INTEGRATED MANAGEMENT SYSTEM

Title:
TAIHEI ALLTECH Document No.: OD-OHS-002
CONSTRUCTION EMERGENCY PREPAREDNESS AND RESPONSE TEAM Rev. No.: 1
(PHIL.) INC. Effective Date: July 25, 2017

0.1 DOCUMENT SENSITIVITY LEVEL


SENSITIVITY LEVEL – INTERNAL shared with TACOPHIL employees. Information may also be shared with external interested parties as permitted by the EVP/ President
Electronic copy – PDF available in shared folder with read only access MS Word accessible only to DCO
Printed copy – A4 size paper
Language – English

0.2 TRACKING OF CONTROLLED COPIES

Electronic
Hardcopy
COPY DOCUMENT RECEIVED BY RETURNED BY REASON RECEIVED BY
NO. LOCATION CUSTODIAN (initial & date) (initial & date) (initial & date)

Sta. Rosa Plant/


1 QC Office DCO

Sta. Rosa Plant/


2 EVP Office EVP

Marketing,
Sales &
3 Makati Head Office Finance Dept.

Sta. Rosa Plant/ Engineering


4 Engineering Office Dept.

Sta. Rosa Plant/ Production


5 Production 1 Office Dept.

Construction
6 Project Site Dept.

Sta. Rosa Plant/


7 QAQC Office QA/ QC Dept.

Sta. Rosa Plant/


8 Admin Office Admin Dept.

Sta. Rosa Plant/ Purchasing


9 Purchasing Office Dept.

Sta. Rosa Plant/ Cable Tray


10 Production 2 (CTF) Factory

Sta. Rosa Plant/


11 Maintenance Office Maintenance

Sta. Rosa Plant/


12 PCO Office PCO

Sta. Rosa Plant/


13 Safety Office Safety

0.3 TRACKING OF ADDITIONAL COPIES


d
lle
d

tro
lle

COPY ISSUED BY RECEIVED BY


tro

on
on

nc

NO. (initial & date) PURPOSE (signature & date over printed name)
C

TAIHEI ALLTECH CONSTRUCTION (PHIL.) INC.


This document is a property of

No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means; electronic, mechanical, photocopying, recording or
otherwise, without prior permission from the management of the organization.
INTEGRATED MANAGEMENT SYSTEM

Title:
TAIHEI ALLTECH Document No.: OD-OHS-002
CONSTRUCTION EMERGENCY PREPAREDNESS AND RESPONSE TEAM Rev. No.: 2
(PHIL.) INC. Effective Date: July 25, 2017

REVISION HISTORY

Revision Change Description Date of Change

0 n/a n/a

1 Update team member July 20, 2017

2 Update team member for Makati Head Office January 03, 2019

Endorsed by: Reviewed by: Approved by: Noted by:

Mr. Manny Velasquez Mr. Ariel Dolera Mr. Keiichi Sato Mr. Koichi Fukushima
DCO/Technical Working OHS Practitioner Executive Vice President President
Secretariat

(Stamp here)

MASTER COPY DISTRIBUTION COPY OBSOLETE

TAIHEI ALLTECH CONSTRUCTION (PHIL.) INC.


This document is a property of

No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means; electronic, mechanical, photocopying,
recording or otherwise, without prior permission from the management of the organization.
INTEGRATED MANAGEMENT SYSTEM

Title:
Document No.: OD-OHS-002
TAIHEI ALLTECH
Rev. No.: 3
CONSTRUCTION EMERGENCY PREPAREDNESS AND RESPONSE TEAM
(PHIL.) INC. Efffective Date:April 29, 2021

Eden Merka
Incident Commander

Angelito Pascua Richmond Yoro


Fire Marshall I Fire Marshall II

Fire Fighting
Cristobal Gatchalian
Team Shaina Mejia Grace Catindig Edgar Caratihan
Marco Panganiban Charlene Roque Dave Cubio Aiko Valencia Crispin Arcita
Maximo Dimaunahan Marvin Tinasas Amy Lalog Jinelyn Rozano
Christopher Abary Justine Umali
Ruel Morados Cristel Arcita Pauline Belen Danny Basco
Melvin Banza Gienel Esteban Robert Caldeo
Rico Valencia
Search and Rescue Communication Salvage Team Security and Traffic First Aid Team Romulo Lamod
Team Group Team Robin Ravanes
Galo Basuan
.
Lino Millanes
Arriane Joyce Dabu

Evacuation Team
Hosemen
Jowel Lalog
Sesinando
. Gatchalian
.
Raymund Dela Trinidad
Water Source
Russel Navarra
John Bernard Santiago

Fire Extinguisher
Team Emergency Driver
Hernan Caputolan Victor Baron Emmanuel Fernandez
Sereno Tagupa Robert Tano Melicio Untalan
Arvin Acuzar Electricity Sources
Manny Velasquez
Edwin De Los Santos
Nozzleman Back- up Nozzleman Valve Men Line Men
Food and Beverages
Daniel Laza

SUPPORT TEAM
Prepared by: Reviewed by: Approved by:

ULYSSIS O. TANO EDUARDO B. RUSIA KEIICHI SATO


LSO & SO3 GENERAL MANAGER EXECUTIVE VICE PRESIDENT
ULYSSIS O. TANO EDUARDO B. RUSIA KEIICHI SATO
LSO & SO3 GENERAL MANAGER EXECUTIVE VICE PRESIDENT
INTEGRATED MANAGEMENT SYSTEM

Title:
Document No.: OD-OHS-002
TAIHEI ALLTECH
Rev. No.: 2
CONSTRUCTION EMERGENCY PREPAREDNESS AND RESPONSE TEAM
(PHIL.) INC. Efffective Date: January 3, 2019

INCIDENT COMMANDER
Mr. Koichi Fukushima

FIRE MARSHALL
Mr. Rex Otero

SEARCH AND RESCUER


FIRE FIGHTER MARYBETH CASTRO COMMUNICATIONS SALVAGER FIRST AIDER EVACUATION
JESSIE RAMOS CORA BARITUA MARYBETH CASTRO LYKA VITUALLA DIANE ERICKA CHAVEZ ARVIN JOHN RULL

.
SUPPORT TEAM

Emergency Driver :
Co. Driver

Food and Beverages:


Ms. Elsa Souza
MEMBERS MEMBERS MEMBERS MEMBERS
1. Jessie Ramos - Leader 1. Dianne Erika Chavez - LeaderDianne 1. Corazon Baritua - LeaderDianne 1. Marybeth Castro - LeaderDianne
2. Arvin John Rull 2. Arvin John Rull 2. Arvin John Rull 2. Corazon Baritua
3. Lyka Vitualla 3. Lyka Vitualla 3. Rex Fiel Otero 3. Elsa Souza
4. Dianne Erika Chavez 4. Jessie Ramos 4. Jessie Ramos 4. Dianne Erika Chavez
Jessie Ramos Jessie Ramos Jessie Ramos