.96 J 0.18 J <0.19 0.72 B,J 13 8.3 9

g/L

0.26

1.2

3.2 620 J B

1.6 88 J

0.15 41

J B,J+

Total Recoverable Manganese (Mn)

g/L

290

94

180

Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) 1.3 <0.088 <0.11 11 B <0.064 <0.054 <0.064 <0.054 J <0.50 <0.50

g/L g/L g/L <0.016 57 26 <0.016 2.5 15 <0.016 1.8 10 <0.016 1.4 1.8 <0.016 1.7 1.2 <0.016 2.2 420 0.058 1.9 310

0.042 37 37

B,J

<0.016 58 14

B B

<0.016 59 67

0.092 2 350 <0.54 0.15 0.12 100

0.022 1.8 120 <0.54 J J <0.088 <0.11 38

0.018 3.9 7.8 1.1 <0.064 <0.054 -

<0.016 1.9 4.8 J <0.50 <0.064 <0.054 -

B,J+ J+

Total Recoverable Selenium (Se)

g/L

0.94

<0.50

<0.54

Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V)

g/L g/L g/L

0.5 0.15 -

J J

<0.064 <0.054 -

<0.088 <0.11 32

g/L

B,J+

Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) B ND ND ND ND ND ND

mg/L mg/L mg/L mg/L

68 140 31 390 11

58 70 16 380 9.3

40 27 11 320 7.5

14 18 7.6 260 6.5

32 47 82 19 2.2

16 44 88 19 1.9

8.7 41 81 17 1.1

3.2 41 80 17 1.1

99 120 91 37 5.4

79 130 93 24 5.2 -

86 130 110 23 5.7 -

35 120 64 21 3.7 -

37 97 32 38 3.6 ND ND

19 120 35 23 2.8 ND ND

Pesticides PCBs VOCs Total Trihalomethanes (TTHM) <0.23 <0.23 0.48 J <0.24 -

ND ND

ND ND

Bromoform

g/L

<0.24

<0.24

<0.24 <0.23

1.1 0.94 J+

<0.24 0.24 J,J+

Chloroform

g/L

<0.23

<0.23

g/L g/L J 230 6.9 200 25 24 25 470 <2.5 380 460 <2.5 380 31 J+ 2.5 B,J,J+ 0.4 0.34 J J <0.23 0.24

<0.23 <0.12

<0.23 0.41

470 <2.5 380 25 B

460 <2.5 380 25

<0.23 0.30 <1.1 480 <2.5 390 47

J B

480 <2.5 400 46

480 <2.5 390 46

430 <2.5 350 45

2.6 <0.12 16 360 <2.5 290 46 J+

0.41 0.48 <1.1 410 <2.5 340 32

J J B

g/L

22

J+

4.1 B,J,J+

Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3)

mg/L mg/L mg/L

280 <5.0 230

250 <2.5 210

220 11 200

Chloride

mg/L

51

41

28

Fluoride 380 45

mg/L

0.32

0.39

0.55

0.58

0.073 11 380

0.080 15 400

<0.010 8.6 410

0.13 16 390

0.18 31 440

0.2 31 450

0.2 30 460

0.25 29 430

0.30 48 340

0.37 38 390

Sulfate Hardness (as CaCO3)

mg/L mg/L

770 340

770 240

500 69

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 3 of 9

HG-4 9-Feb-09 880 70 J+ H J+ H J+ J J 490 81 470 91 460 3.3 460 2 550 1,100 530 840 580 1,000 530 400 480 88

HG-4 14-Apr-09

HG-4 26-Oct-09

HG-4 4-Jan-10

HG-6 9-Feb-09

HG-6 14-Apr-09

HG-6 29-Oct-09

HG-6 4-Jan-10

HG-7 15-Apr-09

HG-7 27-Oct-09

HG-7 DUP 27-Oct-09

HG-7 29-Dec-09

HG-9 9-Feb-09

HG-9 15-Apr-09 490 34

Total Dissolved Solids (TDS) Total Suspended Solids (TSS)

mg/L mg/L

1,500 190

1,500 290

1,000 840

H B J J J+

J J

H J J

J J J+

J,J+

Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide

mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L

<0.10 0.21 0.068 0.01 0.4 <0.050

<0.10 0.28 <0.026 <0.0081 0.37 0.13

<0.10 0.28 <0.026 0.014 0.45 0.24

<0.10 0.17 <0.026 <0.0081 0.49 1

<0.10 0.084 0.051 0.012 0.12 <0.050

<0.10 0.094 <0.026 <0.0081 0.077 <0.050

<0.10 H 0.064 <0.026 0.012 B,J,J+ <0.016 <0.050

<0.10 0.057 <0.026 0.031 <0.016 <0.050

<0.10 0.090 <0.026 <0.0081 0.64 0.15

<0.50 H 0.18 <0.026 0.0099 B,J,J+ 0.51 <0.25

<0.50 H 0.042 J <0.026 0.0094 B,J,J+ 0.63 <0.25

<0.10 0.035 0.026 <0.0081 0.21 <0.050

<0.10 0.037 1.3 0.0087 0.19 <0.050

<0.10 <0.025 0.72 <0.0081 0.044 <0.050

pH Electrical Conductivity (@ 25 C)

s.u. umhos/cm

8.04 1,900

8.12 1,900

8.55 1440

8.35 1300

8.00 740

7.88 725

7.92 736

7.87 708

7.38 839

7.37 870

7.4 871

7.3 880

7.99 747

7.64 753

Odor Turbidity Cyanide Dioxins Aquatic Toxicity B,J+ J ND ND 1.4 ND <1.2 -

odor units NTU mg/L pg/L

2 350 <0.0032 <1.2 pass

2 540 0.017 <0.78 pass

B,J+

2 140 <0.0028 -

4 43 <0.0028 -

1.0 120 <0.0032 <0.82 pass

2.0 56 0.021 <0.88 pass

none 3.4 <0.0028 -

1 2.4 <0.0028 -

none 810 <0.0028 <0.94 pass

none 210 <0.0028 -

none 320 <0.0028 -

none 160 <0.0028 -

1.0 210 <0.0032 <0.54 pass ND -

none 34 <0.0028 <0.80 pass ND <1.2

Asbestos (# of fibers) Oil and Grease

# of fibers mg/L

ND -

ND <1.2

Notes:

1 = Baseline criteria from SAN FRANCISCO BAY BASIN (REGION 2) WATER QUALITY CONTROL PLAN (BASIN PLAN), Table 3.4 For Cd, Cu, Pb, Ni, Ag, Zn are based on hardness values, baseline criteria listed use hardness of 100 mg/L. 2 = Environmental Protection Agency (EPA) maximum contaminant level (MCL) for drinking water, Region 9 SMCL - secondary maximum contaminant level bolded value and yellow shading identify California limits that differ from the national limits. TT - Treatment technique (a required process intended to reduce the level of a contaminant in drinking water) MRDL - maximum residual disinfectant level

Data Qualifiers (Q): J = estimated value below laboratory reporting limit - laboratory qualifier B = detected in blank sample - laboratory qualifier H = holding time exceeded - laboratory qualifier J+ = biased high due to detection in field blank or equipment blank

ND - below detectable limits

"-" - not analyzed

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 4 of 9

HG-9 27-Oct-09

HG-9 29-Dec-09

HG-10 28-Sep-09

HG-10 4-Jan-10

SW-1 4-Feb-09

SW-1 2-Apr-09

SW-1 22-Sep-09

SW-1 19-Jan-10

SW-2 4-Feb-09

SW-2 Dup 4-Feb-09

SW-2 2-Apr-09

SW-2 Dup 2-Apr-09

SW-2 22-Sep-09

Dissolved Metals <38 0.48 J ` B B J <0.013 0.022 B,J <0.13 <0.13 0.098 J 0.14 J 0.055 B,J B,J+ J J B J,J+ J <38 <0.23 <38 <0.23 <76 <0.17 <38 0.26 <38 6.3 <38 6.1 <38 3.8 <38 4.0 <38 2.4 J

Aluminum (Al) Antimony (Sb)

g/L g/L

<38 <0.17

<38 <0.17

<38 <0.17

Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) <0.13

g/L g/L g/L g/L <0.52 24 <0.18 15 0.79 34 <0.046 <0.67 91 <0.046 55 B,J,J+ <0.52 63 <0.18 200 0.74 58 <0.18 51 4.5 37 <0.046 4.8 35 <0.046 2.8 63 0.059 J,J+ 89 B,J,J+

1.2 19 <0.18 10

B,J

1 20 <0.18 33

<0.52 150 <0.18 33

B,J

3.4 66 <0.046 91 B,J,J+ 0.057 B,J

1.5 60 <0.18 100 <0.13

J+

Cadmium (Cd)

g/L

<0.13

<0.13

<0.13

Chromium (Cr) Hexavalent Chromium (Cr VI) 15 1.9 J J J J, H <0.64 0.98 1.5 <0.7 J <0.55 <0.70 <0.55 1.2 B,J,J+ <0.64 0.95 <0.64 1.2

g/L g/L

1.5 <0.70

<0.55 <0.70

<0.55 <0.01

<0.64 0.83

<0.64 0.92

<0.55 <0.70

Copper (Cu) 2.3 <9.3 8.1 J <7.2 B <19 9.7 J <7.2 1.2 B,J,J+ 1.6 B,J,J+ 4.2 3.1 1.3 B,J,J+

g/L

0.86

<0.68

1.9

1.0 <7.2

J,J+

1.3 B,J,J+ 18 B,J

1.3 B,J,J+ <7.2 B

3.3 <9.3 B

Iron (Fe)

g/L

<9.3

<9.3

<9.3

Lead (Pb) <0.054 0.16 B J+ J+ 2.3 1.7 J J 0.33 J,J+ 0.58 J 0.79 J,J+ 1.9 2.2 <0.019 0.029 J <0.054 <0.054 0.023

g/L

<0.054

<0.054

0.13

<0.019 2.1

<0.019 3.0 B B

<0.019 3.0 B

<0.054 2.1 J+

Manganese (Mn)

g/L

2.5

0.19

85

Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) B,J+ 2.2 7.1 J,J+ 11 4.7 1.7 2.8 8.9 J 3.3

g/L g/L g/L 0.0631 16 <0.016 0.00078 5.7 <0.016 0.00101 3.9 0.00178 3.8 0.0547 1.8

