COMMON LOOP LINE NO.6 CAL (L-6) = 710.18 (PT TO PT) CSL (L-6) = 696.

18 M (STR TO STR) LEGEND:


BRIDGE DETAILS GRADIENT POST NABI NAGAR RD. (NBG) CAL (L-5) = 744.22M (FM TO FM) CSL (L-5) = 723.22M (FM TO STR)
GRADIENT POST BRIDGE DETAILS DETAILS OF LEVEL CROSSING ( SONE NAGAR END )
UP MAIN LINE NO.5
DETAILS OF LEVEL CROSSING ( GARHWA END ) KM:381.84 REVERSIBLE LINE NO.4 CAL (L-4) = 1019.30M (FM TO FM) CSL (L-4) = 900.00M (STR TO STR) 1. RAILWAY LAND BOUNDARY
LOCATION AT Km TRAFFIC/ CONTROLLING TVU/YEAR INTERLOCKING DN MAIN LINE NO.3 CAL (L-3) = 995.44M (FM TO FM) CSL (L-3) = 974.44M (STR TO FM)
LOCATION AT Km TRAFFIC/ CONTROLLING TVU/YEAR INTERLOCKING REMARKS Sr.No L.C. NO. WITH EP (DECIMAL) M/UM CLASS ENGG. BLOCK SECTION STATION YES/NO
REMARKS CH.0.00 COMMON LOOP LINE NO.2 CAL (L-2) = 769.63M (FM TO FM) CSL (L-2) = 727.63M (STR TO STR)
2. EXISTING WORK
Sr.No L.C. NO. WITH EP (DECIMAL) M/UM CLASS ENGG. BLOCK SECTION STATION YES/NO 3. DISMANTLED WORK
ROB SANCTIONED VIDE P.B. 1 25 383/25-27 (383.856) M C A E NBG - BSYA NBG 31860/DEC-19 NO
TO BE CONVERTED
DN UP COMMON LOOP LINE NO. 1 CAL (L-1) = 734.67M (PT TO PT) CSL (L-1) = 720.67M (STR TO STR)

CANAL
1 29 381.335 M SPL T NBG STN LIMIT NBG 497387/AUG-19 YES ITEM NO- 322 OF 2019-20
INTO LHS 6. PROPOSED WORK (BY RVNL)
NBG - BSYA E.C. RAILWAY BOUNDARY
LHS SANCTIONED VIDE L.B. 2 21 388/15-17 (388.922) M B1 T BSYA 26023/JLY-19 YES
2 31 379/01-03 (379.054) M C E KYF - NBG NBG 1796/MARCH-19 NO ITEM NO. 221 OF 2012-13
LHS SANCTIONED
3 32 377/05-07 (377.186) M C E KYF - NBG KYF 19022/NOV-18 NO (DRM LSG 2012-13)
2.4M+3.0M WIDE EXG. FOB AT
CH: 32.29M (F/CSB) BRBCL LAND BOUNDARY

30.404
LHS SANCTIONED VIDE P.B.
4 34 375/03-05 (375.646) M C E KYF - NBG KYF 13510/NOV-18 NO THIS MODIFICATION WILL BE DONE BY BRBCL

