Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
7+000.00 -8.70 27.25 -5.50 27.38 -0.43 -8.70 17.82 -6.50 15.62 -23.60
-5.50 27.38 -3.21 27.22 -0.34 -6.50 15.62 -5.50 14.62 -12.33
-3.21 27.22 -1.49 27.19 -0.42 -5.50 14.62 -5.21 14.71 -3.65
-1.49 27.19 -0.38 27.35 -0.20 -5.21 14.71 0.00 14.81 -66.16
-0.38 27.35 0.00 27.36 -0.04 0.00 14.81 5.21 14.71 -66.16
0.00 27.36 2.20 27.41 -0.14 5.21 14.71 5.50 14.62 -3.65
2.20 27.41 4.89 27.33 -0.22 5.50 14.62 6.50 15.62 -12.33
4.89 27.33 6.12 27.26 -0.19 6.50 15.62 9.20 18.32 -28.29
6.12 27.26 9.20 28.00 0.56
-1.42 -216.18 214.75
TOTAL AREAS(M2): 214.75 0.00
7+020.00 -9.00 27.50 -5.61 27.57 -0.56 -9.00 18.15 -6.50 15.65 -26.99
-5.61 27.57 -2.81 27.15 -0.96 -6.50 15.65 -5.50 14.65 -12.55
-2.81 27.15 -1.38 27.24 -0.72 -5.50 14.65 -5.21 14.74 -3.72
-1.38 27.24 -0.48 27.38 -0.35 -5.21 14.74 0.00 14.84 -67.31
-0.48 27.38 0.00 27.39 -0.15 0.00 14.84 5.21 14.74 -67.31
0.00 27.39 2.30 27.44 -0.65 5.21 14.74 5.50 14.65 -3.72
2.30 27.44 4.89 27.38 -0.75 5.50 14.65 6.50 15.65 -12.55
4.89 27.38 5.71 27.29 -0.30 6.50 15.65 9.00 18.15 -26.99
5.71 27.29 9.00 27.97 -0.21
-4.65 -221.13 216.49
TOTAL AREAS(M2): 216.49 0.00
7+040.00 -8.90 27.92 -5.61 27.86 -0.76 -8.90 18.04 -6.50 15.64 -27.06
-5.61 27.86 -3.83 27.65 -0.65 -6.50 15.64 -5.50 14.64 -12.98
-3.83 27.65 -2.62 27.43 -0.70 -5.50 14.64 -5.21 14.73 -3.84
-2.62 27.43 -0.50 27.38 -1.51 -5.21 14.73 0.00 14.83 -69.55
-0.50 27.38 0.00 27.38 -0.37 0.00 14.83 5.21 14.73 -69.55
0.00 27.38 2.40 27.42 -1.73 5.21 14.73 5.50 14.64 -3.84
2.40 27.42 4.99 27.35 -1.90 5.50 14.64 6.50 15.64 -12.98
4.99 27.35 6.10 27.24 -0.92 6.50 15.64 9.70 18.84 -34.81
6.10 27.24 9.70 27.72 -2.31
-10.85 -234.61 223.76
TOTAL AREAS(M2): 223.76 0.00
7+060.00 -8.00 28.14 -5.22 28.08 -0.64 -8.00 17.10 -6.50 15.60 -17.98
-5.22 28.08 -2.84 27.59 -1.19 -6.50 15.60 -5.50 14.60 -13.24
-2.84 27.59 -1.52 27.25 -1.21 -5.50 14.60 -5.21 14.69 -3.91
-1.52 27.25 -0.49 27.34 -1.07 -5.21 14.69 0.00 14.79 -70.91
-0.49 27.34 0.00 27.34 -0.49 0.00 14.79 5.21 14.69 -70.91
0.00 27.34 2.50 27.38 -2.45 5.21 14.69 5.50 14.60 -3.91
2.50 27.38 4.79 27.32 -2.27 5.50 14.60 6.50 15.60 -13.24
4.79 27.32 6.12 27.19 -1.44 6.50 15.60 8.60 17.70 -24.54
6.12 27.19 8.60 27.89 -1.97
-12.73 -218.64 205.91
TOTAL AREAS(M2): 205.91 0.00
7+080.00 -8.50 27.91 -5.32 27.82 -0.78 -8.50 17.59 -6.50 15.59 -23.03
-5.32 27.82 -3.02 27.37 -1.18 -6.50 15.59 -5.50 14.59 -13.02
-3.02 27.37 -1.70 27.30 -1.02 -5.50 14.59 -5.21 14.68 -3.85
-1.70 27.30 -0.70 27.31 -0.81 -5.21 14.68 0.00 14.78 -69.76
-0.70 27.31 0.00 27.33 -0.55 0.00 14.78 5.21 14.68 -69.76
0.00 27.33 2.20 27.37 -1.67 5.21 14.68 5.50 14.59 -3.85
2.20 27.37 4.79 27.32 -1.98 5.50 14.59 6.50 15.59 -13.02

Página 1
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
4.79 27.32 6.32 27.18 -1.31 6.50 15.59 9.40 18.49 -32.09
6.32 27.18 9.40 27.94 -1.68
-10.98 -228.39 217.41
TOTAL AREAS(M2): 217.41 0.00
7+100.00 -8.30 27.93 -6.22 27.71 -0.65 -8.30 17.40 -6.50 15.60 -20.93
-6.22 27.71 -3.43 27.50 -1.46 -6.50 15.60 -5.50 14.60 -13.03
-3.43 27.50 -1.81 27.15 -1.30 -5.50 14.60 -5.21 14.69 -3.85
-1.81 27.15 -0.68 27.33 -1.00 -5.21 14.69 0.00 14.79 -69.81
-0.68 27.33 0.00 27.34 -0.55 0.00 14.79 5.21 14.69 -69.81
0.00 27.34 2.30 27.38 -1.77 5.21 14.69 5.50 14.60 -3.85
2.30 27.38 4.80 27.33 -1.94 5.50 14.60 6.50 15.60 -13.03
4.80 27.33 5.91 27.32 -0.90 6.50 15.60 10.00 19.10 -37.72
5.91 27.32 10.00 27.96 -1.99
-11.54 -232.04 220.50
TOTAL AREAS(M2): 220.50 0.00
7+120.00 -8.80 27.51 -7.01 27.34 -0.51 -8.80 17.89 -6.50 15.59 -25.22
-7.01 27.34 -5.71 27.31 -0.50 -6.50 15.59 -5.50 14.59 -12.62
-5.71 27.31 -3.50 27.14 -1.07 -5.50 14.59 -5.21 14.68 -3.74
-3.50 27.14 -1.99 27.23 -0.80 -5.21 14.68 0.00 14.78 -67.68
-1.99 27.23 -0.89 27.31 -0.48 0.00 14.78 5.21 14.68 -67.68
-0.89 27.31 0.00 27.33 -0.35 5.21 14.68 5.50 14.59 -3.74
0.00 27.33 2.10 27.35 -0.78 5.50 14.59 6.50 15.59 -12.62
2.10 27.35 4.80 27.29 -1.05 6.50 15.59 9.20 18.29 -29.07
4.80 27.29 6.10 27.26 -0.57
6.10 27.26 9.20 27.42 -1.15
-7.25 -222.35 215.10
TOTAL AREAS(M2): 215.10 0.00
7+140.00 -9.00 27.02 -6.20 27.09 -0.46 -9.00 18.08 -6.50 15.58 -25.97
-6.20 27.09 -3.49 27.14 -0.28 -6.50 15.58 -5.50 14.58 -12.14
-3.49 27.14 -1.99 27.29 -0.01 -5.50 14.58 -5.21 14.67 -3.60
-1.99 27.29 -0.90 27.32 0.09 -5.21 14.67 0.00 14.77 -65.17
-0.90 27.32 0.00 27.32 0.09 0.00 14.77 5.21 14.67 -65.17
0.00 27.32 2.10 27.32 0.21 5.21 14.67 5.50 14.58 -3.60
2.10 27.32 4.69 27.25 0.17 5.50 14.58 6.50 15.58 -12.14
4.69 27.25 6.10 27.18 -0.01 6.50 15.58 9.50 18.58 -30.41
6.10 27.18 9.50 27.23 -0.05
-0.25 -218.20 217.95
TOTAL AREAS(M2): 217.95 0.00
7+160.00 -8.80 27.04 -6.50 27.00 -0.51 -8.80 17.89 -6.50 15.59 -24.14
-6.50 27.00 -3.18 27.11 -0.61 -6.50 15.59 -5.50 14.59 -12.15
-3.18 27.11 -1.78 27.29 -0.06 -5.50 14.59 -5.21 14.68 -3.60
-1.78 27.29 -1.00 27.33 0.06 -5.21 14.68 0.00 14.78 -65.23
-1.00 27.33 0.00 27.33 0.09 0.00 14.78 5.21 14.68 -65.23
0.00 27.33 2.10 27.33 0.19 5.21 14.68 5.50 14.59 -3.60
2.10 27.33 4.88 27.21 0.08 5.50 14.59 6.50 15.59 -12.15
4.88 27.21 6.19 27.07 -0.13 6.50 15.59 9.00 18.09 -25.99
6.19 27.07 9.00 27.11 -0.42
-1.31 -212.08 210.78
TOTAL AREAS(M2): 210.78 0.00
7+180.00 -8.70 26.85 -5.79 26.92 -0.48 -8.70 17.81 -6.50 15.61 -22.74
-5.79 26.92 -3.18 27.03 -0.20 -6.50 15.61 -5.50 14.61 -11.94

