February 1, 2016
1. Pursuant to Section VII, 9 of COA Memorandum 2014-009 dated August 28, 2014,
we have prepared this Report consolidating the issues and observations on the audit
of DRRM Funds of various government agencies (national and local) for the year
2014. This report is being made in the absence of a single/consolidated report on
financial data on disaster management, particularly on the receipt and utilization
thereof. This will serve as valuable reference in the programming of DRRM Funds
by the Council Members and various government agencies as this will enable them
to see the overall picture of the management of DRRM Funds.
2. This consolidated report highlights the financial and operational data on DRRM
which were included in the Annual Audit Reports on the following agencies:
1
3. The significant Audit observations and recommendations were likewise incorporated
in the Annual Audit Report (AAR) on the concerned government agencies for CY
2014.
4. For the Local Government Sector, the only data made available were the
observations and recommendations. The financial and operational data for the local
government units are not available.
5. Financial Highlights
a. NDRRMF
The QRF is the thirty percent of the NDRRMF allocated to the agencies
identified by the National Disaster Risk Reduction and Management Council
(NDRRMC) as stand-by-fund for relief and recovery programs in order that
situation and living conditions of people in communities or areas stricken by
disasters, calamities, epidemics, or complex emergencies, may be normalized
as quickly as possible for affected communities in the shortest possible time.
2
Cash Donations from Local and Foreign Sources
Not less than five percent of the estimated revenue from regular sources shall be
set aside to support disaster risk management activities such as, but not limited to,
pre-disaster preparedness programs, including training, purchasing life-saving
rescue equipment, supplies and medicines, for post-disaster activites, and for the
payment of premiums on calamity insurance.
Thirty percent of the amount appropriated shall be allocated to the QRF or stand-
by fund for relief and recovery projects and activities.
These are funds received from the National Government for DRRM activities
upon approval of the President.
These are cash donations received from other LGUs, local and foreign sources.
6. Operational Highlights
The total allotments/NCAs and donations received for CY 2014 by various NGAs for
DRRM including balances from PY are summarized below with details shown in
Annex A.
3
7. MAJOR ACCOMPLISHMENTS
The major accomplishments of the various agencies for CY 2014 in connection with
DRRM are summarized below with details shown in Annex B:
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
GOAL: DRRM and CCA mainstreamed and integrated in national, sectoral and local
development policies, plans and budget.
Housing and Land Use Included Climate Change Vulnerability Assessment and Disaster
Regulatory Board Risk Assessment in Vol. 2 of the 2013-2014 CLUP Guidebook
(HLURB) Produced the Supplemental Guidelines on Mainstreaming
Climate and Disaster Risks in the CLUP
Included OCD, DOST, CCC, PAGASA, and PHIVOLCS as
suggested members of PLUC under Vol. 1 of the 2013-2014
CLUP Guidebooks
GOAL: DRRM and CCA sensitive environmental management
HLURB Mainstreamed CCA-DRR and enhanced the CLUP process in
the 2013-2014 CLUP Guidebook
GOAL: Increased disaster resilience of Infrastructure Systems
Department of Education Implemented disaster-resilient school building designs with
(DepEd) necessary budget adjustments
Upgrade of the Building Code with the inclusion of Green
Building under process.
Assessed damages for 61 State Colleges and Universities at the
end of 2013
Department of Public Implemented Structural Resiliency Program in new construction
Works and Highways and in the reconstruction of calamity damaged.
(DPWH) Recovered road right of way of critical national roads and bridges
and upgraded design to ensure flood-free at all times
Identified public facilities as safe Shelter Centers in disaster
prone municipalities for resilient design and redundancy, also be
used as emergency command center and evacuation facility
Completed design of one storey resilient school building as well
as two storey multi-purpose building
Upgraded engineering design standards for flood control,
drainage and slope protection works
Upgraded National Code to include DRRM and CCA
HLURB Mainstreamed CCA-DRR in the new Integrated Model Zoning
Ordinance (MZO) for cities and municipalities
GOAL: Community based and scientific DRRM and CCA assessment, mapping, analysis
and monitoring
DEPED & DPWH Approved DepEd order on the annual conduct of student-led risk
assessment in schools
Conducted vulnerability assessment prior to construction of
infrastructures.
DPWH Used Geo-hazard maps as one tool for planning for climate
resilient infrastructure
4
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
Conducted training for all 16 Regional Offices for CCA and
DRRM at the end of 2014
Philippine Atmospheric Provided the LGUs with the hazard/Risk Map and completed the
Geophysical conduct of IECs to 17 municipalities/cities.
