HSE Observation Report

Date: 15-9-2022
Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level
Energized cable has
been removed from
Contractor need to the scaffold and
Observed that ensure that all energized arranged
energized electrical
electrical cables direct Life properly .also tbt
cables direct contact / Critical
contact with metal must conducted with
tied with scaffold One
1 Fire Pump be remove or provide operatives regarding
edge protection, working
Room Potential risk of
proper insulation and day cable arrangement .
electrocution or advise operatives do not
electric shock tie cables directly with
metal

Proper edge
protection has
installed by
Contractor need to scaffolding team .
provide proper edge Life
Inadequate edge Critical
protection or any means
protection was One
2 Basement- of fall protection to
observed at working
1 prevent the workers day
mechanical opening
from falling to a lower
level
HSE Observation Report

WAH & full body


harness refresh
training given to
Found Operative Contractor need to
from Meras was
operatives and
ensure that all operatives Life advised him to
working on the
are trained and Critical anchor lanyard with
scaffolding platform
Basement- competent when One scaffold top rail .
3 hook his safety
1 working at heights. working
lanyard with day
firefighting Pipe Must be secure their
which is not lanyard with proper
acceptable anchor point

TBT conducted with


operatives regarding
mobile scaffold
Observed that transferring
Contractor need to procedure and
operative (Meras) Non-Life
ensure that nobody Critical advised him don’t
was pushing the
Basement- scaffold platform works or standing on the 1>3 stay on scaffold
4 working
1 scaffold platform when while pushing or
while the worker is day
moving or transferred in transferring .
standing on the
one location to another
working platform
HSE Observation Report

Rebars area has been


barricaded with
warning tape
informed to scaffold
Contractor need to Non-Life inspector to provide
ensure that all Critical hard barricades
Observed
Level-1, protruding rebar’s are 1>3 around the rebars .
5 Unprotected
A05 well protected/ covered working
protruding rebar’s day
with rebar caps or
barricade the area

Fire extinguish has


been provided at
material storage
Contractor need to area . informed to
Combustible
ensure that all concern person for
material
combustible materials Non-Life removal of material .
( polystyrene foam) Critical
must be remove from
was found kept and 1>3
6 Basement- the site if it is not in use
stored, Potential risk working
1 at site, or managed to day
to fire hazard, fire
prevent the risk of fire,
extinguisher not in
fire extinguisher must be
place
available in place
HSE Observation Report

Rebar cape has been


provided on the
Contractor need to rebars at staircase
ensure that all access area .
Unprotected and egress paths are Non-Life
Ground protruding rebar clear , remove the Critical
Level to 1>3
7 observed in the Stair protruding rebar from working
Basement- Case , Potential risk stair case access or well day
1, A05 of injury protected/ cover
properly to prevent from
personnel being injured

Material has
removed from the
fire point access.

Contractor need to Non-Life


Fire point was Critical
ensure that all access
Level-2, blocked and 1>3
8 towards the fire point
A05 obstructed with working
must be cleared and day
material
unobstructed.
HSE Observation Report

Scaffold has
removed from the
access .
Contractor need to
No Access /
provide temporary
temporary closed Non-Life
closed / no access Critical
signage’s were not
Basement- provided at stair case warning signs if the 1>3
9
1 access is closed due to working
when it was closed day
work to notify the
with scaffold due to
workers in case of
MEP works
emergency

Bulb has replaced


new bulb installed .
now illumination is
Contractor need to good .
ensure that all Non-Life
access/egress and Critical
Observed poor
Basement- illumination , due to working areas are well 1>3
10 working
1 illuminated, regular
bulb failure day
inspection must be
conducted by
maintenance department

Prepared by:
Mohammed Vajid Ali
HSE Observation Report

Life Critical Major failure e.g. fatality, LTI, major injury, or Immediate> 1 Working day (if not temporary suspended)
dangerous occurrence
Non-Life Critical Potential Minor injury Incident, Environmental or 1 > 3 working day
Welfare Issue.
Good Practice N/A None however look to share good practice