Calculation of the Discharge Under Burst

Pipe Condition of a Penstock Head Valve


Bruno SPENNATO
Dominique SOURIE
Victor WINCKLER

EDF Hydro Engineering Centre


France

Waterpower XV
July 23-26, 2007
Chattanooga, Tennessee USA



×
Pressure Flow

70 50

60
40
50
Pressure (mWC)

40
30

Flow (m /s)
3
30

20
20

10
10
0

-10 0
0 50 100 150 200 250
Time (s)
Pressure Acceptable max. pressure Flow

50 60

40 50

30 40
Pressure (mWC)

Flow (m /s)
3
20 30

10 20

0 10

-10 0
0 2 4 6 8 10 12 14 16 18 20
Time (s)
Bid at 48 m3/s Bid at 39 m3/s

1200
1000
800
kEuros

600
400
200
0
VALVES COST TOTAL COST