1. What does APU supply ?

Answer: bleed and electrical power

2. What are the conditions for Autoshutdown of APU in air and ground?

3. Fire loop in APU? Answer: single loop

4. Fuel supply in APU

5. How do you start an APU?

6. Which doors are used as emergency exit in MA60?

7. What are zone 100, 200,300,400,500,600,700 and 800?

8. Fuselage divided into how many portion?

9. Number of frames of fuselage?

10. Lavatory located at which frame?

11. Which portion of fuselage is pressurized?answer : cockpit upto door at Frame 40

12. Wing divided into how many parts?

13. What is used for the pitch control of the propeller? Answer: propeller

14. If there is oil leak from propeller blade, what will you check first? Answer: blade seal( o-ring)

15. How do you do overspeed and auto feather test of propeller?

16. Function of electrical feathering pump

17. How many ways you can do propeller feathering?

18. Propeller synchrophasing and it working values

19. Construction of PW127 J engines

20. How many shafts are there in the engine?

21. Which bearing support LP shaft, HP shaft?

22. Which bearings are radial , axial?

23. Starter limitation of the engine.

24. Function of power lever and condition lever

25. When do you use continuous ignition?

26. Where is the engine fault code displayed? Answer: torque indicator

27. How do you erase engine fault code?

28. What indications are there in control box located in LH landing gear bay? Answer: oil filter
bypass..........
CAMMOE

1. What are the repetitive defects in MA60?

2. What is the latest revision of our CAMMOE? answer: Issue 02 Rev 04

3. What is the main role of certifying Engineer? answer: to issue CRS

4. Which portion of CAMMOE is mostly applicable to line maintenance?answer: part 2 and L2

5. What is MEL?

6. How do you release the aircraft under MEL? Answer: refer MEL, raise ADD....

7. What procedures are there in our CAMMOE to ensure the tools are not left in aircraft after the
completion of maintenance?

8. What will you do after use of calibrated tools? Answer: make entry in tech log with Serial number
and due date

9. What is CAMMOE?

10. What is Part145?