Astronomical Services Developed severe wind risk calculator which can be used by
Administration LGUs to estimate potential damage to buildings due to severe
(PAGASA) winds in GMMA
GOAL: End-to-end monitoring forecasting and early warning systems are established and/or
improved
PAGASA, DILG, LGUs, Provided weather hazard monitoring and timely, accurate and
OCD reliable weather forecasts, advisories and warnings
Conducted public education and awareness to enhance the
capability of various stakeholders to respond to hydro-
meteorological disasters
Used a variety of available media (radio, tv, internet and social
media (SMS, facebook and twitter) in a variety of format (textual,
graphics, color-coded and audio) to disseminate information.
Organized Training Workshop, IEC and Flood Drill and
conducted actual flood drills for stakeholders to appropriately
respond to disaster.
PAGASA calibrated instruments for CBFEWS for compliance
with the World Meteorological Organization (WMO) standards.
PAGASA designed the network density of the monitoring
stations as prescribed by WMO when it comes to exposure of
instruments for weather observations
Provided specifications for weather monitoring instruments for
EWS.
PAGASA utilized the 8” standard rain gauge for the synoptic
stations all over the country as recommended by the World
Meteorological Organization (WMO).
Used indigenous materials like batingaw and drum as a means of
communications.
Established Community-based flood early warning system in
various areas of the country.
PAGASA, LGUs PAGASA provided training on observation and data transmission
as well as on the protocols of data interpretation and issuance of
flood warnings and advisories and how it can be integrated in the
existing disaster mitigation program of the community
GOAL: Increased level of awareness and enhanced capacity of the community to the threats
and impacts of all hazards
Philippine Institute of Included “Volcano, Earthquake, and Tsunami Disaster Risk
Volcanology and Reduction Program” in the PHIVOLCS Strategic Plan 2012-
Seismology (PHIVOLCS) 2016, as one of the strategic initiatives of the plan.
GOAL: Increased DRRM and CCA capacity of Local DRRM Councils and Offices at all
levels
DILG Formulated Climate Change Action Plan (9 Provinces, 59 Cities,
and 238 Municipalities)
5
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
Conducted Infrastructure Audit Workshops in 334 LGUs
DILG Conducted Training on Geographic Information System (GIS) for
Climate and Disaster and Vulnerability Reduction to 52
Provinces, 43 Cities, 433 Municipalities and 376 Barangays
Conducted Training on Understanding the Multi-Hazard Maps,
their Usage and Application in Local Development Planning for
LGUs
Conducted Flood/Swift Water First Responder Training
Formulated the National Disaster Preparedness Plan
Formulated the Minimum Preparedness Standards
Formulated the Early Preparedness Manuals for LCEs
Formulated the Critical Preparedness for LCEs
Formulated the Checklist of Minimum Actions for MLGOOs,
COPs, and FMs
Created the DepEd DRRM Office through DepEd Order No 50 s
2011
Prepared DRRM plans by field offices and schools
Formed Regional, division, district and school DRRM
teams/committees
Inventoried DRRM materials available in DepEd
GOAL: Developed and implemented comprehensive national and local preparedness and
response policies, plans, and systems
DepEd Conducted simulation exercises in the nationwide DRRM
Orientation and Planning Workshop to check the immediate
responses of field officials before and during calamities
Set up of coordination and information management protocols
Provided disaster preparedness measures to schools through
DepEd Order No. 83, s. 2011
DA Activated the DA – Disaster Quick Response Center
Ensured communications and EWS are in place
Conducted situation assessment
Coordinated response operations and resources mobilization
DILG Developed and implemented:
- JMC No. 2014-01
- JMC No 2013-0
- Dept. Memo No 2012-73
- Dept Memo re Directing every DILG City Director, City Local
Government Operations Officer and Municipal Local
Government Operations Officer to ensure functionality of
BDRRMC
- Dept Circular No 2012-08
- Dept Memo for the President re DILG issuances on Calamity
Response Protocols
- Dept Order No 2011-1564
6
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
- Dept Order No 2011-8
- Dept Memo Circular No 2011-35
- Dept Memo Circular No 2010-143
DILG Formulated Compendium of Disaster Preparedness and Response
Protocols in 2012
Mainstreamed DRRM and CCA in Comprehensive Development
Plan Guidelines in mainstreaming being finalized.
