4.barkisalaiya Esp (Bsya) 26-02-21 - V8 - R1 - Approve - P139
4.barkisalaiya Esp (Bsya) 26-02-21 - V8 - R1 - Approve - P139
4.barkisalaiya Esp (Bsya) 26-02-21 - V8 - R1 - Approve - P139
LOCATION ( IN Km. ) DISTANCE CHANAGE (in M ) DETAILS OF LEVEL CROSSING ( BSYA - NBG ) NOTE : -
GRADE REMARKS SL. NO. OF OPENIG LOCATION AT KM SL. NO. OF OPENIG LOCATION AT KM LOCATION ( IN Km. ) DISTANCE CHANAGE (in M ) DETAILS OF LEVEL CROSSING
SL.NO. FROM TO ( IN M ) FROM TO TRAFFIC/ CONTROLLING TVU/YEAR INTERLOCKING REMARKS BR.NO. TYPE OF BRIDGE WITH EP (DECIMAL) REMARKS 1. OLD LOCATIONS OF ALTERATIONS HAS BEEN DELETED AND ONLY NEW BR.NO. TYPE OF BRIDGE REMARKS SL.NO. FROM GRADE REMARKS
NO. WITH CLEAR SPAN CURVE NO-9 (R/H) NO. WITH CLEAR SPAN WITH EP (DECIMAL) TO ( IN M ) FROM TO CONTROLLING
Sr.No L.C. NO. KM M/UM CLASS ENGG. BLOCK SECTION STATION YES/NO LOCATIONS OF ALTERATIONS HAS BEEN SHOWN, TO MAKE IT CLEARLY READABLE. TVU/YEAR INTERLOCKING REMARKS LEGEND:
1. 382.200 384.150 1950.00 FALL 1 IN 303 7030.00 5080.00 TO BE EXTENDED AS 1 X 1.35M PROP. UP M/L TO BE EXTENDED AS 1 X 1.35M Sr.No L.C. NO KM M/UM CLASS E/T BLOCK SECTION STATION YES/NO
TO BE EXT. FOR UP M/ L.
1. 42 OPEN TOP 1 x 0.61m DELTA = 2°50'29"
2. DETAILS OF ALTERATIONS HAS BEEN GIVEN IN TABLE IN WHICH OLD & NEW FC SLAB(UP)/ 1. 389.230 390.650 1420.00 LEVEL 0.00 1420.00 1. RAILWAY LAND BOUNDARY
1 21 388.922 M C B1 T BSYA - NBG BSYA 26023/JUL-19 YES 389/15-17, 388.937 RCC BOX 1. 39 1 x 0.91m 390/25-27, 390.115 RCC BOX 51726/JUL-19
& EXT. FOR DN LOOP LINE
F-500 LOCATIONS ARE MENTIONED. RC SLAB(DN) 1 15 395.098 M C SPL T ANH-BSYA ANH YES TO BE UPGRADED
2. 384.150 385.700 1550.00 5080.00 3530.00 R= 1750m (1.0°) 2. EXISTING WORK
FALL 1 IN 833 2 25 383.856 M CA E BSYA - NBG NBG 31860/DEC-19 NO LHS SANCTIONED TO BE EXTENDED AS 1 X 1.20M LEVEL TO BE EXTENDED AS 1 X 1.35M 2. 390.650 393.100 2450.00 FALL 1 IN 400 1420.00 3870.00
2. 43 FC SLAB 1 x 0.91m T.L.=43.401m 2. 40
PROPOSED FOR CLOSURE 388/27-29, 388.477 RCC BOX FC SLAB 1 x 0.91m 390/09-11, 389.767 RCC BOX 3. DISMANTLED WORK
3 28 382.009 M C T BSYA - NBG NBG 1399/SEPT-19 YES T.C.L.= 126.785m
CH: 430.00
3. 385.700 386.850 1150.00 LEVEL 3530.00 2380.00 CLOSED CURVE NO. 6 (R/H) LEVEL F-812 F-400
3. 393.100 394.220 1120.00 LEVEL 3870.00 4990.00 F-400 4. PROPOSED WORK DONE BY RVNL