0.00113 0.93

J+ J,J+

0.00105 2.2

<0.016 0.00141 750 70 80

<0.016 740 79

<0.016 0.00133 460 110 74

<0.016 0.00157 490 110 76

0.00182 470 44 81

J+

Nickel (Ni)

g/L

1.6

2.2

10

Selenium (Se)

g/L

<0.38

<0.38

<0.38

J B J B J+ B,J+

Silver (Ag) Thallium (Tl) Vanadium (V) <0.065 <0.11 1.7 J,J+ <0.028 <0.054 0.063 <0.054 <0.065 <0.11 <1.2

g/L g/L g/L

0.34 <0.11 <1.2

<0.065 <0.11 <1.2

<0.065 <0.11 <1.2

<0.065 0.17 1.8

J J B,J

<0.028 0.16 -

B,J

<0.028 0.085 J+

<0.028 <0.054 B,J+

<0.028 <0.054 B,J+

<0.065 <0.11 97 J,J+ B B

g/L

Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Metals <1.9 57 28 18 3.5 6 B,J+ 7.2 220 85 25 1.1 15 58 160 59 19 1.1 17 J B B

mg/L mg/L mg/L mg/L mg/L

3.2 110 31 18 1.7 23

2.1 100 34 18 1.4 21

35 74 35 16 0.6 16

3.4 310 120 28 1.5 17

2.2 61 28 9.6 0.88 16

12 200 38 25 1.1 11

200 37 25 1.1 11

61 210 46 30 1.4 12

71 200 46 30 1.4 12

3.1 200 53 24 1.1 17

J B B B,J+ J

J J

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) 38 <0.20 <1.1 200 <0.20 15 J <0.11 <0.051 <28 <0.23 <0.82 38 <0.060 -

g/L g/L g/L g/L g/L g/L

160 <0.20 <1.1 19 <0.20 16

160 <0.20 <1.1 23 <0.20 33

94 <0.20 <1.1 170 <0.20 26

85 J+ <0.23 <0.82 100 B <0.060 60 B,J,J+ <0.051

62 <0.40 <2.2 61 <0.40 290 <0.22

3,700 <0.20 <1.1 100 <0.20 70 <0.11

32 6.2 2.4 40 <0.060 0.14

39 6.1 1.9 40 <0.060 J 0.16

63 J+ 4.0 2.0 72 B <0.060 90 B,J,J+ J 0.086 J

110 J+ 4.0 2.1 76 B 0.10 J 85 B,J,J+ 0.099 J

<38 2.3 <1.1 60 <0.20 110 0.14

B,J+ J

Total Recoverable Cadmium (Cd)

g/L

<0.11

<0.11

<0.11

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 5 of 9

Q J

Q J,J+

Total Recoverable Chromium (Cr)

g/L

HG-9 27-Oct-09 <0.64

HG-9 29-Dec-09 <0.64

HG-10 28-Sep-09 3.5

HG-10 4-Jan-10 1.2

SW-1 4-Feb-09 <1.6

SW-1 2-Apr-09 <1.6

SW-1 22-Sep-09 <1.3

SW-1 19-Jan-10 40

SW-2 4-Feb-09 <1.6

SW-2 Dup 4-Feb-09 <1.6

SW-2 2-Apr-09 <1.6

SW-2 Dup 2-Apr-09 <1.6

SW-2 22-Sep-09 0.93

Total Recoverable Copper (Cu) 11 57 <16 46 J 99 6,600 87 J+ 100 J+ 75 120 1.6 J 1.6 B,J,J+ 3.2 J,J+ 15 1.4 J 1.3 J 1.7 B,J,J+ 4.2

g/L

1.2

0.92

4.8

2.5 58

J+

Total Recoverable Iron (Fe)

g/L

350

350

160

Total Recoverable Lead (Pb) 0.69 5.2 J B,J+ B 87 84 B J+ 9.2 7.6 9.2 2.3 <0.016 770 75 <0.016 750 77 B 0.92 J 3.3 J+ 3.2 130 B 4.8 4.9 5.5 J+ B,J <0.053 <0.053 <0.38 1.7 B,J+ <0.053 <0.053 <0.053

g/L

<0.19

<0.19

0.26

<0.053 7.2 <0.016 180 120 J+ B B

<0.19 4 0.02 470 44 J,J+

Total Recoverable Manganese (Mn)

g/L

9.5

8.6

92

Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) 0.050 6.7 5.4 <0.54 <0.016 8.2 4.3 0.028 B,J,J+ 3.3 3.2 B <0.016 4.5 5.8 <0.016 2 27

g/L g/L g/L

0.05 1.2 2.1

<0.016 1.1 2.6

B,J+

<0.016 5.5 11

0.028 B,J,J+ 430 120 B 74

Total Recoverable Selenium (Se)

g/L

<0.54

<0.54

<0.54

75

71

Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) B J+ B,J+ J+

g/L g/L g/L <0.088 <0.11 <2.6 <0.064 <0.054 <0.064 <0.054 <0.18 <0.22 <5.2 <0.088 <0.11 23 <0.064 <0.054 -

<0.088 <0.11 <2.6

<0.088 <0.11 2.8

<0.088 <0.11 4.3

<0.064 <0.054 J+

<0.064 <0.054 B,J+

<0.064 <0.054 B,J+

<0.088 <0.11 93

g/L

Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) B B B J ND ND ND ND ND ND

mg/L mg/L mg/L mg/L

9.9 120 33 20 1.9

5.5 100 34 19 1.5

40 87 41 18 0.62

B J

10 70 32 17 3.7

6.0 240 92 26 1.3

8.4 180 64 19 0.89

8.7 310 120 30 1.5

18 71 32 10 1.1

15 230 43 27 1.2

B B

16 230 43 43 1.2 ND ND

12 220 48 31 1.2 ND ND

15 200 44 30 1.1 ND ND

10 200 52 24 0.99 -

Pesticides PCBs VOCs Total Trihalomethanes (TTHM) 290 8.8 250 14 23 B 280 <5.0 230 270 <2.5 220 15 B 2 B,J,J+ 3.2 B,J,J+ <0.23 <0.12 <0.23 <0.12 290 <5.0 240 28 B <0.23 <0.23 <0.24 <0.24 170 <2.5 140 9.4

Bromoform

g/L

<0.24 <0.23 <0.23 <0.12 1.8 B,J,J+ 190 <5.0 150 B 14 B

<0.24 <0.23 <0.23 <0.12 150 14

<0.24 <0.23 <0.23 <0.12 2.1 B,J,J+ 180 <2.5 150 12 B

<0.24 <0.23 <0.23 <0.12 4.6 180 <2.5 150 12 B B,J+

240 <5.0 190 18 B

Chloroform

g/L

g/L g/L

g/L

Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3)

mg/L mg/L mg/L

420 <2.5 350

440 <2.5 360

390 <2.5 320

Chloride

mg/L

26

27

14

Fluoride 29 260

mg/L

0.36

0.46

0.14

0.11

0.13 650 900 B

0.11 450 650

0.12 1,100 1,300

0.12 110 270 B

0.15 560 650 B

0.14 560 750

0.085 600 740

0.10 610 690

0.17 550 710

Sulfate Hardness (as CaCO3)

mg/L mg/L

31 400

26 390

30 330

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 6 of 9

HG-9 27-Oct-09

HG-9 29-Dec-09

HG-10 28-Sep-09

HG-10 4-Jan-10

SW-1 4-Feb-09

SW-1 2-Apr-09

SW-1 22-Sep-09

SW-1 19-Jan-10

SW-2 4-Feb-09

SW-2 Dup 4-Feb-09

SW-2 2-Apr-09

SW-2 Dup 2-Apr-09

SW-2 22-Sep-09

Total Dissolved Solids (TDS) Total Suspended Solids (TSS) J H B

mg/L mg/L

450 6

J+

460 5.2

400 18

340 7

1,400 <2.5

890 0.75

1,800 5.2

350 340

1,100 <2.5

970 2.2

1,100 2.0

1,000 2.2

1,000 5.2 H

H B

J J,J+ J,J+

Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide

mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L

<0.10 H <0.025 0.91 0.0091 B,J,J+ 0.067 <0.050

<0.10 <0.025 0.77 <0.0081 <0.016 <0.050

<0.10 <0.025 0.05 <0.0081 <0.016 <0.050

<0.10 0.026 0.029 0.021 0.036 <0.050

H J J J J

<0.10 <0.025 4.9 <0.0081 <0.012 <0.050

<0.10 <0.050 3.3 <0.0081 0.031 <0.050

<0.10 <0.025 5.6 <0.0081 <0.016 <0.050

<0.10 H 0.038 B,J,J+ 0.81 <0.0081 0.26 <0.050

<0.10 <0.025 0.65 <0.0081 <0.012 <0.050

<0.10 <0.025 0.67 <0.0081 <0.012 <0.050

<0.10 <0.025 2.3 <0.0081 0.025 <0.050

<0.10 <0.025 2.3 <0.0081 0.012 <0.050

J,J+

<0.10 <0.025 0.48 <0.0081 <0.016 <0.050

pH Electrical Conductivity (@ 25 C)

s.u. umhos/cm

7.55 752

7.44 775

7.52 662

8.5 533

7.97 1,500

8.13 1,110

7.86 2040

7.07 515

8.30 1,240

8.29 1,210

8.15 1,210

8.28 1,210

8.24 1,270

J+

Odor Turbidity Cyanide Dioxins Aquatic Toxicity B ND <1.2 1 -

odor units NTU mg/L pg/L

none 3.6 <0.0028 -

none 1.4 <0.0028 -

none 4.6 <0.0028 -

none 2.7 <0.0028 -

none 0.38 <0.0032 <0.64 pass

none 0.24 0.0034 B,J,J+ <0.29 pass

none 2.1 <0.0028 -

4 120 <0.0028 -

none 2.9 <0.0032 <0.64 pass

4 2.4 <0.0032 -

none 0.44 0.0036 B,J,J+ <1.0 pass <1.2

none 0.48 <0.0028 <0.72 pass

2 1.5 <0.0028 -

Asbestos (# of fibers) Oil and Grease

# of fibers mg/L

1.6 B,J,J+

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 7 of 9

SW-2 Dup 22-Sep-09 1,000 200 SMCL

SW-2 20-Jan-10

SW-2 Dup 20-Jan-10

SW-3 4-Feb-09

SW-3 1-Apr-09

SW-3 22-Sep-09

SW-3 14-Jan-10

North Quarry 13-Jan-10 Q Q Basin Plan 1 Criteria USEPA 2 DW MCL

West Material Storage Area Runoff 13-Jan-10

Dissolved Metals

Aluminum (Al) Antimony (Sb)

g/L g/L <38 <0.23 <38 <0.23 <38 <0.17 <38 <0.17 <38 8.2 <38 0.86

<38 3.0

<38 0.98

<38 0.99

J
6 150 (4-day) 340 (1 hr) 50 1,000 4

J,J+ B J,J+ <0.13 <0.13 0.53 J,J+

Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B)

g/L g/L g/L g/L <0.67 96 <0.046 <0.67 100 <0.046 39 <0.52 170 <0.18 67 <0.52 110 <0.18 40 J 4.5 41 <0.18 69

2.2 68 <0.18 100

J,J+

J+

J,J+

J+ 0.017 J <0.013

1.5 43 <0.18 36

1.5 42 <0.18 35

J J
<0.13 5 50 1.1 (H) (4-day) 3.9 (H) (1 hr) 11 (4-day) 16 (1 hr) Cr (VI)

1.3 24 <0.18 31

Cadmium (Cd)

g/L

<0.13

<0.13

<0.13

Chromium (Cr) Hexavalent Chromium (Cr VI) J

g/L g/L <0.64 1.4 0.81 <0.7 J <0.55 <0.70 <0.55 2.0

0.58 <0.70

<0.55 1.2 B,J,J+

<0.55 1.2 B,J,J+

0.63 J 1.3 J,J+

J+ J
1.2 <9.3

<0.55 -

Copper (Cu) <7.2 <7.2 B <9.3 B <9.3 B <9.3

g/L 0.7 B,J,J+ 0.6 J,J+ 2.2 1.5

4.8

1.8

1.4 J

9 (H) (4-day) 13 (H) (1 hr)

