Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

 

                                                                                                      DOC  No. : MH IMS DSN : 022 : F1 
                                                                                                  REV No. : 00 , DATE : 30/01/13 

     
  SR NO. ______ 
  DATE : ______ 
CAE REQUEST FORM 
A) GENERAL INFO : 

  Design Engineer* :  

  Immediate Supervisor* : 

  Head of Department* : 

  Ext No. : 

B) PROJECT DETAILS : 

  Part No.* : 

  Component/ Assy Description : 

  Location of solid model* : 

  Brief background of project : 

  Function of comp/Assy : 

  Note : *Attach the drawings and documents 

C) TECHNICAL DATA : 

  Aim of Analysis * : 

  Type of Analysis * : 
  (Static or Dynamic) 

  Material * : 

  Material ‐ std No./Grade *: 

  Yield strength (MPa) : 

  Ultimate tensile strength (MPa) : 

  Specify heat treatment details : 

  Hardness Data (In RC/BHN) : 

  Type of loading : 
  (Acceleration, Displacement, Force or Moment) 

* Mandatory field 
Prepared By: ‐ Ansari Naushad                            Approved By: V G Kulkarni                                Page 1 of 3 
                                                                                                       DOC  No. : MH IMS DSN : 022 : F1 
                                                                                                  REV No. : 00 , DATE : 30/01/13 

     
   
D) DYNAMIC LOADING DETAILS : 

  Operating frequency range * : 

  Response area * : 

  Mass Details and CG locations * : 

  Damping coefficient & Details * : 

E) ANALYSIS DATA : 

  Specify benchmark model : 
  (if any applicable) 

  Failure photograph (Y/N)* : 

  Magnitude of loads / Torque* : 

  Specify locations of load / moment on assembly* : 

  Specify location of constraints* : 

* Attach free body diagram 

 
 
 

 
* Mandatory field 
Prepared By: ‐ Ansari Naushad                            Approved By: V G Kulkarni                                Page 2 of 3 
                                                                                                       DOC  No. : MH IMS DSN : 022 : F1 
                                                                                                  REV No. : 00 , DATE : 30/01/13 

     
 

F) TESTING PLANNED AFTER CAE : 

  Lab Testing : 

  Expected cycle time : 

  Field testing : 

  Implements: 

  Others : 

  Special remarks :   
 
 

_______________  _______________  ______________ 


DESIGN ENGINEER  IMMEDIATE SUPERVISOR  DESIGN HEAD 
 
 
ISSUED BY VGK  REV NO. 00  SUPERCEDES :  
ISSUED ON:30/01/2013  REV DATE : 30/01/2013  SUPERCEDES DATE :  

* Mandatory field 
Prepared By: ‐ Ansari Naushad                            Approved By: V G Kulkarni                                Page 3 of 3 

You might also like