TRL = 40.0m DELTA = 2°21'52" 3. TO BE EXTENDED AS 1 X 1.35M
41 FC SLAB
CH:2510.00
CH:1420.00
CURVE 8 CURVE 7 4. 394.220 394.900 680.00 RISE 1 IN 400 4990.00 5670.00
(t) ALT-1 A=6D11'26" A=6D11'26" PROP UP M/L PROP UP M/L T.L.=18.057m 6. PROPOSED WORK DONE BY DIVISION
(d) A = 3°21'52" CURVE NO. 5 (L/H) F-400
5. 387.900 388.800 1330.00 FALL 1 IN 500 1330.00 430.00 R=450.00(3.89°) R=450.00(3.89°) A = 3°21'52" T.C.L.= 56.108m F-812 DELETED
DELTA = 2°21'52" ALT-1
CH:2290.00
PROP. POINT & FM AT CH: 636.50m (F/CSB)
5. 388.800 389.230 1330.00 LEVEL 430.00 0.00 ALT-1 PROP. UP MAIN LINE C.L.=46.119m C.L.=46.119m T.L. = 25.697m
CH:2995.00
PROP. STR (L-7) AT CH: 350.45m (F/CSB)
T.C.L. = 91.380m ALT-1
PROP.POINT&FMATCH:727.20m(F/CSB)
RCC BOX AT CH: 231.00m (F/CSB)
CH:2810.00
F-400 KM:389.23 (FROM GOMOH)
CH:1330.00
LEVEL T.C.L.= 126.785m PROP. UP MAIN LINE
TO BE DISMANTLED
TO BE DISMANTLED
TO BE DISMANTLED
TO BE DISMANTLED
TO BE TAKENOUT
KM 387.900 NEXT BLOCK STATION NABINAGAR (NBG) NEXT BLOCK STATION ANKORAH
PROP. UP MAIN LINE DN UP T.L.=21.834m
TO BE DISMANTLED
TO BE DISMANTLED
TO BE DISMANTLED
TO BE DISMANTLED
PROP. UP MAIN LINE AT KM - 381.84 (FROM GOMOH) AT KM- 395.91 (FROM GOMOH) T.C.L.= 43.633m
TO BE DISMANTLED
KM 385.740 TO SON NAGAR (SEB)
TO BE DISMANTLED
DISTANCE FROM BSYA AT 7.39 KM DISTANCE FROM BSYA AT 6.68KM
TO BE DISMANTLED
TO BE DISMANTLED
TO BE DISMANTLED
PROP. UP MAIN LINE KM 387.060
TO BE DISMANTLED
AT KM:- 411.83 (FROM GOMOH)
(F/CSB)
PROP. UP MAIN LINE
ALT-1 NEXT BLOCK STATION ANKORAH
TO GARWA ROAD (GHD ) (n) AT KM- 395.91 (FROM GOMOH)
AT Km.- 319.04 (FROM GOMOH) CURVE NO. 1 DISTANCE FROM BSYA AT 6.68KM
NEXT BLOCK STATION NABINAGAR (NBG) DELTA = 6°27'30"
AT KM - 381.84 (FROM GOMOH) R= 405.0m (4.32°)
T.L.=22.850m DN UP TO PLANT (NPGCL)
DISTANCE FROM BSYA AT 7.39 KM ALT-1 EXISTING LINE TO BE SLEWED 1275 MM CURVE NO. 2
(E.C.RLY.BOUNDARY) (d) ALT-1 T.C.L.= 65.651m R= 422m (3.89°) TO PLANT (NPGCL) 6.000m
(E.C.RLY.BOUNDARY) (u) ALT-1 DN UP
(E.C.RLY.BOUNDARY) TRL = 20.0m
PROP.GATELODGE
EXIST. LIFTING BARRIER & HEIGHT CURVE NO. 6
(u)
6.260mX4.830m 34.975m
GAUGETO BE TAKEN OUT & ALT-1 5.33m COMMON LOOP LINE LINE-7,CAL=818.981M(PTTOPT)&CSL=804.981M(STRTOSTR) ALT-1 LINE NO.-7 OVER RUN LINE OF 120M LONG(NOT FOR STABLING) TS R= 875m (2°) CURVE NO. 5 ALT-1 ALT-1 ALT-1 ALT-1