GOAL: Strengthened partnership and coordination among all key players and stakeholders
DepEd Developed a directory of all regional and division DRRM focal
persons
DA with DOST-PAGASA Coordinated with PAGASA, PHIVOLCS and other agencies
and PHIVOLCS, BSWM, regarding calamity advisory
Quad-media, and DA Developed localized disaster EWS
attached agencies
DILG CSO-Managed/Co-Managed trainings and projects
CSO-prepared modules /guidebooks/ manuals
BLGS engaged 5 CSOs with DRRM Projects
GOAL: Well-established disaster response operations
OCD Issued NDRRMC Memo Cir. No. 04, s. 2012 dtd 28 March 2012
DPWH Conducted ICS training for 9 DPWH Regional Offices and 90
District Offices in 2012 to 2014
Provided 520 trucks and heavy equipment and 1220 personnel for
clearing operations and relief distribution after typhoon Yolanda
DepEd Issued weather advisories to DepEd field offices through
Infoboard textblast, SMS, emails and facsimile
PCG Monitored a total of 2,002 incidents and conducted a total of
2,000 SAR operations from January 2012 to November 2014
Constructed SAR Base Roxas which enhanced the PCG's
presence in terms of capability development and sustainment of
needed support thru extension of its bases and facilities.
Constructed a 2- storey building for the Coast Guard District
Bicol
Participated in the procurement of Disaster Response Equipment
worth PhP521,664,500.00.
GOAL: Adequate and prompt assessment of needs and damages at all levels
OCD Deployed inter-agency DANA Team
Drafted NDRRMC Guidelines in the Conduct of Joint Rapid
Damage Assessment and Needs Analysis
DepEd Submitted Rapid Disaster Assessment Reports( RaDAR) through
SMS, email or facsimile (school-level)
Consolidated RaDARs from affected schools
Mobilized volunteers in the consolidation of RaDARs
Prepared situation reports for DepEd management and oversight
agencies for the appropriation of necessary intervention
7
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
DWPH Deployed DRRM members as part of the inter-agency RDANA
Team
GOALS: Integrated and coordinated Search, Rescue and Retrieval (SRR) capacity
NBI Formed 4 Disaster Victim Identification (DVI) Teams, each is
assigned for a particular quadrant of Metro Manila.
GOAL: Evacuated safely and on time affected communities
DepEd Prepared schools for possible use as evacuation center
GOAL: Temporary shelter needs are adequately addressed
DPWH Assisted DILG/LGU in the determination of the feasibility of
shelter sites
Constructed 273 bunkhouses in Region VIII after the onslaught
of Typhoon Yolanda
Set the Minimum Performance Standards and Specifications
(MPSS) for one storey school building and multipurpose building
DepEd Identified and/or established TLS to disaster / emergency-
affected areas
GOAL: Basic health services provided to affected population whether inside or outside ECs
DSWD Conducted NDRRMC Meeting re Enhancement of the Provision
of Health Services During Disaster
GOAL: Psychosocial well-being promoted and mental health problems and risks reduced
DepEd Mobilized external partners for the provision of psychosocial
support
GOAL: Coordinated, Integrated System for Early Recovery implemented on the national
and local levels
OCD Conducted:
- PDNA for TY Yolanda on 08 January-28 February 2014
- National Writeshop of PDNA on 5-7 March 2014
Presented the 1st draft of PDNA to the C, NDRRMC -13 March
2014
Presented PDNA Report to the President – 15 May 2014
DepEd Conducted detailed damage assessment of schools by DepEd
engineers
Endorsed consolidated RaDARs to concerned offices for
appropriate action
Immediately resumed classes to track students
Mobilized donations through social media (Twitter and facebook)
Uploaded K-12 learning materials for easier access and
reproduction
Pooled volunteers for the provision of PSS
DPWH Deployed DRRM members as part of the inter-agency PDNA
Team for typhoons Sendong, Pablo and Yolanda
Constructed five temporary bridges in Bohol damaged by the 7.2
earthquake in 2013. Construction on permanent bridges on-going
Conducted clearing operations for all national roads immediately
after a disaster
8
IMPLEMENTING
ACCOMPLISHMENT
AGENCIES
GOAL: Damages, Losses and Needs Assessed
OCD, NEDA Participated in the activities relative to the conduct of PDNA for
the following major disasters:
- TS Sendong (2011)
- TY Pablo (2012)
- Central Visayas Earthquake (Bohol 2013)
- Zamboanga Siege (2013)
- TY Yolanda (2013)
- TD Agaton (2014)
DepEd, DPWH Deployed DepEd Engineers to schools with reported major and
totally damaged classrooms based on the Rapid Assessment of
Damages Report (RADaR) for detailed assessment.
Enhanced the protocols and monitoring mechanisms for the
conduct of detailed assessment.