76.200
ITEM NO. 213 OF 2018-19 BRBCL LAND BOUNDARY
PROP. TIE BAR FENCING

RO
E.C. RAILWAY BOUNDARY ROAD

ROAD
ROAD
EC RAILWAY BOUNDARY BRBCL LINE
PROP. COMMON LOOP LINE PROP. LINE NO.6 EC RAILWAY BOUNDARY UP

AD
120.0 m LONG OVER RUN LINE ROAD 3.425
ROAD 1:12(CS) PROP. UP MAIN LINE PROP. LINE NO.5 D/S DN
E.C. RLY. BOUNDARY5.000
PROP. UP MAIN LINE 27.150 1:12 (CS) 1:12 (CS)
8.746 1:12 (CS) 6.000 1:12 (CS)
13.110 HIGH LEVEL PLATFORM 600.0 m LONG AND 9.75 m WIDTH
6.000 1:12 (CS) 1:12 (CS) 6.840
22.566 PRO. UP MAIN LINE
C/C 7.80m PROP. REVERSIBLE LINE 8.382 1:12 (CS)
PROP. LINE NO.4 PROP. REVERSIBLE LINE 6.000 1:12 (CS)
1:12 (CS) 14.189 1:12 (CS)
1:12 (CS) 6.000 6.000 PROP. REV. LINE
C/C 4.73m DN MAIN LINE 1:12 (CS) 1:12 (CS) 1:12 (CS) 1:12 (CS) 1:12 (CS) 4.730 4.730 DN MAIN LINE PROP. LINE NO.3 4.750 1:12 (CS) 1:12 (CS) 1:12 (CS) 1:12 (CS) 4.730 4.730 EXG. DN MAIN LINE
1:12 (CS) 1:8.5 (CS) 4.730 PROP. COMMON LOOP LINE NO.2 4.86 1:12(CS) 1:12 (CS)
Signature block
1:12 (CS) 6.000
5.193
1:12(CS) 120M LONG OVER RUN LINE SSP

14.235
1:12 (CS)
28.28 28.340 120M LONG OVER RUN LINE S. B. 1:12(CS) 120.0m LONG OVER RUN LINE
HIGH LEVEL PLATFORM 600.0 m LONG AND 19.274 m WIDTH 35.550
14.212 Date: 2022.01.13 10:25:14
BRIJESH KUMAR SINGH +05'30'
G
PROP. COMMON LOOP LINE NO. 1 TIE-BAR FENCIN

NABI NAGAR RD. (NBG) E.C. RAILWAY BOUNDARY CPDE

CANAL
R.L. PLATFORM 641.19 m LONG AND 10.00m WIDTH EC RAILWAY BOUNDARY

39.684
STATION BUILDING 5.0m WIDE ROAD
KM:381.84 (FROM GOMOH) NEERAJ AMBASTHA Digitally signed by NEERAJ AMBASTHA

106.680
(26.0m x 6.0m) AT CH:
F- 10 TO GARHWA ROAD (GHD) 55.97M (F/CSB)
PARKING ROAD ROAD ROAD
TO SONNAGAR (SEB) CTPM/ECR
Date: 2022.01.12 17:04:20 +05'30'
F- 750 95 LEVEL
CH.0.00 AT KM.- 319.04 (FROM GOMOH)

70.880
F- 1 0 RAILWAY QUATERS AT KM.- 411.83 (FROM GOMOH)
95 RAILWAY QUATERS RAJESH KUMAR PANDEY Digitally signed by RAJESH KUMAR PANDEY

F.L.-136.768m

F.L.-133.978m
CH: 3840.00M
DRM/MGS

CH: 780.00 M

ROAD
Date:2021.12.18 05:39:57 +05'30'

KM. 381/07-09, SPAN 1X1.061, OPEN TOP

PROP. PF END AT CH: 315.00m (F/CSB)


EC RAILWAY BOUNDARY
WARIJ NAYAN Digitally signed by WARIJ NAYAN

PF END AT CH: 285.00m (F/CSB)


Sr.DEN/Co/MGS
Date:2021.12.16 07:05:04 +05'30'

POINT AT CH:485.54M (F/CSB)


KEY PLAN

BR.NO.61 AT CH:398.58m,(F/CSB)

STR(L-5) AT CH: 234.45M (F/CSB)


STR(L-6) AT CH: 231.46M (F/CSB)

PF END AT CH: 205.00m (F/CSB)


PF END AT CH: 227.19m (F/CSB)
KAJARAT NAWADIH KM 8.38 KM 7.39

POINT AT CH: 350.96M (F/CSB)


POINT AT CH: 344.46M (F/CSB)
BARKISALAIYA ( NOT TO SCALE ) SUDHANSU RANJAN Digitally signed by SUDHANSU RANJAN

POINT AT CH: 238.46M (F/CSB)


SrDOM/MGS

DE AT CH: 470.96M (F/CSB)


Km- 378.000 Km- 381.060 Date:2021.12.17 05:59:04 +05'30'

D/E AT CH: 358.46M (F/CSB)