6.5m ALT-1 (u) (p) R= 875m (2°) (u) TS TS
PLACED AT NEW LOCATION HG ALT-1 ALT-1 (u) UP LOOP LINE PROP. UP MAIN LINE LINE-6,CAL=932.131M(FMTOFM)&CSL=899.931M(FMTOSTR) LINE NO.-6 6.000m CURVE - R= 875m (2.0°)
1:12 (TWS) FM 28.183m ALT-1 11.860m ALT-1 (u) (u) (u) CURVENO.1
ALT-1 ALT-1 30.250m (u) 30.250m
(u) 120M LONG OVER RUN LINE (NOT FOR STABLING) (u) 27.487m
(u) 6.007m 5.33m (u) FM 1:12 (TWS) FM
PROP.UP MAIN LINE (u) 1:12 (TWS) RAIL LEVEL UP PLATFORM 350.0M x 9.75M CAL=910.00M(FMTOSIG) LINE NO.4NB
Radius = 437m DE HOT AXLE SIDING (CAL=45m) CURVE - R= 875m (2.0°) FM 1:12 (TWS) 6.000m
1:12 (TWS) FM 1:12 (TWS) CURVE NO. 3 PROP. UP MAIN LINE
HG 6.00m 120M LONG OVER RUN LINE (NOT FOR STABELING) 1:12 (TWS) FM 6.000m PROP.UP MAIN LINE 34.975m ALT-1 14.360m TS 1:12 (TWS) 1:12 (TWS) CURVE NO. 4
(p) PROP. HIGH LEVEL UP PLATFORM (600.0 M LONG X 11.0M WIDE) DEGREE=4° FM SAND HUMP FM FM 120M LONG OVER RUN LINE (NOT FOR STABLING) R= 875m (2°) PROP. 3RD MAIN LINE
7.743m
PROP.REV.LINE 6.000m 1:12 (TWS) F M FM 1:12 (TWS) 6.000m 1:12 (CS) FM 4.725m 9.366m LINE-5,CAL=1051.131(FMTOFM)&CSL=900.00M(STRTOSTR) 5.33m COMMON LINE ALT-1 CAL=1066.87M(SIGTOSIG) LINE NO.3 LINE NO.-5 4.725m 1:8.5(CS)
8.500m
FM 1:12 (TWS) 1:12 (TWS) FM 8.500m R= 875m (2°)
PROP.REV.LINE 5.487m
8.500m
UP MAIN LINE 1:12 (CS) 1:12 (CS) (p) 1:8.5(CS) FM 1:12 (CS) UP MAIN LINE
4.725m DN MAIN LINE FM
1:12 (TWS)
1:12 (TWS)
FM 4.725m 3.781
m
1:12 (CS) 4.725m UP MAIN LINEDN MAIN LINE REV.LINE LINE-4,CAL=1302.0M(FMTOFM)&CSL=900.0M(STRTOFM) CAL=968.08M(FMTOSIG) LINE NO.2 LINE NO.-4 4.725m 4.725m 4.725m 1:12 (CS) 1:12 (CS)
FM
1:12 (TWS) 1:12 (TWS)
FM 4.725m DN MAIN LINE 4.725m
420.000m
HG
PROP.POINT & FM AT CH: 964.90m (F/CSB)
(u) (c) PROP. HIGH LEVEL DN PLATFORM ( 600.0 M LONG X 10.0M WIDE ) (m)
PROP. TPCC2 AT CH: 988.540m (F/CSB)
TO BE DISMANTLED
(E.C.RLY.BOUNDARY) PROP.S&TCOMPLEX NO. 29 IS PROVIDED AS PER DM/AURANGABAD LETTER
STATION ROAD
(13.0m X 8.0m) CURVE NO-8A (L/H) CURVE NO-8(R/H) INFRINGEMENT AND MAXIMUM & MINIMUM DIMENSION ( GRADIENT WITH STATION LIMITS ) NO. 2951/G ,DATED 110.07.2020. ROB IS SANCTIONED IN
TO BE TAKENOUT
COMMON LOOP COMMON LOOP ALT-1 F-400
TO BE DISMANTLED
TO BE DISMANTLED