Joined Representatives from the Department in the conduct of
PDNA for Typhoon Yolanda on January – March 2014.
GOAL: DRRM/CCA elements incorporated in human settlement
DPWH Assisted the DILG in the determination of the feasibility and
suitability of relocation sites.
Upgraded the structural design standards for disaster resiliency for
school buildings and other public infrastructures to withstand 250
kph wind velocity.
Trained and engaged some of the male survivors of Typhoon
Yolanda to help in the construction of bunkhouses in Tacloban.
GOAL: Disaster and climate-change resilient infrastructure reconstructed
DPWH, DepEd Repaired 88 damaged infrastructure as of 2014.
Rehabilitated and repaired damaged school facilities.
Strictly implemented the National Building Code of the
Philippines and awareness program on green technology
conducted
Implemented disaster-resilient school design from 2014 onwards
Prepared the Minimum Performance Standards and Specifications
(MPSS) for Public Buildings as guide in preparing design
requirements for rehabilitation and reconstruction of damaged
LGU infrastructures and facilities.
DPWH Established the Project Monitoring System (PMS) for the
monitoring of all infrastructure projects including rehabilitation
projects for damaged infrastructure.
9
8. DRRM Equipments purchased and received from Donors
10
AGENCY ITEM QTY VALUE LOCATION
Typhoon Pablo
Boston and
Construction of
2 3,100,000.00 Caraga, Davao
Slaughterhouse
Oriental
Construction of Kapalong, Davao
1 900,000.00
Slaughterhouse del Norte
Construction of New Corella,
1 1,600,000.00
Slaughterhouse Davao del Norte
Construction of
1 1,600,000.00 Baganga
Slaughterhouse
Montevista,
Construction of
1 1,600,000.00 COMVAL
Slaughterhouse
Province
Construction of Monkayo,
1 1,600,000.00
Slaughterhouse COMVAL
Nabunturan,
Construction of
1 1,500,000.00 COMVAL
Slaughterhouse
Province
Compostela,
Construction of Laak, New
3 4,600,000.00
Slaughterhouse Bataan,
COMVAL
Lamdag sa
Panginabuhi,
Brgy. Pasian,
Establishment of Municipal
2 2,000,000.00 Monkayo; Brgy.
Native Chicken Hatchery
Salingcamot,
Baganga, Davao
Oriental
Establishment of Artificial Monkayo; New
Insemination Centers for 4 4,000,000.00 Corella; Boston;
Native Pigs Manay
Shallow Tube Wells 15 1,277,025.00 Davao Oriental
Open Surface Pump 18 1,650,375.00 Davao Oriental
Compostela
Open Surface Pump 29 1,467,000.00
Valley
DA – Zampiarc - Roger
Payloader 1 3,555,000.00
RFO IX Bagaforo
Zampiarc - Roger
Grader 1 7,950,000.00
Bagaforo
PAF Ground Rescue Equipment 1 12,945,818.00 PAF
Collapsed Structure, Ground
Vehicle and Aircraft Rescue 1 15,616,000.00 PAF
Equipment
Underwater Rescue
1 2,155,269.00 PAF
Equipment
Water Rescue Equipment 1 14,891,000.00 PAF
Individual Rescue 1 14,080,000.00 PAF
11
AGENCY ITEM QTY VALUE LOCATION
Equipment
Disaster Response
Operation (DRO) 1 19,323,456.65 PAF
Machineries and Equipment
Technical and Scientific
1 20,464,309.74 PAF
Equipment
Communication Van 1 8,988,000.00 PAF
Communication Equipment 1 1,792,000.00 PAF
Warehouse #2,
LSG, ASCOM,
Flood Rescue Equipment 1 21,216,500.00
GHQ Camp
Aguinaldo, QC
Warehouse #2,
Earthquake Rescue LSG, ASCOM,
1 8,000,000.00
Equipment GHQ Camp
Aguinaldo, QC
3000 units at
RFO VIII
750 units at RFO
VII
5.5 HP Marine Gasoline
BFAR - CO 5491 21,305,080.00 750 units at RFO
Engine
VI
991 units at
BFAR MCS
Station
BFAR MCS
16 HP Marine Engine 450 5,265,000.00
Station
Ambulance with accessories
MMDA (2012 Nissan Urvan 2 4,830,000.00 MMDA
Escapade Brand New)
12
AGENCY ITEM QTY VALUE LOCATION
Paratech Airgun Porta
10 3,950,000.00 MMDA
Hammer
Remote Area Lighting
10 440,000.00 MMDA
System
Heavy Duty Lift Bags 10 17,960,000.00 MMDA
Medium Cutter - LUKAS
10 4,380,000.00 MMDA
s330 cutter blade
Combi Tool - LUKAS
10 5,520,000.00 MMDA
sc357
RAM - LUKAS R410