Página 2
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-3.18 27.03 -1.78 27.28 0.15 -5.50 14.61 -5.21 14.70 -3.54
-1.78 27.28 -0.60 27.36 0.32 -5.21 14.70 0.00 14.80 -64.13
-0.60 27.36 0.00 27.35 0.18 0.00 14.80 5.21 14.70 -64.13
0.00 27.35 2.29 27.32 0.65 5.21 14.70 5.50 14.61 -3.54
2.29 27.32 4.79 27.21 0.54 5.50 14.61 6.50 15.61 -11.94
4.79 27.21 6.19 27.07 0.13 6.50 15.61 9.40 18.51 -28.96
6.19 27.07 9.40 27.00 -0.05
1.24 -210.92 212.17
TOTAL AREAS(M2): 212.17 0.00
7+200.00 -9.00 26.96 -6.70 27.09 -0.31 -9.00 18.18 -6.50 15.68 -25.57
-6.70 27.09 -4.09 26.82 -0.53 -6.50 15.68 -5.50 14.68 -11.98
-4.09 26.82 -1.86 27.28 -0.23 -5.50 14.68 -5.21 14.77 -3.55
-1.86 27.28 -0.98 27.44 0.18 -5.21 14.77 0.00 14.87 -64.34
-0.98 27.44 0.00 27.42 0.26 0.00 14.87 5.21 14.77 -64.34
0.00 27.42 2.19 27.37 0.52 5.21 14.77 5.50 14.68 -3.55
2.19 27.37 4.99 27.24 0.41 5.50 14.68 6.50 15.68 -11.98
4.99 27.24 6.69 27.10 0.02 6.50 15.68 9.00 18.18 -25.57
6.69 27.10 9.00 27.02 -0.23
0.08 -210.87 210.95
TOTAL AREAS(M2): 210.95 0.00
7+209.45 -8.24 27.03 -7.04 27.10 -0.20 -8.24 17.45 -6.50 15.71 -18.57
-7.04 27.10 -5.67 26.96 -0.27 -6.50 15.71 -5.50 14.71 -12.02
-5.67 26.96 -3.85 26.92 -0.53 -5.50 14.71 -5.21 14.79 -3.56
-3.85 26.92 -2.66 27.16 -0.22 -5.21 14.79 0.00 14.90 -64.56
-2.66 27.16 -1.86 27.34 0.02 0.00 14.90 5.21 14.79 -64.56
-1.86 27.34 -1.40 27.42 0.07 5.21 14.79 5.50 14.71 -3.56
-1.40 27.42 -0.90 27.46 0.11 5.50 14.71 6.50 15.71 -12.02
-0.90 27.46 -0.38 27.45 0.12 6.50 15.71 9.14 18.35 -26.94
-0.38 27.45 0.00 27.45 0.08
0.00 27.45 0.89 27.42 0.18
0.89 27.42 2.05 27.40 0.21
2.05 27.40 3.42 27.32 0.18
3.42 27.32 4.88 27.25 0.09
4.88 27.25 5.59 27.14 -0.02
5.59 27.14 6.50 27.06 -0.12
6.50 27.06 7.93 27.07 -0.23
7.93 27.07 9.14 27.03 -0.21
-0.75 -205.80 205.06
TOTAL AREAS(M2): 205.06 0.00
7+220.00 -7.40 27.11 -3.58 27.03 -0.92 -7.40 16.71 -6.50 15.81 -9.94
-3.58 27.03 -1.87 27.40 -0.16 -6.50 15.81 -5.50 14.81 -12.00
-1.87 27.40 -0.79 27.49 0.15 -5.50 14.81 -5.18 14.91 -4.02
-0.79 27.49 0.00 27.48 0.14 -5.18 14.91 0.00 14.93 -64.14
0.00 27.48 1.89 27.43 0.28 0.00 14.93 5.21 14.83 -64.81
1.89 27.43 4.78 27.27 0.12 5.21 14.83 5.50 14.74 -3.58
4.78 27.27 6.28 27.03 -0.24 5.50 14.74 6.50 15.74 -12.07
6.28 27.03 9.30 27.05 -0.81 6.50 15.74 9.30 18.54 -28.47
-1.46 -199.02 197.57
TOTAL AREAS(M2): 197.57 0.00
7+223.25 -7.58 27.08 -7.21 27.06 -0.08 -7.58 16.91 -6.50 15.83 -11.77
-7.21 27.06 -4.01 27.00 -0.79 -6.50 15.83 -5.50 14.83 -11.95

Página 3
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-4.01 27.00 -3.77 27.03 -0.06 -5.50 14.83 -5.17 14.93 -4.13
-3.77 27.03 -2.35 27.34 -0.12 -5.17 14.93 0.00 14.93 -63.79
-2.35 27.34 -1.88 27.40 0.05 0.00 14.93 5.21 14.83 -64.65
-1.88 27.40 -0.96 27.48 0.15 5.21 14.83 5.50 14.74 -3.57
-0.96 27.48 -0.79 27.49 0.04 5.50 14.74 6.50 15.74 -12.04
-0.79 27.49 -0.14 27.48 0.14 6.50 15.74 9.23 18.47 -27.81
-0.14 27.48 -0.01 27.48 0.03
-0.01 27.48 0.35 27.47 0.07
0.35 27.47 1.94 27.43 0.28
1.94 27.43 2.38 27.40 0.06
2.38 27.40 4.80 27.27 0.14
4.80 27.27 5.06 27.23 -0.01
5.06 27.23 6.33 27.03 -0.18
6.33 27.03 6.72 27.01 -0.10
6.72 27.01 9.23 27.03 -0.65
-1.05 -199.70 198.65
TOTAL AREAS(M2): 198.65 0.00
7+237.05 -8.34 26.94 -6.38 26.88 -0.46 -8.34 17.76 -6.50 15.92 -18.94
-6.38 26.88 -5.80 26.86 -0.16 -6.50 15.92 -5.50 14.92 -11.73
-5.80 26.86 -4.67 27.05 -0.21 -5.50 14.92 -5.13 15.03 -4.56
-4.67 27.05 -4.42 27.10 -0.02 -5.13 15.03 0.00 14.93 -62.34
-4.42 27.10 -1.88 27.42 0.30 0.00 14.93 5.33 14.82 -65.44
-1.88 27.42 -1.72 27.43 0.04 5.33 14.82 5.62 14.74 -3.53
-1.72 27.43 -0.79 27.50 0.30 5.62 14.74 6.62 15.74 -11.91
-0.79 27.50 -0.69 27.50 0.04 6.62 15.74 8.96 18.07 -23.95
-0.69 27.50 -0.01 27.48 0.24
-0.01 27.48 1.87 27.44 0.59
1.87 27.44 2.15 27.43 0.08
2.15 27.43 4.45 27.29 0.50
4.45 27.29 4.87 27.27 0.06
4.87 27.27 6.31 27.07 0.04
6.31 27.07 6.53 27.03 -0.02
6.53 27.03 8.51 26.93 -0.32
8.51 26.93 8.96 26.93 -0.09
0.91 -202.40 203.30
TOTAL AREAS(M2): 203.30 0.00
7+240.00 -8.50 26.91 -6.19 26.83 -0.56 -8.50 17.94 -6.50 15.94 -20.36
-6.19 26.83 -4.87 27.05 -0.23 -6.50 15.94 -5.50 14.94 -11.68
-4.87 27.05 -1.88 27.43 0.36 -5.50 14.94 -5.12 15.05 -4.64
-1.88 27.43 -0.80 27.50 0.38 -5.12 15.05 0.00 14.93 -62.04
-0.80 27.50 -0.01 27.48 0.30 0.00 14.93 5.37 14.80 -65.81
-0.01 27.48 2.19 27.44 0.75 5.37 14.80 5.65 14.72 -3.39
2.19 27.44 4.88 27.27 0.63 5.65 14.72 6.65 15.72 -11.90
4.88 27.27 6.58 27.04 0.06 6.65 15.72 8.90 17.97 -23.16
6.58 27.04 8.90 26.91 -0.32
1.37 -202.98 204.35
TOTAL AREAS(M2): 204.35 0.00
7+260.00 -9.00 26.83 -7.29 26.95 -0.25 -9.00 18.68 -6.50 16.18 -24.02
-7.29 26.95 -5.69 26.97 -0.13 -6.50 16.18 -5.50 15.18 -11.36
-5.69 26.97 -2.77 27.33 0.32 -5.50 15.18 -5.07 15.31 -5.12
-2.77 27.33 -1.18 27.63 0.71 -5.07 15.31 0.00 15.04 -60.10

Página 4
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-1.18 27.63 -0.01 27.59 0.68 0.00 15.04 5.63 14.74 -68.39
-0.01 27.59 1.79 27.52 0.93 5.63 14.74 5.82 14.68 -2.33
1.79 27.52 4.69 27.39 1.20 5.82 14.68 6.82 15.68 -11.85
4.69 27.39 8.10 27.09 0.70 6.82 15.68 8.10 16.96 -13.72
4.16 -196.88 201.04
TOTAL AREAS(M2): 201.04 0.00
7+280.00 -8.80 26.96 -7.20 27.05 -0.25 -8.80 18.67 -6.50 16.37 -22.19
-7.20 27.05 -4.99 26.87 -0.44 -6.50 16.37 -5.50 15.37 -11.30
-4.99 26.87 -2.76 27.22 -0.26 -5.50 15.37 -5.02 15.51 -5.59
-2.76 27.22 -1.27 27.67 0.42 -5.02 15.51 0.00 15.10 -59.58
-1.27 27.67 -0.01 27.65 0.63 0.00 15.10 5.91 14.61 -72.78
-0.01 27.65 1.99 27.59 0.90 5.91 14.61 5.99 14.59 -1.02
1.99 27.59 4.68 27.47 0.97 5.99 14.59 6.99 15.59 -12.08
4.68 27.47 6.08 27.25 0.27 6.99 15.59 8.30 16.89 -14.27
6.08 27.25 8.30 27.14 0.07
2.29 -198.80 201.09
TOTAL AREAS(M2): 201.09 0.00
7+292.25 -8.75 26.96 -8.12 27.00 -0.12 -8.75 18.72 -6.50 16.47 -21.53
-8.12 27.00 -6.73 27.04 -0.20 -6.50 16.47 -5.50 15.47 -11.19
-6.73 27.04 -5.88 26.97 -0.14 -5.50 15.47 -5.00 15.62 -5.81
-5.88 26.97 -4.33 26.92 -0.34 -5.00 15.62 0.00 15.12 -58.96
-4.33 26.92 -3.45 27.06 -0.15 0.00 15.12 6.10 14.51 -75.32
-3.45 27.06 -2.27 27.37 0.06 6.10 14.51 7.10 15.51 -12.15
-2.27 27.37 -1.69 27.55 0.17 7.10 15.51 8.03 16.45 -10.44
-1.69 27.55 -1.11 27.69 0.26
-1.11 27.69 -0.63 27.68 0.25
-0.63 27.68 0.16 27.67 0.41
0.16 27.67 1.20 27.65 0.51
1.20 27.65 1.97 27.62 0.36
1.97 27.62 3.81 27.53 0.76
3.81 27.53 4.84 27.48 0.35
4.84 27.48 5.69 27.36 0.22
5.69 27.36 6.23 27.28 0.08
6.23 27.28 7.16 27.15 0.04
7.16 27.15 8.03 27.11 -0.03
2.49 -195.41 197.91
TOTAL AREAS(M2): 197.91 0.00
7+300.00 -9.00 26.96 -6.70 27.02 -0.39 -9.00 18.99 -6.50 16.49 -23.57
-6.70 27.02 -4.18 26.95 -0.44 -6.50 16.49 -5.50 15.49 -11.18
-4.18 26.95 -2.25 27.46 0.08 -5.50 15.49 -5.00 15.64 -5.80
-2.25 27.46 -1.28 27.70 0.41 -5.00 15.64 0.00 15.14 -58.89
-1.28 27.70 0.00 27.69 0.67 0.00 15.14 6.10 14.53 -75.23
0.00 27.69 1.69 27.65 0.85 6.10 14.53 7.10 15.53 -12.14
1.69 27.65 4.68 27.50 1.21 7.10 15.53 7.60 16.03 -5.69
4.68 27.50 6.07 27.30 0.32
6.07 27.30 7.60 27.08 0.04
2.75 -192.49 195.24
TOTAL AREAS(M2): 195.24 0.00
7+320.00 -8.90 26.93 -7.19 26.99 -0.30 -8.90 18.96 -6.50 16.56 -22.50
-7.19 26.99 -4.48 27.06 -0.31 -6.50 16.56 -5.50 15.56 -11.08
-4.48 27.06 -2.35 27.43 0.23 -5.50 15.56 -5.00 15.71 -5.75