A = 4°34'4" BLDG COMMON LOOP COMMON LOOP LOCATION NAME OF PRESCRIBED MAXIMUM EXISTING AMOUNT OF PARTICULAR OF SANCTION LIEU OF L.C. NO-29. LEVEL
IkwoZ e/; jsyos
A = 4°34'4" SL. (t)
ALTERATION- 01:- R= 875.0 (2.0°) R= 875.0 (2.0°) PROP. NEW STN.BLDG A = 4°34'4" A = 4°34'4" NO. DIVISION & KILOMETERAGE STRUCTURE CHAPTER MAXIMUM/ ACTUAL INFRINGEMENT OF INFRINGEMENT AND
CH:3870.00
OF SIZE (23.0m X 8.0m) R= 875.0 (2.0°) R= 875.0 (2.0°) SECTION WHICH INFRINGE ITEMS MINIMUM DIMENSION REMARKS UPTO
DURING SHIFFTING OF POINT AND CROSSING WITHIN TRANSITION PORTION AND OTHER CORRECTIONS AS PER CRS/KKK T.L. = 34.897m T.L. = 34.897m
Mh-Mh-;w-eaMy
CH:1420.00
TRL = 40.0m TRL = 40.0m (o) LEVEL
CH:450.504M HAS BEEN SHIFTED TOWARDS SEB END TPTC1 CH:449.273M, TPCC1 CH:409.273M, TPCC2 CH: 379.15M & TPTC2
CH: 339.515M. IN GHD END CURVE DETAILS OF 10 (L/H) TPTC1 CH:435.099M, TPCC1 CH:395.099M, TPCC2 CH:365.341M & ALT-1 ALT-1 EAST CENTRAL RAILWAY
CH:4990.00
TPTC2 CH:214.352M. (g) (g) DDU DIVISION
TO BE DISMANTLED
TO BE DISMANTLED
3. POINT AND CROSSINGS- 60 KG (1 IN 12) CURVED SWITCH
TO BE DISMANTLED
R= 3500m (0.5°)
TO BE DISMANTLED
ALT-01 (g)- IN SEB END CURVE DETAILS OF 8A (L/H) TPTC1 CH:189.617M, TPCC1 CH:229.617M, TPCC2 CH:259.375M & TPTC2 CH:299.375M
AT Km.- 319.04 (FROM GOMOH) DN UP
TO BE DISMANTLED
T.L.=39.852m NEXT BLOCK STATION NABINAGAR (NBG) NEXT BLOCK STATION ANKORAH
HAS BEEN SHIFTED TOWARDS GHD END AT TPTC1 CH:39.952M, TPCC1 CH:79.952M, TPCC2 CH:109.710M & TPTC2
BR.NO.41 1X0.91m FC SLAB (UP),1X0.91 FC WITH CMS CROSSING AND PSC SLEEPERS (FAN SHAPED LAYOUT)
CH:149.710M. IN SEB END CURVE DETAILS OF 8 (R/H) TPTC1 CH:314.780M, TPCC1 CH:354.780M, TPCC2 CH:384.538M & TPTC2 NEXT BLOCK STATION NABINAGAR (NBG) AT KM - 381.84 (FROM GOMOH) AT KM- 395.91 (FROM GOMOH) EXIST. BR. NO.-39 1X0.91m FC SLAB(UP) PROJECT:-
T.C.L.= 119.700m
CH:424.538M HAS BEEN SHIFTED TOWARDS GHD END AT TPTC1 CH:165.115M, TPCC1 CH:205.115M, TPCC2 CH:234.873M & DISTANCE FROM BSYA AT 7.39 KM DISTANCE FROM BSYA AT 6.68KM
SLAB (DN) AT KM.390/0-1 TO BE EXTENDED 4. BALLAST- 50mm SIZE 350mm CUSHION (HARD STONE) CONSTRUCTION OF 3rd LINE BETWEEN
TO BE DISMANTLED
1X0.91m RCC SLAB(DN), AT KM -390/25-27
TRL = 40.0m AT KM - 381.84 (FROM GOMOH) L-XING NO.21 'C' TRAFFIC AT KM.- 388.51 AS 1X1.35m RCC BOX AT CH:231.00m (F/CSB)
TPTC2 CH:274.873M.
