This document contains a list of expenses from March 1-24 related to construction work. It includes line items for materials, labor, and supplies purchased each day with associated costs. The largest expenses were for hollow blocks, demolishing buildings, plastering walls, cement, steel, and construction materials. The total expenditure for the 24 day period was 59,808.02.
This document contains a list of expenses from March 1-24 related to construction work. It includes line items for materials, labor, and supplies purchased each day with associated costs. The largest expenses were for hollow blocks, demolishing buildings, plastering walls, cement, steel, and construction materials. The total expenditure for the 24 day period was 59,808.02.
This document contains a list of expenses from March 1-24 related to construction work. It includes line items for materials, labor, and supplies purchased each day with associated costs. The largest expenses were for hollow blocks, demolishing buildings, plastering walls, cement, steel, and construction materials. The total expenditure for the 24 day period was 59,808.02.
1-Mar-22 demolation down building,plastering main wall 1040 1-Mar-22 material building/rta 100 1-Mar-22 disk 20 2-Mar-22 pva primer,riffle 73 2-Mar-22 plastering+block on rhe 1st floor 1080 2-Mar-22 adwanc to consultion 3000 2-Mar-22 material building/rta 100 2-Mar-22 black sand,heelkurb/tipper bobcat 600 3-Mar-22 pva primer,nat stuco filler/nsn shop 138.5 3-Mar-22 material building/rta 100 3-Mar-22 compact on pool,primer on wall,removing glue on floor 1030 3-Mar-22 material building/ ayas shop 110 3-Mar-22 material building/adwa al shop 1237 3-Mar-22 material building/adwa al shop 876.75 4-Mar-22 agregate,cement/tipper bobcat shop 500 4-Mar-22 plastering the bath,compacting pool,primer on the wall 1150 4-Mar-22 material building/rta 125 5-Mar-22 plastering the wall,primer on the plaster,removing soil pool 1200 5-Mar-22 material building/rta 80 5-Mar-22 material building/adwa al shop 405.3 5-Mar-22 material building/adwa al shop 492.45 6-Mar-22 material building/adwa al shop 274 6-Mar-22 material building/mohshin shop 60 6-Mar-22 material building/noor al mufadal shop 32.55 7-Mar-22 material building/mohammad burhan shop 60 7-Mar-22 plastering bath,making block cemenet on the filter room 1180 7-Mar-22 material building/rta 100 7-Mar-22 gun nail clip/sun ray shop 73.5 7-Mar-22 cement,white wash sand/tipper bobcat 370 8-Mar-22 main channel,furryng channel 567 8-Mar-22 cement block on pool,plastering down+up 1180 8-Mar-22 material building/rta 20 8-Mar-22 material building/rta 100 8-Mar-22 8 hollow block/ducon shop 1814.4 8-Mar-22 channel screw/sun ray shop 25.2 8-Mar-22 wash black sand/tipper bobcat shop 1150 8-Mar-22 b0bcat,rubbish,recovery/tipper bobcat shop 1630 8-Mar-22 cement/tipper bobcat shop 270 9-Mar-22 material building/rta 100 9-Mar-22 steel8,steel12,steel16/jb shop 7339 9-Mar-22 making cement block on pool,making block+steel on 1st floor 980 9-Mar-22 material building/rta 100 9-Mar-22 material building/rta 100 10-Mar-22 material building/rta 8 10-Mar-22 cement/ alhadi shop 1300 10-Mar-22 making cement block on pool,plastering main wall 1400 10-Mar-22 material building/rta 100 11-Mar-22 material building/ ayas shop 300 11-Mar-22 plywood film faced,steel nail,cutting charges/planet eco shop 178.5 11-Mar-22 making cement block on pool,plastering main wall 1490 12-Mar-22 material building/adwa al shop 940.5 12-Mar-22 material building/adwa al shop 21 12-Mar-22 powder,main channel/art shop 131.25 12-Mar-22 making cement block on filter 1290 13-Mar-22 material building /abdulah shop 240 13-Mar-22 material building /abu murah shop 34.65 13-Mar-22 pvc gurmala,noora brush/rgbmt shop 26.25 13-Mar-22 steel cutting disc,gypsum screw,steel nail 148.05 13-Mar-22 commercial ply wood/rgbmt shop 39.9 14-Mar-22 gypsum board ordinary/rgbmt shop 40.95 14-Mar-22 gypsum screw,main channel,furryng channel/art shop 92.4 14-Mar-22 plastering main wall,removing soil locker room 840 14-Mar-22 material building/rta 100 14-Mar-22 material building/rta 100 14-Mar-22 wheel alignment,electronic wheel balancing/al furqan shop 570 15-Mar-22 white sand/transport 240 15-Mar-22 plastering backside wall,plastering 1st floor 960 15-Mar-22 material building/rta 8 16-Mar-22 material building/rta 100 16-Mar-22 plastering backside wall,plastering 1st floor 1350 17-Mar-22 material building/adwa al shop 201.6 17-Mar-22 making beam on mine big door,plastering backside wall 1270 17-Mar-22 material building/rta 100 18-Mar-22 making pcc pool,electrical working wiring +piping 1220 18-Mar-22 material building/rta 9 18-Mar-22 material building/rta 100 19-Mar-22 making cement block,making pcc on the base, 1220 19-Mar-22 material building /ayas shop 40 21-Mar-22 contract labor supplyer 630 21-Mar-22 ppr pipe,ppr tee,ppr elbow,ppr socket/rgbmt shop 305 21-Mar-22 cement block on 1st floor,remaining base channel 1140 21-Mar-22 material building/rta 210 21-Mar-22 material building/rta 800 21-Mar-22 material building/rta 100 21-Mar-22 material building/ badri shop 31.5 22-Mar-22 rubbish 300 22-Mar-22 electric work wiring and piping,plastering and making pvc 1290 22-Mar-22 material building /rbm7 shop 21 23-Mar-22 material building/adwa al shop 76.12 23-Mar-22 material building/adwa al shop 273 23-Mar-22 material building / adwal shop 656.25 23-Mar-22 making water pipe on bath,electeric work,plastering wall 1000 23-Mar-22 material building/rta 100 23-Mar-22 material building/rta 9 24-Mar-22 material building /ahmed merrah shop 988.05 24-Mar-22 cement,black sand 1700 24-Mar-22 making bar steel on pool,concrite of colomn on 1st floor 1000 24-Mar-22 material building/rta 170 TOTAL: 59808.02