Iron (Fe)

g/L

<9.3

<9.3

<9.3

Lead (Pb) 0.11 J,J+ 0.31 J 0.73 J,J+ 1.4 21 14

g/L <0.019 0.026 J <0.054 <0.054 <0.054 <0.054

<0.054

<0.054

0.22

2.5 (H) (4-day) 65 (H) (1 hr)

Manganese (Mn)

g/L

2.8

J+

3.9

4.2

TT 1,000 SMCL 300 SMCL TT Action Level = 15 50 SMCL 0.025 (4-day) 2.4 (1 hr) 0.025 (4-day) 120 3.4 29

Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) B,J+ J 0.7 J <0.38 0.45 J 82 1.0 J 1.3 J,J+ 0.87 J 160 J+ 1.4 <0.23

g/L g/L g/L <0.016 0.00072 24 <0.016 <0.00020 0.91 B,J,J+ 0.00069 10 0.00089 J+ 3.6 0.0107 540

0.00173 470

J+

0.070 83

0.0662 84

2 2

Nickel (Ni)

g/L

47

27

27

100 50 100 SMCL 3.4 (H) (1-hr)

Selenium (Se)

g/L

90

13

13

52 (H) (4-day) 470 (H) (1 hr) 5 (4-day) 20 (1-hour)

Silver (Ag) Thallium (Tl) Vanadium (V) <0.028 <0.054 B J J,J+ B J+ <0.028 0.1 <0.065 <0.11 <1.2 <0.065 <0.11 1.9 J

g/L g/L g/L

<0.065 <0.11 110

<0.065 <0.11 66

<0.065 <0.11 66

<0.065 0.39 400

<0.065 <0.11 2.6

J
120 (H) (4-day) 120 (H) (1 hr) 5,000 SMCL

g/L

J,J+ B

B,J

B,J

Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Metals B J J,J+ J

mg/L mg/L mg/L mg/L mg/L

4 210 55 24 0.89 17

4.1 84 28 13 2.2 13

4.4 79 26 12 2.1 12

4.7 55 37 18 0.55 18

67 58 34 14 0.63 22

<1.9 64 37 16 0.51 23

<1.9 61 B 36 16 0.63 J 19

120 210 36 22 0.85 12

28 160 42 24 2 7.4

1,000 200 SMCL

J B

B,J

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) <28 <0.23 <0.82 110 <0.060 J,J+ <0.051 <0.051 <28 0.29 <0.82 110 <0.060 48

g/L g/L g/L g/L g/L g/L

<76 2.2 1.4 61 <0.20 350

6 50 1,000 4 B,J+ <0.11

B,J+

4,900 1.4 2.2 180 <0.20 52

5,200 1.1 2.3 170 <0.20 54

<76 <0.20 <1.1 160 <0.20 360

72 0.42 J <1.1 110 <0.20 39 J 0.7 B,J

720 7.9 3.7 59 <0.20 70 1.3

J B

87,000 1.6 21 4,200 1.1 52 5.8

J B
1.1 (H) (4-day) 3.9 (H) (1 hr) 5

Total Recoverable Cadmium (Cd)

g/L

0.11

0.49

0.44

Table D-1 - Report.xlsx

May 2010 Water Quality Monitoring Results

TABLE D-1

063-7109 Page 8 of 9

Q J,J+

Basin Plan 1 Criteria

Total Recoverable Chromium (Cr)

g/L

SW-2 Dup 22-Sep-09 <0.64

SW-2 20-Jan-10 25

SW-2 Dup 20-Jan-10 25

SW-3 4-Feb-09 <1.6

SW-3 1-Apr-09 <1.6

SW-3 22-Sep-09 1.1

SW-3 Q 14-Jan-10 1.3 J

North Quarry 13-Jan-10 6

West Material Storage Area Runoff 13-Jan-10 370

Total Recoverable Copper (Cu) 0.67 <16 30 J <60 150 1,200 160,000 J 0.78 J 1.3 J,J+ 3.3 170

g/L

2.2

J+

14

13

1.2 J

Total Recoverable Iron (Fe)

g/L

<60

8,300

9,000

Total Recoverable Lead (Pb) 0.37 J,J+ J,J+ <0.54 73 33 5 (4-day) 20 (1-hour) 0.025 (4-day) 2.4 (1 hr) 2 100 50 100 SMCL 2 J 0.75 J,J+ 1.1 4.5 B,J+ 38 3,000

g/L <0.053 0.064 J,J+ <0.19 17

<0.19

2.5

B,J+

2.3

B,J+

0.2 B,J,J+

0.5 B,J,J+

B B

Total Recoverable Manganese (Mn)

g/L

3.7

170

150

USEPA 2 DW MCL 50 TT 1,000 SMCL 300 SMCL TT Action Level = 15 50 SMCL

Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) B J 0.52 J <0.54 <0.50

g/L g/L g/L <0.016 16 1.3 <0.016 1.3 1.0 B B,J+ J,J+ 0.018 1.1 1.5 <0.016 1.1 1.4 J,J+ <0.016 630 180 1.5 140 460

0.058 450 43

J,J+

0.032 92 77

J,J+

<0.016 94 73

Total Recoverable Selenium (Se)

g/L

69

13

13

Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) J

g/L g/L g/L <0.064 <0.054 <0.064 0.14 <0.088 <0.11 <2.6 <0.088 0.13 J <2.6 <0.088 0.24 430

<0.088 <0.11 86

<0.088 0.28 100

<0.088 0.14 96

0.89 0.79 350

J J

Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) B B J J J ND ND ND ND -

g/L J+ J+

5,000 SMCL

mg/L mg/L mg/L mg/L

12 200 53 25 0.89

89 100 31 13 2.7

85 100 33 13 2.8

7.8 61 41 19 0.6

6.0 66 39 16 0.72

5.9 31 18 17 0.53

5.9 B 69 42 17 0.75 J 140 230 40 23 1.0 600 1000 160 25 8.2

Pesticides PCBs VOCs Total Trihalomethanes (TTHM) <0.24 <0.23 <0.23 <0.12 2.3 B,J,J+ 320 <2.5 260 28 B 16 320 13 270 310 7.1 260 23 B <1.1 <0.23 <0.12 330 <2.5 270 20 <0.23 <0.24 200 <5.0 170 13

Bromoform

g/L

71 <5.0 58 25

Chloroform

g/L

g/L g/L

80 80 TTHM 80 TTHM 80 TTHM 1,000

g/L

Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3)

mg/L mg/L mg/L

230 <5.0 190

170 <2.5 140

170 <2.5 140

Chloride

mg/L

18

10

10

250 - 600 SMCL 1.4 - 2.4 0.12 0.099 0.14 0.22


(temp. dependent) SMCL

Fluoride 28 290 B

mg/L

0.17

0.13

0.13

0.18

0.14 18 290 J+

Sulfate Hardness (as CaCO3)

mg/L mg/L

560 750

160 320

160 300

22 310

23 300

550 673

550 580

250 - 600 SMCL

Table D-1 - Report.xlsx

May 2010 Water QualityMonitoring Results

TABLE D-1

063-7109 Page 9 of 9

SW-2 Dup 22-Sep-09 340 <2.5 J H J J 6.5 to 8.5 within 0.5 of ambient 6.5 - 8.5 SMCL 3 SMCL TT 0.2 10 1 4.0 MRDL 360 0.86 350 <2.0 360 <3.3 790 18 900 3,600

SW-2 20-Jan-10

SW-2 Dup 20-Jan-10

SW-3 4-Feb-09

SW-3 1-Apr-09

SW-3 22-Sep-09

SW-3 14-Jan-10

North Quarry 13-Jan-10 Q Q Basin Plan 1 Criteria USEPA 2 DW MCL 500 SMCL

West Material Storage Area Runoff 13-Jan-10

Total Dissolved Solids (TDS) Total Suspended Solids (TSS)

mg/L mg/L

1,000 4

410 200

400 190

H B

H B,J+

H B,J+

H J+

Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide

mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L

<0.10 <0.025 0.51 <0.0081 <0.016 <0.050

<0.10 0.15 1.4 <0.0081 0.29 <0.050

<0.10 0.07 1.4 <0.0081 0.59 <0.050

<0.10 <0.025 <0.018 <0.0081 <0.012 <0.050

<0.10 <0.025 <0.026 <0.0081 <0.012 <0.050

<0.10 <0.025 0.055 <0.0081 0.016 <0.050

<0.10 H 0.027 J,J+ <0.026 <0.0081 <0.016 B <0.050 <0.10 <0.025 0.73 <0.0081 <0.016 <0.050 <0.10 0.095 7.6 <0.0081 1.8 -

pH Electrical Conductivity (@ 25 C)

s.u. umhos/cm

8.16 1250

7.49 602

7.55 605

8.18 577

8.39 541

8.39 589

8.27 H 596 7.94 1,130 7.90 1,090

Odor Turbidity Cyanide Dioxins Aquatic Toxicity J+ ND J,J+ 2.8 -

odor units NTU mg/L pg/L

2 1.9 <0.0028 -

8 90 <0.0028 -

4 100 <0.0028 -

2 0.22 <0.0032 <0.64 pass

none 0.36 <0.0032 <0.31 pass

1 2.1 <0.0028 -

none 0.78 J+ -

<0.0028 -

Asbestos (# of fibers) Oil and Grease

# of fibers mg/L

7E+6 10 m fibers

Table D-1 - Report.xlsx

May 2010

TABLE D-2 PER070 Water Quality Data Dry Jun-02 1.02 8.92 8.18 16.69 2.21 1.02 202 0.17 55.8 424 3.5 336 720 0.07 0.007 0.37 0.025 0.04 0.074 0.071 1.85 1.74 0.019 0.008 2.17 1.6 ND ND 1.88 1.25 0.92 0.86 0.87 0.46 0.0024 5.84 5.84 1.4 2 Spring Apr-02 1.01 11.21 8.33 13.52 1.4 1.94 189 0.06 49.7 498 1.5 326 724 0.07 1.54 0.007 0.37 0.012 0.04 0.38 0.37 1.69 1.55 ND 0.02 8.71 7.86 ND ND 1.42 1.11 1 1.04 2.72 2.31 0.00137 10.3 5.09 5.1 12.9 Wet Jan-03 1.14 10.78 7.50 14.01 4.90 185 0.18 42.3 533 9.74 379 850 ND 2.11 0.0207 0 0.014 0.056 0.95 1 2.26 1.68 0.108 0.00478 33.7 30.9 ND ND 5.27 2.64 1.95 1.94 8.12 6.8 0.0156 18.7 18.8 0.7 0.9

063-7109

Parameter Specific Conductance Dissolved Oxygen pH Temperature Turbidity Velocity Alkalinity Boron Chloride Hardness SSC Sulfate TDS Total Ammonia Nitrate Nitrite Total Kjeldahl Nitrogen Orthophospate Total Phosphorus Cadmium (T) Cadmium (D) Copper (T) Copper (D) Lead (T) Lead (D) Nickel (T) Nickel (D) Silver (T) Silver (D) Zinc (T) Zinc (D) Arsenic (T) Arsenic (D) Chromium (T) Chromium (D) Mercury (T) Selenium (T) Selenium (D) Organic Carbon (D) Organic Carbon (T) (TOC)

Unit mS/cm mg/L s.u. C NTU ft/s mg/L as CaCO3 mg/L mg/L mg/L as CaCO3 mg/L mg/L mg/L mg/L as N mg/L as N mg/L as N mg/L mg/L as P mg/L as P g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L

Notes: Yellow shading identifies peak concentration. SSC - suspended sediment concentration ND - concentration is below detectable limits Source: SFBRWQCB, 2007

APPENDIX E QUALITY ASSURANCE / QUALITY CONTROL

TECHNICAL MEMORANDUM
Date: March 1, 2010 Project No.: 063-7109 RE: BASELINE WATER QUALITY AND GEOCHEMICAL DATA QA/QC REPORT

1.0

INTRODUCTION
This Technical Memorandum presents the results of the quality

A primary objective of the baseline water quality data collection effort is to provide analytical data that are of known and defensible quality. assurance/quality control (QA/QC) evaluation of the baseline data set.