FM AT CH: 415.54M (F/CSB)

FM AT CH: 255.45M (F/CSB)


FOR PROP.UP MAIN FOR PROP.UP MAIN
AT KM:373.46 DN UP AT KM:389.23

PF END AT CH: 372.81 m (F/CSB)

POINT AT CH: 691.72M (F/CSB)


F- 83

PRO. DS AT CH: 1126.00 M (F/CSB)


F- 59

STR (L-6) AT CH: 464.72M (F/CSB)


STR (L-5) AT CH: 467.77M (F/CSB)
3 F- 3 LEVEL SrDSTE CO MGS
BRIJESH KUMAR YADAV Digitally signed by BRIJESH KUMAR YADAV

STR (L-4) AT CH: 582.76M (F/CSB)

POINT AT CH: 906.45M (F/CSB)

POINT AT CH: 919.46M (F/CSB)


Date:2021.12.16 06:58:05 +05'30'

TP2 AT CH: 1096.66M FOR UP LINE (F/CSB)


303

POINT AT CH: 471.72M (F/CSB)

TP2 AT CH: 1228.65M FOR UP LINE (F/CSB)


POINT AT CH: 577.72M (F/CSB)

POINT AT CH: 585.72M (F/CSB)

TP1 AT CH: 1182.70M FOR UP LINE (F/CSB)


TO BE TAKEN OUT

EXG. PF. ENDS AT CH: 144.70M (F/CSB)

CH: 3910.00M
KM.- 382/29-31, SPAN 1x1.22m/1x0.91m

CH: 1344.18M

Km- 385.750
Km- 383.184
FM AT CH: 887.98M (F/CSB)

FM AT CH: 934.49M (F/CSB)


FM AT CH: 673.68M (F/CSB)

FM AT CH: 819.03M (F/CSB)


POINT AT CH: 800.04M (F/CSB)
FM AT CH: 488.77M (F/CSB)

FM AT CH: 559.69M (F/CSB)


RUPESH KUMAR Digitally signed by RUPESH KUMAR

FM AT CH: 603.76M (F/CSB)

TP1 AT CH: 1051.65 FOR UP LINE (F/CSB)


DS AT CH:591.72M (F/CSB)

DS OF LINE NO-5 TO BE TAKEN OUT


SrDCM/MGS

BR.NO.57 AT CH: 1187.72m,(F/CSB)


F- 303 Date:2021.12.16 07:00:22 +05'30'

FOR BRBCL DN LINE


F- 83

C/L OF STATION BUILDING

2.4M + 3.0M WIDE FOB AT


3

POINT AT CH:1025.47M (F/CSB)


INDU PRAKASH Digitally signed by INDU PRAKASH

CH: 2360.00M
SrDEE/TRD/MGS

Km- 384.200
Date:2021.12.17 04:25:45 +05'30'

FM AT CH: 1009.20M (F/CSB)


AT CH: 55.97M (F/CSB)

CH: 1144.37M (F/CSB)


DS AT CH: 1035.00M (F/CSB)
F.L.-127.006 M

CH: 32.29M (F/CSB)


F.L.-132.220 M KARPOOR CHANDRA YADAV Digitally signed by KARPOOR CHANDRA YADAV
F- 47 SrDEE/G/MGS

CANAL
F- 59 5 LEVEL Date:2021.12.17 11:53:07 +05'30'
E.C. RAILWAY BOUNDARY 3 F-
475

F.L.-126.920m
CH: 3860.00M
F.L.-132.220m
(FC SLAB/ARCH)

CH: 1344.18M
Mohit Sahu Digitally signed by Mohit Sahu
SrDEN/3/MGS
F.L.-128.867 M Date:2021.12.16 08:10:04 +05'30'

Ajay Kumar Saha Digitally signed by Ajay Kumar Saha


SSE/DRG/S&T/1/MGS
Date:2021.12.17 10:47:26 +05'30'
TO BRBCL PLANT
TO R&D YARD CABIN (BRBCL) Km- 385.700 VISHAL KUMAR YADAV Digitally signed by VISHAL KUMAR YADAV
COMPOUND WALL Km- 383.184 JE/2/DRG/MGS
BRBCL LAND BOUNDARY Date:2021.12.16 06:44:22 +05'30'
FOR PROP.UP MAIN AT KM.- 385.74 (FROM GOMOH) FOR PROP.UP MAIN

