BLDG
E 3005/MAR-19 (PROP.CURVE UP M/L ) T.C.L.= 65.756m E CONVERTED INTO L.H.S. BLDG BLDG BLDG BLDG
4. 363.900 364.750 850.00 FALL 1 IN 400 2110.00 1260.00 4. 104/A COMPOSITE GIRDER 2x12.2m / 2 x 12.2m 364 / 17 - 19 / 364.837 TO BE EXTENDED AS 2 x 12.2 M COMP. GIRDER 4. 99 RC BOX / ARCH 1x1.0m / 1x0.91m 367 / 17 - 19 / 367.712 TO BE EXTENDED AS 1 x 1.2 M RCC BOX 4. 369.750 370.100 350.00 LEVEL 3740.00 4090.00 6. FUTURE WORK
4 47 361/17-19 / ( 361.487 ) M C JPL - HDN HDN NO T.R.L.= 55.0m 4 39 368/21-23 / ( 368.607 ) M C E KYF - JPL JPL NO E.C RAILWAY BOUNDARY
E 18519/MAR-19 Delta Angle=1°32'32.55'' KM:366.01(WTT) 2165/DEC-19 TOBECONVERTEDINTOL.H.S. BLDG
BLDG
LEVEL T.L.= 32.880m
BLDG PRO. GOODS PAVED PF ( 750.0 M X 20.0M ) E.C RAILWAY BOUNDARY
R 444
LINE NO. 7 OVERRUNLNIE120mLONG
5. 103 FC SLAB / ARCH 1x1.83m / 1x1.83m 365 / 03 - 05 / 365.253 TO BE EXTENDED AS 1 x 2.0 M RCC BOX Radius=2500m(0.70°) 5. 98 RCC BOX / FC SLAB 1x1.0m / 1x0.61m 367 / 21 - 23 / 367.865 TO BE EXTENDED AS 1 x 1.2 M RCC BOX BLDG
5 49 359/17-19 / ( 359.761 ) M C T JPL - HDN HDN 14716/MAR-19 YES L.H.S. SANCTIONED 5. 364.750 365.000 250.00 LEVEL 1260.00 1010.00 T.C.L.= 67.298m SP= 120KmPh (FROM GOMOH) F 530 PROP UP MAIN LINE
HG HG
LINE NO. 6
LINE NO. 6
1IN12(CS) 1IN12(CS)
1IN12(CS)
PRO. OVER RUN LINE 120m LONG
Km.-365.594
FLOW
FL:-144.743
LEVEL F 204 F 565 PVT 1IN12(CS) COMMON GOODS LINE LINE NO. 5 1IN12(CS) OVER RUN LINE 120m LONG
CH:-416.0m
1IN12(CS)
6. 102 RC BOX / FLAT TOP 1x1.0m / 1x0.61m 365 / 11 - 15 / 365.619 TO BE EXTENDED AS 1 x 1.5 M RCC BOX T.R.L.= 55.0m Ca= 39.5mm, Cd= 39.5mm 6. 97 RC BOX / OPEN TOP 1x1.0m / 1x0.61m 368 / 07 - 09 / 368.216 TO BE EXTENDED AS 1 x 1.2 M RCC BOX BLDG DE
OVERUNLIE120mLONG\
1IN12(CS) PROP. UP MAIN LINE LINE NO. 4
LINE NO. 5 LINE NO. 5 1IN12(CS) 1IN12(CS) DE
TS
Signature block
6. 365.000 365.700 700.00 RISE 1 IN 400 1010.00 310.00 PROP UP MAIN LINE PROP UP MAIN LINE
CH.0.00 PROP.REVERSIBLE LINE 1IN12(CS) PROP UP MAIN LINE LINE NO. 4
PROP. REVERSIBLE LINE PROP. COMMON LINE LINE NO. 3 1IN12(CS)
T.L.= 33.651m 1IN12(CS) 1IN12(CS) 1IN12(CS) 1IN12(CS)
H.L. UP PF ( 500.0 M X 7.30M )
1IN12(CS) EXIST. UP MAIN LINE PROP.REVERSIBLE LINE
UPTO Km.-363.020 7. 96 RC BOX / FC SLAB 3x1.0m / 3x0.61m 368 / 09 - 11 / 368.270 TO BE EXTENDED AS 3 x 1.5 M RCC BOX DN MAIN LINE 1IN12(CS) LINE NO. 2 EXG. DN MAIN LINE EXG. DN MAIN LINE 1:12(CS) 1IN12(CS) 1IN12(CS) DN MAIN LINE
Km.-366.850
SAND HUMP
R 1180 95
F 489 8. TO BE EXTENDED AS 1 x 1.2 M RCC BOX CPDE
FL:-144.555
Km.-363.480
CH:-840.0m
1:8.5(CS
LEVEL STATION ROAD
FLOW
FLOW
FLOW
FLOW
FLOW
HG HG MACHINE SIDING CAL-226.478M
FLOW
KM 7.02 KM 7.45 KAJRAT NAWADIH Delta Angle=1°31'19.383''
BLDG STORE RPF
TOWER
FLOW
(CURVE NO- 48 (RH) ) R 444 HAIDAR NAGAR 9. 94 RCC BOX / ARCH 1x1.0m / 1x0.91m 368 / 17 - 19 / 368.486 TO BE EXTENDED AS 1 x 1.2 M RCC BOX
STNS. BUILDING
SE / WORKS / GODOWN (TEM.) SE / P- WAY/ GODOWN (TEM.)