2.0

QUALITY ASSURANCE/QUALITY CONTROL PROGRAM

The QA/QC program for baseline sample collection included the following: (1) collection and analysis of field duplicate water samples; (2) collection and analysis of equipment blank and field blank samples; and (3) calculation of charge balance errors.

2.1

Field Duplicate Sample Results

Field duplicate sample results were evaluated following guidelines presented in the U.S. Environmental Protection Agency (USEPA) Contract Laboratory Program Functional Guidelines for Inorganic Data Review (USEPA, 2004). Although the USEPA provides no required review criteria for determining the comparability of field duplicate analyses, or laboratory duplicate analyses of water samples, a control limit of 20% for the Relative Percent Difference (RPD) is typically applied to original and duplicate sample values that are greater than or equal to five times the Contract Required Quantitation Limit (CRQL). A control limit of 35% is applied for solid phase analysis results. For the current study, the CRQL was assumed equal to the practical quantitation limit (PQL). If the concentration in either the original or duplicate sample is less than five times the CRQL (PQL), a control limit of one times the CRQL is applied. These criteria were applied to assess duplicate results. The RPD of all duplicate samples greater than five times the CRQL was calculated as follows (Equation 1):

(%) =


+ 2

100

(Equation 1)

2.2

Field Blank Sample Results


Equipment blanks are used to verify the adequacy of sampling equipment

One field blank or equipment sample was collected and analyzed during each groundwater and surface water sampling event.

appendix e - data quality assurance quality control.docx

Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, WA 98052 USA Tel: (425) 883-0777 Fax: (425) 882-5498 www.golder.com Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

March 2010 063-7109

decontamination procedures. All samples reporting values less than ten times the reporting limit for any constituent detected in a blank sample were qualified as estimated high (J+ qualifier) (USEPA, 2004).

2.3

Charge Balance Errors

Calculation of a charge balance error is a standard practice in assessing the accuracy of a water analysis. Solution electroneutrality means that the sum of cations in solution (expressed in meq/L) should be equal to the sum of anions. A charge balance error of less than 5% to 10% is generally regarded as indicative of a good analysis. Charge balance errors for water samples were calculated as follows:

% =

100

(Equation 2)

Charge balance errors were calculated for speciated solutions using PHREEQC (Version 2.12), an equilibrium speciation and mass-transfer code developed by the United States Geological Survey (USGS) (Parkhurst and Appelo, 1999). Concentrations of constituents reported below detectable limits were assumed equal to the detection limit.

3.0 3.1

QUALITY ASSURANCE/QUALITY CONTROL RESULTS Surface Water and Groundwater Samples

One field duplicate sample was collected during each sampling round. Duplicate analysis results are presented in Attachment A. Results are summarized in Table E-1. The results of field duplicate analysis were satisfactory. For each duplicate sample, greater than 94% percent of determinations met the project defined acceptable criteria. One field blank (FB) or equipment blank (EB) sample was collected during each surface water and groundwater sampling event, respectively. Complete blank sample results are provided in Attachment B. Summaries of only the blank sample detections that resulted in qualification of one or more sample results as biased high (J+ qualifier) are presented in Table E-2 (equipment blanks) and Table E-3 (field blanks). Constituents detected in the blank samples were typically present at concentrations below the PQL. Equipment and field blank samples collected in April 2009 yielded the highest number of detections. A number of constituents were detected in the laboratory blank sample (identified with a B qualifier), indicating that laboratory contamination may have been the source. Constituents detected in 4 or more blank samples are listed below:

Molybdenum Dissolved molybdenum was often detected in both field and equipment blanks. This result suggests that the filters may introduce low levels of molybdenum into the samples. The maximum concentration measured in a blank sample (11 g/L) is much lower than the range of concentrations measured at SW-2 (83 to 750 g/L).

appendix e - data quality assurance quality control.docx

March 2010 063-7109

Zinc Dissolved zinc was often detected in both field and equipment blanks. Nickel Total recoverable nickel was detected in five out of eight blank samples. Concentrations were consistently low (<1 g/L). Bis(2-ethylhexyl)phthalate - Bis(2-ethylhexyl)phthalate was detected in all blank samples in which it was analyzed. This constituent was often detected in the laboratory blank, indicating that the laboratory is a possible source of contamination.

Charge balance error results are shown in Table E-4. All charge balance errors were acceptable. Thirtytwo (32) of the 34 water samples reported charge balance errors less than 5%. All samples reported charge balance errors less than 10%.

3.2

Mine Water Samples

Duplicate and blank samples were not collected during the mine water (i.e., North Quarry and storage area runoff) sampling event. Charge balance error results are shown in Table E-4. Charge balance errors were acceptable (<10%).

3.3

Laboratory Geochemical Testing

Charge balance error results for WET test leachates are shown in Table E-5. Charge balance errors were positive for all samples, indicative of a cation surplus or anion deficit. Charge balance errors ranged from 3% to 17%. The WET leach test is mainly intended to provide information on trace metal leaching. Because the charge balance errors are most likely attributable to inaccurate analysis of major ions, the errors are considered acceptable for the current evaluation.

3.4

Field Geochemical Testing Wall Washing

Wall washing field blank results are presented in Table E-6. Most constituents were below detectable limits in the single blank sample collected. Low level detections of the following constituents resulted in qualification of some sample results as biased high (i.e., assigned a J+ qualifier): dissolved zinc and dissolved potassium. Charge balance error results are shown in Table E-7. Charge balance errors were acceptable for the wall washing rinsates from the three limestone samples (less than 5%). The chert, greywacke and greenstone rinsate samples reported charge balance errors ranging from 15 to 20%. omission of an analyte. All errors were positive, indicative of a cation excess or anion deficit. It is possible that the poor charge balance results from Charge balance errors were calculated using only dissolved phase concentrations. Total phosphorus concentrations for these three samples ranged from 2 to 100 mg/L. Exclusion of dissolved phosphate in the calculation of charge balance errors may in part explain the anion deficit. dissolved nickel,

appendix e - data quality assurance quality control.docx

March 2010 063-7109

4.0

SUMMARY

A primary objective of the baseline water quality data collection is to provide analytical data that are of known and defensible quality. This Technical Memorandum presents the results of the QA/QC evaluation of the baseline water quality data set. Based on this evaluation, the data are of acceptable quality for their intended purpose.

4.1

References

Parkhurst, D.L., and C.A.J. Appelo, 1999. Users Guide to PHREEQC (Version 2) - A Computer Program for Speciation, Batch-Reaction, One-Dimensional Transport, and Inverse Geochemical Calculations, U.S. Geological Survey Water-Resources Investigations Report 99-4259, Denver, CO. U.S. Environmental Protection Agency (USEPA), 2004. US EPA Contract Laboratory Program National Functional Guidelines for Inorganic Data Review Final. EPA 540-R-04-004, October 2004.

List of Tables
Table E-1 Table E-2 Table E-3 Table E-4 Table E-5 Table E-6 Table E-7 Field Duplicate Result Summary Water Quality Monitoring Summary of Equipment Blank Sample Results Water Quality Monitoring Summary of Field Blank Sample Results Water Quality Monitoring Charge Balance Errors Water Quality Monitoring Charge Balance Errors WET Test Field Blank Sample Result Wall Washing Charge Balance Errors Wall Washing

List of Attachments
Attachment A Attachment B Field Duplicate Results Field and Equipment Blank Results

appendix e - data quality assurance quality control.docx

March 2010

063-7109

TABLE E-1 Field Duplicate Result Summary Water Quality Monitoring


No. of Determinations
66 77 69 70 69

Location
SW-2 SW-2 SW-2 HG-7 SW-2

Date
4-Feb-09 2-Apr-09 22-Sep-09 27-Oct-09 20-Jan-10

No. of Failures
2 3 2 4 2

% Failure
3% 4% 3% 6% 3%

Appendix E Tables.xlsx

March 2010

063-7109

TABLE E-2 Summary of Equipment Blank Sample Results Water Quality Monitoring

February
Q J J 14 0.24 8.9 0.019 0.24 0.058 3 0.13 0.099 J 0.06 1 J 0.071 1 B,J 0.28 5 J J 0.031 0.054 1 1 0.00052 0.21 J 0.0002 5E-04 0.13 1 0.21 J B,J J J J 4.9 0.045 7.2 0.019 100 2 50 1 0.13 0.67 0.046 2 1 MDL PQL

April
EB-1 15-Apr-09 Q MDL PQL EB-1 29-Oct-09 Q MDL PQL EB-1 29-Dec-09 Q MDL

October

December
PQL

Parameter

Unit

EB-1 9-Feb-09 1 0.058

Total EB

J B B B,J J B,J J 0.025 0.05 0.0089

0.56

B,J

0.25

5 6.5 0.025 0.025 0.0041 B,J J 0.012 0.05 0.003 0.01

0.23 1.5

0.5 5.5

4.4 1.4 5.4 1.6 0.99 3.5 2.9 2.2 12

1.6 0.045 0.092 0.031 0.065 1.3 0.23 1.1

3 2 1 1 2 5 0.5 4.8 20 B,J 0.0081 20 0.05

Arsenic (As) Beryllium (Be) Boron (B) Copper (Cu) Iron (Fe) Lead (Pb) Mercury (Hg) by 1631 Molybdenum (Mo) Thallium (Tl) Zinc (Zn) Potassium (K) Total Recoverable Beryllium (Be) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Manganese (Mn) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Zinc (Zn) Chloroform bis(2-ethylhexyl)phthalate Total Suspended Solids (TSS) Ammonia (as N) Nitrite (as N) Total Phosphorus Cyanide

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L-N mg/L-N mg/L mg/L

1 1 1 1 1 1 1 3 1 1 1 1 1 1 1 1 2 1 2 2 1 1 1 1 1

Notes: MDL - method detection limit PQL - practical quantitation limit Laboratory Qualifiers (Q): J = estimated value below laboratory reporting limit B = detected in blank sample. H = holding time exceeded

detected in blank sample - one or more results bold qualified as estimated biased high (J+)