76.200M
76.010M
BRBCL LAND BOUNDARY THIS MODIFICATION WILL BE DONE BY BRBCL DIST. KM.- 3.90 (FROM NABINAGAR) KRISHNA KUMAR BHARGAVA Digitally signed by KRISHNA KUMAR BHARGAVA
0.350M CPM/PATNA/RVNL
Date:2021.03.19 12:05:38 +05'30'
C6 3.43M

ROAD
ROAD ROAD FOR DIVERTING TRAFFIC OF LC NO. 28 TO LC NO. 29 ROAD ROAD

RO
E.C. RAILWAY BOUNDARY E.C. RAILWAY BOUNDARY EC RAILWAY BOUNDARY 5.30M 12.50M BRBCL LINE
TIE BAR FENCING COMMON LOOP LINE 6.830M LINE NO.6 CAL (L-6) = 710.18 (PT TO PT) CSL (L-6) = 696.18 M (STR TO STR) UP C6 KAILASH CHAND SHARMA Digitally signed by KAILASH CHAND SHARMA

AD
120.0mLONG OVERRUNLINE(NOTFORSTABLING) 18.336M EC RAILWAY BOUNDARY 18.336M 18.336M 18.336M
3.43M 3.43M
GM/S&T/RVNL/RNC
Date:2021.03.20 12:57:09 +05'30'
R OA D ROAD
14.04m 14.12m 14.12m HG FM 1:12(CS) 6.000M PROP. UP MAIN LINE COMMON LOOP LINE 6.000M LINE NO.5 CAL (L-5) = 744.22M (FM TO FM) CSL (L-5) = 702.22M (STR TO STR) CSL (L-5) = 723.22 M 5.219M 120M LONG OVER RUN LINE (NOT FOR STABLING) 5.836M 22.566M C5
E.C. RLY. BOUNDARY 5.00M 5.00M 5.00 RLY. LAND OF 5.0 M WIDTH TO BRBCL
27.150M (FM TO STR) D/S D/S DS DN 11.84M
UP MAIN LINE 27.150M HG 1:12 (CS) 5.330M VINOD KUMAR VERMA Digitally signed by VINOD KUMAR VERMA

21.949M
120.0mLONGOVERRUNLINE(NOTFORSTABLING) HIGH LEVEL PLATFORM 349.70 m LONG AND 9.75m WIDTH 1:12 (CS) 21.866M FM 1:12 (CS)
6.000M F M 6.000M C5 6.84M 22.57M Manager/Civil/Exp/RVNL/PNBE
HIGH LEVEL PLATFORM 600.0 m LONG AND 9.75 m WIDTH 6.000M 6.000M FM 1:12 (CS) 1:12 (CS) FM D/S 1:12 (CS) FM PRO. UP MAIN LINE 12.84M PRO. UP MAIN LINE Date:2021.03.19 10:50:02 +05'30'
1:12 (CS) 13.110M PF SHED 9.750M PF SHED TOILET
C/C 8.382m REVERSIBLE LINE C/C 8.382m GATE
8.382M 110.00m UP MAIN LINE (CAL-842.54) 5.330M LINE NO.4 CAL (L-4) = 1019.30M (FM TO FM) CSL (L-4) = 998.30M (FM TO STR) CSL (L-4) = 900.00 M (STR TO STR) 6.000M 6.000M
1:12 (CS) FM 6.000M FM F M 1:12 (CS) 6.000M 6.00M
UP MAIN LINE 1:12 (CS) FM REVERSIBLE LINE FM 1:12 (CS) 14.189M 1:12 (CS) PROP. REV. LINE PROP. REV. LINE EXG. UP LINE
1:12 (CS) 1:12 (CS) FM 1:12 (CS) FM
C/C 4.730m DN MAIN LINE C/C 4.730m 1:12 (CS) FM FM FM FM 1:12 (CS) 4.730M 4.730M DN MAIN LINE (CAL-748.53) 4.730M LINE NO.3 CAL (L-3) = 995.44M (FM TO FM) CSL (L-3) = 974.44M (STR TO FM) 4.750M 4.728M 1:12 (CS) FM 1:12 (CS) FM 1:12 (CS)4.730M 4.73M EXG. DN MAIN LINE
1:12 (CS)
REFERENCE LINE