Página 5
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-2.35 27.43 -1.17 27.78 0.56 -5.00 15.71 0.00 15.21 -58.38
-1.17 27.78 0.00 27.76 0.74 0.00 15.21 6.10 14.60 -74.62
0.00 27.76 2.09 27.71 1.25 6.10 14.60 7.10 15.60 -12.04
2.09 27.71 4.77 27.57 1.34 7.10 15.60 8.70 17.20 -17.18
4.77 27.57 6.47 27.22 0.44
6.47 27.22 8.70 27.06 0.01
3.96 -201.55 205.51
TOTAL AREAS(M2): 205.51 0.00
7+340.00 -8.20 26.98 -5.59 27.11 -0.37 -8.20 18.34 -6.50 16.64 -16.48
-5.59 27.11 -3.77 27.17 -0.09 -6.50 16.64 -5.50 15.64 -11.05
-3.77 27.17 -2.15 27.59 0.31 -5.50 15.64 -5.00 15.79 -5.74
-2.15 27.59 -0.88 27.86 0.69 -5.00 15.79 0.00 15.29 -58.24
-0.88 27.86 -0.01 27.84 0.58 0.00 15.29 6.10 14.68 -74.43
-0.01 27.84 2.09 27.79 1.31 6.10 14.68 7.10 15.68 -12.01
2.09 27.79 4.88 27.65 1.48 7.10 15.68 9.30 17.88 -22.90
4.88 27.65 6.47 27.34 0.49
6.47 27.34 9.30 27.13 0.14
4.55 -200.84 205.39
TOTAL AREAS(M2): 205.39 0.00
7+360.00 -8.00 27.76 -5.42 27.56 -0.79 -8.00 18.26 -6.50 16.76 -15.69
-5.42 27.56 -3.89 27.41 -0.73 -6.50 16.76 -5.50 15.76 -11.71
-3.89 27.41 -2.07 27.73 -0.72 -5.50 15.76 -5.00 15.91 -6.07
-2.07 27.73 -0.69 27.97 -0.16 -5.00 15.91 0.00 15.41 -61.54
-0.69 27.97 -0.01 27.96 0.00 0.00 15.41 6.10 14.80 -78.46
-0.01 27.96 2.19 27.90 -0.09 6.10 14.80 7.10 15.80 -12.67
2.19 27.90 5.48 27.72 -0.52 7.10 15.80 9.00 17.70 -21.31
5.48 27.72 6.98 27.48 -0.56
6.98 27.48 9.00 27.42 -1.04
-4.60 -207.43 202.83
TOTAL AREAS(M2): 202.83 0.00
7+380.00 -8.30 27.86 -5.51 27.79 -0.65 -8.30 18.64 -6.50 16.84 -18.57
-5.51 27.79 -3.19 27.52 -0.93 -6.50 16.84 -5.50 15.84 -11.72
-3.19 27.52 -1.66 27.81 -0.60 -5.50 15.84 -5.00 15.99 -6.07
-1.66 27.81 -0.48 28.06 -0.15 -5.00 15.99 0.00 15.49 -61.59
-0.48 28.06 -0.01 28.04 0.00 0.00 15.49 6.10 14.88 -78.52
-0.01 28.04 2.69 27.97 -0.15 6.10 14.88 7.10 15.88 -12.68
2.69 27.97 5.68 27.79 -0.54 7.10 15.88 8.90 17.68 -20.30
5.68 27.79 6.69 27.67 -0.33
6.69 27.67 8.90 27.82 -0.70
-4.05 -209.44 205.39
TOTAL AREAS(M2): 205.39 0.00
7+400.00 -9.00 28.12 -5.32 28.05 -0.87 -9.00 19.40 -6.50 16.90 -25.42
-5.32 28.05 -3.61 27.79 -0.68 -6.50 16.90 -5.50 15.90 -11.92
-3.61 27.79 -1.18 27.92 -1.13 -5.50 15.90 -5.00 16.05 -6.17
-1.18 27.92 -0.18 28.10 -0.31 -5.00 16.05 0.00 15.55 -62.59
-0.18 28.10 0.00 28.10 -0.04 0.00 15.55 6.10 14.94 -79.74
0.00 28.10 2.69 28.04 -0.67 6.10 14.94 7.10 15.94 -12.88
2.69 28.04 5.89 27.90 -1.12 7.10 15.94 10.00 18.84 -31.69
5.89 27.90 6.99 27.81 -0.51
6.99 27.81 10.00 27.75 -1.63
-6.96 -230.40 223.44

Página 6
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
TOTAL AREAS(M2): 223.44 0.00
7+410.06 -8.87 27.90 -7.02 27.87 -0.40 -8.87 19.30 -6.50 16.93 -23.66
-7.02 27.87 -6.23 27.92 -0.16 -6.50 16.93 -5.50 15.93 -11.67
-6.23 27.92 -5.39 27.79 -0.21 -5.50 15.93 -5.00 16.08 -6.05
-5.39 27.79 -4.17 27.76 -0.40 -5.00 16.08 0.00 15.58 -61.35
-4.17 27.76 -2.97 27.82 -0.38 0.00 15.58 6.10 14.97 -78.24
-2.97 27.82 -1.61 27.83 -0.38 6.10 14.97 7.10 15.97 -12.63
-1.61 27.83 -1.09 27.92 -0.12 7.10 15.97 9.92 18.79 -30.21
-1.09 27.92 -0.41 28.05 -0.08
-0.41 28.05 -0.31 28.05 0.00
-0.31 28.05 0.19 28.13 -0.01
0.19 28.13 1.69 28.10 0.02
1.69 28.10 3.02 28.07 -0.02
3.02 28.07 4.58 27.99 -0.11
4.58 27.99 6.15 27.92 -0.23
6.15 27.92 6.86 27.82 -0.16
6.86 27.82 7.41 27.77 -0.17
7.41 27.77 8.43 27.74 -0.35
8.43 27.74 9.92 27.71 -0.56
-3.71 -223.81 220.10
TOTAL AREAS(M2): 220.10 0.00
7+420.00 -9.10 27.69 -7.50 27.79 -0.24 -9.10 19.50 -6.50 16.90 -25.20
-7.50 27.79 -5.10 27.73 -0.31 -6.50 16.90 -5.50 15.90 -11.49
-5.10 27.73 -2.38 27.74 -0.42 -5.50 15.90 -5.02 16.04 -5.74
-2.38 27.74 -0.97 28.01 -0.02 -5.02 16.04 0.00 15.61 -60.54
-0.97 28.01 0.01 28.16 0.19 0.00 15.61 5.95 15.10 -74.52
0.01 28.16 2.99 28.11 0.73 5.95 15.10 6.01 15.08 -0.86
2.99 28.11 6.08 27.95 0.43 6.01 15.08 7.01 16.08 -12.31
6.08 27.95 7.48 27.74 -0.06 7.01 16.08 9.50 18.57 -26.26
7.48 27.74 9.50 27.67 -0.37
-0.07 -216.91 216.84
TOTAL AREAS(M2): 216.84 0.00
7+440.00 -10.00 27.59 -7.30 27.68 -0.42 -10.00 20.27 -6.50 16.77 -32.42
-7.30 27.68 -4.00 27.64 -0.43 -6.50 16.77 -5.50 15.77 -11.51
-4.00 27.64 -1.97 27.75 -0.19 -5.50 15.77 -5.06 15.91 -5.25
-1.97 27.75 0.02 28.17 0.34 -5.06 15.91 0.00 15.62 -60.85
0.02 28.17 2.80 28.18 1.07 0.00 15.62 5.66 15.30 -69.79
2.80 28.18 5.78 28.10 1.05 5.66 15.30 5.84 15.25 -2.23
5.78 28.10 7.59 27.85 0.33 5.84 15.25 6.84 16.25 -12.04
7.59 27.85 10.00 27.90 0.20 6.84 16.25 10.00 19.41 -31.48
1.95 -225.57 227.52
TOTAL AREAS(M2): 227.52 0.00
7+460.00 -9.00 27.66 -5.19 27.74 -0.61 -9.00 19.11 -6.50 16.61 -24.98
-5.19 27.74 -2.89 27.85 -0.15 -6.50 16.61 -5.50 15.61 -11.74
-2.89 27.85 -1.08 28.01 0.13 -5.50 15.61 -5.11 15.73 -4.75
-1.08 28.01 0.01 28.14 0.24 -5.11 15.73 0.00 15.59 -62.33
0.01 28.14 2.60 28.21 0.81 0.00 15.59 5.40 15.44 -66.65
2.60 28.21 5.68 28.14 0.97 5.40 15.44 5.67 15.36 -3.31
5.68 28.14 7.08 27.96 0.27 5.67 15.36 6.67 16.36 -12.00
7.08 27.96 9.50 27.73 -0.04 6.67 16.36 9.50 19.20 -28.57
1.62 -214.32 215.94