Appendix E Tables.xlsx

March 2010

063-7109

TABLE E-3 Summary of Field Blank Sample Results Water Quality Monitoring

February Unit
J FB-1 4-Feb-09 0.52 Q MDL PQL FB 3-Apr-09 Q MDL PQL FB-1 22-Sep-09 Q MDL PQL Q MDL FB 20-Jan-10 0.64 1 0.81 0.25 0.064 0.22 2 0.00023 J 1.9 5 0.13 0.15 1 2 J 0.0002 4.5 B 0.32 0.031 1 J 0.031 1 2.4 0.00080 11 0.22 18 B,J J 0.045 0.025 2 1 0.3 B,J 0.045 2 B,J 0.7

April

September

January
PQL 2 2

Parameter

Total FB

0.092 J 0.046 14 B,J 4.9 23 B 0.18

1 100

0.0005

4.8

0.28

0.044 J 0.028 68 B 0.28 0.14 B,J 0.071 36 J 28

1 5 1 50

0.33 B,J 0.045 17 J 16 50

190 B,J 1 J 0.81 J

24 0.64 0.66

200 3 2

0.03 0.43

J J

0.016 0.25

0.2 2

0.78 0.47 0.028 0.35

B,J B,J J B,J

0.19 0.11 0.016 0.25

1 1 0.2 2

1.2 1.7 3.7 J B,J 1.3 1.9 5 7

0.031

0.064 J 0.053 5.3 0.092 0.018 B,J 0.016 0.16 J 0.031 0.24 B,J 0.065 40 B 1.3 2.4 B,J 1.1 3.5 0.21 0.13 0.012 0.05

1 1 0.2 1 2 5 4 1

0.065 0.1 0.1 0.1 0.003 B,J 0.003 0.005 3.8 B,J 1.2 6.2 0.18

0.025 0.1

0.05 0.1

Arsenic (As) Beryllium (Be) Boron (B) Hexavalent Chromium (Cr VI) Copper (Cu) Manganese (Mn) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Silver (Ag) Zinc (Zn) Potassium (K) Total Recoverable Aluminum (Al) Total Recoverable Boron (B) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Zinc (Zn) bis(2-ethylhexyl)phthalate Sulfate Ammonia (as N) Total Phosphorus Turbidity Cyanide Oil and Grease

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L-N mg/L NTU mg/L mg/L

1 1 2 1 2 2 2 3 1 1 3 1 1 1 1 2 1 2 2 3 2 3 2 2 1 1 1 2 1 1

Notes: MDL - method detection limit PQL - practical quantitation limit Laboratory Qualifiers (Q): J = estimated value below laboratory reporting limit B = detected in blank sample. H = holding time exceeded

detected in blank sample - one or more results qualified as estimated biased high bold (J+)

V:\PROJECTS\_2006 PROJECTS\063-7109_Permanente_Quarry\Geochemistry\Baseline Report (Nov 2009)\Report\2_Draft Appendices to GAI-CA (Mar 2 2010)\Appendix E\Appendix E Tables.xlsx

March 2010

063-7109

TABLE E-4 Charge Balance Errors Water Quality Monitoring


Groundwater Mine Water

Surface Water

Location
-0.1 -3.9 -4.3 0.1 0.8 -3.2 -1.6 -4.5 -5.7 -1.6 0.2 5.1 2.2 3.7 5.0 1.1 HG-4 HG-6 HG-9 HG-4 HG-6 HG-7 HG-9 HG-10 HG-4 HG-7 HG-7 DUP HG-9 HG-6 HG-7 HG-9 HG-4 HG-6 HG-10 9-Feb-09 9-Feb-09 9-Feb-09 14-Apr-09 14-Apr-09 15-Apr-09 15-Apr-09 28-Sep-09 26-Oct-09 27-Oct-09 27-Oct-09 27-Oct-09 29-Oct-09 29-Dec-09 29-Dec-09 4-Jan-10 4-Jan-10 4-Jan-10 -0.8 -0.4 0.1 -0.9 1.5 0.6 -0.2 -0.9 -2.2 0.2 2.2 2.6 3.5 2.3 0.2 -1.1 -0.6 0.2 Storage Area Runoff North Quarry

Date

Charge Balance Error (%) Location Date Location Date


13-Jan-10 13-Jan-10

Charge Balance Error (%)

Charge Balance Error (%)


-6.7 -3.7

SW-1 SW-2 SW-2 Dup SW-3 SW-3 SW-1 SW-2 SW-2 Dup SW-1 SW-2 SW-2 Dup SW-3 SW-3 SW-1 SW-2 SW-2 Dup

4-Feb-09 4-Feb-09 4-Feb-09 4-Feb-09 1-Apr-09 2-Apr-09 2-Apr-09 2-Apr-09 22-Sep-09 22-Sep-09 22-Sep-09 22-Sep-09 14-Jan-10 19-Jan-10 20-Jan-10 20-Jan-10

Appendix E Tables.xlsx

March 2010

063-7109

TABLE E-5 Charge Balance Errors WET Test


Charge Balance Error (%)
17 11 11 5.4 5.2 10 2.6

Sample
Composite 1 Composite 2 GT1-2-08-213 Composite 3 Composite 4 Composite 5 CS-01 Graywacke Limestone and Dolomitic Limestone Chert Fault Breccia Greenstone Metabasalt Overburden

Appendix E Tables.xlsx

March 2010

063-7109

TABLE E-6 Field Blank Sample Result Wall Washing


FB-01 24-Nov-09
<38 <0.17 <0.52 <0.70 1.2 <0.18 <9.7 <0.13 <0.55 <0.68 <9.3 <0.054 <0.11 <0.13 0.18 <0.38 <65 <0.065 <0.11 <1.2 2 0.14 <0.029 <0.12 0.099 <38 <0.20 <1.1 0.69 <0.20 <12 <0.11 <0.64 <0.66 <30 <0.19 0.63 <0.016 <0.23 0.84 <0.54 <0.088 <0.11 <2.6 4.6

Parameter
Aluminum Antimony Arsenic Hexavalent Chromium Barium Beryllium Boron Cadmium Chromium Copper Iron Lead Manganese Molybdenum Nickel Selenium Silicon as SiO2 Silver Thallium Vanadium Zinc Calcium Magnesium Sodium Potassium Total Recoverable Aluminum Total Recoverable Antimony Total Recoverable Arsenic Total Recoverable Barium Total Recoverable Beryllium Total Recoverable Boron Total Recoverable Cadmium Total Recoverable Chromium Total Recoverable Copper Total Recoverable Iron Total Recoverable Lead Total Recoverable Manganese Total Recoverable Mercury Total Recoverable Molybdenum Total Recoverable Nickel Total Recoverable Selenium Total Recoverable Silver Total Recoverable Thallium Total Recoverable Vanadium Total Recoverable Zinc

Unit
g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L

B,J

B,J J

March 2010

063-7109

TABLE E-7 Charge Balance Errors Wall Washing


Charge Balance Error (%)
-0.1 15 -1 20 4 15

Sample
HG-01 GW-01 MG-01 CT-01 HMG-01 GS-01 Limestone - high grade Greywacke Limestone - med to high Chert Limestone - high and med/low Greenstone

Appendix E Tables.xlsx

March 2010

063-7109

Parameter
Total Recoverable Calcium Total Recoverable Magnesium Total Recoverable Sodium Total Recoverable Potassium Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Nitrate as N Sulfate Hardness (as CaCO3) pH Electrical Conductivity @ 25 C Total Dissolved Solids @ 180 C Total Suspended Solids (Glass Fiber) Turbidity Residual Chlorine Ammonia as N Nitrite as N Total Phosphorus Notes: Q - Laboratory qualifiers B - constituent detected in method blank J - estimated value H - holding time exceeded

Unit
mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L pH Units umhos/cm mg/L mg/L NT Units mg/L mg/L mg/L mg/L

FB-01 24-Nov-09
0.18 <0.038 <0.070 <0.092 <5.0 <2.5 <4.1 <0.059 <0.010 <0.026 <0.21 0.43 5.81 2.2 <6.7 <4.0 0.31 <0.10 <0.025 <0.0081 <0.016

J H

ATTACHMENT A

ATTACHMENT A Duplicate Analysis Results


Parameter Metals Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) Units MDL PQL February 2009 SW-2 SW-2 Dup 4-Feb-09 4-Feb-09 50 2 2 1 1 1 3 2 2 50 1 1 0.2 0.0005 1 2 2 1 1 5 0.1 0.05 0.5 1 0.2 50 2 2 1 1 1 3 2 50 1 1 0.2 1 2 2 1 1 5 0.1 0.05 0.5 1 <38 6.3 4.5 37 <0.046 0.098 <0.64 0.95 1.3 <7.2 0.023 2.2 <0.016 0.00141 750 70 80 <0.028 0.16 12 200 38 25 1.1 11 32 6.2 2.4 40 <0.060 0.14 <1.6 1.4 87 <0.053 4.8 <0.016 770 75 87 <0.064 <0.054 15 230 43 27 1.2 <38 6.1 4.8 35 <0.046 0.14 <0.64 1.2 1.0 <7.2 <0.019 2.1 <0.016 740 79 <0.028 0.085 200 37 25 1.1 11 39 6.1 1.9 40 <0.060 0.16 <1.6 1.3 100 <0.053 4.9 <0.016 750 77 84 <0.064 <0.054 16 230 43 43 1.2
+/- PQL +/- PQL +/- PQL 6% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 1% 1% +/- PQL +/- PQL 0% 3% 0% +/- PQL 0% +/- PQL +/- PQL +/- PQL 0% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 3% 3% 4% +/- PQL +/- PQL +/- PQL 0% 0% 46% +/- PQL

Page 1 of 10

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L

38 0.23 0.67 0.068 0.046 0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016 0.0002 0.031 0.04 0.23 0.028 0.054 0.28 0.019 0.021 0.049 0.071 0.038 28 0.23 0.82 0.072 0.06 0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064 0.054 1.3 0.021 0.019 0.053 0.12

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Pesticides PCBs VOCs Total Trihalomethanes (TTHM) Bromoform Chloroform Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) Odor Turbidity g/L g/L g/L g/L 0.24 0.23 0.23 0.12 0.5 0.5 0.5 0.5 <0.24 <0.23 <0.23 <0.12 <0.24 <0.23 <0.23 <0.12
+/- PQL +/- PQL +/- PQL +/- PQL

Page 2 of 10

Units

MDL

PQL

February 2009 SW-2 SW-2 Dup 4-Feb-09 4-Feb-09 ND ND ND ND

g/L

1.1

1.8

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU

10 5 8.2 0.075 0.0083 0.26 0.1 50 2.5 0.1 0.025 0.018 0.0081 0.012 0.05 0.05 1 1 0.1

10 5 8.2 0.5 0.05 2 0.5 50 2.5 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1

190 <5.0 150 14 0.15 560 650 1100 <2.5 <0.10 <0.025 0.65 <0.0081 <0.012 <0.050 8.30 1240 none 2.9