10 2,690,000.00 MMDA
Rescur RAM
Lukas Extension 250mm for
10 260,000.00 MMDA
R410
Pump Motor - Lukas P650-
10 6,460,000.00 MMDA
SG motor pump
Hose; Lukas Coaxial Hose
20 4,360,000.00 MMDA
15
Lukas KSV 8/50 Chain Set 10 1,010,000.00 MMDA
Lukas Tool Station 10 270,000.00 MMDA
Achilles, Inflatable Rubber
2 995,000.00 MMDA
Boat
Thermal Dynamics Drag-
Gun Plus Plasma Cutting 10 1,000,000.00 MMDA
System
Various Scuba Diving
405,825.00 MMDA
Equipment
DOST Laptop 1 49,990.00 NCR
Laptop 1 50,900.00 IVB
Municipalities of
DTI – Boston, Cateel
Hot Chili Processing Project 3 1,243,000.00
Region XI and Bagangga,
Davao Oriental
DILG -
NAPOLCOM Generator, Diesel,10KVA 8 1,512,000.00 OCD, DND
Center
Big Generator Set 1 672,000.00 OCD, DND
Forklift, JAC (brand new) 1 1,749,000.00 OCD, DND
Portalets/Temp.
20 1,190,000.00 OCD, DND
Latrines/Chemical Toilets
Rescue Boat with outboard
2 1,505,200.00 OCD, DND
motors
Rescue Spine Board 15 378,000.00 OCD, DND
Demolition Jack Hammer 13 773,500.00 OCD, DND
Radio Portable VHF 20 316,000.00 OCD, DND
Ropes and Accessories 147 1,808,100.00 OCD, DND
13
AGENCY ITEM QTY VALUE LOCATION
Water Pump Set 25 449,250.00 OCD, DND
Waste Sludge Pumps 10 287,090.00 OCD, DND
Chainsaw 13 204,165.00 OCD, DND
Powder Coated Steel 40 543,800.00 OCD, DND
Powder Coated Steel Addon 40 342,400.00 OCD, DND
Water Bladder 5 597,500.00 OCD, DND
Community Tents 10 340,000.00 OCD, DND
Family Tents 50 925,000.00 OCD, DND
Water Treatment Plant 3 11,589,000.00 OCD, DND
3 sets at CO; 2
sets at ROIVA;
10 sets at ROV; 6
Generator Sets KENBO w/ sets at ROXII; 3
50 1,490,000.00
extension cords sets at ROXIII;
15 sets at PPSC;
6 sets at ROVI; 5
sets at ROI
TOTAL 7,081 ₱407,758,553.39
14
Significant Audit Observations and Recommendations
9.1 DILG, DSWD and Phivolcs implemented various infrastructure projects totalling
P6,368,782,496.00 out of their DRRM funds.
9.2 The result of the evaluation of the projects disclosed that these were not finished
within the specific contract time or target completion dates for various causes as
indicated in the table below;thus, the objective of the projects was not timely and
fully attained.
Contract Amount/
Implementing
Project Balance as of Cause/s of delay
Agency
December 31, 2014
a) DILG Shortage of construction materials and
RAY 1 P1,791,450,000.00
workers.
RAY 2 2,000,000,000.00 Delay in the release of funds
BEA 2,486,000,000.00 Lack of technical personnel and incomplete
documentary requirements
Sub-total 6,277,450,000.00
Delay in the release of funds and non-
b) DSWD Pilot Evacuation compliance with the terms and conditions
10,000,000.00
Center by the concerned LGUs.
Non-systematic and no standardized
c) Phivolcs DYNASLOPE identification of deployment sites, and
81,332,496.00
Project delays in the manufacture and delivery of
sensors/data loggers.
TOTAL P6,368,782,496.00
15
BEA –Slow projectimplementation by the Administration was due to lack of
technical personnel (one engineer and one support staff only), despite the
numerous projects to be implemented while the Provincial Project
Management Team (PPMT) has its own checklist of required documents prior
to the release of funds to the LGUs. Funds will not be released unless the
deficiences noted are corrected/completed by the concerned LGUs regardless
of whether the deficiences were major or minor which causes the slow
utilization of funds and implementation of projects.
b) There was no indication that the DSWD Field Office (FO) VI regularly
coordinated regarding the construction of the pilot evacuation cum multi-
purpose center; no report on the monitoring and inspection of the status of the
project implementation as well as the verification of the utilization of funds;
and have not required the LGU the submission of monthly reports on the
progress of project implementation.