WAGON SHED PROP. WEST E.I. RELAY
Km.-366.750
QTRS
Radius=2500m(0.70°) PROP. EAST E.I. RELAY GANG
F 489 GANG QTRS HUT (13.5m x 7.5m).
NEERAJ AMBASTHA2022.03.16 11:16:18+05'30'
FL:-144.744
F 262 R SE / P- WAY NO.
CH:-740.0m
OFFICE SE / WORKS HUT NO.
DN UP
CH:-2370.00m
ROAD
PARKING
93 RC BOX / OPEN TOP 368 / 25 - 27 / 368.702 TO BE EXTENDED AS 1 x 1.5 M RCC BOX
Km.-363.640
TYPE II QRS.
CH:-1010.0m
Km.-364.863
Km.-365.000
T.R.L.= 40.0m (66.950m x 9.170m).
FL:-143.290
FL:-143.406
Delta Angle=3°21'05.91' (CURVE NO- 50 (LH) ) RAILWAY BOUNDARY
(CURVE NO- 49 (LH) ) Digitally signed by RAJESH KUMAR PANDEY
Radius=1750.0m(1.0°) (CURVE NO- 50A (RH) ) T.L.= 29.240m C/L OF BRIDGE NO- 99 (1x0.91m ARCH/ 1x1.0m 2.5.4.20=01a1aa8eb25230265ceb03c93a8c2519220f88965513bafd3eabe86f7e347bff, postalCode=232101, st=Uttar
CH:-2050.00m
PROP. UP MAIN LINE (PROP.CURVE UP M/L) PROP. UP MAIN LINE RCC BOX) AT Km,- 367/17-19 ( CH: 1702.00 m )
Km.-363.960
PANDEY
T.C.L.= 102.370m (PROP.CURVE LINE 6&7) (PROP.CURVE LINE 6&7) SP= 120KmPh Date: 2022.03.13 07:08:41 +05'30'
CH:-1660.00m
Radius=2000m(0.875°) C/L OF BRIDGE NO- 103 (1x1.83m FC Date: 2022.03.12 14:44:16 +05'30'
Km.-364.540
BY PROP. 3.0m WIDE 600.54m ) TO BE EXTENDED AS 2 x 4.0M
TO BE TAKEN OUT
TO BE TAKEN OUT
COMPOSITE GIRDER.
