BECK UP VOLUME

11 134.15

10.15 0.85 8 0.85

40 320 ?m

g
e

an
f ic

d
of

Gu
10.15 15.6

0.85 drop
12.2
5 190.32

11 209 ?m 8 ?m 6 0.85

846 6

0.85 0.85
85.7 74.3
160

SKETSA Uditch 60x60 Kasnsteen tinggi 30 Eksisting


Box Culvert 60x60 Bak Kontrol Pas. Batu

PERHITUNGAN VOLUME
Volume Selisih Vol
A DRAINASE unit panjang lebar tinggi Luas Gambar/L Boq IGP Gambar - Ket
ap BoQ
1 Pembersihan Lahan ls 356.15 0.85 302.73 302.73 1 301.73 Gambar
2 Galian Tanah m3 356.15 0.85 0.85 257.32 152.32 105.00 Gambar
3 Urugan Pasir m3 356.15 0.85 0.10 30.27 19.04 11.23 Gambar
4 Lantai Kerja m3 356.15 0.85 0.07 21.19 13.33 7.86 Gambar
5 Pemasangan Uditch 60x60120 pcs 135.85 113.21 121.00 121 0.00 Bq
5 Pemasangan Box Culvert 60x60x100 pcs 93.00 93 0.00 Bq
6 Pemasangan Kansten P50cm, T30cm m 300.25 300.25 145 155.25 Bq
7 Pasangan Batu Bak Kontrol + Aci m3 3.40 3.4 0.00 Bq
8 Cat Kansteen (hitam putih) m 300.25 300.25 145 155.25 Bq

B AREA JALAN SAMPING GUDANG


1 Penyiapan Badan Jalan 1245.3 1245.32 1295 -49.68
2 Galian Perkerasan Butir (tanah asli) m3 0.30 1245.3 373.60 388.5 -14.90
3 LPB m3 0.20 1245.3 249.06 259 -9.94
4 CTB ( LPA + Semen) m3 0.15 1245.3 186.80 194.25 -7.45
5 Prime Coat liter 1.10 1245.3 1369.85 1554 -184.15
6 Laston Lapis Antara (ACBC) ton 2.23 0.06 1245.3 166.62 177.31 -10.69

C AREA JALAN DEPAN OFFICE


1 Penyiapan Badan Jalan 320 320.00 270 50.00
2 Galian Perkerasan Butir (tanah asli) m3 0.30 320 96.00 81 15.00
3 LPB m3 0.20 320 64.00 54 10.00
4 CTB ( LPA + Semen) m3 0.15 320 48.00 40.5 7.50
5 Prime Coat liter 1.10 320 352.00 324 28.00
6 Laston Lapis Antara (ACBC) ton 2.23 0.06 320 42.82 36.97 5.85