PRO. TP1 AT CH: 1183.35M


1:12 (CS) FM

PRO. TP2 AT CH: 1229.30M


6.0M GATE 1:8.5 (CS) 4.730M COMMON LOOP LINE 4.755M LINE NO.2 CAL (L-2) = 769.63M (FM TO FM) CSL (L-2) = 727.63M (STR TO STR) 4.860M 4.728M 1:12(CS) FM 4.730M 4.363M
TO SONNAGAR (SEB) 100.00 M

PRO. POINT AT CH:1046.535M (F/CSB)


1:12 (CS) FM 6.000M 6.069M 6.000M FM 6.000M 1:12(CS) SSP 5.400M
1:12 (CS) 5.193M PF SHED 6.549M 120M LONG OVER RUN LINE (NOT FOR STABLING)
HG

10.0m
DSO AT KM.- 411.83 (FROM GOMOH)

FOR DN LINE (F/CSB)

FOR DN LINE (F/CSB)


ER R 120M LONG OVER RUN LINE (NOT FOR STABLING) 1:12(CS) 120.0m LONG OVER RUN (NOT FOR STABLING) 17.900M
MP (AS P HIGH LEVEL PLATFORM LENGHT 371.89 HIGH
m
STN. BLDG.

35.588M
LEVEL PLATFORM 600.0 m LONG AND 19.274 m WIDTH

PRO. FM AT CH:1120.33M (F/CSB)


28.280M 28.340M
SAND HU /T -347) 26.0 m x 6.0 m 19.274M THIS PLAN IS ONLY PRINTED TO SCALE IF THIS LINE MEAURES 100 METER
GATE DRG.NO.R
DS O 35.550M 35.563M 35.588M NEXT BLOCK STATION BARKISALAIYA

TP2 AT CH: 1091.67 FOR DN LINE (F/CSB)


IkwoZ e/; jsyos
35.529M

TP1 AT CH: 1045.66 FOR DN LINE (F/CSB)


LODGE 24.913M AT KM.- 389.23 (FROM GOMOH)
48.030M 9.500M 7.820M COMMON LOOP LINE NO. 1 CAL (L-1) = 734.67M (PT TO PT) CSL (L-1) = 720.67M (STR TO STR) TIE-BAR FENCING DIST. KM.- 7.39 (FROM NABINAGAR)

PROP. STR(L-4) AT CH: 317.240 M (F/CSB)


E.C. RAILWAY BOUNDARY
Mh- Mh- ;qq- eaMy
E.C. RAILWAY BOUNDARY
6.830M

END OF SAND HUMP AT CH: 491.51 M (F/CSB)

CANAL
R.L. PLATFORM 641.19 m LONG AND 10.00m WIDTH EC RAILWAY BOUNDARY F- 59 F- 47
EAST CENTRAL RAILWAY

STR (L-3) AT CH: 389.19M (F/CSB)


5 LEVEL

STR (L-2) AT CH: 276.43M (F/CSB)


TO GARHWA ROAD (GHD)

STR (L-1) AT CH: 272.51M (F/CSB)


3 F-

99.210M
475

POINT AT CH: 393.51M (F/CSB)

POINT AT CH: 385.51M (F/CSB)

POINT AT CH: 279.51M (F/CSB)


5.0m WIDE ROAD

DE AT CH: 399.51M (F/CSB)

PAVEMENT END AT CH: 269.51m (F/CSB)

106.680M

CH: 3860.00M
AT KM.- 319.04 (FROM GOMOH)

CH: 1344.18M
FM AT CH: 410.19M (F/CSB)

POINT & FM AT CH: 897.98M (F/CSB)


