TABLE OF CONTENTS
1. PURPOSE............................................................................................................................................5
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
2. DEFINITION.......................................................................................................................................5
3. PROGRESS SUMMARY.......................................................................................................................5
1. PURPOSE
This document creating for inform work progress report period XXXXX, Lamipak
Indonesia New Plant Project.
2. DEFINITION
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
3. PROGRESS SUMMARY
Below explained achievement progress work for this Monthly period XXXXX
Plan : 0.0000 %
Actual : 0.0000 %
Deviation : 0.0000 %
Length of the delays / Acceleration achievement: ….. days
Cumulative Delays / Acceleration until this week: ….. days
C PILING WORK WITH HSPD 1.00 ls 4.865% 0.000% 0.000% 0.000% 0.000%
D PILING WORK WITH PILING RIG + DD55 1.00 ls 4.728% 0.000% 0.000% 0.000% 0.000%
Actual : 0.0000 %
Deviation: 0.0000 %
1. Activity:
XXXXX
XXXXX
2. Main Issues:
XXXXX
XXXXX
3. Issues Action Taken:
XXXXX
XXXXX
1. Activity:
XXXXX
XXXXX
2. Main Issues:
XXXXX
XXXXX
3. Issues Action Taken:
XXXXX
XXXXX
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
1. Activity:
XXXXX
XXXXX
2. Main Issues:
XXXXX
XXXXX
3. Issues Action Taken:
XXXXX
XXXXX
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
E PEKERJAAN TEST
(Test dilakukan di eksisting level)
1 Axial Loading Test menggunakan bebean Jacking 17.000 nos 5.071% - - - 0.000% - 0.000%
2 PDA Test 44.000 nos 2.297% - - - 0.000% - 0.000%
3 PIT Test 533.000 nos 5.068% - - - 0.000% - 0.000%
4 Loadcell (jika diperlukan) 1.000 nos
SUB TOTAL PEKERJAAN TEST TIANG 12.436% - 0.000% 0.000%
100.000% - 0.000% 0.000%
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
S-CURVE
LAMIPAK INDONESIA NEW PLANT PROJECT
35.00% 100.00%
30.00%
80.00%
25.00%
20.00% 60.00%
15.00%
10.00% 40.00%
5.00%
20.00%
0.00%
-5.00% 0.00%
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15
PT LAMI PACKAGING INDONESIA CONRACTOR XXXXXX
8. MONTHLY MANPOWER
12. PHOTOGRAPH
No Documentation Remarks
1 ACTIVITY
PHOTO