ASAWER PHASE III UPSTREAM SURFACE FACILITIES KEYI FPF PROJEC PMC

& CONTRACT No.: Petro-Energy/11/2008-5250


ZPEB Petro-Energy
INSPECTION AND TEST PLAN-ALTERNATING CURRENT INDUCTION MOTOR
DOCUMENT NO.: KE3-PRO-ELC-0908-6012

THE RECORD OF MOTOR INSULATION RESISTANCE


Form-ELC-015
Unit: _____________________________Location:___________________________
Date:_____________________________ Record No.:________________________
Procedure Ref:______________________ Testing Equipment:_________________
Last Calibration:_____________________ Drawing No:_______________________

Parameters
Manufacturer Series No.
Rated speed (RPM) Capacity (kVA)
Insulation class Designing temp.
Frequency Hz Phases
Voltage (kV) Cooling manner

1. Visual inspection
2. Check the parameters of motor
3. Check control panel and feeding panel.
Measuring insulation resistance
Three feeding Six feeding
Winding Remark
Ph - E Ph 1 - E Ph 2 - E Ph 3 - E
Rotor
Stator

SUB-CONTRACTOR CONTRACTOR
APPROVAL (VICOM) (ASAWER-ZPEB)
PMC/OWNER

SIGNATURE

DATE

AC MOTOR INSPECTION FORM


(Form-ELC-016 )
ASAWER PHASE III UPSTREAM SURFACE FACILITIES KEYI FPF PROJEC PMC
& CONTRACT No.: Petro-Energy/11/2008-5250
ZPEB Petro-Energy
INSPECTION AND TEST PLAN-ALTERNATING CURRENT INDUCTION MOTOR
DOCUMENT NO.: KE3-PRO-ELC-0908-6012

Project Title:____________________________ Date:________________________


Contract No.:____________________________ Location:______________________
Manufacturer:___________________________ Series No
Capacity: Voltage:
Phases: Current:
Frequence: Cooling manner:

No. Description Conclusion

1. Check the type and specification of all motors .

2. Check explosion proof and seal.

3. Check the grounding of motor.

4. Check cable connection and seal.

5. Check the rotating direction of motor.

6. Check the grease of motor bearing.

7. Check the installing record of motor.

8. Check the test running of motor without load.

9. Check the test running of motor with load.

SUB-CONTRACTOR CONTRACTOR
APPROVAL (VICOM) (ASAWER-ZPEB)
PMC/OWNER

SIGNATURE

DATE
ASAWER PHASE III UPSTREAM SURFACE FACILITIES KEYI FPF PROJEC PMC
& CONTRACT No.: Petro-Energy/11/2008-5250
ZPEB Petro-Energy
INSPECTION AND TEST PLAN-ALTERNATING CURRENT INDUCTION MOTOR
DOCUMENT NO.: KE3-PRO-ELC-0908-6012