DDU DIVISION

KM. 382/03-05, SPAN 1x0.61m/1x0.61m

KM. 382/23-25, SPAN 1x0.91m/1x0.61m


POINT & FM AT CH: 787.45M (F/CSB)
EXG. SSP AT CH: 717.70M (F/CSB)
TP2 AT CH: 269.51M (F/CSB)

POINT & FM AT CH: 988.72M (F/CSB)


FM AT CH: 297.43M (F/CSB)
POINT AT CH: 483.64M (F/CSB)

PROP. TP1 & TP2 AT CH: 143.51M (F/CSB)


ROAD

POINT AT CH: 528.24M (F/CSB)


NEXT BLOCK STATION KAJRAT NAWADIH R.P.F. PARKING ROAD ROAD

POINT AT CH: 728.78M (F/CSB)

POINT AT CH: 638.04M (F/CSB)

POINT AT CH: 618.98M (F/CSB)

TO BE REMOVED
11.04

TO BE REMOVED
EXECUTED BY:-

BR.NO.59 AT CH: 506.21m,(F/CSB)

BR.NO.58 AT CH: 945.46m,(F/CSB)


BUILDING

PAVEMENT END AT CH: 371.68M (F/CSB)


jsy fodkl fuxe fyfeVsM

POINT AT CH: 658.89M (F/CSB)

POINT & FM AT CH: 696.72M (F/CSB)


AT KM.- 373.46 (FROM GOMOH)

FM AT CH: 711.79M (F/CSB)

FM AT CH: 655.03M (F/CSB)

FM AT CH: 601.98M (F/CSB)

FM AT CH: 545.25M (F/CSB)


12.44

POINT AT CH:561.16M (F/CSB)

POINT AT CH:568.16M (F/CSB)


KM. 381/33-35, SPAN 1x3.66m/1x3.66m

DE AT CH: 688.16M (F/CSB)


DIST. KM.- 8.38 (FROM NABINAGAR)

70.880M

FM AT CH:472.20M (F/CSB)
RAIL VIKAS NIGAM LIMITED

D/E AT CH:575.16M (F/CSB)

FM AT CH:585.25M (F/CSB)
BR.NO.60A AT CH: 383.12m,(F/CSB)

TP2 AT CH: 432.77M (F/CSB)

STR (L-2) AT CH:451.20M (F/CSB)


382/00-01, SPAN 1x0.91m/1x0.91m

POINT AT CH:455.16M (F/CSB)


STR (L-1) AT CH:448.16M (F/CSB)
BR.NO.60 AT CH: 404.07m,(F/CSB)
RAILWAY QUATERS Km- 383.184 Km- 385.700

TP2 & TP1 AT CH: 306.77M (F/CSB)


NOTES :- F.L. - 132.220 M F.L. - 126.92 M (A GOVERNMENT OF INDIA ENTERPRISE)

(FC SLAB/OPEN TOP)


RAILWAY QUATERS

CH: 35.43

(ARCH/OPEN TOP)
1. ALL MEASUREMENTS ARE IN MM, EXCEPT OTHERWISE AS SPECIFIED. PROJECT:- CONSTRUCTION OF 3rd LINE BETWEEN

(RCC SLAB/RCC SLAB)


(RCC SLAB/RCC SLAB)
2. THIS DRAWING IS PREPARED BASED ON PREVIOUS APPROVED CE'S DRG. NO:- Y-108-2021
(DRM/MGS PLAN NO- 112-2021) . SONE NAGAR - JAPLA
3. CH:0.00 IS RECKONED FOR C.L OF EXISTING STATION BUILDING.
F- 750 F- 10
95 LEVEL 4. STATION IS IN "NSG-6" CATEGORY. irjkrw ls l¨u uxj ds chp rhljh ykbZu ifj;¨tuk

ROAD
F- 1 0
¼291-0fd-eh-½

TP2 AT CH: 17.51M (F/CSB)


95 5. EXISTING LINES RENUMBERED.
CH: 3840.00M

CH: 780.00 M
6. ALL BLUE LINE WORK WILL BE DONE BY DIVISION.
OTHER NOTES :- TITLE : ENGINEERING SCALE PLAN OF NABINAGAR ROAD (NBG) uohuxj j¨M