150 14 0.14 560 750 970 2.2 <0.10 <0.025 0.67 <0.0081 <0.012 <0.050 8.29 1210 4.0 2.4

0% 0% +/- PQL 0% 14% 13% +/- PQL +/- PQL +/- PQL 3% +/- PQL +/- PQL +/- PQL 0% 2%

> +/- PQL


19%

Cyanide Dioxins Aquatic Toxicity Asbestos (# of fibers) Oil and Grease

mg/L pg/L # of fibers mg/L

0.0032

0.005

<0.0032 <0.64 pass 1 NA

<0.0032 -

+/- PQL -

Determinations Failures % Failure

66 2 3%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Metals Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) Units MDL PQL April 2009 SW-2 SW-2 Dup 2-Apr-09 2-Apr-09 <38 3.8 2.8 63 0.059 89 0.055 <0.64 0.83 1.3 18 <0.019 3.0 <0.016 0.00133 460 110 74 <0.028 <0.054 61 210 46 30 1.4 12 63 4.0 2.0 72 <0.060 90 0.086 <1.6 1.7 75 <0.053 5.5 0.028 430 120 74 <0.064 <0.054 12 220 48 31 1.2 <38 4.0 3.4 66 <0.046 91 0.057 <0.64 0.92 1.3 <7.2 <0.019 3.0 <0.016 0.00157 490 110 76 <0.028 <0.054 71 200 46 30 1.4 12 110 4.0 2.1 76 0.10 85 0.099 <1.6 4.2 120 <0.053 7.2 <0.016 180 120 75 <0.064 <0.054 15 200 44 30 1.1
+/- PQL +/- PQL +/- PQL 5% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 6% 0% 3% +/- PQL +/- PQL 15% 5% 0% 0% +/- PQL 0% +/- PQL +/- PQL +/- PQL 5% +/- PQL +/- PQL +/- PQL +/- PQL > +/- PQL +/- PQL +/- PQL 27% +/- PQL 82% 0% 1% +/- PQL +/- PQL +/- PQL 10% 9% 3% +/- PQL

Page 3 of 10

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L

38 0.23 0.67 0.068 0.046 4.9 0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016 0.0002 0.031 0.04 0.23 0.028 0.054 0.28 0.019 0.021 0.049 0.071 0.038 28 0.23 0.82 0.072 0.06 6.4 0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064 0.054 1.3 0.021 0.019 0.053 0.12

50 2 2 1 1 100 1 3 2 2 50 1 1 0.2 0.0005 1 2 2 1 1 5 0.1 0.05 0.5 1 0.2 50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1 1 5 0.1 0.05 0.5 1

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Pesticides PCBs VOCs Total Trihalomethanes (TTHM) Bromoform Chloroform Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) Odor Turbidity g/L g/L g/L g/L 0.24 0.23 0.23 0.12 0.5 0.5 0.5 0.5 <0.24 <0.23 <0.23 <0.12 <0.24 <0.23 <0.23 <0.12
+/- PQL +/- PQL +/- PQL +/- PQL

Page 4 of 10

Units

MDL

PQL

April 2009 SW-2 SW-2 Dup 2-Apr-09 2-Apr-09 ND ND ND ND

g/L

1.1

2.1

4.6

+/- PQL

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU

5 2.5 4.1 0.059 0.01 0.21 0.1 10 0.5 0.1 0.025 0.026 0.0081 0.012 0.05 0.05 1 1 0.1

10 5 8.2 0.5 0.05 2 0.5 50 1.2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1

180 <2.5 150 12 0.085 600 740 1100 2.0 <0.10 <0.025 2.3 <0.0081 0.025 <0.050 8.15 1210 none 0.44

180 <2.5 150 12 0.10 610 690 1000 2.2 <0.10 <0.025 2.3 <0.0081 0.012 <0.050 8.28 1210 none 0.48

0% +/- PQL 0% 0% +/- PQL 2% 7% 10% +/- PQL +/- PQL +/- PQL 0% +/- PQL +/- PQL +/- PQL 2% 0% +/- PQL +/- PQL

Cyanide Dioxins Aquatic Toxicity Asbestos (# of fibers) Oil and Grease

mg/L pg/L # of fibers mg/L

0.0032 / 0.0028

0.005

0.0036 <1.0 pass <1.2

<0.0032 <0.72 pass 1.6

+/- PQL +/- PQL 0% +/- PQL

1.2

Determinations Failures % Failure

77 3 4%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Metals Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) Units MDL PQL September 2009 SW-2 22-Sep-09 <38 2.4 1.5 60 <0.18 100 <0.13 <0.55 <0.70 3.3 <9.3 <0.054 2.1 470 44 81 <0.065 <0.11 97 3.1 200 53 24 1.1 17 <38 2.3 <1.1 60 <0.20 110 0.14 0.93 2.5 58 <0.19 4 0.02 470 44 71 <0.088 <0.11 93 10 200 52 24 0.99 SW-2 Dup 22-Sep-09 <38 3 2.2 68 <0.18 100 <0.13 0.58 <0.70 4.8 <9.3 <0.054 2.8 470 47 90 <0.065 <0.11 110 4 210 55 24 0.89 17 <76 2.2 1.4 61 <0.20 350 0.11 <0.64 2.2 <60 <0.19 3.7 0.058 450 43 69 <0.088 <0.11 86 12 200 53 25 0.89

Page 5 of 10

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.22 0.13 / 0.26 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 0.065 38 / 76 0.2 1.1 0.21 0.2 12 / 24 0.11 0.64 0.66 30 / 60 0.19 0.11 0.016 0.23 0.25 0.54 0.088 0.11 2.6 3.2 0.036 / 0.072 0.038 / 0.076 0.07 / 0.14 0.092 / 0.18

50 2 2 1 1 100 1 3 2 2 50 1 2 1/2 2 2 1 1 3 5 0.1 0.05 0.5 1 0.2 50 / 100 2 2 1 1 100 / 200 1 3 2 50 / 100 1 1 0.2 1 2 2 1 1 3 5 0.1 / 0.2 0.05 / 0.1 0.5 / 1 1/2

+/- PQL +/- PQL +/- PQL 13% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL

0% 7% 11% +/- PQL +/- PQL 13% +/- PQL 5% 4% 0% +/- PQL 0% +/- PQL +/- PQL +/- PQL 2% +/- PQL > +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 4% 2% 3% +/- PQL +/- PQL 8% +/- PQL 0% 2% 4% +/- PQL

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Pesticides PCBs VOCs Total Trihalomethanes (TTHM) Bromoform Chloroform Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) Odor Turbidity g/L g/L g/L g/L Units MDL PQL September 2009 SW-2 22-Sep-09 SW-2 Dup 22-Sep-09 -

Page 6 of 10

g/L

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU

10 5 8.2 0.059 0.01 0.42 0.1 50 2 0.1 0.025 0.026 0.0081 0.016 0.05 0.05 1 1 0.1

10 5 8.2 0.5 0.05 2 0.5 50 2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1

240 <5.0 190 18 0.17 550 710 1000 5.2 <0.10 <0.025 0.48 <0.0081 <0.016 <0.050 8.24 1270 2 1.5

230 <5.0 190 18 0.17 560 750 1000 4 <0.10 <0.025 0.51 <0.0081 <0.016 <0.050 8.16 1250 2 1.9

4% +/- PQL 0% 0% +/- PQL 2% 5% 0% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 1% 2% +/- PQL 24%

Cyanide Dioxins Aquatic Toxicity Asbestos (# of fibers) Oil and Grease

mg/L pg/L # of fibers mg/L

0.0028

0.005

<0.0028 -

<0.0028 -

+/- PQL

Determinations Failures % Failure

69 2 3%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Metals Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) Units MDL PQL October 2009 HG-7 27-Oct-09 <38 <0.17 2.2 120 <0.18 <9.7 <0.13 2.1 <0.70 <0.68 310 <0.054 330 0.0235 0.62 1.7 <0.38 0.81 <0.11 <1.2 <1.9 110 43 21 0.93 26 36000 0.47 9.7 330 0.81 12 0.28 320 35 53000 8.3 1100 0.058 1.9 310 <0.54 0.14 0.12 91 79 130 93 24 5.2 HG-7 DUP 27-Oct-09 <38 <0.17 2.4 120 <0.18 <9.7 <0.13 1.4 <0.70 <0.68 310 <0.054 320 0.0221 0.54 1.7 <0.38 0.42 <0.11 <1.2 3 110 45 21 0.91 26 47000 0.44 11 350 0.94 17 0.35 360 36 69000 9 1200 0.092 2 350 <0.54 0.15 0.12 100 86 130 110 23 5.7
+/- PQL +/- PQL +/- PQL 0% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 0% +/- PQL 3%

Page 7 of 10

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.11 0.001 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 0.065 38 0.2 1.1 0.21 0.2 12 0.11 0.64 0.66 30 0.19 0.11 0.016 0.23 0.25 0.54 0.088 0.11 2.6 3.2 0.036 0.038 0.07 0.092

50 2 2 1 1 100 1 3 2 2 50 1 1 0.0025 1 2 2 1 1 3 5 0.1 0.05 0.5 1 0.2 50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1 1 3 5 0.1 0.05 0.5 1

6% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 0% 5% 0% +/- PQL 0% 27% +/- PQL +/- PQL 6% +/- PQL +/- PQL +/- PQL 12% 3% 26% 8% 9% +/- PQL +/- PQL 12% +/- PQL +/- PQL +/- PQL 9% 8% 0% 17% 4% 9%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Pesticides PCBs VOCs Total Trihalomethanes (TTHM) Bromoform Chloroform Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) Odor Turbidity g/L g/L g/L g/L Units MDL PQL October 2009 HG-7 27-Oct-09 HG-7 DUP 27-Oct-09 -

Page 8 of 10

g/L

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU

5 2.5 4.1 0.059 0.01 0.21 0.1 33 20 0.5 0.025 0.026 0.0081 0.04 0.25 0.05 1 1 1

5 2.5 4.1 0.5 0.05 1 0.5 33 20 0.5 0.05 0.1 0.05 0.12 0.5 0.05 1 1 1

480 <2.5 400 46 0.2 31 450 530 840 <0.50 0.18 <0.026 0.0099 0.51 <0.25 7.37 870 none 210

480 <2.5 390 46 0.2 30 460 580 1000 <0.50 0.042 <0.026 0.0094 0.63 <0.25 7.4 871 none 320

0% +/- PQL 3% 0% +/- PQL 3% 2% 9% 17% +/- PQL > +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL 0% 0% 0% 42%