Página 7
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
TOTAL AREAS(M2): 215.94 0.00
7+465.26 -8.82 27.69 -6.01 27.75 -0.48 -8.82 18.91 -6.50 16.59 -23.49
-6.01 27.75 -5.09 27.77 -0.12 -6.50 16.59 -5.50 15.59 -11.80
-5.09 27.77 -3.40 27.85 -0.14 -5.50 15.59 -5.13 15.70 -4.59
-3.40 27.85 -2.81 27.84 -0.03 -5.13 15.70 0.00 15.60 -62.73
-2.81 27.84 -1.48 27.96 0.01 0.00 15.60 5.33 15.49 -65.85
-1.48 27.96 -0.97 28.00 0.04 5.33 15.49 5.62 15.41 -3.55
-0.97 28.00 -0.15 28.10 0.13 5.62 15.41 6.62 16.41 -11.98
-0.15 28.10 0.03 28.15 0.04 6.62 16.41 9.58 19.37 -29.60
0.03 28.15 0.72 28.17 0.18
0.72 28.17 2.63 28.22 0.58
2.63 28.22 3.39 28.20 0.24
3.39 28.20 5.66 28.15 0.65
5.66 28.15 6.02 28.11 0.09
6.02 28.11 7.05 27.98 0.16
7.05 27.98 7.79 27.89 0.03
7.79 27.89 9.58 27.72 -0.15
1.25 -213.59 214.84
TOTAL AREAS(M2): 214.84 0.00
7+479.06 -8.33 27.78 -8.15 27.78 -0.04 -8.33 18.36 -6.50 16.53 -19.31
-8.15 27.78 -4.81 27.85 -0.54 -6.50 16.53 -5.50 15.53 -11.95
-4.81 27.85 -4.71 27.86 -0.01 -5.50 15.53 -5.17 15.63 -4.13
-4.71 27.86 -2.61 27.82 -0.30 -5.17 15.63 0.00 15.63 -63.82
-2.61 27.82 -2.51 27.83 -0.02 0.00 15.63 5.21 15.52 -64.68
-2.51 27.83 -0.70 27.99 -0.13 5.21 15.52 5.50 15.44 -3.57
-0.70 27.99 -0.63 28.00 0.00 5.50 15.44 6.50 16.44 -12.04
-0.63 28.00 0.03 28.18 0.07 6.50 16.44 9.79 19.72 -32.53
0.03 28.18 2.58 28.25 0.59
2.58 28.25 2.70 28.25 0.03
2.70 28.25 5.46 28.20 0.68
5.46 28.20 5.59 28.19 0.03
5.59 28.19 6.91 28.03 0.18
6.91 28.03 6.98 28.03 0.00
6.98 28.03 9.65 27.72 -0.29
9.65 27.72 9.79 27.71 -0.04
0.21 -212.05 212.26
TOTAL AREAS(M2): 212.26 0.00
7+480.00 -8.30 27.79 -4.80 27.86 -0.58 -8.30 18.32 -6.50 16.52 -19.01
-4.80 27.86 -2.59 27.82 -0.33 -6.50 16.52 -5.50 15.52 -11.96
-2.59 27.82 -0.66 27.99 -0.16 -5.50 15.52 -5.17 15.62 -4.10
-0.66 27.99 0.03 28.18 0.07 -5.17 15.62 0.00 15.63 -63.90
0.03 28.18 2.70 28.26 0.62 0.00 15.63 5.21 15.53 -64.70
2.70 28.26 5.59 28.20 0.69 5.21 15.53 5.50 15.44 -3.57
5.59 28.20 6.98 28.03 0.17 5.50 15.44 6.50 16.44 -12.05
6.98 28.03 9.80 27.71 -0.34 6.50 16.44 9.80 19.74 -32.66
0.14 -211.96 212.10
TOTAL AREAS(M2): 212.10 0.00
7+492.86 -8.75 27.98 -7.50 28.00 -0.23 -8.75 18.72 -6.50 16.47 -23.83
-7.50 28.00 -5.12 28.05 -0.36 -6.50 16.47 -5.50 15.47 -12.21
-5.12 28.05 -4.34 28.04 -0.11 -5.50 15.47 -5.21 15.55 -3.62
-4.34 28.04 -2.47 27.93 -0.37 -5.21 15.55 0.00 15.66 -65.58

Página 8
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-2.47 27.93 -1.78 27.99 -0.15 0.00 15.66 5.21 15.55 -65.58
-1.78 27.99 -0.74 28.01 -0.19 5.21 15.55 5.50 15.47 -3.62
-0.74 28.01 -0.46 28.08 -0.04 5.50 15.47 6.50 16.47 -12.21
-0.46 28.08 0.03 28.20 -0.02 6.50 16.47 9.61 19.57 -31.57
0.03 28.20 1.87 28.27 0.11
1.87 28.27 2.83 28.30 0.10
2.83 28.30 4.69 28.26 0.19
4.69 28.26 5.71 28.24 0.07
5.71 28.24 6.66 28.03 -0.04
6.66 28.03 7.17 27.97 -0.09
7.17 27.97 8.59 27.82 -0.40
8.59 27.82 9.61 27.71 -0.42
-1.97 -218.22 216.25
TOTAL AREAS(M2): 216.25 0.00
7+500.00 -9.00 28.09 -5.30 28.16 -0.61 -9.00 18.98 -6.50 16.48 -26.39
-5.30 28.16 -2.40 27.99 -0.62 -6.50 16.48 -5.50 15.48 -12.31
-2.40 27.99 -0.77 28.02 -0.46 -5.50 15.48 -5.21 15.57 -3.65
-0.77 28.02 0.03 28.22 -0.14 -5.21 15.57 0.00 15.67 -66.06
0.03 28.22 2.90 28.33 -0.04 0.00 15.67 5.21 15.57 -66.06
2.90 28.33 5.78 28.26 0.01 5.21 15.57 5.50 15.48 -3.65
5.78 28.26 7.27 27.94 -0.28 5.50 15.48 6.50 16.48 -12.31
7.27 27.94 9.50 27.71 -1.04 6.50 16.48 9.50 19.48 -30.92
-3.18 -221.34 218.16
TOTAL AREAS(M2): 218.16 0.00
7+520.00 -5.00 28.57 -2.82 28.28 -0.75 -5.00 15.66 0.00 15.76 -65.28
-2.82 28.28 -0.99 28.15 -1.02 0.00 15.76 5.21 15.66 -68.09
-0.99 28.15 0.02 28.31 -0.55 5.21 15.66 5.50 15.57 -3.76
0.02 28.31 3.00 28.42 -1.21 5.50 15.57 6.50 16.57 -12.70
3.00 28.42 5.69 28.37 -1.01 6.50 16.57 9.70 19.77 -33.91
5.69 28.37 7.49 28.19 -0.88
7.49 28.19 9.70 28.08 -1.41
-6.81 -183.74 176.93
TOTAL AREAS(M2): 176.93 0.00
7+540.00 -8.70 28.11 -5.99 28.29 -0.30 -8.70 18.87 -6.50 16.67 -23.18
-5.99 28.29 -4.80 28.35 0.01 -6.50 16.67 -5.50 15.67 -12.14
-4.80 28.35 -2.50 28.29 0.02 -5.50 15.67 -5.21 15.76 -3.60
-2.50 28.29 -0.68 28.25 -0.07 -5.21 15.76 0.00 15.86 -65.17
-0.68 28.25 0.03 28.41 0.01 0.00 15.86 5.21 15.76 -65.17
0.03 28.41 2.80 28.51 0.42 5.21 15.76 5.50 15.67 -3.60
2.80 28.51 5.99 28.46 0.56 5.50 15.67 6.50 16.67 -12.14
5.99 28.46 8.68 28.16 0.00 6.50 16.67 10.00 20.17 -34.60
8.68 28.16 10.00 28.09 -0.24
0.41 -219.60 220.01
TOTAL AREAS(M2): 220.01 0.00
7+560.00 -9.00 28.57 -5.51 28.52 -0.79 -9.00 19.21 -6.50 16.71 -27.02
-5.51 28.52 -2.91 28.38 -0.83 -6.50 16.71 -5.50 15.71 -12.56
-2.91 28.38 -0.78 28.28 -0.94 -5.50 15.71 -5.21 15.80 -3.72
-0.78 28.28 0.02 28.45 -0.33 -5.21 15.80 0.00 15.90 -67.36
0.02 28.45 2.70 28.53 -0.75 0.00 15.90 5.21 15.80 -67.36
2.70 28.53 5.79 28.49 -0.80 5.21 15.80 5.50 15.71 -3.72
5.79 28.49 7.28 28.34 -0.53 5.50 15.71 6.50 16.71 -12.56

Página 9
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
7.28 28.34 10.00 28.15 -1.43 6.50 16.71 10.00 20.21 -36.07
-6.39 -230.37 223.98
TOTAL AREAS(M2): 223.98 0.00
7+580.00 -9.00 28.70 -5.11 28.54 -1.09 -9.00 19.28 -6.50 16.78 -27.17
-5.11 28.54 -2.41 28.34 -1.24 -6.50 16.78 -5.50 15.78 -12.62
-2.41 28.34 -1.18 28.28 -0.73 -5.50 15.78 -5.21 15.87 -3.74
-1.18 28.28 -0.36 28.46 -0.43 -5.21 15.87 0.00 15.97 -67.68
-0.36 28.46 0.02 28.52 -0.16 0.00 15.97 5.21 15.87 -67.68
0.02 28.52 2.70 28.61 -0.90 5.21 15.87 5.50 15.78 -3.74
2.70 28.61 5.68 28.55 -0.95 5.50 15.78 6.50 16.78 -12.62
5.68 28.55 6.78 28.38 -0.47 6.50 16.78 9.80 20.08 -34.54
6.78 28.38 9.80 28.10 -2.00
-7.97 -229.77 221.80
TOTAL AREAS(M2): 221.80 0.00
7+600.00 -8.50 28.54 -5.01 28.57 -0.65 -8.50 18.80 -6.50 16.80 -21.87
-5.01 28.57 -2.41 28.38 -0.69 -6.50 16.80 -5.50 15.80 -12.44
-2.41 28.38 -0.98 28.39 -0.50 -5.50 15.80 -5.21 15.88 -3.68
-0.98 28.39 0.02 28.54 -0.28 -5.21 15.88 0.00 15.99 -66.74
0.02 28.54 2.60 28.63 -0.40 0.00 15.99 5.21 15.88 -66.74
2.60 28.63 5.79 28.57 -0.45 5.21 15.88 5.50 15.80 -3.68
5.79 28.57 7.99 28.32 -0.65 5.50 15.80 6.50 16.80 -12.44
7.99 28.32 9.70 28.40 -0.65 6.50 16.80 9.70 20.00 -33.08
-4.26 -220.67 216.41
TOTAL AREAS(M2): 216.41 0.00
7+620.00 -9.00 28.40 -7.01 28.29 -0.51 -9.00 19.26 -6.50 16.76 -26.47
-7.01 28.29 -5.30 28.26 -0.56 -6.50 16.76 -5.50 15.76 -12.34
-5.30 28.26 -2.79 28.37 -0.71 -5.50 15.76 -5.21 15.84 -3.66
-2.79 28.37 -1.09 28.45 -0.32 -5.21 15.84 0.00 15.95 -66.22
-1.09 28.45 0.01 28.50 -0.14 0.00 15.95 5.21 15.84 -66.22
0.01 28.50 2.70 28.56 -0.19 5.21 15.84 5.50 15.76 -3.66
2.70 28.56 5.67 28.48 -0.24 5.50 15.76 6.50 16.76 -12.34
5.67 28.48 6.97 28.16 -0.36 6.50 16.76 9.80 20.06 -33.62
6.97 28.16 9.80 27.99 -1.48
-4.51 -224.50 219.99
TOTAL AREAS(M2): 219.99 0.00
7+640.00 -8.50 28.20 -6.20 28.16 -0.50 -8.50 18.64 -6.50 16.64 -21.51
-6.20 28.16 -3.10 28.06 -0.90 -6.50 16.64 -5.50 15.64 -12.26
-3.10 28.06 -0.88 28.24 -0.55 -5.50 15.64 -5.21 15.72 -3.63
-0.88 28.24 0.02 28.38 -0.08 -5.21 15.72 0.00 15.83 -65.80
0.02 28.38 2.60 28.42 0.00 0.00 15.83 5.21 15.72 -65.80
2.60 28.42 5.68 28.36 -0.03 5.21 15.72 5.50 15.64 -3.63
5.68 28.36 7.18 28.13 -0.23 5.50 15.64 6.50 16.64 -12.26
7.18 28.13 10.00 28.10 -0.80 6.50 16.64 10.00 20.14 -35.02
-3.11 -219.92 216.81
TOTAL AREAS(M2): 216.81 0.00
7+660.00 -9.23 28.07 -6.00 28.12 -0.57 -9.23 19.24 -6.50 16.51 -28.39
-6.00 28.12 -3.50 28.11 -0.40 -6.50 16.51 -5.50 15.51 -12.26
-3.50 28.11 -1.29 28.15 -0.32 -5.50 15.51 -5.21 15.59 -3.63
-1.29 28.15 0.01 28.25 -0.10 -5.21 15.59 0.00 15.70 -65.82
0.01 28.25 2.60 28.26 -0.05 0.00 15.70 5.21 15.59 -65.82
2.60 28.26 5.38 28.17 -0.16 5.21 15.59 5.50 15.51 -3.63

