Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

OFFICIAL COMPETENCY ASSESSMENT TOOL

Part 1: RATING SHEET FOR DEMONSTRATION

Trainee’s Name Richie Juls Bacalso


Assessor’s Name
Qualification CONSTRUCTION SITE SUPERVISION LEVEL IV
Unit of Competency UOC 2: RESOLVE CONSTRUCTION RELATED
ISSUES
Date of Assessment
Time of Assessment
General Instructions:
1. Assessor shall provide the Performance Test for UOC2: Resolve
Construction Related Issues for download thru Online Classroom
2. Answer the Performance Test Questions
3. Submit the Accomplished Performance Test in PDF Format on the
designated Submission Bin thru the Online Classroom.
Required Resources
1. Internet Connection
2. MS Office Software or Other Similar Software
3. Laptop or Desktop
Criteria To show if evidence
is demonstrated
During the demonstration, did the candidate...✅
Yes No N/A

Determine construction work issues based on Contract


Documents, Site Strategies and Site Conditions?
1. Identify external and internal work issues in
his/her workplace in Question #1?
2. Write a problem statement in sentence form
indicating: what is the problem, who are
involved, where is it happening, when it is
happening, why is it happening, and how is it
affecting the operations (in terms of cost and/or
productivity) in Question # 2
Investigate construction work issues in accordance with
company and client’s policies and procedures?
3. Identify the root causes of a problem using the
fishbone diagram in Question # 3?
Identify controls in accordance with company and client’s
policies and procedures?
4. Identify the Best Solutions in the Root Cause
identified in Question # 4?

1
OFFICIAL COMPETENCY ASSESSMENT TOOL

Evaluate controls based on Contract Documents, Site


Strategies and Site Conditions?
5. Identify the activities and required outputs to
implement the Best Solution in Question # 4?
Update work activities based on approved action plans?
6. Indicate the Status and Time Frame of the
Activities in Question #4?
Communicate action plans in accordance with company
and client’s policies and procedures?
7. Complete all the required information in
Question # 4?
The candidate’s demonstration was:
𐄂 Satisfactory 𐄂 Not Satisfactory

2
OFFICIAL COMPETENCY ASSESSMENT TOOL

Part 2: QUESTIONS ABOUT THE DEMONSTRATION


Trainee’s Name Richie Juls Bacalso
Qualification CONSTRUCTION SITE SUPERVISION LEVEL IV
Unit of Competency RESOLVE CONSTRUCTION RELATED ISSUES
Satisfactory
QUESTIONS✅
Responses
Yes No
Listening
Provide samples of Active Listening Techniques
Best Possible Answer/s: (1) Pay Attention, (2)
Withhold Judgment, (3) Reflect, (4) Clarify, (5)
Summarize
Questions
What are the different types of questions?
Best Possible Answer/s: (1) Closed Question, (2)
Open Question, (3) Probing Question, (4) Leading
Question, (5) Clarifying Question
Critical Thinking
What are the steps in problem solving?
(Describe a work-related problem using the 6 steps)
Best Possible Answers:
Step 1: Define the Problem
Step 2: Analyze the Problem
Step 3: Generate Solutions
Step 4: Select a Solution
Step 5: Implement the Solution
Step 6: Evaluate the Solution
The Trainee’s underpinning knowledge about the demonstration of
tasks was:
𐄂 Satisfactory 𐄂 Not Satisfactory
Feedback to the Trainee:

Overall Performance:
𐄂 Satisfactory 𐄂 Not Satisfactory
Trainee’s Signature: Date:
RICHIE JULS BACALSO
Assessor’s Signature: Date:

3
OFFICIAL COMPETENCY ASSESSMENT TOOL

Part 3: PERFORMANCE TEST (DEMONSTRATION)

Qualification CONSTRUCTION SITE SUPERVISION LEVEL IV


Unit of
RESOLVE CONSTRUCTION RELATED ISSUES
Competency
Learning IMPLEMENT AND EVALUATE SELECTED SOLUTIONS IN RESOLVING
Objectives CONSTRUCTION RELATED ISSUES
SPECIFIC INSTRUCTIONS FOR THE TRAINEE (ANSWER ALL ITEMS)

1. Identify the most common work issues you face on a daily/weekly basis.
2. Based on the identified issues, choose the most memorable one.
Please write a problem statement about it.
3. Analyze the problem using the FishBone Diagram technique.
Cause/s: Working Conditions, Raw Materials, Management, Technology,
Machine, Workers
4. Think about the root causes that you’ve identified in your fishbone; you
would need to take to implement your solution. Choose 1 root cause only

1. Identify the most common work issues that you face on a daily/weekly basis?
External issues
● Bad Weather Codition
● RROW Concerns

Internal issues
● Communication problem.
● Managing your documents.
● Safety Issues (Accident)

2. Problem-Solving Process – Step One, based on the identified issues, “what is your
problem?” choose the most memorable one.
(Note: Problem is a negative result that INVOLVES you).
Please write a Problem Statement (it should include the 5Ws & 1H: what, who,
where, when, why, how). Do NOT be in bullet form

Write your answer here


Incident happened last September 29,2022 around 8:30 AM in the morning when a dumptruck passing the
area at Purok Dao, Upper Tinanban, Governor Generoso, Davao Oriental where a debri hit on the head of a
bystander namely Geromina Panuncial, that causes lacerated wound at parietal area left .

4
OFFICIAL COMPETENCY ASSESSMENT TOOL

3. Analyze the problem using the FishBone Diagram technique.


Cause/s: Working Conditions, Raw Materials, Management, Technology, Machine, Workers
Write your answer here

5
OFFICIAL COMPETENCY ASSESSMENT TOOL

6
4.
OFFICIAL COMPETENCY ASSESSMENT TOOL

5. Implementation of Solution
Think about the root causes that you’ve identified in your fishbone diagram. Based on this, what do you need to do?
What are the actions needed to implement your idea? Choose 1 Root Cause Only.
 A dumptruck passing the area at Purok Dao, Upper Tinanban, Governor Generoso, Davao Oriental
PROBLEM: where a debri hit on the head of a bystander namely Geromina Panuncial, that causes lacerated
wound at parietal area left due to poor housekeeping.
 Effective housekeeping to control and eliminate work hazards.
SPECIFIC OBJECTIVES:

BEST
ROOT REQUIRED TIME FRAME /
ALTERNATIVE/ ACTIVITIES STATUS BUDGET
CAUSE OUTPUT DUE DATE
SOLUTIONS
Write down activities or
Write a Tangible or Write a fictional You may write a Write a fictional
tasks that will help you
observable output status duration or date budget
achieve your solution
1.Assigned and
Poor maintain regularly a Control and
housekeepin housekeeping on Regular inspection on site. Prevention
Approved Daily No Budget needed
g site. Cleaning and
organization must be Daily cleanup (Street
done regularly,not Eliminate Approved Daily No budget needed
just at the end of the
sweeping and spraying)
shift.
Write your answer Write your answer
Write your answer here Write your answer here Write your answer here
here here

You might also like