Phivolcs to prepare a written criteria for the selection of new sites for
deployment of new landslide sensor system to serve as basis for
scoring/evaluation of all surveys made with the end-view to hasten and
facilitate the indentification of possible sites andcoordinate/collaborate
effectively with University of the Philippines (UP) to fast-track the
manufacture and delivery of needed sensors and data loggers to ensure
that the newly-deployed and installed sensors will be able to communicate
with the PhiVolcs data computers and evaluate results.
16
10. The lack of appropriate work program of DILG that is responsive to disaster
risk reduction management and climate change adaptation (DRRM/CCA) and
the lack of related coordinative activities among the implementing offices
resulted in the underutilization of Disaster Risk Reduction and Management
Funds (DRRMF) with 18.82 per cent utilization rate and 9.03 per cent
absorptive capacity because the road map for Disaster Preparedness has not
been presented/ developed by the DILG as vice chairperson of the National
Disaster Risk Reduction Management Council (NDRRMC).
10.1 The guidelines for the proper accounting of DRRM fund shows the importance of
maintaining DRRM in the development process to better prepare for and lessen
the impact of costly disasters with the goal of promoting sustainable socio-
economic growth. Compliance with accounting procedures and guidelines were
specifically instructed.
10.2 Part IV.A.2 and Part V.A.1 of COA Circular 2014-002 state that:
“The agencies (a) that received Special Allotment Release Orders (SAROs) from
NDRRMF; (b) with QRF; and (c) those with DRRMF allocation included in their
respective budgets shall maintain a separate Registry of Allotments and Obligations
(RAOs) to be labeled as RAO-DRRM for Maintenance and Other Operating
Expenses (MOOE) and Capital Outlay (CO) using the formats prescribed in
Appendices 15 and 16, Volume II, MNGAS”; and “The national and local
government agencies with DRRMF allocation from the GAA and/or cash donations
received from local and/or foreign sources shall prepare and submit to NDRRMC
through the Office of the Civil Defense (OCD), on the 5th day following the end of
each month, the Report on the Receipt and Utilization of the DRRMF sourced from
GAA and Report on the Receipt and Utilization of Cash Donations. The reports shall
be furnished the respective COA Auditor” respectively.
10.3 The Accounting Unit did not maintain a separate Registry of Allotments and
Obligations labeled as RAO-DRRM for the receipt of SARO for DRRM fund and
no report of DRRM allocation from the GAA was prepared and submitted to the
National Disaster Risk Reduction Management Council (NDRRMC) through the
Office of Civil Defense (OCD) and copy furnished the COA Auditor as required
under COA Circular 2014-002.
10.4 The 2014 General Appropriations Act provided P76 million for “Enhancing LGU
Capacity on Disaster Reduction and Climate Change Adaptation” among the
DILG’s locally funded projects in its capacity as Vice Chairman for disaster
preparedness of the NDRRMC.
10.5 As in the past years, project had three components with corresponding fund
allocation:
17
Project Components Amount (Php)
preparedness and post disaster
3. Access to financing – to finance LGU access to People’s Survival Fund and 600,000.00
generate revenues for Capital Outlay for DRR-CCA initiatives (e.g. loans, grants
and subsidies)
Total P76,000,000.00
10.6 The funds were approved and available for release to the implementing offices for
the activities stated in the Operations Plan and Budget (OPB) as allocated based
on the three components, as follows:
10.7 Review of the fund allocation showed that the linkage between the activities in
the OPB and the project components were not clearly identified. The roles of the
implementing offices in connection with the three components had not been
established and how the funds were released and spent in the regions. As a result,
the fund allocations presented were not appropriately aligned with the project
strategies and objectives.
10.8 The transferred funds to the regions were from two sources: 2013 continuing
appropriations (CA) and 2014 appropriations.
10.9 No specific report of accomplishments was submitted for the 2013 utilization,
while for 2014, the reported accomplishments for the implementing offices with
the amount spent were as follows:
2014
Activities per OPB Physical Accomplishments
Disbursements
LGA
Formulation of Local Climate Report submitted did not reflect the performance
Change Action Plan (LCCAP) indicator presented in the 2014 OPB with reference none
to the utilization of P114,410,030 available in 2014
for DRRM Fund.
18
2014
Activities per OPB Physical Accomplishments
Disbursements
The DILG OPBs did not reflect the Disaster
Preparedness Framework pursuant to R.A. 10121
which is being reported by LGA.