TO BE EXTENDED FOR PROP. DN LOOP LINE EXG.BR.NO.40 1X0.91m FC SLAB(UP
TO BE EXETENDED AS 1x1.35 RCC BOX AT 5. ALL FITTINGS TO CONFIRM IRS SPECIFICATION PATRATU - SONNAGAR(291.0KM)
ALT-01 (h) - IN SEB END FM AT CH:320.80M, CH:439.80M, CH:432.40M, CH:457.60M, CH:601.21M, CH:620.60 & CH:801.20M, CH:820.85M, DISTANCE FROM BSYA AT 7.39 KM PROP. FOB AT 1X0.91 FC SLAB (DN) AT KM.390/9-11
CH: 885.50 M (F/CSB)
AND PROP. UP MAIN LINE AT CH: 727.50 M NOTE:
CH:914.20M, CH:979.08M & CH:1100.00M SHIFTED AT CH:316.80M, CH:435.80M, CH:441.45M, CH:448.60M, CH:597.60M,
CH:629.60M, CH:792.20M, CH:824.20M, CH:911.20M, CH:973.20M & CH:1107.20M. (E.C.RLY.BOUNDARY)
CH:59.00m (F/CSB) EXISTING LINE
TO BE
SLEWED 1275 MM (E.C.RLY.BOUNDARY)
TO BE EXTENTED AS 1x1.35m RCC BOX
AT CH:537.50M (F/CSB) (E.C.RLY.BOUNDARY)
TO PLANT (NPGCL)
TO PLANT (NPGCL) 1. ALL MEASUREMENTS ARE IN MM. EXCEPT OTHERWISE AS SPECIFIED. irjkrw ls lksuuxj ds chp rhljh ykbZu ifj;kstuk
ALT-01 (i) - IN SEB END STR. L. NO.2 AT CH:299.80M, L. NO.3 AT CH:418.80M, L. NO.5 AT CH:580.21M & L. NO.6 AT CH:436.60M
SHIFTED AT CH:295.80M FOR L.NO.2, CH:406.80M FOR L. NO.3, CH:416.40M FOR L. NO.5 & CH:416.40M FOR L. NO.6. PROP.GATE
COMMON LOOP LINE LINE NO.-7 TS
TS
2. THIS DRAWING IS PREPARED BASED ON SITE SURVEY AND PREVIOUS CE'S DRG. NO:- Y-70-2019 (291-0 fd-eh-)
ALT-01 (j)- PF END AT CH:270.0M AND PLATFORM LENGTH 600.0M TOWARDS SEB END IS REVISED AS CH:190.50M FOR PF LODGE PROP. UP MAIN LINE LINE NO.-6
1:12 (TWS) FM TS
(THIS ESP WILL SUPERSEDE ALL PREVIOUS APP. ESP OF THIS STATION YARD)
BRIJESH Date: 2022.03.11 FM
FM 1:12 (TWS)
1:12 (TWS) FM PROP. UP MAIN LINE TITLE :
END & PLATFORM LENGTH AS 520.50M. PROP.UP MAIN LINE 1:12 (TWS)
1:12 (TWS)
FM
1:12 (TWS) 1:12 (TWS) FM
3. CH:0.00 IS RECKONED FOR C.L OF EXISTING STATION BUILDING.
F-833 F-303 ALT-01 (k) - IN SEB END LOCATION OF TEXT OF LINE NO. 1&2 IS CHANGED. KUMAR SINGH 15:03:03 +05'30' PROP.REV.LINE FM 1:12 (TWS)
NB
PROP. H/L UP PLATFORM (600.0 M LONG X 11.0M WIDE)
LINE NO.-5
TS F M SAND HUMP 1:12 (TWS) FM FM 1:12 (TWS)
PROP.REV.LINE ENGINEERING SCALE PLAN OF BARKISALAIYA (BSYA)
LEVEL F-500 ALT-1 UP MAIN LINE 1:12 (TWS) FM 1:12 (CS)
1:12 (CS)
FM 1:8.5(CS) 1:8.5(CS) FM 1:12 (CS)