Página 10
Areas 01/26/2023 03:13:56

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
5.38 28.17 6.99 27.95 -0.34 5.50 15.51 6.50 16.51 -12.26
6.99 27.95 8.48 27.97 -0.47 6.50 16.51 8.48 18.49 -21.34
-2.41 -213.16 210.75
TOTAL AREAS(M2): 210.75 0.00

Página 11
Elevaciones 01/26/2023 03:13:56

ELEVACIONES Y ESPESORES DE TERRENO Y SUBRASANTE


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

ELEVACIONES(M) ESPESORES(M)
ESTACION
TERRENO SUBRASANTE CORTE TERRAPLEN
7+000.00 27.56 15.01 12.55
7+020.00 27.59 15.04 12.55
7+040.00 27.58 15.03 12.55
7+060.00 27.54 14.99 12.55
7+080.00 27.53 14.98 12.55
7+100.00 27.54 14.99 12.55
7+120.00 27.53 14.98 12.55
7+140.00 27.52 14.97 12.55
7+160.00 27.53 14.98 12.55
7+180.00 27.55 15.00 12.55
7+200.00 27.62 15.07 12.55
7+209.45 27.65 15.10 12.55
7+220.00 27.68 15.13 12.55
7+223.25 27.68 15.13 12.55
7+237.05 27.68 15.13 12.55
7+240.00 27.67 15.13 12.55
7+260.00 27.78 15.24 12.55
7+280.00 27.84 15.30 12.55
7+292.25 27.87 15.32 12.55
7+300.00 27.88 15.34 12.55
7+320.00 27.96 15.41 12.55
7+340.00 28.03 15.49 12.55
7+360.00 28.15 15.61 12.55
7+380.00 28.24 15.69 12.55
7+400.00 28.30 15.75 12.55
7+410.06 28.33 15.78 12.55
7+420.00 28.36 15.81 12.55
7+440.00 28.37 15.82 12.55
7+460.00 28.34 15.79 12.55
7+465.26 28.35 15.80 12.55
7+479.06 28.38 15.83 12.55
7+480.00 28.38 15.83 12.55
7+492.86 28.40 15.86 12.55
7+500.00 28.42 15.87 12.55
7+520.00 28.51 15.96 12.55
7+540.00 28.61 16.06 12.55
7+560.00 28.65 16.10 12.55
7+580.00 28.72 16.17 12.55
7+600.00 28.74 16.19 12.55
7+620.00 28.70 16.15 12.55
7+640.00 28.58 16.03 12.55
7+660.00 28.45 15.90 12.55

Página 12
Despalme 01/26/2023 03:13:56

VOLUMENES DE DESPALME EN CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

ESPESORES(M) AREAS(M2) DISTANCIA FACTOR VOLUMENES(M3)


ESTACION
CORTE TERRAPLEN CORTE TERRAPLEN D/2 ABUND. CORTE
7+000.00 0.20 0.20 3.60 0.00 0.00 1.00 0.00
7+020.00 0.20 0.20 3.62 0.00 10.00 1.00 72.27
7+040.00 0.20 0.20 3.73 0.00 10.00 1.00 73.58
7+060.00 0.20 0.20 3.36 0.00 10.00 1.00 70.94
7+080.00 0.20 0.20 3.61 0.00 10.00 1.00 69.68
7+100.00 0.20 0.20 3.68 0.00 10.00 1.00 72.93
7+120.00 0.20 0.20 3.61 0.00 10.00 1.00 72.89
7+140.00 0.20 0.20 3.70 0.00 10.00 1.00 73.08
7+160.00 0.20 0.20 3.57 0.00 10.00 1.00 72.67
7+180.00 0.20 0.20 3.63 0.00 10.00 1.00 71.93
7+200.00 0.20 0.20 3.62 0.00 10.00 1.00 72.45
7+209.45 0.20 0.20 3.49 0.00 4.73 1.00 33.60
7+220.00 0.20 0.20 3.35 0.00 5.27 1.00 36.11
7+223.25 0.20 0.20 3.38 0.00 1.63 1.00 10.94
7+237.05 0.20 0.20 3.47 0.00 6.90 1.00 47.26
7+240.00 0.20 0.20 3.49 0.00 1.47 1.00 10.27
7+260.00 0.20 0.20 3.43 0.00 10.00 1.00 69.29
7+280.00 0.20 0.20 3.45 0.00 10.00 1.00 68.80
7+292.25 0.20 0.20 3.38 0.00 6.13 1.00 41.83
7+300.00 0.20 0.20 3.35 0.00 3.87 1.00 26.07
7+320.00 0.20 0.20 3.55 0.00 10.00 1.00 68.93
7+340.00 0.20 0.20 3.53 0.00 10.00 1.00 70.72
7+360.00 0.20 0.20 3.42 0.00 10.00 1.00 69.44
7+380.00 0.20 0.20 3.46 0.00 10.00 1.00 68.75
7+400.00 0.20 0.20 3.81 0.00 10.00 1.00 72.67
7+410.06 0.20 0.20 3.77 0.00 5.03 1.00 38.13
7+420.00 0.20 0.20 3.73 0.00 4.97 1.00 37.27
7+440.00 0.20 0.20 4.01 0.00 10.00 1.00 77.46
7+460.00 0.20 0.20 3.71 0.00 10.00 1.00 77.22
7+465.26 0.20 0.20 3.69 0.00 2.63 1.00 19.47
7+479.06 0.20 0.20 3.64 0.00 6.90 1.00 50.54
7+480.00 0.20 0.20 3.63 0.00 0.47 1.00 3.40
7+492.86 0.20 0.20 3.69 0.00 6.43 1.00 47.08
7+500.00 0.20 0.20 3.72 0.00 3.57 1.00 26.41
7+520.00 0.20 0.20 2.95 0.00 10.00 1.00 66.66
7+540.00 0.20 0.20 3.75 0.00 10.00 1.00 67.00
7+560.00 0.20 0.20 3.81 0.00 10.00 1.00 75.58
7+580.00 0.20 0.20 3.77 0.00 10.00 1.00 75.81
7+600.00 0.20 0.20 3.65 0.00 10.00 1.00 74.20
7+620.00 0.20 0.20 3.77 0.00 10.00 1.00 74.18
7+640.00 0.20 0.20 3.71 0.00 10.00 1.00 74.79
7+660.00 0.20 0.20 3.55 0.00 10.00 1.00 72.55
TOTAL VOLUMENES DESPALME(M3): 2374.85

NOTA: Los volúmenes de despalme en corte y terraplén han sido afectados por el factor de abundamiento.

Página 13
Despalme 01/26/2023 03:13:56

ES DE DESPALME EN CORTE Y TERRAPLEN


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

VOLUMENES(M3)
TERRAPLEN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

erraplén han sido afectados por el factor de abundamiento.

Página 14
Capas 01/26/2023 03:13:56

VOLUMENES DE CAPAS DE SECCION


Obra: TECNOLOGICO
CURVA
Autor: MIRIAM VALENTIN

CAPA ESTACION AREA(M2) D/2 (M) VOLUMEN(M3)


SUBRASANTE 7+000.00 1.94 0.00 0.00
7+020.00 1.94 10.00 38.86
7+040.00 1.94 10.00 38.86
7+060.00 1.94 10.00 38.86
7+080.00 1.94 10.00 38.86
7+100.00 1.94 10.00 38.86
7+120.00 1.94 10.00 38.86
7+140.00 1.94 10.00 38.86
7+160.00 1.94 10.00 38.86
7+180.00 1.94 10.00 38.86
7+200.00 1.94 10.00 38.86
7+209.45 1.94 4.73 18.36
7+220.00 1.94 5.27 20.47
7+223.25 1.94 1.63 6.30
7+237.05 1.96 6.90 26.88
7+240.00 1.96 1.47 5.78
7+260.00 2.00 10.00 39.65
7+280.00 2.04 10.00 40.44
7+292.25 2.07 6.13 25.19
7+300.00 2.07 3.87 16.04
7+320.00 2.07 10.00 41.40
7+340.00 2.07 10.00 41.40
7+360.00 2.07 10.00 41.40
7+380.00 2.07 10.00 41.40
7+400.00 2.07 10.00 41.40
7+410.06 2.07 5.03 20.83
7+420.00 2.05 4.97 20.46
7+440.00 2.01 10.00 40.54
7+460.00 1.97 10.00 39.74
7+465.26 1.96 2.63 10.33
7+479.06 1.94 6.90 26.88
7+480.00 1.94 0.47 1.81
7+492.86 1.94 6.43 24.96
7+500.00 1.94 3.57 13.86
7+520.00 1.94 10.00 38.79
7+540.00 1.94 10.00 38.79
7+560.00 1.94 10.00 38.86
7+580.00 1.94 10.00 38.86
7+600.00 1.94 10.00 38.86
7+620.00 1.94 10.00 38.86
7+640.00 1.94 10.00 38.86
7+660.00 1.94 10.00 38.86
TOTAL VOLUMEN SUBRASANTE (M3): 1304.86

Página 15
SOBREELEVACIONES Y SOBREANCHOS

CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

BOMBEO AMPLIACION (Ac) Ancho Total de Calzada ENSANCHES (Talud)