SrDEE/TRD/MGS
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
CH:-3290.0m
Km.-369.300
TO BE REMOVED
FL:-140.230
PROP. D/E AT CH:1165.50 M (F/CSB)
TO BE TAKEN OUT
CH:-3780.0m
YADAV
Km.-369.790
PROP. FM AT CH:1248.00 M (F/CSB)
SrDEE/G/MGS
FL:-139.807
CH:115.45M
TO BE TAKEN OUT
(CURVE NO- 51A (RH) ) Date: 2022.03.11 12:54:57 +05'30'
CH:60.35M
(PROP.CURVE LINE NO.5)
Mohit Sahu
CH:225.35M
CH:280.20M
CH:372.0M
CH:392.60M
Delta Angle=1°31'19.383''
PROP.DE ATCH:1340.50M(F/CSB)
SrDEN/3/MGS
PROP. UP Date: 2022.03.11 11:10:08 +05'30'
CH:830.00M
Radius=2500m(0.70°)
T.C.L.= 98.478m MAIN LINE
TO BE REMOVED
T.R.L.= 40.0m PROP. UP
RAJESH KUMAR Digitally signed by RAJESH KUMAR
BLDG
BLDG BLDG BLDG BLDG
KRISHNA KUMAR BHARGAVA Digitally signed by KRISHNA KUMAR BHARGAVA
CPM/PATNA/RVNL
E.C RAILWAY BOUNDARY Date:2022.02.07 06:25:56 +05'30'
BLDG
BLDG BLDG RAJESH KUMAR SINGH Digitally signed by RAJESH KUMAR SINGH
PROP. GOODS PAVED PF ( 750.0 M X 20.0 M ) LINE NO. 7 OVERRUNLINE120mLONG(NOTFORSTABLING) E.C RAILWAY BOUNDARY GM/S&T/RVNL/BSB
Date:2022.02.08 11:48:47 +05'30'
BLDG 1IN12(CS)
DE
HG DE OVER RUN LINE 120m LONG (NOT FOR STABLING) LINE NO. 7 CAL-829.700M (PT. TO PT.) CSL-815.700M (STR TO STR) FM 1IN12(CS) PRO. OVER RUN LINE 120m LONG (NOT FOR STABLING)
HG LINE NO. 6 PIYUSH SINGH Digitally signed by PIYUSH SINGH
F M 1IN12(CS) COMMON GOODS LOOP LINE NO. 6 LINE NO. 6 CAL-877.650M (FM TO FM) 1IN12(CS) GM/Electrical/RVNL/BSB
PROP UP MAIN LINE PROP UP MAIN LINE OVER RUN LINE 120m LONG (NOT FOR STABLING) 1IN12(CS) CSL= 822M FM TO FM CSL-835.650M (STR TO STR) Date:2022.02.08 11:05:48 +05'30'
DE
FLOW
PVT 1IN12(CS) F M COMMON GOODS LINE LINE NO. 5 LINE NO. 5 CAL-1193.700M (FM TO FM) CSL-825.000M (STR TO STR) FM 1IN12(CS) OVER RUN LINE 120m LONG (NOT FOR STABLING)
OVERRUNLINE120mLONG(NOTFORSTABLING) 1IN12(CS) CSL= 686.0M FM TO FM LINE NO. 5
BLDG DE 1:8.5(CS)
LINE NO. 5 1IN12(CS) DE MANOJ KUMAR SINGH Digitally signed by MANOJ KUMAR SINGH
1:8.5(CS)
1IN12(CS) PROP. UP MAIN LINE UP GOODS LOOP LINE CSL= 792.68M FM TO FM LINE NO. 4 LINE NO. 4 CAL-1544.500M (FM TO FM) CSL-1523.500M (FM TO STR) R-1750 R-1750 FM 1IN12(CS) PROP UP MAIN LINE TS Sr.DGM/CIVIL/DOS
UP MAIN LINE TS LINE NO. 4 PROP UP MAIN LINE Date:2022.02.09 09:45:08 +05'30'
PROP.REVERSIBLE LINE PROP.REVERSIBLE LINE 1IN12(CS) 1:12 (CS) FM PROP. COMMON LINE UP MAIN LINE LINE NO. 3 LINE NO. 3 CAL-1476.395M (FM TO FM) CSL-782.202M (STR TO STR) R-1750 R-1750 PROP UP MAIN LINE 1:8.5 (CS) 1IN12(CS) 1IN12(CS)
FM PROP. REVERSIBLE LINE CSL = 1097.56 FM TO FM FM
1IN12(CS) 1IN12(CS) 1IN12(CS)
FM 1IN12(CS) 1IN12(CS) FM FM 1IN12(CS) 1IN12(CS) FM 1:12 (CS) TS EXIST. O. C. SIDING 184m LONG R-1750 FM TS FM EXG. UP MAIN LINE PROP.REVERSIBLE LINE VINOD KUMAR VERMA Digitally signed by VINOD KUMAR VERMA
