Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

Symbol explanation

Remark Meaning the important information when using the dryer

Notice
Meaning the information that it is possible to damage inner
accessories of dryer or reduce purification efficiency.

Warning
Meaning the prompt information that it is possible result in
personal injury or property damage.
Maintenance & Operation Manual

Foreword

Honorific customers:
Thank you for your choice of our product. In order to use the
product conveniently, please read this operation manual carefully.
It will outline the installation, operation, maintenance and simple
repair with malfunction. The manual is a general operation guide,
and the illustration and description is an example of introduction.
We will offer the services for you, if you have any queries or ideas,
just the same if you want the latest information, please contact
with our company staff or agents.

Remark
In order to provide better services, we retain the right to
modify the content of the manual and will not inform any
more.

Foreword 1
Heated Adsorption Dryer

C
Index

1 Installation ................................................................ 3

2 Operation .................................................................. 6

3 Maintenance............................................................ 11

4 Point out malfunction and simple repair .............12

5 Troubleshooting..................................................... 14

6 Quality Guarantee ................................................. 15

7 Service Affiliation Form ....................................... 16

2 Index
Maintenance & Operation Manual

1
Installation
Installation includes inspection, porterage, placement,air
pipe connection and power wire connection. Please read the
following content careful in order to insure.
1、Inspection
Please check carefully whether the dryer has been damaged
during transportation when opening the packing. To check the
accessories according to the packing list, if any assort &
detection,please notify our company or agents with written form
within 2 days.
2、Porterage
a、The porterage of dryer can be
carried by bores on the base of
dryer.
b、Making sure the load of handling
equipment can meet the request
when porterage.
c、Make sure keeping the balance
of dryer, and avoid inclination or handstand, and handle with
care.

Warning Forbid to carry dryer from side. Because the dryer would
easily fall down and lead to damage of both machine and
personnel if carriage from side.

3、Placement

Installation 3
Heated Adsorption Dryer

a、Machine can put without base platform, but the ground must
the level with hardness、stabilization、without shock and the
intensity must can bear the weight of machine.
b、The distance between machine and surrounding objects must
keep more than 1meter (See pictureⅠ). Consider those factors,
such as drain, ventilation and maintenance space during installation.
c、The dryer couldn’t be installed in the following conditions,
moisture, outdoor, high temperature, dusty, and aggressive gas.
4、Compressed air pipe line connection
a、When installed, you must avoid too
>100cm
long pipeline,too much curvatures,too
small pipe diameter in order to avoid
>100cm
pressure drop.
b、When two or more than two machines pictureⅠ
share a dryer, you must consider the air volume and pipeline
whether match.
c、Inlet/outlet of dryer must install bypass valve to easy maintain.
d、When installed pipeline, we advise to collocate filter to
filtrate oil and impurity on the system(See picture Ⅱ).
e、When installed pipeline, we advise to collocate muffler
outside, and drain muffler timing.

Notice After finished piping, please open drain valve if has, so that
it can discharge impurity or dusty on the pipeline after entering
compressed air ( please close manual drain valve after opening
few seconds.)
Bypass Bypass Bypass Bypass Bypass Bypass

Compressor Tank Grade Q Refrigerated dryer Grade P Grade S Adsorption dryer Special filter used
Filter Filter Filter after Adsorption Dryer

picture Ⅱ

4 Installation
Maintenance & Operation Manual

5、Power cord connection


a、Users need prepare the circuit breaker or fuse follow nameplate.
b、Please connect with ground or other protection switch in
order of safety.
c、Check again after finishing connection follow nameplate
information to make sure whether voltage is right, each points
are tighten. If the fixing point looses caused by long term
transport or others, please tighten again.
d、The diameter of power supply can be chosen follow the
current value on nameplate.