NBOO
Conduct of Community-Based Request for the transfer of funds to the NBOO was
Disaster Risk Reduction and disapproved by FMS due to the absence of the
Management approved OPB for CY 2014. The project was not none
Training on Response and implemented in 2014 due to time constraint.
Rescue
BLGD
Consultation Workshop on Draft MC on Mainstreaming CCA-DRR in Local
Mainstreaming CCA-DRR in Development Planning was finalized.
Local Development Planning Memo Circular on Mainstreaming CCA-DRR in 14,000
National Orientation on Local Development Planning is not yet signed by
Mainstreaming CCA-DRR in Sec. Mar Roxas.
LDP The National Orientation needs to be conducted 253,000
Regional Roll-out on prior to the roll-out.
Mainstreaming CCA-DRR in none
LDP
PACS
Interfacing with LCEs Activity has not taken off pending the approval
of the concept note; re-enrolled in the 2015
2 Day Disaster Lecture and DRR-CCA AOPB (new budget).
First draft has been submitted to none
Simulation Exercises
LGA/incorporated in the Disaster checklist.
Disaster Playbook
OPDS
Infrastructure Audit Workshop Seminar-workshop on the “Conduct of Infrastructure
Audit” in five (5) out of seven (7) regions
programmed for 2014. 226,157
BLGS
Counterpart Funds for Consultation-workshops were conducted to
Protocol Simplification and formulate the study design on the Disaster Risk
Improvement of Standards and Management and Institutional Strengthening.
Disaster Preparedness Audit Hired consultants 150,000
Tool 280,000
Consultancy Services
Regional Offices No report 5,945,300
TOTAL P6,868,457
10.10 Per 2014 Registry of Allotment and Obligation – Maintenance and Other
Operating expenses (RAOMO), the object of expenditures for the released funds
of P52,592,965.33 were the following:
19
Authorized Allotments/ Allotment
Particulars Appropriations Obligations Disbursements Balance
(a) (b) (a-b)
Rent/Lease - 45,000.00 17,500.00 (45,000.00)
Total MOOE P76,000,000.00 P52,592,965.33 P6,868,456.62 P23,407,034.67
10.11 As shown, the fund allocations were inappropriately obligated for trainings,
supplies and materials, awards and prizes, and rent/lease that weremade in excess
of the appropriated funds. While the amount spent was only P6,868,457 out of
P76,000,000 appropriated for the year or 9.03 percent absorptive capacity or
disbursements over total appropriations.
10.12 As shown in Annex C of the herein report, expenses of P14,669,104 in 2014 were
from the 2013 continuing appropriations with no accomplishment report. With the
funds totaling P114,410,030 for disaster preparedness with only P21,537,561
disbursed or 18.82 percent utilization rate, shows that there is the lack of direction
in the disaster preparedness initiatives of the DILG as Vice-Chair of the
NDRRMC pursuant to Section 5 paragraph 2, RA 10121 which provides that:
10.13 The Local Government Academy (LGA), as outcome manager, have not
consolidated/ submitted its report on the results of DRRM/CCA preparedness.As
shown, due to lack of monitoring activities based on the accomplishment reports
and liquidation/report of disbursements, the agency performance on disaster
preparedness DRRM fund cannot be measured with 9.03 percent absorptive
capacity of the project implemented.
Regional Implementation
10.14 The failure to evaluate properly the project design on debris management
under Task Force Pablo of the Proponent LGU in Region XI resulted in
funded projectswith unattainable implementation scheme.
10.14.1 In 2013, the Project Design on Debris Management under Task Force Pablo
of Davao Oriental includes: a) Social Preparation; b) Inventory of Usable
Timber Debris, Retrieval and Clearing; c) Monitoring and Evaluation; d)
Provision for Salaries and Wages of the Debris Provincial Team Field
Workers; and e) Contingency Allowance.
20
10.14.2 The audit disclosed that the Debris Management Work Plan and Project
Design was not followed in the implementation stages.
10.14.5 The DILG Focal Person explained that the inventory taking of usable timber
debris did not push through because of the problems encountered in the field
such as: a) Disagreement with the residents about the removal of usable
timbers; b) Lack of coordination between the Department of Environment
and Natural Resources (DENR) XI and other stakeholders; c) inaccessible
terrain of timberlands; d) lack of heavy equipment and trucks; and e) peace
and order condition in the identified areas.