HIGH LEVEL UP PLATFORM 450mx7.3m WIDE PF SHELTER HIGH LEVEL UP PLATFORM 500mx7.3m WIDE NB 1IN12(CS) FM FM Manager/Civil/Exp/RVNL/PNBE
LINE NO. 2 CAL-843.714M (FM TO FM) CSL-822.714M (STR TO FM) EXG. DN MAIN LINE EXG. DN MAIN LINE 1IN12(CS) 1:12(CS) 1:12(CS) F M F M1IN12(CS) 1IN12(CS) Date:2022.02.07 06:10:58 +05'30'
DN MAIN LINE DN MAIN LINE FM 1IN12(CS) 1IN12(CS) FM
1:12 (CS) 1:12 (CS) FM EXG. DN MAIN LINE LINE NO. 2
FM DN MAIN LINE
FM 1:12 (CS) FM 1:12(CS)
1:12 (CS) FM DN LOOP LINE PROP. COMMON LOOP DE LINE NO. 1 LINE NO. 1 CAL-755.954M (PT TO FM) CSL-721.954M (STR TO STR) 1:8.5(SS)
TWS TS
1:8.5(SY) FM 1:8.5(CS) FM 1:12 (CS) REFERENCE LINE
GL SAND HUMP HIGH LEVEL DN PLATFORM 450m x 9m WIDE HIGH LEVEL DN PLATFORM 520m LONG x 11.72m / 9.0m WIDE NB
TO GARHWA ROAD ) TS TS 100.00 M
STATION ROAD
FM 1:8.5(CS TO SONNAGAR (SEB)
FLOW
FLOW
FLOW
FLOW
FLOW
SAND
FLOW
PROP. EAST MACHINE SIDING CAL-226.478M HUMP
AT KM:319.04 FROM GOMOH HG HG COMPOUND WALL (A
FLOW
PROP.TSATCH:1710.50M(F/CSB)
GANG QTRS
ROAD
PARKING TYPE II QRS.
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
TO BE TAKEN OUT
PROJECT:-
TO BE TAKEN OUT
CONSTRUCTION OF 3rd LINE BETWEEN
TO BE TAKEN OUT
NOTES :-
TO BE TAKEN OUT
TO BE TAKEN OUT
F 500 LEVEL 1. ALL MEASUREMENTS ARE IN MM, EXCEPT OTHERWISE AS SPECIFIED. PATRATU - SONNAGAR (291.0KM)
TO BE EXTENDED
TO BE TAKEN OUT
2. CH:0.00 IS RECKONED FOR C.L OF EXISTING STATION BUILDING.
TO BE EXTENDED
UPTO Km.-360.560
LEVEL R 500
irjkrw & l®uuxj ds chp rhljh ykb±u ifj;®tuk ¼291-0fd-eh-½
TO BE DISMANTLED
3. STATION IS IN "NSG-6" CATEGORY.
TO BE TAKEN OUT
CH:-3310.0m
RCC BOX.
R 500 MODIFICATION REQUIRED IN EXISTING OHE WILL BE DONE BY RVNL.
CH:-3110.0m
TITLE :
Km.-362.900
R 824
F 400 7. MINIMUM PASSENGERS AMENITY WILL BE PROVIDED AS PER CIRCULAR NO.
F 565 F 1200 F 1200 LEVEL PHASE -1 PLAN OF ESP JAPLA (JPL) tiyk LVs'ku
2018/LM(PA)/03-06, DATED 09-04-2018 INCLUDING AMENITIES FOR DISABLED AS
R 3333 F 400 STATION AT Km.- 366.01 (FROM GOMOH)
CH:-2310.0m
Km.-363.700
BOX.
EXIST.G.P. (CURVE NO- 49A (LH) ) UPTO Km.-370.050
(CURVE NO- 48A (RH) ) (PROP.CURVE REV.LINE) F 530
CH:-1147.0m
LEVEL F 530 8. 1 : 1200 GRADE IS NOT FEASIBLE AS THE EXISTING LINES ARE IS STEEPER
Km.-364.863
F 565
FL:-143.282
CH:-3590.0m
R 444 AUTHORITY OF WORK: PINK BOOK ITEM No. 50 OF 2021-22
Km.-369.600
(CURVE NO- 50B (LH) )
CH:-3290.0m
Km.-369.300
(PROP.CURVE REV M/L) Delta Angle=1°40'12.22''
FL:-139.905
R 444 GRADE. EXISTING GRADIENT IS NOT STEEPER THAN 1 : 400 IN STATION LIMIT
FL:-140.145
(CURVE NO- 50C (LH) ) (CURVE NO- 51B (RH) )
R 824
CH:-2110.0m
EXIST.G.P. Radius=2500m(0.70°)
Km.-365.700
Km.-365.594
Delta Angle=2°2'11.94' (PROP.CURVE LINE NO.5) AREA.