Installation 5
Heated Adsorption Dryer

2
Operation
The operation includes those items, startup, stop, debug, record
and so on. User should understand the structure of machine, the
way to read and record the data in the meter.
1、schematic diagram

2、The principle of air dry


When wet compressed air passes into working tower by air
operated valve from the bottom of the tower. The moisture in
compressed air adsorbs by dry desiccant, and pressure dew point
of compressed air would reach -40℃ after adsorbed. Lots of
compressed air after dry passes to air supply scene by check valve.
Parts of compressed air passes into heater by regenerative adjustment

6 Operation
Maintenance & Operation Manual

valve, and then passes into no-working tower after raising


temperature, and brings out moisture in no-working tower by muffler.
After this,it comes true the purpose of desiccant regeneration and
reaches the effect of circulate dehumidification. The whole circulate
system needs 8 hours, per tower works 4 hours, at the same time
regenerative tower heats 2 hours, blow cooling needs 118 minutes,
supply pressure 2 minutes, The dryer can keep dehumidifying when
two towers operate alternative. It makes sure desiccant dry deeply
and energy saving by adapting to heat regeneration compressed air
and raising its temperature. The regenerative air consumption is 7%.
3、The explanation of main instrument and control switch
3.1 、Main instrument
Air pressure gauge of dry tower uses to show compressed
air pressure of the dryer. Mpa and kg/cm2 representatives unit
of pressure. When reading, look at the opposite scale value and
add the value of unit.
3.2 、Main controller
a、Power supply protection switch is used to control and protect
main equipments, and make sure safe of the machine.
b、ON/OFF Switch uses to control dryer running or stop.
c、Temperature switch uses to control the temperature of
adsorption dryer.
d、Low pressure protection switch is used to control the inlet
pressure of adsorption dryer
e、Solid state relay is used to control open or break of heater.
3.3 、System composition
Controller is made of microcomputer processor, LCD and
temperature sensor. The function of LCD is to show procedure
parameter, alarm information, input calculate data, start/stop
order and so on.

Operation 7
Heated Adsorption Dryer

3.4 、The function of LCD


It shows running condition and relative parameter, setting or
modifies heating and pre-cooling time by LCD. These would be
easier to normal operation and take record for user. The detail
content as follow:

No. Contents
1 Condition of start Condition of stop
2 Local control Remote control
dry、regeneration、heating、
3 Working condition of tower blow cooling、pressure
balancing

Detail parameter of running condition:


(1) Dry time of dry tower
(2) Heating time of regenerative tower
(3) Pre-cooling time of regenerative tower
(4) Dew-point control condition of energy
4 conservation (if has)
(5) Outlet temperature of heater
(6) Regenerative temperature of tower A
(7) Regenerative temperature of tower B
(8) Inlet temperature
(9) Outlet temperature
(10) Dew-point gauge(option)
Model of start/ stop:
5 (1) Remote control / Local control
(2) Standard time control/ dew-point control(optional meter)
Setting valve and display
(1) Current value of heating time of regenerative tower
(2) Current value of blow cooling time of regenerative tower
(3) Modify setting value of heating time of regenerative tower
6 (4) Modify setting value of blow cooling time of regenerative
tower
(5) Setting value of outlet temperature of heater
(6) Setting value of regenerative temperature of tower
(7) Setting value of dewpoint control time limit
(8) Setting value of dewpoint control and high dewpoint alarm

8 Operation
Maintenance & Operation Manual

3.5 、Operation ways of LCD


Expect display window, there are schematic diagram, valves
condition and operation indicator on LCD. Those would know
the operation condition of dryer; LCD is like as picture.

Function
Explanation of function
keys
To start dryer

To stop dryer

To page down

To page up

To enter information search

To enter compilation page

Left shift the bit, then flashing would move 1bit to


left when modify data.

Operation 9
Heated Adsorption Dryer

Function
Explanation of function
keys
Right shift the bit, then flashing would move 1bit
to right when modify data.

Function choose up

Function choose down

Confirmation after modification finished

3.6 、Start process


a、Choose the right 3 phase power and compressed air supply.
b、Close outlet cut off valve,pressurizing dual dry towers to
steady state slowly.
c、Open control circuit (non fuse
switch) on electric control box, power
supply indicator lights. LCD shows
the original pictures, as picture Ⅰ,
so the dryer is prepare well.
picture Ⅰ
d、At this time, press [compilation],
enter password as picture Ⅱ,input
password *password is 000123* then
enter setting page.
e、Move cursor to running parameter picture Ⅱ

setting, as pictureⅢ. Press [enter].