FM 1:12 (TWS) 1:12 (TWS) FM
4. FOB WILL BE 3.0 M WIDE.
DN MAIN LINE 1:12 (TWS) FM 1:12 (CS) REV.LINE LINE NO.-4 1:12 (CS) F M1:12 (TWS) 1:12 (TWS)
DN MAIN LINE
cM+dh lyS;k STATION AT Km.- 389.23 (FROM GOMOH)
1:12 (TWS)
ALT-01 (l) - IN SEB END AT BRIDGE NO. 41, TRACK CENTER BETWEEN LINE NO. 1&3 IS REVISED AS 12.324M & TRACK CENTER BETWEEN (g) FM
FM
1:12 (CS) DN MAIN LINE
F M1:12 (TWS)
1:12 (CS)
1:12 (TWS)
FM
5. STATION IS IN "NSG-6" CATEGORY.
F-303 LINE NO. 2&3 IS REVISED AS 6.324M NEERAJ 2022.03.11 1:12 (TWS) 1:12 (TWS) 1:12 (CS)
EXG.SAN
D HUMP
FM
1:8.5 (CS) DN LOOP LINE LINE NO.-3 FM 1:12 (CS)
CH:3530.00
NB
ALT-01 (m)- IN SEB END LOCATION TURN OUT AT CH:294.80M & STR. LINE NO.1 AT CH:287.80M IS CHANGED.
ALT-1 ALT-1 AMBASTHA15:38:04+05'30' (h) ALT-1 1:12 (TWS) FM
1:12 (TWS)
FM 1:12 (TWS) (13.50 m x 7.50 m)
ALT-01 (n) - IN SEB END CURVE NO.1 DETAILS OF TPTC1 AT CH:1013.304M, TPCC1 CH:1033.304M, TPCC2 CH:1063.02M & TPTC2
F-500 ALT-1 (a) (a) ALT-1 ALT-1 ALT-1 ALT-1 (h)
1:12 (TWS)
(E.C.RLY.BOUNDARY) 7. ELECTRIFICATION OF THIRD LINE WILL BE DONE BY RVNL. ANY MODIFICATION REQUIRED IN
ALT-1 ALT-1 ALT-1 ALT-1 ALT-1 (E.C.RLY.BOUNDARY) TO SON NAGAR (SEB) AUTHORITY OF WORK: PINK BOOK ITEM No. 50/2021-22
CH:5080.00
CH:2380.00
UP TO CH:1083.02M IS CHANGED AS TPTC1 CH:1015.391M, TPCC1 CH:1035.391M, TPCC2 CH:1061.042M & TPTC2 CH:1081.042M. (a) (a) ALT-1 ALT-1 ALT-1 ALT-1 COMMON LOOP LINE
S.B
LINE NO.-1
ALT-1 LEVEL ALT-1 (a) (a) (a) (g) (g) (g) (g) (g) (j) EXISTING OHE WILL BE DONE BY RVNL.
KM 382.200 ALT-01 (o) - IN GHD END EAST RELAY HUT ADDED AT CH:655.00M. & IN SEB END WEST RELAY HUT ADDED AT CH:746.00M. ALT-1 (g) (g) (i) ALT-1 EAST RELAY HUT
ALT-1 ALT-1 AT KM:- 411.83 (FROM GOMOH)
CH: 430.00
ALT-1 (a) (f) (13.50 m x 7.50 m) PROP. H/L DN PLATFORM ( 600.0 M LONG X 10.0M WIDE )
8. PASSENGER AMENITIES SHOULD BE PROVIDED AS PER RAILWAY BOARDS GUIDE LINES. Y - 89 - 2021 (ALT - 1)
ALT-01 (p) - CAL=816.0M&CSL=774.0MOFLINENO.-2,CAL=1054.0M&CSL=1012.0MOFLINENO.-3, CSL=1200.0MOFLINE-4,CAL=1207.74M&
ALT-1 (e) (f) (e) (f) (i) STATION
ALT-1 CES. DRG. No. :
CSL=1165.74MOFLINENO.-5 AND CAL=945.131M&CSL=924.131MOFLINENO.-6ISREVISEDAS CAL=808.0M & CSL=766.0M FOR STATION ROAD S&T
BUILDING NEXT BLOCK STATION ANKORAH 9. 1:1200 GRADE IS NOT FEASIBLE AS THE EXISTING LINES ARE IN STEEPER GRADE.
