Professional Documents
Culture Documents
BKSHPP 04 32C01 C02 (Rev A)
BKSHPP 04 32C01 C02 (Rev A)
BKSHPP 04 32C01 C02 (Rev A)
3m
Surface Drain Headrace Pipe
SOP8
R5
.0
0
R4
.0
0
R3
.75 SOP9 SOP10
R3.5 SOP3
0
R3.00 SOP1
SOP4 SOP2
Penstock Pipe
SOP7
SOP5 SOP11
SOP12
8.00
7.50
1345
7.00
SOP6
6.00
1382.726
C C
Static Water Level 1375.00
V
V
SOP Easting Northing
V
SOP1 423503.762 3130376.947
Normal Water Level 1371.02
1370.598 V
V SOP2 423500.775 3130376.671 NOTES:
V
SOP3 423504.058 3130373.977 1. All dimensions are in meter and Elevations in masl.
Gabion Protection 2. Excavation slopes shall be maintained as per site condition
D D V SOP4 423506.745 3130377.267 under the supervision of site engineer.
V
SOP5 423503.463 3130379.955 3. Steel for Penstock pipe shall confirm to IS 2062: Grade
1365.596
Downsurge Level 1364.87
SOP6 423503.265 3130381.942 4. The pipe is exposed unless mentioned.
SOP7 423508.733 3130377.462 5. In case of buried pipe, the depth of the cover shall be at
V
SCALE
V
SECTION A-A
UN
IT S E N G IN
V
CY
EE
R
N
IN T A
G C
O NS U L
V
V
ANCHOR BLOCK 40
8.00
7.50
7.00
50
6.00 0.
1382.726
00
Upsurge Level 1380.72 6.
V
V
V
C C
V Static Water Level 1375.00
V
V
22.38
1370.598
23.38
V
V
0.3m*0.3m Surface Drain SECTION C-C
D D
V SCALE B
V 1365.596
Downsurge Level 1364.87
E E
1360.34
1359.34
6.00 NOTES:
1.00
1.00 1.00 1.00 1. All dimensions are in meter and Elevations in masl.
M25 Concrete 2. Excavation slopes shall be maintained as per site condition
0.1m PCC under the supervision of site engineer.
0.15m Stone Soling
3. Steel for Penstock pipe shall confirm to IS 2062: Grade
SECTION B-B
SCALE A 4. The pipe is exposed unless mentioned.
5. In case of buried pipe, the depth of the cover shall be at
least 1.2m. Compaction of soil on top of the pipe shall be
carefully carried out in such a way that the shape of the
0 pipe is not distorted.
1.0
0
6.0
0
6.0
UN
IT S E N G IN
CY
EE
SECTION E-E R
N
IN T A
G C
O NS U L
SCALE B
SECTION D-D
SCALE B