After setting operation method of
priority tower, then press [compilation]
to return standby.
picture Ⅲ

1 Operation
0
Maintenance & Operation Manual

f、Press [ON] to start dryer after


setting priority tower running model.
At the moment, the screen would
enter confirmation page, as picture
Ⅳ. If the dryer start first time, choose
retrun, and then press [confirmation], picture Ⅳ

the dryer startup, and page enters to operation page, like


picture Ⅳ.
3.7 、Stop process
Press [OFF] after dryer operating. The dryer enters delayed
stop condition, and stop dryer automatic after finished delay.
Remark: it is failure to press [compilation] during operation,it
would be available when dryer stop.

3.8 、Parameter setting and data enquiry


a、Pressing [compilation] would enter password setting page
during dryer stop. You can follow the page show【▲】or
【 】 to set parameter after input password.
b、You can data query both in the
condition of operation and stop.
Press[information search] to enter
search page when need query, and
press [▲] or [▼] to read the query
picture Ⅴ
items, as the picture Ⅴ.
c、The controllor has the function
of history malfunction query, when
dryer is abnormal, the controllor
would show the abnormal contents,
and take the abnormal information
automatic. Follow the second step picture Ⅵ

to choose history malfunction query when need, as picture Ⅵ

Operation 11
Heated Adsorption Dryer

d、You need to know the password


when you need to enter picture Ⅶ.
Picture shows as follow. However,
we refuse to offer the password to
user. If you really need to modify,
please contact our company service picture Ⅶ
person, we will offer after confirmation.

1 Operation
2
Maintenance & Operation Manual

3
Maintenance

The purpose of maintenance makes sure the dryer operating


normal and air quality. The maintenance can be divided into
daily and periodic.
1、Maintenance protects daily
a、Check whether working pressure is normal or not after
startup the machine and input compressed air.
b、Check whether inlet temperature is normal or not after startup
the machine and input compressed air.
c、Check whether pressure meter is normal or not after startup the
machine and input compressed air.
d、Check whether auto drain valve of prefilter is drain or not after
dryer operating normally.
e、Check whether all parts are working normally after dryer
operating normally.
2、Periodic maintenance protects
a、It needs to check muffler working condition per month, if
muffler can't exhaust or noise loud, you must clean or replace.
b、Check and tighten all the bolts and all kinds of fixing per year.
c、Check and tighten all of the electrical connection per year.
NOTICE
d、It needs to check the air quality in fixed time. It is the time

Maintenance 13
Heated Adsorption Dryer

to check the absorbent loading level or replace adsorbent when


dew point is higher than normal value at long time, dry indicator
of dry tower is lower than wet condition or there is lots of powder
on the special filter used after adsorption dryer.

Please use original adsorbent to make sure the dryer operating


Notice
steady long time. This adsorbent has strong adsorbability and
wear resistance.

14 Maintenance
Maintenance & Operation Manual

4
Point out malfunction and simple repair

There are many reasons caused malfunction, detail as follow:


Malfunction Reason Solution

Too strong of inlet flowrate Control the air inflow in the setting value

High inlet temperature (exceed 40℃) check upstream of aftercooler

Poor Too much moisture of inlet compressed air Check upstream air-water separator or cooler、dryer
on
dehumidify Higher inlet oil connect and desiccant is
Replace prefilter, and cleaning pipe, then replace desiccant
polluted by lubricating oil
Lower flow rate of regeneration Check the working condition of regenerative
compressed air and inlet pressure adjustment valve and pressure drop of prefilter

Cycle malfunction in tower A and B Replace computer panel or check the setting of computer panel

Too large air inflow control air inflow in setting value or choose bigger capacity of dryer

Low inlet pressure Check pressure drop of prefilter

Too strong pressure drop of prefilter or afterfilter Replace element


Strong
on Pipe is plugged Cleaning pipes
flow
resistance Diameter of pipe is not accord with request Replace suitable diameter pipe

Too much of elbow pipe Decrease elbow pipe suitable

The volume of regeneration air is large Decrease the volume of regeneration air suitable.