DESCRIPCION ESTACION
IZQ DER IZQ DER IZQ DER IZQ DER
7+000.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.20 2.70
7+020.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 2.50
7+040.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.40 3.20
7+060.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 1.50 2.10
7+080.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.00 2.90
7+100.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 1.80 3.50
7+120.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.30 2.70
7+140.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 3.00
7+160.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.30 2.50
7+180.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.20 2.90
7+200.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 2.50
SEC."A" 7+209.45 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 1.74 2.64
7+220.00 -0.5 % -2.0 % 0.00 0.00 4.50 4.50 0.90 2.80
SEC."B" 7+223.25 0.0 % -2.0 % 0.00 0.00 4.50 4.50 1.08 2.73
SEC."C" 7+237.05 2.0 % -2.0 % 0.00 0.12 4.50 4.62 1.84 2.34
7+240.00 2.4 % -2.4 % 0.00 0.15 4.50 4.65 2.00 2.25
7+260.00 5.3 % -5.3 % 0.00 0.32 4.50 4.82 2.50 1.28
7+280.00 8.2 % -8.2 % 0.00 0.49 4.50 4.99 2.30 1.31
SEC."E" 7+292.25 10.0 % -10.0 % 0.00 0.60 4.50 5.10 2.25 0.93
7+300.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 2.50 0.50
7+320.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 2.40 1.60
7+340.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 1.70 2.20
7+360.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 1.50 1.90
7+380.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 1.80 1.80
7+400.00 10.0 % -10.0 % 0.00 0.60 4.50 5.10 2.50 2.90
SEC."E" 7+410.06 10.0 % -10.0 % 0.00 0.60 4.50 5.10 2.37 2.82
7+420.00 8.6 % -8.6 % 0.00 0.51 4.50 5.01 2.60 2.49
7+440.00 5.7 % -5.7 % 0.00 0.34 4.50 4.84 3.50 3.16
7+460.00 2.8 % -2.8 % 0.00 0.17 4.50 4.67 2.50 2.83
SEC."C" 7+465.26 2.0 % -2.0 % 0.00 0.12 4.50 4.62 2.32 2.96
SEC."B" 7+479.06 0.0 % -2.0 % 0.00 0.00 4.50 4.50 1.83 3.29
7+480.00 -0.1 % -2.0 % 0.00 0.00 4.50 4.50 1.80 3.30
SEC."A" 7+492.86 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.25 3.11
7+500.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 3.00
7+520.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 0.50 3.20
7+540.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.20 3.50
7+560.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 3.50
7+580.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 3.30
7+600.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.00 3.20
7+620.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.50 3.30
7+640.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.00 3.50
7+660.00 -2.0 % -2.0 % 0.00 0.00 4.50 4.50 2.73 1.98

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
1
2
3
4 CAMINO:
5 TRAMO: ESTACION:
6 SUBTRAMO: ORIGEN:
7
8 ESTACION ELEVACION
DISTANCIA
ELEVACIONES
9 IZQ DER
10
11 7+000.000 15.010 0.000 15.010
12 8.700 17.820
13 6.500 15.620
14 5.500 14.620
15 5.214 14.706
16 4.500 14.920
17 4.500 14.920
18 5.214 14.706
19 5.500 14.620
20 6.500 15.620
21 9.200 18.320
22 7+020.000 15.040 0.000 15.040
23 9.000 18.150
24 6.500 15.650
25 5.500 14.650
26 5.214 14.736
27 4.500 14.950
28 4.500 14.950
29 5.214 14.736
30 5.500 14.650
31 6.500 15.650
32 9.000 18.150
33 7+040.000 15.030 0.000 15.030
34 8.900 18.040
35 6.500 15.640
36 5.500 14.640
37 5.214 14.726
38 4.500 14.940
39 4.500 14.940
40 5.214 14.726
41 5.500 14.640
42 6.500 15.640
43 9.700 18.840
44 7+060.000 14.990 0.000 14.990
45 8.000 17.100
46 6.500 15.600
47 5.500 14.600
48 5.214 14.686
49 4.500 14.900
50 4.500 14.900
51 5.214 14.686
52 5.500 14.600
53 6.500 15.600
54 8.600 17.700
55 7+080.000 14.980 0.000 14.980
56 8.500 17.590
57 6.500 15.590
58 5.500 14.590
59 5.214 14.676

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
60 4.500 14.890
61 4.500 14.890
62 5.214 14.676
63 5.500 14.590
64 6.500 15.590
65 9.400 18.490
66 7+100.000 14.990 0.000 14.990
67 8.300 17.400
68 6.500 15.600
69 5.500 14.600
70 5.214 14.686
71 4.500 14.900
72 4.500 14.900
73 5.214 14.686
74 5.500 14.600
75 6.500 15.600
76 10.000 19.100
77 7+120.000 14.980 0.000 14.980
78 8.800 17.890
79 6.500 15.590
80 5.500 14.590
81 5.214 14.676
82 4.500 14.890
83 4.500 14.890
84 5.214 14.676
85 5.500 14.590
86 6.500 15.590
87 9.200 18.290
88 7+140.000 14.970 0.000 14.970
89 9.000 18.080
90 6.500 15.580
91 5.500 14.580
92 5.214 14.666
93 4.500 14.880
94 4.500 14.880
95 5.214 14.666
96 5.500 14.580
97 6.500 15.580
98 9.500 18.580
99 7+160.000 14.980 0.000 14.980
100 8.800 17.890
101 6.500 15.590
102 5.500 14.590
103 5.214 14.676
104 4.500 14.890
105 4.500 14.890
106 5.214 14.676
107 5.500 14.590
108 6.500 15.590
109 9.000 18.090
110 7+180.000 15.000 0.000 15.000
111 8.700 17.810
112 6.500 15.610
113 5.500 14.610
114 5.214 14.696
115 4.500 14.910
116 4.500 14.910
117 5.214 14.696
118 5.500 14.610

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
119 6.500 15.610
120 9.400 18.510
121 7+200.000 15.070 0.000 15.070
122 9.000 18.180
123 6.500 15.680
124 5.500 14.680
125 5.214 14.766
126 4.500 14.980
127 4.500 14.980
128 5.214 14.766
129 5.500 14.680
130 6.500 15.680
131 9.000 18.180
132 7+209.452 15.098 0.000 15.098
133 8.244 17.452
134 6.500 15.708
135 5.500 14.708
136 5.214 14.794
137 4.500 15.008
138 4.500 15.008
139 5.214 14.794
140 5.500 14.708
141 6.500 15.708
142 9.142 18.350
143 7+220.000 15.130 0.000 15.130
144 7.400 16.709
145 6.500 15.809
146 5.500 14.809
147 5.177 14.906
148 4.500 15.109
149 4.500 15.040
150 5.214 14.826
151 5.500 14.740
152 6.500 15.740
153 9.300 18.540
154 7+223.252 15.130 0.000 15.130
155 7.579 16.909
156 6.500 15.830
157 5.500 14.830
158 5.167 14.930
159 4.500 15.130
160 4.500 15.040
161 5.214 14.825
162 5.500 14.740
163 6.500 15.740
164 9.235 18.475
165 7+237.052 15.128 0.000 15.128
166 8.338 17.756
167 6.500 15.918
168 5.500 14.918
169 5.125 15.031
170 4.500 15.218
171 4.620 15.036
172 5.334 14.822
173 5.620 14.736
174 6.620 15.736
175 8.959 18.075
176 7+240.000 15.128 0.000 15.128
177 8.500 17.937

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
178 6.500 15.937
179 5.500 14.937
180 5.117 15.052
181 4.500 15.237
182 4.646 15.015
183 5.371 14.798
184 5.646 14.715
185 6.646 15.715
186 8.900 17.970
187 7+260.000 15.238 0.000 15.238
188 9.000 18.678
189 6.500 16.178
190 5.500 15.178
191 5.066 15.308
192 4.500 15.478
193 4.820 14.981
194 5.630 14.738
195 5.820 14.681
196 6.820 15.681
197 8.100 16.962
198 7+280.000 15.298 0.000 15.298
199 8.800 18.668
200 6.500 16.368
201 5.500 15.368
202 5.023 15.511
203 4.500 15.668
204 4.993 14.887
205 5.912 14.612
206 5.993 14.587
207 6.993 15.587
208 8.300 16.894
209 7+292.252 15.323 0.000 15.323
210 8.751 18.723
211 6.500 16.473
212 5.500 15.473
213 5.000 15.623
214 4.500 15.773
215 5.100 14.813
216 6.100 14.513
217 6.100 14.513
218 7.100 15.513
219 8.033 16.446
220 7+300.000 15.338 0.000 15.338
221 9.000 18.988
222 6.500 16.488
223 5.500 15.488
224 5.000 15.638
225 4.500 15.788
226 5.100 14.828
227 6.100 14.528
228 6.100 14.528
229 7.100 15.528
230 7.600 16.028
231 7+320.000 15.408 0.000 15.408
232 8.900 18.958
233 6.500 16.558
234 5.500 15.558
235 5.000 15.708
236 4.500 15.858

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
237 5.100 14.898
238 6.100 14.598
239 6.100 14.598
240 7.100 15.598
241 8.700 17.198
242 7+340.000 15.488 0.000 15.488
243 8.200 18.338
244 6.500 16.638
245 5.500 15.638
246 5.000 15.788
247 4.500 15.938
248 5.100 14.978
249 6.100 14.678
250 6.100 14.678
251 7.100 15.678
252 9.300 17.878
253 7+360.000 15.608 0.000 15.608
254 8.000 18.258
255 6.500 16.758
256 5.500 15.758
257 5.000 15.908
258 4.500 16.058
259 5.100 15.098
260 6.100 14.798
261 6.100 14.798
262 7.100 15.798
263 9.000 17.698
264 7+380.000 15.690 0.000 15.690
265 8.300 18.640
266 6.500 16.840
267 5.500 15.840
268 5.000 15.990
269 4.500 16.140
270 5.100 15.180
271 6.100 14.880
272 6.100 14.880
273 7.100 15.880
274 8.900 17.680
275 7+400.000 15.750 0.000 15.750
276 9.000 19.400
277 6.500 16.900
278 5.500 15.900
279 5.000 16.050
280 4.500 16.200
281 5.100 15.240
282 6.100 14.940
283 6.100 14.940
284 7.100 15.940
285 10.000 18.840
286 7+410.064 15.780 0.000 15.780
287 8.870 19.300
288 6.500 16.930
289 5.500 15.930
290 5.000 16.080
291 4.500 16.230
292 5.100 15.270
293 6.100 14.970
294 6.100 14.970
295 7.100 15.970

