Date: 15-9-2022
Potential
Location Action required /
S.no Issues Photograph Risk Rectification Close Out Photo
Recommendations
Level
Energized cable has
been removed from
Contractor need to the scaffold and
Observed that ensure that all energized arranged
energized electrical
electrical cables direct Life properly .also tbt
cables direct contact / Critical
contact with metal must conducted with
tied with scaffold One
1 Fire Pump be remove or provide operatives regarding
edge protection, working
Room Potential risk of
proper insulation and day cable arrangement .
electrocution or advise operatives do not
electric shock tie cables directly with
metal
Proper edge
protection has
installed by
Contractor need to scaffolding team .
provide proper edge Life
Inadequate edge Critical
protection or any means
protection was One
2 Basement- of fall protection to
observed at working
1 prevent the workers day
mechanical opening
from falling to a lower
level
HSE Observation Report
Material has
removed from the
fire point access.
Scaffold has
removed from the
access .
Contractor need to
No Access /
provide temporary
temporary closed Non-Life
closed / no access Critical
signage’s were not
Basement- provided at stair case warning signs if the 1>3
9
1 access is closed due to working
when it was closed day
work to notify the
with scaffold due to
workers in case of
MEP works
emergency
Prepared by:
Mohammed Vajid Ali
HSE Observation Report
Life Critical Major failure e.g. fatality, LTI, major injury, or Immediate> 1 Working day (if not temporary suspended)
dangerous occurrence
Non-Life Critical Potential Minor injury Incident, Environmental or 1 > 3 working day
Welfare Issue.
Good Practice N/A None however look to share good practice