PERHITUNGAN VOLUME
Volume Selisih Vol
A DRAINASE unit panjang lebar tinggi Luas Gambar/L Boq IGP Gambar - Ket
ap BoQ
1 Pembersihan Lahan ls 356.15 0.85 302.73 302.73 1 301.73 Gambar
2 Galian Tanah m3 356.15 0.85 0.85 257.32 152.32 105.00 Gambar
3 Urugan Pasir m3 356.15 0.85 0.10 30.27 19.04 11.23 Gambar
4 Lantai Kerja m3 356.15 0.85 0.07 21.19 13.33 7.86 Gambar
5 Pemasangan Uditch 60x60120 pcs 135.85 113.21 121.00 121 0.00 Bq
5 Pemasangan Box Culvert 60x60x100 pcs 93.00 93 0.00 Bq
6 Pemasangan Kansten P50cm, T30cm m 300.25 300.25 145 155.25 Bq
7 Pasangan Batu Bak Kontrol + Aci m3 3.40 3.4 0.00 Bq
8 Cat Kansteen (hitam putih) m 300.25 300.25 145 155.25 Bq