CERTIFICATION
I hereby certify that the following items of works consisting of 1 month (covering
(May 24 – June 23, 2022) has been accomplished in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
CERTIFICATION
I hereby certify that the following items of works consisting of 750.00 sq.m
(covering (May 24 – June 23, 2022) for the Item Removal of Actual
Structures / Obstruction – PCCP has been accomplished in accordance with the
Department of Public Works and Highways Standard Specifications and Special
Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
CERTIFICATION
this is to certify that the water used on all concreting works in the 18B00053:
Organizational Outcome 1: Ensure Safe and Reliable National Road
System: Bridge Program: Replacement of Permanent Weak Bridges –
Abusag Bridge (B04258lZ) along Baybayog – Baggao – Dalin – Sta.
Margarita Road Baggao, Cagayan, was found to be clean and free from
deleterious substances.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 8,008.96 Kgs
(Covering (May 24 – June 23, 2022) for the Item 403(1)a1 Structural Steel,
Furnished (Craneway & Platform) has been checked and inspected in
accordance with the Department of Public Works and Highways Standard
Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN
INSPECTION REPORT
I hereby certify that the following items of works consisting of 100 sq. m. (Covering
(May 24 – June 23, 2022) for the Item 411(1) Paint has been checked and
inspected in accordance with the Department of Public Works and Highways
Standard Specifications and Special Provisions of contract.
Certified by:
ALEJANDRO S. ABELLA
Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE PROJECT ENGINEER
BAGGAO, CAGAYAN