Cyanide Dioxins Aquatic Toxicity Asbestos (# of fibers) Oil and Grease

mg/L pg/L # of fibers mg/L

0.0028

0.005

<0.0028 -

<0.0028 -

+/- PQL

Determinations Failures % Failure

70 4 6%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Metals Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) Units MDL January 2010 PQL SW-2 SW-2 Dup 20-Jan-10 20-Jan-10 50 2 2 1 1 100 1 3 2 2 50 1 1 1 2 2 1 1 3 5 0.1 0.05 0.5 1 0.2 50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1 1 3 5 0.1 0.05 0.5 1 <38 0.98 1.5 43 <0.18 36 <0.13 <0.55 1.2 1.8 <9.3 <0.054 3.9 83 27 13 <0.065 <0.11 66 4.1 84 28 13 2.2 13 4900 1.4 2.2 180 <0.20 52 0.49 25 14 8300 2.5 170 0.032 92 77 13 <0.088 0.28 100 89 100 31 13 2.7 <38 0.99 1.5 42 <0.18 35 <0.13 <0.55 1.2 2 <9.3 0.22 4.2 84 27 13 <0.065 <0.11 66 4.4 79 26 12 2.1 12 5200 1.1 2.3 170 <0.20 54 0.44 25 13 9000 2.3 150 <0.016 94 73 13 <0.088 0.14 96 85 100 33 13 2.8
+/- PQL +/- PQL +/- PQL 2% +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL +/- PQL

Page 9 of 10

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L mg/L mg/L mg/L mg/L

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.11 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 0.065 38 0.2 1.1 0.21 0.2 12 0.11 0.64 0.66 30 0.19 0.11 0.016 0.23 0.25 0.54 0.088 0.11 2.6 3.2 0.036 0.038 0.07 0.092

1% 0% 0% +/- PQL +/- PQL 0% +/- PQL 6% 7% 8% +/- PQL 8% 6% +/- PQL +/- PQL 6% +/- PQL +/- PQL +/- PQL 0% 7% 8% +/- PQL 13% +/- PQL 2% 5% 0% +/- PQL +/- PQL 4% 5% 0% 6% 0% +/- PQL

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT A Duplicate Analysis Results


Parameter Pesticides PCBs VOCs Total Trihalomethanes (TTHM) Bromoform Chloroform Dibromochloromethane Toluene SVOCs bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) Odor Turbidity g/L g/L g/L g/L Units MDL January 2010 PQL SW-2 SW-2 Dup 20-Jan-10 20-Jan-10 -

Page 10 of 10

g/L

mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU

5 2.5 4.1 0.059 0.01 0.21 0.1 20 6.2 0.1 0.025 0.026 0.0081 0.016 0.05 0.05 1 1 0.5

5 2.5 4.1 0.5 0.05 1 0.5 20 6.2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.5

170 <2.5 140 10 0.13 160 320 410 200 <0.10 0.15 1.4 <0.0081 0.29 <0.050 7.49 602 8 90

170 <2.5 140 10 0.13 160 300 400 190 <0.10 0.07 1.4 <0.0081 0.59 <0.050 7.55 605 4 100

0% +/- PQL 0% 0% +/- PQL 0% 6% 2% 5% +/- PQL +/- PQL 0% +/- PQL 68% +/- PQL 1% 0% >+/- PQL 11%

Cyanide Dioxins Aquatic Toxicity Asbestos (# of fibers) Oil and Grease

mg/L pg/L # of fibers mg/L

0.0028

0.005

<0.0028 -

<0.0028 -

+/- PQL

Determinations Failures % Failure

69 2 3%

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B

ATTACHMENT B Blank Sample Results


February Q MDL PQL FB-1 4-Feb-09 PQL EB-1 15-Apr-09 MDL PQL February Q MDL April Q

Page 1 of 6

EB-1 9-Feb-09

Metals

<38 <0.23 1 0.11 0.058 J J J B,J B,J

38 0.23 0.67 0.068 0.046

50 2 2 1 1

<38 <0.23 <0.67 0.27 <0.046

38 0.23 0.67 0.068 0.046

50 2 2 1 1

B B,J J J J

<0.013 <0.64 <0.7 <0.045 <7.2 <0.019 <0.025 <0.016 J 0.21 <0.04 <0.23 <0.028 <0.054 B J B,J B B,J B,J B,J B B B 0.031 0.04 0.23 0.028 0.054 1 2 2 1 1 4.5 <0.04 <0.23 <0.028 <0.054 B 0.031 0.04 0.23 0.028 0.054 1 2 2 1 1 0.24 <0.04 <0.23 <0.028 0.058 J

0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016

1 3 2 2 50 1 1 0.2

<0.013 <0.64 <0.7 0.25 <7.2 <0.019 0.064 <0.016

0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016

1 3 2 2 50 1 1 0.2

<38 <0.23 <0.67 <0.068 <0.046 14 <0.013 <0.64 <0.7 0.24 8.9 0.019 <0.025 <0.016

38 0.23 0.67 0.068 0.046 4.9 0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016

50 2 2 1 1 100 1 3 2 2 50 1 1 0.2

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L J 0.031 0.04 0.23 0.028 0.054 1 2 2 1 1 mg/L mg/L mg/L mg/L mg/L 3 0.2 0.068 0.3 <0.071 <0.038 0.28 0.019 0.021 0.049 0.071 0.038 5 0.1 0.05 0.5 1 0.2 4.8 0.12 0.087 0.39 <0.071 <0.038 0.28 0.019 0.021 0.049 0.071 0.038 5 0.1 0.05 0.5 1 0.2 <0.28 0.092 0.025 0.66 0.13 0.075 J J J J 0.28 0.019 0.021 0.049 0.071 0.038 5 0.1 0.05 0.5 1 0.2

Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2)

B B,J

B J J

<28 <0.23 <0.82 0.096 0.099 B,J J

28 0.23 0.82 0.072 0.06

50 2 2 1 1

<28 <0.23 <0.82 0.079 <0.06

28 0.23 0.82 0.072 0.06

50 2 2 1 1

J J

B B B B,J

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag) <0.051 <1.6 0.09 <16 <0.053 0.12 <0.016 <0.031 <0.065 <0.5 <0.064 0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064 1 3 2 50 1 1 0.2 1 2 2 1

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L

<0.051 <1.6 0.05 17 <0.053 <0.092 <0.016 1.2 <0.065 <0.5 <0.064

0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064

1 3 2 50 1 1 0.2 1 2 2 1

<28 <0.23 <0.82 0.11 <0.06 6.4 <0.051 4.4 1.4 <16 <0.053 5.4 <0.016 1.6 0.99 <0.5 <0.064

28 0.23 0.82 0.072 0.06 6.4 0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064

50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B Blank Sample Results

Page 2 of 6

g/L g/L g/L 1 J B B,J J J 1 0.054 1 J mg/L mg/L mg/L mg/L g/L g/L g/L g/L <0.24 5 <0.23 <0.12 6.5 1.5 5.5 3.7 B,J 1.9 7 2.2 B,J 1.1 0.24 0.23 0.23 0.12 0.5 0.5 0.5 0.5 <0.24 3.3 <0.23 <0.12 0.24 0.23 0.23 0.12 0.5 0.5 0.5 0.5 <0.24 2.9 <0.23 <0.12 0.24 0.23 0.23 0.12 g/L 0.5 0.5 0.5 0.5 4.8 2.4 <0.021 <0.019 <0.053 <0.12 1.3 0.021 0.019 0.053 0.12 5 0.1 0.05 0.5 1 1.7 <0.021 <0.019 0.12 <0.12 1.3 0.021 0.019 0.053 0.12 5 0.1 0.05 0.5 1 3.5 <0.021 <0.019 0.059 <0.12 1.3 0.021 0.019 0.053 0.12 5 0.1 0.05 0.5 1

Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K)

February EB-1 Q MDL 9-Feb-09 <0.054 0.054 PQL PQL EB-1 15-Apr-09 <0.054 MDL PQL

February FB-1 Q MDL 4-Feb-09 <0.054 0.054

April Q

Bromoform Chloroform Dibromochloromethane Toluene

SVOCs

<5 <2.5 <4.1 <0.075 <0.0083 <0.13 0.67 <6.7

5 2.5 4.1 B 0.075 0.0083 B 0.13 0.1 6.7

5 2.5 4.1 0.5 0.05 1 0.5 6.7

6.9 <2.5 5.6 0.44 <0.01 <0.21

5 2.5 4.1 0.059 0.01 0.21

5 2.5 4.1 0.5 0.05 1

J 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005

bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU mg/L mg/L <0.025 <0.018 <0.0081 <0.012 <0.05 5.66 2.8 No Obs Odor 0.1 <0.0032 B 0.025 0.018 0.0081 0.012 0.05 0.05 1 1 0.1 0.0032 5 <2.5 4.1 <0.059 <0.01 <0.21 0.79 <6.7 <5 <0.1 <0.025 <0.026 <0.0081 0.025 <0.05 5.86 2.25 No Obs Odor <0.1 <0.0032 5 2.5 4.1 0.059 0.01 0.21 0.1 6.7 5 0.1 0.025 0.026 0.0081 J 0.012 0.05 0.05 1 1 0.1 0.0032 5 2.5 4.1 0.5 0.05 1 0.5 6.7 5 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005 10 1 <0.1 0.025 <0.026 <0.0081 <0.012 <0.05 5.95 3.77 No Obs Odor 0.11 0.0041 <1.2

Odor Turbidity Cyanide Oil and Grease

10 0.5 0.1 J 0.025 0.026 0.0081 0.012 0.05 0.05 1 1 0.1 B,J 0.0028 1.2

10 5 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005 7.6

Notes:

Laboratory Qualifiers (Q): J = estimated value below laboratory reporting limit B = detected in blank sample. H = holding time exceeded

bold bold

detected in blank sample detect in blank sample - one or more results qualified as J+

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B Blank Sample Results


April Q MDL PQL FB-1 22-Sep-09 PQL EB-1 29-Oct-09 PQL September Q MDL October Q MDL

Page 3 of 6

FB 3-Apr-09

Metals

<38 <0.23 <0.67 0.46 J 0.092 J 14 B,J <0.013 B <0.64 <0.7 0.3 B,J <7.2 B <0.019 <0.025 <0.016 B B J J J

38 0.23 0.67 0.068 0.046 4.9 0.013 0.64 0.7 0.045 7.2 0.019 0.025 0.016

50 2 2 1 1 100 1 3 2 2 50 1 1 0.2

<38 <0.17 <0.52 1.4 <0.18 23 <0.13 <0.55 <0.70 <0.68 <9.3 <0.054 2.4

38 0.17 0.52 0.7 0.12 0.18 9.7 0.13 0.55 0.68 9.3 0.054 0.22

50 2 2 2 1 1 100 1 3 2 50 1 2

<38 <0.17 <0.52 <0.12 <0.18 <9.7 <0.13 <0.55 <0.70 <0.68 <9.3 <0.054 <0.11

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.11

50 2 2 1 1 100 1 3 2 2 50 1 1

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L 0.32 <0.04 <0.23 0.044 <0.054 J 0.031 0.04 0.23 0.028 0.054 1 2 2 1 1 J J

Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2) mg/L mg/L mg/L mg/L mg/L J 68 B 0.23 0.086 0.12 J 0.14 B,J <0.038 0.28 0.019 0.021 0.049 0.071 0.038 5 0.1 0.05 0.5 1 0.2 0.00080 11 0.22 <0.38 <0.065 <0.11 <1.2 18 0.041 <0.029 0.2 <0.074 <0.065 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 65 1 2 2 1 1 3 5 0.1 0.05 0.5 1 200 0.00052 0.21 <0.15 <0.38 <0.065 <0.11 <1.2 <1.9 <0.016 <0.029 0.14 <0.074 <0.065 J 0.0002 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 0.065 0.0005 1 2 2 1 1 3 5 0.1 0.05 0.5 1 0.2

