Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Business Data Direction businessdatadirection@gmail.

com

Occurrence potential (O) for the process (time based failure prediction value)

Potential Failure Causes rated according to the criteria below. Consider Prevention Controls when determining the best Occurrence

Time based failure cause


OCC Type of controls Prevention controls
prediction

10 Every time None No prevention control.

9 Almost every time


Behavioral Prevention control will have little effect in preventing failure
8 More than once per shift

7 More than once per day


Prevention control somewhat effective in preventing failure
6 More than once per week
Behavioral or
technical
5 More than once per month
Prevention control are effective in preventing failure cause
4 More than once per year

3 Once per year


Best practices:
Prevention control are highly effective in preventing failure
Behavioral or
2 Less than once per year

1 Never Technical Prevention control are extremely effective in preventing

Page | 1 of 1

You might also like