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
296 9.918 18.788
297 7+420.000 15.810 0.000 15.810
298 9.100 19.495
299 6.500 16.895
300 5.500 15.895
301 5.019 16.040
302 4.500 16.195
303 5.014 15.381
304 5.946 15.101
305 6.014 15.081
306 7.014 16.081
307 9.500 18.567
308 7+440.000 15.820 0.000 15.820
309 10.000 20.275
310 6.500 16.775
311 5.500 15.775
312 5.061 15.907
313 4.500 16.075
314 4.840 15.546
315 5.661 15.299
316 5.840 15.246
317 6.840 16.246
318 10.000 19.406
319 7+460.000 15.790 0.000 15.790
320 9.000 19.114
321 6.500 16.614
322 5.500 15.614
323 5.110 15.731
324 4.500 15.914
325 4.666 15.661
326 5.400 15.441
327 5.666 15.361
328 6.666 16.361
329 9.500 19.195
330 7+465.264 15.801 0.000 15.801
331 8.816 18.906
332 6.500 16.591
333 5.500 15.591
334 5.125 15.703
335 4.500 15.891
336 4.620 15.708
337 5.334 15.494
338 5.620 15.408
339 6.620 16.408
340 9.579 19.367
341 7+479.064 15.828 0.000 15.828
342 8.333 18.361
343 6.500 16.528
344 5.500 15.528
345 5.167 15.628
346 4.500 15.828
347 4.500 15.738
348 5.214 15.524
349 5.500 15.438
350 6.500 16.438
351 9.786 19.724
352 7+480.000 15.830 0.000 15.830
353 8.300 18.324
354 6.500 16.524

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
355 5.500 15.524
356 5.170 15.623
357 4.500 15.824
358 4.500 15.740
359 5.214 15.526
360 5.500 15.440
361 6.500 16.440
362 9.800 19.740
363 7+492.864 15.856 0.000 15.856
364 8.750 18.716
365 6.500 16.466
366 5.500 15.466
367 5.214 15.551
368 4.500 15.766
369 4.500 15.766
370 5.214 15.551
371 5.500 15.466
372 6.500 16.466
373 9.607 19.573
374 7+500.000 15.870 0.000 15.870
375 9.000 18.980
376 6.500 16.480
377 5.500 15.480
378 5.214 15.566
379 4.500 15.780
380 4.500 15.780
381 5.214 15.566
382 5.500 15.480
383 6.500 16.480
384 9.500 19.480
385 7+520.000 15.960 0.000 15.960
386 5.000 15.660
387 5.000 15.660
388 4.500 15.870
389 4.500 15.870
390 5.214 15.656
391 5.500 15.570
392 6.500 16.570
393 9.700 19.770
394 7+540.000 16.060 0.000 16.060
395 8.700 18.870
396 6.500 16.670
397 5.500 15.670
398 5.214 15.756
399 4.500 15.970
400 4.500 15.970
401 5.214 15.756
402 5.500 15.670
403 6.500 16.670
404 10.000 20.170
405 7+560.000 16.100 0.000 16.100
406 9.000 19.210
407 6.500 16.710
408 5.500 15.710
409 5.214 15.796
410 4.500 16.010
411 4.500 16.010
412 5.214 15.796
413 5.500 15.710

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
414 6.500 16.710
415 10.000 20.210
416 7+580.000 16.170 0.000 16.170
417 9.000 19.280
418 6.500 16.780
419 5.500 15.780
420 5.214 15.866
421 4.500 16.080
422 4.500 16.080
423 5.214 15.866
424 5.500 15.780
425 6.500 16.780
426 9.800 20.080
427 7+600.000 16.189 0.000 16.189
428 8.500 18.799
429 6.500 16.799
430 5.500 15.799
431 5.214 15.885
432 4.500 16.099
433 4.500 16.099
434 5.214 15.885
435 5.500 15.799
436 6.500 16.799
437 9.700 19.999
438 7+620.000 16.149 0.000 16.149
439 9.000 19.259
440 6.500 16.759
441 5.500 15.759
442 5.214 15.845
443 4.500 16.059
444 4.500 16.059
445 5.214 15.845
446 5.500 15.759
447 6.500 16.759
448 9.800 20.059
449 7+640.000 16.029 0.000 16.029
450 8.500 18.639
451 6.500 16.639
452 5.500 15.639
453 5.214 15.725
454 4.500 15.939
455 4.500 15.939
456 5.214 15.725
457 5.500 15.639
458 6.500 16.639
459 10.000 20.139
460 7+660.000 15.899 0.000 15.899
461 9.231 19.240
462 6.500 16.509
463 5.500 15.509
464 5.214 15.595
465 4.500 15.809
466 4.500 15.809
467 5.214 15.595
468 5.500 15.509
469 6.500 16.509
470 8.482 18.491

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
1
2
3
4
5
6
7
8 DESCRIPCION
9
10
11 CL
12 Cero
13
14
15 Hombro Terracerías
16 Hombro Subrasante
17 Hombro Subrasante
18 Hombro Terracerías
19
20
21 Cero
22 CL
23 Cero
24
25
26 Hombro Terracerías
27 Hombro Subrasante
28 Hombro Subrasante
29 Hombro Terracerías
30
31
32 Cero
33 CL
34 Cero
35
36
37 Hombro Terracerías
38 Hombro Subrasante
39 Hombro Subrasante
40 Hombro Terracerías
41
42
43 Cero
44 CL
45 Cero
46
47
48 Hombro Terracerías
49 Hombro Subrasante
50 Hombro Subrasante
51 Hombro Terracerías
52
53
54 Cero
55 CL
56 Cero
57
58
59 Hombro Terracerías

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
60 Hombro Subrasante
61 Hombro Subrasante
62 Hombro Terracerías
63
64
65 Cero
66 CL
67 Cero
68
69
70 Hombro Terracerías
71 Hombro Subrasante
72 Hombro Subrasante
73 Hombro Terracerías
74
75
76 Cero
77 CL
78 Cero
79
80
81 Hombro Terracerías
82 Hombro Subrasante
83 Hombro Subrasante
84 Hombro Terracerías
85
86
87 Cero
88 CL
89 Cero
90
91
92 Hombro Terracerías
93 Hombro Subrasante
94 Hombro Subrasante
95 Hombro Terracerías
96
97
98 Cero
99 CL
100 Cero
101
102
103 Hombro Terracerías
104 Hombro Subrasante
105 Hombro Subrasante
106 Hombro Terracerías
107
108
109 Cero
110 CL
111 Cero
112
113
114 Hombro Terracerías
115 Hombro Subrasante
116 Hombro Subrasante
117 Hombro Terracerías
118

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
119
120 Cero
121 CL
122 Cero
123
124
125 Hombro Terracerías
126 Hombro Subrasante
127 Hombro Subrasante
128 Hombro Terracerías
129
130
131 Cero
132 CL
133 Cero
134
135
136 Hombro Terracerías
137 Hombro Subrasante
138 Hombro Subrasante
139 Hombro Terracerías
140
141
142 Cero
143 CL
144 Cero
145
146
147 Hombro Terracerías
148 Hombro Subrasante
149 Hombro Subrasante
150 Hombro Terracerías
151
152
153 Cero
154 CL
155 Cero
156
157
158 Hombro Terracerías
159 Hombro Subrasante
160 Hombro Subrasante
161 Hombro Terracerías
162
163
164 Cero
165 CL
166 Cero
167
168
169 Hombro Terracerías
170 Hombro Subrasante
171 Hombro Subrasante
172 Hombro Terracerías
173
174
175 Cero
176 CL
177 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
178
179
180 Hombro Terracerías
181 Hombro Subrasante
182 Hombro Subrasante
183 Hombro Terracerías
184
185
186 Cero
187 CL
188 Cero
189
190
191 Hombro Terracerías
192 Hombro Subrasante
193 Hombro Subrasante
194 Hombro Terracerías
195
196
197 Cero
198 CL
199 Cero
200
201
202 Hombro Terracerías
203 Hombro Subrasante
204 Hombro Subrasante
205 Hombro Terracerías
206
207
208 Cero
209 CL
210 Cero
211
212
213 Hombro Terracerías
214 Hombro Subrasante
215 Hombro Subrasante
216 Hombro Terracerías
217
218
219 Cero
220 CL
221 Cero
222
223
224 Hombro Terracerías
225 Hombro Subrasante
226 Hombro Subrasante
227 Hombro Terracerías
228
229
230 Cero
231 CL
232 Cero
233
234
235 Hombro Terracerías
236 Hombro Subrasante

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
237 Hombro Subrasante
238 Hombro Terracerías
239
240
241 Cero
242 CL
243 Cero
244
245
246 Hombro Terracerías
247 Hombro Subrasante
248 Hombro Subrasante
249 Hombro Terracerías
250
251
252 Cero
253 CL
254 Cero
255
256
257 Hombro Terracerías
258 Hombro Subrasante
259 Hombro Subrasante
260 Hombro Terracerías
261
262
263 Cero
264 CL
265 Cero
266
267
268 Hombro Terracerías
269 Hombro Subrasante
270 Hombro Subrasante
271 Hombro Terracerías
272
273
274 Cero
275 CL
276 Cero
277
278
279 Hombro Terracerías
280 Hombro Subrasante
281 Hombro Subrasante
282 Hombro Terracerías
283
284
285 Cero
286 CL
287 Cero
288
289
290 Hombro Terracerías
291 Hombro Subrasante
292 Hombro Subrasante
293 Hombro Terracerías
294
295

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
296 Cero
297 CL
298 Cero
299
300
301 Hombro Terracerías
302 Hombro Subrasante
303 Hombro Subrasante
304 Hombro Terracerías
305
306
307 Cero
308 CL
309 Cero
310
311
312 Hombro Terracerías
313 Hombro Subrasante
314 Hombro Subrasante
315 Hombro Terracerías
316
317
318 Cero
319 CL
320 Cero
321
322
323 Hombro Terracerías
324 Hombro Subrasante
325 Hombro Subrasante
326 Hombro Terracerías
327
328
329 Cero
330 CL
331 Cero
332
333
334 Hombro Terracerías
335 Hombro Subrasante
336 Hombro Subrasante
337 Hombro Terracerías
338
339
340 Cero
341 CL
342 Cero
343
344
345 Hombro Terracerías
346 Hombro Subrasante
347 Hombro Subrasante
348 Hombro Terracerías
349
350
351 Cero
352 CL
353 Cero
354

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
355
356 Hombro Terracerías
357 Hombro Subrasante
358 Hombro Subrasante
359 Hombro Terracerías
360
361
362 Cero
363 CL
364 Cero
365
366
367 Hombro Terracerías
368 Hombro Subrasante
369 Hombro Subrasante
370 Hombro Terracerías
371
372
373 Cero
374 CL
375 Cero
376
377
378 Hombro Terracerías
379 Hombro Subrasante
380 Hombro Subrasante
381 Hombro Terracerías
382
383
384 Cero
385 CL
386 Hombro Terracerías
387 Cero
388 Hombro Subrasante
389 Hombro Subrasante
390 Hombro Terracerías
391
392
393 Cero
394 CL
395 Cero
396
397
398 Hombro Terracerías
399 Hombro Subrasante
400 Hombro Subrasante
401 Hombro Terracerías
402
403
404 Cero
405 CL
406 Cero
407
408
409 Hombro Terracerías
410 Hombro Subrasante
411 Hombro Subrasante
412 Hombro Terracerías
413

