Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

P.

NAGESWAR RAO /INST/ELTC/USLAPUR/SECR


AUTOMATIC SECTION SINGLE LINE
SL SEC CIRCUMSTANCES AUTHORITY SPEED RULE
1 SL Direction of Traffic T/A 912 15/10 kmph up
establish but Advance to the foot of the
starter failed next auto stop
signal
2 SL Direction of Traffic T/A 912+ T511 15/10 kmph up BWM 6.23
establish but Manual to the foot of the
starter / Semi next auto stop
automatic starter signal
working as a manual
signal failed.
3 SL Direction of Traffic T/A 912 15/10 kmph up BWM 6.23
establish but T/511 to the foot of the
(i) Advance starter next auto stop
failed signal
(ii) Semi automatic
starter working as a
manual signal also
failed
4 SL Direction of Traffic T/A 912 15/10 kmph up BWM 6.23
establish but T/511 to the foot of the
(i) Advance starter next auto stop
failed signal
(ii) Manual Starter also
failed
5 SL Direction of Traffic Not T/C 1425 (for Up trains) 1st Train 25 SR 9.12.07
established due to any T/D 1425 (for Dn Kmph 2nd &
reason or contradictory trains) Subsequent
indication or no light T/A 912 for Adv+Starter booked speed &
(Panel has to be (All mid section Auto observe all
suspended) but line Signals, semi auto, gate precautions at the
clear can be obtain stop signal to be level crossing
from the block section mentioned in T/A 912) gate. .
in advance by any one T/b 409 caution order
means of
communication
T/C 1425 (for Up trains) BWM 6.23
Block section clear ofT/D 1425 (for Dn
all trains. Direction of
trains) 1st Train 25
Traffic established but
T/A 912 for Adv Starter Kmph 2nd &
6 SL
the UP/DN direction (All mid section Subsequent
arrow illuminated in Auto/semi automatic/ booked speed
red gate stop Signals to be
mentioned in T/A 912)
T/C 912 SR 9.12.08
Working in obstructed T/A 912 if governing or
7 SL 15/10 Kmph
line non governing auto
signal pass at on

P.NAGESWAR RAO /INST/ELTC/USLAPUR/SECR

You might also like