PF. ENDS AT CH: 144.70M (F/CSB)


EC RAILWAY BOUNDARY 7. THERE IS NO ANY FIXED STRUCTURE IS INFRINGING FROM RAIL LEVEL TO
FORMATION LEVEL OF ENGINEERING PORTION AS PER IRSOD PARA 11(B)

TP1 AT CH: 180.77M (F/CSB)


1. BRIDGE NOS- 61, 60A, 60, 59, 58, 57, 56, 55 & 54 SHALL BE SUITABLY EXTENDED TO ACCOMMODATE ADDITIONAL
STATION YARD AT Km.- 381.840 (FROM GOMOH ) IN CONNECTION WITH
(vii)/(viii) OF CHAPTER-II.
TRACKS. TRACK STRUCTURE: - PROVISION OF CONNECTIVITY TO 3RD UP MAIN.
8. NO CHANGE IN GRADIENT WITHIN 30M OF TURN OUT AS PER SOD AND NO TURN OUT IS
2. REQUIRED LAND OUT SIDE PLANT AREA FOR RAILWAY TRACK TO BE ACQUIRED BY BRBCL. TAKING OF FROM TRANSITION PORTION OF ANY CURVE AS PER IRPWM.
Km- 378.000 Km- 381.060 3. FINAL LAND BOUNDARY SHALL BE MARKED AFTER ACTUAL LAND ACQUISITION. 1. RAILS- 60KG AUTHORITY OF WORK: PINK BOOK ITEM No. 50/2021-22
LEVEL F- 5 6. ELECTRIFICATION OF THIRD LINE WILL BE DONE BY RVNL. ANY MODIFICATION
Y - 07 - 2022
F.L. - 136.768 M F.L. - 133.978 M 93 4. THE VERTICAL & HORIZONTAL CLEARANCES OF CONVEYOR BELT SHALL BE KEPT AS LAID DOWN IN I.R. 2. SLEEEPERS- MONO BLOCK PSC WITH 1660 NOS. PER KM. FOR MAIN LINE
REQUIRED IN EXISTING OHE WILL BE DONE BY RVNL. CES. DRG. No. :
& 1540 NOS. PER KM FOR LOOP LINE & OTHER.

CH: 302.00M
Ranjan Kumar

SCHEDULE OF DIMENSION.
Digitally signed by Ranjan Kumar
Date: 2022.01.13 12:57:14 +05'30'

7. MINIMUM PASSENGERS AMENITY WILL BE PROVIDED AS PER CIRCULAR NO.


5. THERE ARE TREES TO BE REMOVED FALLING IN PROPOSED ALIGNMENT IN RAILWAY LAND.. 3. BALLAST- 50mm SIZE 350mm CUSHION (HARD STONE) DIV. DRG. No. : DRM / DDU PLAN NO-240-2021
2012/LM(PA)/03/06 DATED 09-04-2018 INCLUDING AMENITIES FOR DISABLED AS PER
6. DISMANTLING OF OHE MAST / PORTAL TO BE INCORPORATED WITH ELECTRICAL PLAN. 4. ALL FITTINGS TO CONFIRM IRS SPECIFICATION
(PARA 10)
7. RAILWAY LAND OF 5.0M WIDTH TO BE LEASED TO BRBCL. 8. ALL THE RED LINE WORK WILL BE DONE BY RVNL. RVNL. DRG. No. : RVNL/ CPM / PNBE / 07 - 2021
8. CLOSURE OF L.C. NO.- 28 BY DIVERTING TRAFFIC TO L.C. NO. 29 IS PROVIDED AS PER DM/AURANGABAD 9. ALL MAGENTA LINE WORK WILL BE DONE BY RAILWAY/OTHER AGENCY (BRBCL). SCALE :- 1 : 1000
Km- 382.142 LETTER NO. 1951/G, DATED 10.07.2020. ROB IS SANCTIONED IN LIEU OF L.C. NO. 29. 10. THIS DRAWING SUPERSEDES CE'S DRAWING No.- Y -108 - 2021.
F.L. - 133.978 M PREPARED BY:-