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
414
415 Cero
416 CL
417 Cero
418
419
420 Hombro Terracerías
421 Hombro Subrasante
422 Hombro Subrasante
423 Hombro Terracerías
424
425
426 Cero
427 CL
428 Cero
429
430
431 Hombro Terracerías
432 Hombro Subrasante
433 Hombro Subrasante
434 Hombro Terracerías
435
436
437 Cero
438 CL
439 Cero
440
441
442 Hombro Terracerías
443 Hombro Subrasante
444 Hombro Subrasante
445 Hombro Terracerías
446
447
448 Cero
449 CL
450 Cero
451
452
453 Hombro Terracerías
454 Hombro Subrasante
455 Hombro Subrasante
456 Hombro Terracerías
457
458
459 Cero
460 CL
461 Cero
462
463
464 Hombro Terracerías
465 Hombro Subrasante
466 Hombro Subrasante
467 Hombro Terracerías
468
469
470 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

NOTA: Los conceptos que se incluirán


SIMBOLOGIA en el cálculo de volúmenes aparecen
DC DESPALME EN CORTE subrayados. Se ha considerado el
DT DESPALME EN TERRAPLEN
terreno ya despalmado al calcular áreas
y volúmenes de corte y terraplén.
C CORTE
T TERRAPLEN
SBR SUBRASANTE

COORDENADA INICIAL DE CURVA


MASA 10,000.00 AREAS VOLUME
SECCIONES DE ELEVACIONES ESPESORES DESPALME Factor de DESPALME
TN SEMI-
LEVANTADAS
C T SBR abundamiento DISTANCIA
EN CAMPO TN SUBRASANTE C T DC DT en corte DC DT

7+000.000 27.557 15.010 12.55 0.00 3.60 0.00 214.75 0.00 1.94
7+020.000 27.587 15.040 12.55 0.00 3.62 0.00 216.49 0.00 1.94 1.00 10.00 72.27 0.00
7+040.000 27.577 15.030 12.55 0.00 3.73 0.00 223.76 0.00 1.94 1.00 10.00 73.58 0.00
7+060.000 27.537 14.990 12.55 0.00 3.36 0.00 205.91 0.00 1.94 1.00 10.00 70.94 0.00
7+080.000 27.527 14.980 12.55 0.00 3.61 0.00 217.41 0.00 1.94 1.00 10.00 69.68 0.00
7+100.000 27.537 14.990 12.55 0.00 3.68 0.00 220.50 0.00 1.94 1.00 10.00 72.93 0.00
7+120.000 27.527 14.980 12.55 0.00 3.61 0.00 215.10 0.00 1.94 1.00 10.00 72.89 0.00
7+140.000 27.517 14.970 12.55 0.00 3.70 0.00 217.95 0.00 1.94 1.00 10.00 73.08 0.00
7+160.000 27.527 14.980 12.55 0.00 3.57 0.00 210.78 0.00 1.94 1.00 10.00 72.67 0.00
7+180.000 27.547 15.000 12.55 0.00 3.63 0.00 212.17 0.00 1.94 1.00 10.00 71.93 0.00
7+200.000 27.617 15.070 12.55 0.00 3.62 0.00 210.95 0.00 1.94 1.00 10.00 72.45 0.00
7+209.452 27.645 15.098 12.55 0.00 3.49 0.00 205.06 0.00 1.94 1.00 4.73 33.60 0.00
7+220.000 27.677 15.130 12.55 0.00 3.35 0.00 197.57 0.00 1.94 1.00 5.27 36.11 0.00
7+223.252 27.677 15.130 12.55 0.00 3.38 0.00 198.65 0.00 1.94 1.00 1.63 10.94 0.00
7+237.052 27.675 15.128 12.55 0.00 3.47 0.00 203.30 0.00 1.96 1.00 6.90 47.26 0.00
7+240.000 27.675 15.128 12.55 0.00 3.49 0.00 204.35 0.00 1.96 1.00 1.47 10.27 0.00
7+260.000 27.785 15.238 12.55 0.00 3.43 0.00 201.04 0.00 2.00 1.00 10.00 69.29 0.00
7+280.000 27.845 15.298 12.55 0.00 3.45 0.00 201.09 0.00 2.04 1.00 10.00 68.80 0.00
7+292.252 27.870 15.323 12.55 0.00 3.38 0.00 197.91 0.00 2.07 1.00 6.13 41.83 0.00
7+300.000 27.885 15.338 12.55 0.00 3.35 0.00 195.24 0.00 2.07 1.00 3.87 26.07 0.00
7+320.000 27.955 15.408 12.55 0.00 3.55 0.00 205.51 0.00 2.07 1.00 10.00 68.93 0.00
7+340.000 28.035 15.488 12.55 0.00 3.53 0.00 205.39 0.00 2.07 1.00 10.00 70.72 0.00
7+360.000 28.155 15.608 12.55 0.00 3.42 0.00 202.83 0.00 2.07 1.00 10.00 69.44 0.00
7+380.000 28.237 15.690 12.55 0.00 3.46 0.00 205.39 0.00 2.07 1.00 10.00 68.75 0.00
7+400.000 28.297 15.750 12.55 0.00 3.81 0.00 223.44 0.00 2.07 1.00 10.00 72.67 0.00
7+410.064 28.327 15.780 12.55 0.00 3.77 0.00 220.10 0.00 2.07 1.00 5.03 38.13 0.00
7+420.000 28.357 15.810 12.55 0.00 3.73 0.00 216.84 0.00 2.05 1.00 4.97 37.27 0.00
7+440.000 28.367 15.820 12.55 0.00 4.01 0.00 227.52 0.00 2.01 1.00 10.00 77.46 0.00
7+460.000 28.337 15.790 12.55 0.00 3.71 0.00 215.94 0.00 1.97 1.00 10.00 77.22 0.00
7+465.264 28.348 15.801 12.55 0.00 3.69 0.00 214.84 0.00 1.96 1.00 2.63 19.47 0.00
7+479.064 28.375 15.828 12.55 0.00 3.64 0.00 212.26 0.00 1.94 1.00 6.90 50.54 0.00
7+480.000 28.377 15.830 12.55 0.00 3.63 0.00 212.10 0.00 1.94 1.00 0.47 3.40 0.00
7+492.864 28.403 15.856 12.55 0.00 3.69 0.00 216.25 0.00 1.94 1.00 6.43 47.08 0.00
7+500.000 28.417 15.870 12.55 0.00 3.72 0.00 218.16 0.00 1.94 1.00 3.57 26.41 0.00
7+520.000 28.507 15.960 12.55 0.00 2.95 0.00 176.93 0.00 1.94 1.00 10.00 66.66 0.00
7+540.000 28.607 16.060 12.55 0.00 3.75 0.00 220.01 0.00 1.94 1.00 10.00 67.00 0.00
7+560.000 28.647 16.100 12.55 0.00 3.81 0.00 223.98 0.00 1.94 1.00 10.00 75.58 0.00
7+580.000 28.717 16.170 12.55 0.00 3.77 0.00 221.80 0.00 1.94 1.00 10.00 75.81 0.00
7+600.000 28.736 16.189 12.55 0.00 3.65 0.00 216.41 0.00 1.94 1.00 10.00 74.20 0.00
7+620.000 28.696 16.149 12.55 0.00 3.77 0.00 219.99 0.00 1.94 1.00 10.00 74.18 0.00
7+640.000 28.576 16.029 12.55 0.00 3.71 0.00 216.81 0.00 1.94 1.00 10.00 74.79 0.00
7+660.000 28.446 15.899 12.55 0.00 3.55 0.00 210.75 0.00 1.94 1.00 10.00 72.55 0.00
VOLUMENES

RESUMEN (ORDENADAS DE LA
C T SBR
CURVA MASA)

7+000.000 10,000.00
4312.38 0.00 38.86 7+020.000 14,312.38
4402.47 0.00 38.86 7+040.000 18,714.86
4296.73 0.00 38.86 7+060.000 23,011.58
4233.18 0.00 38.86 7+080.000 27,244.76
4379.06 0.00 38.86 7+100.000 31,623.82
4356.03 0.00 38.86 7+120.000 35,979.85
4330.50 0.00 38.86 7+140.000 40,310.34
4287.22 0.00 38.86 7+160.000 44,597.57
4229.42 0.00 38.86 7+180.000 48,826.99
4231.21 0.00 38.86 7+200.000 53,058.20
1965.99 0.00 18.36 7+209.452 55,024.19
2123.51 0.00 20.47 7+220.000 57,147.70
644.17 0.00 6.30 7+223.252 57,791.86
2773.47 0.00 26.88 7+237.052 60,565.33
600.96 0.00 5.78 7+240.000 61,166.29
4053.90 0.00 39.65 7+260.000 65,220.19
4021.36 0.00 40.44 7+280.000 69,241.55
2444.20 0.00 25.19 7+292.252 71,685.75
1523.11 0.00 16.04 7+300.000 73,208.86
4007.41 0.00 41.40 7+320.000 77,216.27
4108.92 0.00 41.40 7+340.000 81,325.19
4082.14 0.00 41.40 7+360.000 85,407.33
4082.19 0.00 41.40 7+380.000 89,489.51
4288.31 0.00 41.40 7+400.000 93,777.83
2231.84 0.00 20.83 7+410.064 96,009.67
2170.74 0.00 20.46 7+420.000 98,180.40
4443.60 0.00 40.54 7+440.000 102,624.00
4434.60 0.00 39.74 7+460.000 107,058.60
1133.77 0.00 10.33 7+465.264 108,192.37
2946.98 0.00 26.88 7+479.064 111,139.35
198.64 0.00 1.81 7+480.000 111,337.99
2755.10 0.00 24.96 7+492.864 114,093.09
1550.01 0.00 13.86 7+500.000 115,643.10
3950.94 0.00 38.79 7+520.000 119,594.04
3969.45 0.00 38.79 7+540.000 123,563.49
4439.98 0.00 38.86 7+560.000 128,003.47
4457.85 0.00 38.86 7+580.000 132,461.32
4382.11 0.00 38.86 7+600.000 136,843.42
4364.04 0.00 38.86 7+620.000 141,207.46
4368.06 0.00 38.86 7+640.000 145,575.52
4275.67 0.00 38.86 7+660.000 149,851.19