FL:-144.741
(PROP.CURVE LINE NO.4)
CH:-416.0m
CH:-310.0m
Radius=2000.0m(0.875°) (PROP.CURVE LINE NO.4) TRACK STRUCTURE: CES. DRG. No. :
UP/DN MAIN Radius=2000.0m(0.875°) (PROP.CURVE REV. LINE) T.C.L.= 72.870m Delta Angle=1°31'19.383'' Delta Angle=1°25'35.818'' 9. BEFORE EXECUTION OF WORK AT SITE DM CONSENT MUST BE OBTAINED FOR Y - 60 - 2022
Km.-366.750
CH:-1010.0m
Km.-365.000
1. RAILS- 60KG
Ranjan Kumar
T.C.L.= 71.092m
Digitally signed by Ranjan Kumar
Date: 2022.03.16 15:26:29 +05'30'
FL:-144.659
Delta Angle=1°25'35.818''
Km.-366.850
CH:-740.0m
T.R.L.= 50.0m
FL:-143.424
FL:-144.495
T.C.L.= 71.092m Delta Angle=1°42'19.44''
CH:-840.0m
DRM/DDU PLAN NO.- 74-2022
EXIST.G.P. T.R.L.= 50.0m Radius=2500m(0.70°) Radius=2500m(0.70°) 2. SLEEEPERS- MONO BLOCK PSC WITH 1660 NOS. PER KM. FOR MAIN LINE CONSTRUCTION OF LHS IN LIEU OF L.C. Digitally signed by VISHAL KUMAR
RCC BOX.
EXIST.G.P. T.L.= 35.549m T.L.= 35.549m T.C.L.= 74.412m SP= 120KmPh T.C.L.= 102.248m & 1540 NOS. PER KM FOR LOOP LINE & OTHER.
SP= 120KmPh T.R.L.= 40.0m T.R.L.= 40.0m AS PER IRSOD AND NO POINT IS TAKING OFF FROM TRANSITION PORTION OF EXIST.G.P. RVNL. DRG. No. : RVNL/CPM/ PNBE / 59- 2022
UP/DN MAIN SP= 120KmPh T.R.L.= 50.0m Ca= 39.5mm, Cd= 39.5mm T.R.L.= 40.0m 3. POINT AND CROSSINGS- 60 KG (1 IN 12) CURVED SWITCH EXIST.G.P.
EXIST.G.P. Ca= 49.5mm, Cd= 49.5mm T.L.= 33.208m T.L.= 31.126m CURVE AS PER IRPWM.
Ca= 49.5mm, Cd= 49.5mm EXIST.G.P. UP/DN MAIN T.L.= 37.208m T.L.= 31.126m WITH CMS CROSSING PSC SLEEPERS (FAN SHAPED LAYOUT) UP/DN MAIN UP/DN MAIN SCALE :- 1 : 1000
SP= 120KmPh SP= 120KmPh 11 CONDONATION FOR INFRINGEMENT TO IRSOD PARA-1 (ii) & 11(B) OF CH-II WILL
UP/DN MAIN TMS GRADIENT POST HAS BEEN REVISED SP= 120KmPh SP= 120KmPh 4. BALLAST- 50mm SIZE 350mm CUSHION (HARD STONE)
EXIST.G.P. Ca= 40mm, Cd= 40mm EXIST.G.P. Ca= 40mm, Cd= 40mm
Ca= 39.5mm, Cd= 39.5mm EXIST.G.P. Ca= 40mm, Cd= 40mm BE TAKEN. PREPARED BY:-
AS PER PREVIOUS APPROVED ESP & UP/DN MAIN 5. ALL FITTINGS TO CONFIRM IRS SPECIFICATION
UP/DN MAIN UP/DN MAIN 12. THIS DRAWING IS BASED ON CE'S APPROVED ESP DRG. NO- Y-01-2022
JOINT SURVEY REPORT (COPY ATTACHED) 6. ALL PROPOSED POINTS ARE TWS.