Regenerative regulating valve blocks Cleaning or Replace


Regeneration
function Malfunction of regulative blow-down valve ( close) Check solenoid valve or computer panel wiring
drop
Discharge muffler blocks Cleaning or replace

Couldn’t pressurize Check regenerative regulating valve and check valve


Pressurizing
abnormal Not power Check power supply, control switch and wires connect of
computer panel.

Point out malfunction and simple repair 15


Heated Adsorption Dryer

Malfunction Reason Solution


Block on muffler Cleaning or Replace
High
pressure Poor drainage on regenerative discharge pipeline Replace a little larger pipeline
on
regeneration Leaks on check valve Cleaning or Replace
tower
Failure on valves switching Check and replace destroy parts

Destroy in control heat of solid state relay Check and replace same specification solid state relay

Power supply and wire of heater failure Check and exclude


Heater
couldn’t Connection of heater is broken or destroy Check and exclude or replace heater
work No signal from programme controllor
normally Check and exclude or replace heater
output or control signal is abnormal
Abnormal Programme controllor is working abnormal Check or replace programme controller
on
tower Failure of switch valve or leaks serious Check and replace destroy parts
A and B
switching Abnormal on power or destroy of solenoid valve Check and replace destroy parts

16 Point out malfunction and simple repair


Maintenance & Operation Manual

1
7 Debar malfunction scheme

Malfunction

Turn off power supply,


and stop machine

Check up machine whether it accords with request

Accord with request No accord with request

Whether it is accord with the maintenance


item to protect The malfunction still exists after improving

protecting No protecting

Malfunction are go with the maintenance to protect all around


also existing

According to the manual to find out the reason ,and resolve

Malfunction are
also existing

Fill service affiliation form and then fax to our company or our agency

Receipt faxes to affirm malfunction, and need to confirm if in the guarantee time

In the Out of the


Guarantee time Guarantee time

Quote

Consumer’s signature

Maintenance in locale or
back to our company

Inspect and accept

Debar malfunction scheme 17


Heated Adsorption Dryer

6
Quality Guarantee

Before dispatched from our factory, dryers have been


performance testing and product inspection. Guarantee period
is 12 months from dispatched from factory (other agreements
are based on the written). If dryers are destroyed during guarantee
period, we will repair it free. However, we don’t have the
responsibility when it is broken by the following reasons: by
transport, collision, visitation of providence, battle, etc; don’t
use according to our manual; don’t repair by our company
service personals, meanwhile, some indirect conditions lead to
the distorters during guaranteed time, we also refuse to take
responsibility.
Our company advises all buyers: when you find something
wrong with our products, please notice us or our agent, we will
let our service personnel to deal with malfunctions. Please do
not amend the system by yourself, because forcing to operate
the machine will cause damage.

18 Quality Guarantee
Maintenance & Operation Manual

1
9 Service affiliation form
Se rvic e服務聯繫表
1、User information
af f il i at i o n form

Company name: Contact person:

Address: Tel:

2、Machine Information

Model: Manufacture No.:

Dealer: Release date:

3、Malfunctions explanation
( )Machine stops ( )Malfunction indicator
( )Poor in water drainage
( )Pressure meter is point to zero or low after stop dryer 5 minutes.
( )Excessive pressure drop

4、Operation Conditions
Air inlet temperature ℃ Air inlet pressure MPa
Running condition of intake valve Working condition of exhaust valve
( refer to panel indication) ( refer to panel indication)
( )Action ( )Stop ( )Action ( )Stop
Exhaust condition of muffler ( )Normal Shop temperature ℃
( )Not exists ( )Noise loud ( )higher( )suitable( )lower
Pressure dew point ℃

5、Others

Discharge volume of compressor m3/min Working pressure MPa

Working Voltage V

S e r vi c e af f il i at i on form 19

You might also like