B B,J J B,J J B,J J B,J

B,J J J

J J J

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag)

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L 36 <0.23 <0.82 1.2 <0.06 17 <0.051 1.6 0.33 <16 0.064 5.3 0.018 0.16 0.24 <0.5 <0.064 28 0.23 0.82 0.072 0.06 6.4 0.051 1.6 0.045 16 0.053 0.092 0.016 0.031 0.065 0.5 0.064 50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1

<76 <0.20 <1.1 <0.21 <0.20 190 <0.11 1 0.81 <60 <0.19 0.11 0.03 <0.23 0.43 <0.54 <0.088

76 0.2 1.1 0.21 0.2 24 0.11 0.64 0.66 60 0.19 0.11 0.016 0.23 0.25 0.54 0.088

100 2 2 1 1 200 1 3 2 100 1 1 0.2 1 2 2 1

<38 <0.20 <1.1 <0.21 <0.20 <12 <0.11 <0.64 <0.66 <30 <0.19 <0.11 <0.016 <0.23 <0.25 <0.54 <0.088

38 0.2 1.1 0.21 0.2 12 0.11 0.64 0.66 30 0.19 0.11 0.016 0.23 0.25 0.54 0.088

50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B Blank Sample Results

Page 4 of 6

g/L g/L g/L 1

April FB Q MDL 3-Apr-09 <0.054 0.054 PQL PQL PQL

October Q MDL

Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) mg/L mg/L mg/L mg/L J g/L g/L g/L g/L <0.24 4.9 <0.23 <0.12 2.4 B,J 1.1 4 0.24 0.23 0.23 0.12 0.5 0.5 0.5 0.5 g/L 40 B <0.021 <0.019 0.13 B,J <0.12 1.3 0.021 0.019 0.053 0.12 5 0.1 0.05 0.5 1

September FB-1 Q MDL 22-Sep-09 <0.11 0.11 <2.6 2.6 <3.2 3.2 <0.072 0.072 <0.076 0.076 0.26 J 0.14 <0.18 0.18 1 3 5 0.2 0.1 1 2 EB-1 29-Oct-09 <0.11 <2.6 <3.2 <0.036 <0.038 0.24 <0.092 0.11 2.6 3.2 0.036 0.038 0.07 0.092 1 3 5 0.1 0.05 0.5 1

Bromoform Chloroform Dibromochloromethane Toluene

SVOCs

B,J J

B,J

bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU mg/L mg/L H 5 5 <2.5 2.5 4.1 4.1 0.19 B,J 0.059 <0.01 0.01 3.5 0.21 <0.1 0.1 10 10 <0.5 0.5 <0.1 0.1 <0.025 0.025 0.047 J 0.026 <0.0081 0.0081 0.13 0.012 <0.05 0.05 6.08 0.05 1.81 1 No Obs Odor 1 <0.1 0.1 0.003 B,J 0.0028 3.8 B,J 1.2 5 2.5 4.1 0.5 0.05 1 0.5 6.7 1.2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005 6.2 5 <2.5 4.1 0.12 <0.010 0.25 <0.10 <6.7 <2.0 <0.10 <0.025 <0.026 <0.0081 <0.016 <0.050 6.02 1.7 No Obs Odor <0.10 <0.0028 5 2.5 4.1 0.059 0.01 0.21 0.1 6.7 2 0.1 0.025 0.026 0.0081 0.016 0.05 0.05 1 1 0.1 0.0028 5 2.5 4.1 0.5 0.05 1 0.5 6.7 2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005 5 <2.5 4.1 <0.059 <0.010 <0.21 <0.10 <6.7 12 <0.10 <0.025 <0.026 0.0089 <0.016 <0.050 5.72 2.39 No Obs Odor <0.10 <0.0028

Odor Turbidity Cyanide Oil and Grease

5 2.5 4.1 0.059 0.01 0.21 0.1 33 20 0.5 0.025 0.026 0.0081 0.04 0.25 0.05 1 1 1 0.0028

5 2.5 4.1 0.5 0.05 1 0.5 33 20 0.5 0.05 0.1 0.05 0.12 0.5 0.05 1 1 1 0.005

Notes:

Laboratory Qualifiers (Q): J = estimated value below laboratory reporting limit B = detected in blank sample. H = holding time exceeded

bold bold

detected in blank sample detect in blank sample - one or more results qualified as J+

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B Blank Sample Results


December Q MDL PQL FB 20-Jan-10 PQL January Q MDL

Page 5 of 6

EB-1 29-Dec-09

Metals

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.11 B,J J

50 2 2 1 1 100 1 3 2 2 50 1 1

<38 <0.17 0.64 <0.12 <0.18 <9.7 <0.13 <0.55 0.81 <0.68 <9.3 <0.054 <0.11

38 0.17 0.52 0.12 0.18 9.7 0.13 0.55 0.7 0.68 9.3 0.054 0.11

50 2 2 1 1 100 1 3 2 2 50 1 1

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L J mg/L mg/L mg/L mg/L mg/L <38 <0.17 <0.52 <0.12 <0.18 <9.7 <0.13 <0.55 <0.70 <0.68 <9.3 <0.054 <0.11 <0.0002 0.21 <0.15 <0.38 <0.065 <0.11 <1.2 <1.9 <0.016 <0.029 <0.12 <0.074 <65 0.0002 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 65 B 0.0005 1 2 2 1 1 3 5 0.1 0.05 0.5 1 200 0.00023 <0.13 <0.15 <0.38 <0.065 <0.11 <1.2 <1.9 <0.016 <0.029 <0.12 <0.074 <0.065 0.0002 0.13 0.15 0.38 0.065 0.11 1.2 1.9 0.016 0.029 0.12 0.074 0.065 0.0005 1 2 2 1 1 3 5 0.1 0.05 0.5 1 0.2

Aluminum (Al) Antimony (Sb) Arsenic (As) Barium (Ba) Beryllium (Be) Boron (B) Cadmium (Cd) Chromium (Cr) Hexavalent Chromium (Cr VI) Copper (Cu) Iron (Fe) Lead (Pb) Manganese (Mn) Mercury (Hg) Mercury (Hg) by 1631 Molybdenum (Mo) Nickel (Ni) Selenium (Se) Silver (Ag) Thallium (Tl) Vanadium (V) Zinc (Zn) Calcium (Ca) Magnesium (Mg) Sodium (Na) Potassium (K) Silicon (as SiO2)

B,J B,J J B,J B,J

Total Recoverable Aluminum (Al) Total Recoverable Antimony (Sb) Total Recoverable Arsenic (As) Total Recoverable Barium (Ba) Total Recoverable Beryllium (Be) Total Recoverable Boron (B) Total Recoverable Cadmium (Cd) Total Recoverable Chromium (Cr) Total Recoverable Copper (Cu) Total Recoverable Iron (Fe) Total Recoverable Lead (Pb) Total Recoverable Manganese (Mn) Total Recoverable Mercury (Hg) Total Recoverable Molybdenum (Mo) Total Recoverable Nickel (Ni) Total Recoverable Selenium (Se) Total Recoverable Silver (Ag)

g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L g/L <38 <0.20 <1.1 <0.21 <0.20 <12 <0.11 <0.64 <0.66 <30 <0.19 <0.11 <0.016 <0.23 0.56 <0.54 <0.088 38 0.2 1.1 0.21 0.2 12 0.11 0.64 0.66 30 0.19 0.11 0.016 0.23 0.25 0.54 0.088 50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1

<38 <0.20 <1.1 <0.21 <0.20 <12 <0.11 <0.64 <0.66 <30 0.78 0.47 0.028 <0.23 0.35 <0.54 <0.088

38 0.2 1.1 0.21 0.2 12 0.11 0.64 0.66 30 0.19 0.11 0.016 0.23 0.25 0.54 0.088

50 2 2 1 1 100 1 3 2 50 1 1 0.2 1 2 2 1

Water Quality Eval (Mar 2010).xlsx

ATTACHMENT B Blank Sample Results


December Q MDL PQL 1 3 5 0.1 0.05 0.5 1 0.11 2.6 3.2 0.036 0.038 0.07 0.092 1 3 5 0.1 0.05 0.5 1 PQL 0.11 2.6 3.2 0.036 0.038 0.07 0.092 FB 20-Jan-10 <0.11 <2.6 <3.2 <0.036 <0.038 <0.070 <0.092 January Q MDL

Page 6 of 6

Total Recoverable Thallium (Tl) Total Recoverable Vanadium (V) Total Recoverable Zinc (Zn) Total Recoverable Calcium (Ca) Total Recoverable Magnesium (Mg) Total Recoverable Sodium (Na) Total Recoverable Potassium (K) mg/L mg/L mg/L mg/L g/L g/L g/L g/L g/L

g/L g/L g/L

EB-1 29-Dec-09 <0.11 <2.6 <3.2 <0.036 <0.038 <0.070 <0.092

Bromoform Chloroform Dibromochloromethane Toluene

SVOCs

J J B,J

B,J

H B

J H

bis(2-ethylhexyl)phthalate General Chemistry Bicarbonate Carbonate Total Alkalinity (as CaCO3) Chloride Fluoride Sulfate Hardness (as CaCO3) Total Dissolved Solids (TDS) Total Suspended Solids (TSS) Residual Chlorine Ammonia (as N) Nitrate (as N) Nitrite (as N) Total Phosphorus Total Sulfide pH Electrical Conductivity (@ 25 C) mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L-N mg/L-N mg/L-N mg/L mg/L s.u. umhos/cm odor units NTU mg/L mg/L H <5.0 <2.5 <4.1 0.4 <0.010 0.36 <0.10 <6.7 <2.0 <0.10 <0.025 <0.026 <0.0081 <0.016 <0.050 5.63 2.33 No Obs Odor <0.10 <0.0028 5 2.5 4.1 0.059 0.01 0.21 0.1 6.7 2 0.1 0.025 0.026 0.0081 0.016 0.05 0.05 1 1 0.1 0.0028 5 2.5 4.1 0.5 0.05 1 0.5 6.7 2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005 <5.0 <2.5 <4.1 0.25 <0.010 0.22 <0.10 <6.7 <2.0 <0.10 0.065 <0.026 <0.0081 0.018 <0.050 5.36 2.27 No Obs Odor 0.18 <0.0028 5 2.5 4.1 0.059 0.01 0.21 0.1 6.7 2 0.1 0.025 0.026 0.0081 0.016 0.05 0.05 1 1 0.1 0.0028 5 2.5 4.1 0.5 0.05 1 0.5 6.7 2 0.1 0.05 0.1 0.05 0.05 0.1 0.05 1 1 0.1 0.005

Odor Turbidity Cyanide Oil and Grease

Notes:

Laboratory Qualifiers (Q): J = estimated value below laboratory reporting limit B = detected in blank sample. H = holding time exceeded

bold bold

detected in blank sample detect in blank sample - one or more results qualified as J+

Water Quality Eval (Mar 2010).xlsx