Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

METRO MANILA SUBWAY PROJECT

Health, Safety, Environment & Security

VISITORS / TEMPORARY EMPLOYEES HSE ORIENTATION


Name of SFTE-JV / Subcon Date:
Representative:

Designation: Dept. / Craft:

Date / Time of Orientation: Date of Visit / Entry:

Time of Visit / Entry: From to

TEMPORARY CONTACT
NAME COMPANY SIGNATURE
ACCESS PASS NUMBER

1. Emergency Procedures
a. Emergency Contact numbers or person to contact in case of emergency
b. Evacuation route, Safe Assembly Point and evacuation instruction.
c. First Aid facilities location.

2. Project HSE facilities or Area present condition / hazardous activity and restricted area.
a. Designated Parking area
b. Designated shelter

3. Personal Protective Equipment requirements; i.e. face mask, face shield, hard hat, safety glasses,
protective clothing, safety shoes, reflective vest and other required PPE’s.
a. Alcohol & Drug Policy

4. Responsibilities
a. Report to host any unsafe condition or activity observed.
b. Report to host the injury or adverse health effects experienced.
c. Comply with all posted signs, tags and barricades.
d. Comply with all requirements including smoking restrictions.

5. Visitors are not allowed to:


a. Perform work without authorization.
b. Tour unescorted.
c. Remove any property from premises without authorization.
d. Bring cameras, video production and other photographic equipment without prior
authorization.
e. Bringing of deadly weapon at site; i.e. gun, knife, etc.

Orientation Conducted by: Entry at Project Site Approved by:

HSE Representative Proj. HSE&S Manager

PSB-MMSP-SF003A

You might also like