(o) BR.NO.43, 1X0.91m FC SLAB AT KM.- 388.477 TO BR.NO.42 1X0.61m OPEN TOP(UP),1X0.61m OPEN LINE-7, CAL= 818.981 M (PT TO PT) & CSL= 804.981 M (STR TO STR) (r) ALT-1
KM 385.700 KM 387.900
LINE NO.-2, CAL=1046.0M & CSL=900.0M FOR LINE NO.-3, CSL=900.0M FOR LINE NO.-4 , CAL=1051.131M & CSL=900.00M FOR
BE EXTENDED AS 1x1.20m RCC BOX TOP(DN) AT KM.389/15-17 TO BE EXTENDED AS PROP. S&T COMPLEX LINE-6,CAL=932.131M(FMTOFM)&CSL=899.931M(FMTOSTR) AT KM- 395.91 (FROM GOMOH) 10. EXISTING GRADIENT HAS BEEN MENTIONED AS PER TMS OF DDU DIVISION. (t) DIV. DRG. No. : DRM / DDU PLAN NO- 102 - 2021
STATION ROAD
LINE NO.-5 , CAL=932.131M & CSL=899.931M FOR LINE NO.-6 . 1x1.35m RCC BOX AT CH:293.00m (F/CSB) (13.0m X 8.0m)
EXIT. UP/DN FOR PROP. UP M/L AT CH:753.00 M (F/CSB) BLDG LINE-5,CAL=1051.131(FMTOFM)&CSL=900.00M(STRTOSTR) DISTANCE FROM BSYA AT 6.68KM 11. L.C. NO. 28 IS TO BE CLOSED AS PER DM/AURANGABAD LETTER NO. 881/G DATED 15.06.2015.
EXIT. UP/DN ALT-01 (q) - CONDONATION TABLE ADDED.
KM 384.150 KM 386.850
PROP. NEW STN.BLDG
OF SIZE (23.0m X 8.0m)
LINE-4, CAL = 1302.0 M (FM TO FM) & CSL = 900.0 M (STR TO FM) RVNL. DRG. No. : RVNL/ CPM / PNBE / 06 - 2021 ( ALT- 01)
ALT-01 (r) - KEY PLAN CHANGES AS PER CHANGES IN DRAWING. LINE-3,CAL=1046.0M(FMTOFM)&CSL=900.0M(STRTOSTR) PLEASE REFER APPROVED C.E.'S DRAWING NO. Y-75-2015 'ALT-1' FOR CLOSURE OF THIS L.C.
EXIT. UP/DN EXIT. UP/DN ALT-01 (s)- BLUE COLOR DELETED. LINE-2,CAL=808.0M(FMTOFM)&CSL=766.0M(STRTOSTR)
ALT-01 (t) - NOTE NO- 11 HAS BEEN REVISED AS L.C. NO. 28 IS TO BE CLOSED AS PER DM/AURANGABAD LETTER NO.2951 DATED:- LINE-1, CAL= 764.0 M (PT TO PT) & CSL= 750.0 M (STR TO STR) KEY PLAN
12. TRACK MACHINE IS AVAILABLE AT ANKORA & KOSIARA STATION. SCALE :- 1 : 1000
10.07.2020 AND NOW CLOSED. KM 388.800 (E.C.RLY.BOUNDARY) 13. BEFORE EXECUTION OF WORK AT SITE DM CONSENT MUST BE OBTAINED FOR CONSTRUCTION
(E.C.RLY.BOUNDARY) (NOT TO SCALE) PREPARED BY:-
ALT-01 (u)- ALL THE PROPOSED POINTS ARE TWS. EXIT. UP/DN OF LHS IN LIEU OF LC.