Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

May 24, 2022

CERTIFICATION

I hereby certify that the following items of works consisting of 1 month (covering
(April 24 – May 23, 2022) has been accomplished in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.

1) 101(3)b3 Removal of Actual Structures / Obstruction - PCCP

This certification is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

May 24, 2022

CERTIFICATION

this is to certify that the water used on all concreting works in the 18B00053:
Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Bridge Program: Replacement of Permanent Weak Bridges –
Abusag Bridge (B04258lZ) along Baybayog – Baggao – Dalin – Sta.
Margarita Road Baggao, Cagayan, was found to be clean and free from
deleterious substances.

This certification is issued in connection with the construction of the above-


mentioned project, under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN

May 24, 2022

INSPECTION REPORT

I hereby certify that the following items of works consisting of 8,008.96 Kgs
(Covering (April 24 – May 23, 2022) for the Item 403(1)a1 Structural Steel,
Furnished (Craneway & Platform) has been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.

This report is issued in connection with the construction of the 18B00053:


Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Replacement of Permanent Work Bridges – Abusag Bridge
(B04258lZ) along Baybayog – Baggao – Dalin – Sta. Margarita Road
Baggao, Cagayan under the contract with FREY-FIL CORP.

Certified by:

ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN