BOQ-Bikiltu Charo & Bikiltu Kalala WSP
BOQ-Bikiltu Charo & Bikiltu Kalala WSP
2 Masonry Work
50X50 cm thick hard core or equivalent stone masonry
2.1 construction on the floor of the supported column M³ 4.50 -
cement mortar (1:3)
3 Concrete Work
IV) Bill of Quantities for Distribution Line Installations including cuting, bending and Laying the Pipe
No Description OF Work Unit QTY Rate amount
A Earth Work
Trench Excavation to depth of 70cm and 60 cm width
1.1 m3 504.00 community
and 1200m length
1.2 Back fill and compaction of all excavated materials m3 504.00 community
Total summary carried
Supply & LAYING OF HDPE(PN16) , GS PIPES
B
& FITTINGS
1.1 HDPE PIPE PN16 1 ¼’’ with all works on a site m 1,200.00 -
1.2 GS pipe 1 1/4'' (Cating, twisting & Fixing including) m 36.00 -
C Fittings
1.1 Nipples 1 1/4’’ GS Pcs 8.00 -
1.2 Female adapter HDPE 40mm pcs 4.00 -
1.3 Union HDPE PN16 40mm Pcs 20.00 -
1.4 GS union 1 1/4'' Pcs 3.00 -
1.5 Reducer HDPE PN16 (1 1/4’' -1'') Pcs 3.00 -
1.6 Reducer HDPE PN16 (1 ¼’’-3/4’') Pcs 4.00 -
1.7 Tee HDPE PN16 1 ¼’’ PCS 2.00 -
1.8 Socket 1 1/4’’ GS Pcs 8.00 -
1.9 Elbo 1 1/4’’GS Pcs 10.00 -
1.1 Get valve GS 1 1/4'' Pcs 1.00 -
1.11 GS checkvalve 1 1/4'' Pcs 1.00 -
1.12 fiber kg 1.00 -
1.13 paint Lt 4.00 -
Total for Pipe Line InstalaltionWorks -
Total for Bikiltu Kalala SQ Flex-Civil & Surface Works -
Bill of Quantities for Charo Gobano SQ Flex-Civil & Surface Work Activities
I) Roto Seat for 10M3 capacity
Item Work Description unit Quantity Unit rate Total Cost
A.Sub-Structure
1 Excavation and Earth work
Clearing of the site to remove top soils to an average
1.1 M2 25.00 -
depth of 25 cm
Excavation of foundation to depth of 1.5m below
1.2 M3 8.64 -
NGL and 1.2X1.2m wide
2 Masonry Work
50X50 cm thick hard core or equivalent stone masonry
2.1 construction on the floor of the supported column M³ 4.50 -
cement mortar (1:3)
3 Concrete Work