10.14.7 The Task Force Monitoring Report disclosed that the unused fund for Social
Preparationis proposed for reprogramming, for updating of the 10-year
Ecological Waste Management Program of the Proponent LGU, while the
unused fund for Inventory of usable timber debris is proposed for
realignment, the purpose of which was not indicated thereof. The remaining
budget for Timber Debris Retrieval may no longer be necessary since the
Inventory of usable timber debris is proposed for reprogramming for
Ecological Waste Management Program.
10.14.8 The remaining budget for Monitoring and Evaluation, may no longer be
necessary as well since mixed debris clearing/retrieval is 100 percent
accomplished already, and that usable timber debris inventory/geo-tagging,
retrieval, collection and consolidation are unattainable project schemes.
21
10.15 We recommended that Management present a) Disaster Preparedness
framework envisioned in the NDRRMC Plan as the road map for
“Enhancing LGU Capacity on DRRM-CCA” and require the PMO to
develop a work plan responsive to DRRM-CCA (preparedness) with
coordinated activities of the implementing offices and the regions.
11.1 The table below shows the details of the QRF transferred to six implementing
agencies and its utilization.
Year
Source Implemen Amount
Project Trans Utilized Balance
Agency ting Agency Transferred
ferred
1. DA DA RFU VI RAY 2014 P256,309,851.00 P225,035,778.00 P31,274,073.00
Purchase of
RFU CAR 2012 41,268,120.00 32,268,120.00 9,000,000.00
Corn seeds
2. DND Various
Various 2012-
agencies 1,020,736,208.56 268,623,572.28 752,112,636.28
Projects 2014
under DND
3. OCD OCD
Stand-by
Regional 2012 989,244,460.05 66,090,738.21 923,153,721.84
Fund
Offices
4. DILG
DSWD MMRB 2014 350,000,000.00 - 350,000,000.00
5. DSWD DSWD FO
ESA 2014 3,063,902,643.23 3,036,000,000.00 27,902,643.23
IV
FO III, 2008-
CSAP 909,271,293.24 403,636,373.37 505,634,919.87
VI,VIII,X 2014
6. DEPED Regional School
2014 823,000,000.00 589,000,000.00 234,000,000.00
Offices Buildings
Total P7,453,732,576.08 P4,620,654,581.86 P2,833,077,994.22
11.2 As can be gleaned from the afore-cited table, only 62 percent of the total amount
transferred(P4,620,654,581.86/P7,453,732,576.08) was utilized by the
implementing agencies for a period ranging from one year to six years.
22
11.3 The slow utilization was caused by the following:
Implementing
Source Agencies Projects Reasons for slow utilization
Agencies
DA RAY RFU VI Delay in the procurement process and in the
distribution of reconstruction materials
Purchase of RFU CAR CAR did not experience much calamity during
Corn seeds Typhoons Quiel and Pedring; thus, the amount
downloaded by DA OSEC was not fully utilized.
The unused fund was withdrawn by DA OSEC and
transferred the same to RFU XI to augment the QRF
for the Typhoon Pablo victims.
DND Various projects Various agencies Multiple fund transfers made by DND rendered
under DND improbable for these IAs to fully implement the
projects
OCD Stand-by Fund OCD Regional The main purpose of QRF is inconsistent with the
Offices mandate of OCD, thus no planned action of
activities for the released funds
DILG MMRB DSWD Unavailability of land and the procurement of land
are not included in the fund releases
DSWD ESA FO IV Most masterlist and other necessary documents
from LGUs were only submitted on the 2nd week of
January 2015
CSAP FO III Inadequate water and power supply; land ownership
disputes; lack of monitoring and supervision of the
implementation by the LGU; and aggravating road
condition due to weather condition, among others
FO VIII Land site is still owned by the Gawad Kalinga and
the needed Deed of Donation will no longer be
given by the said owner; and required Certificates
from concerned government agencies were not
obtained because the said land site is not safe for
human occupancy
FO X Unavailability of land as relocation site for the
construction of shelter units
DepEd School Regional Offices Late issuance of Sub-AROs from DepEd Central
Buildings Office
The concerned officials of DA ensure that funds released are fully utilized
to benefit the typhoon affected farmers to assist them in rehabilitating
their farms and recover their losses;
23
particular to ensure that the government resources are utilized to the
optimum level to the advantage of those victimized by calamities;
12.1 As defined under the GAA, QRF are stand-by fund for relief and recovery
programs in order that situation and living conditions of people in communities or
areas stricken by disasters, calamities, epidemics, or complex emergencies, may
be normalized as quickly as possible.
12.2 QRF are built-in in the budgetary allocations of various agencies to enable them
to immediately assist areas/victims sticken by catastrophies and crises and ensure
immediate action during calamities and does not require the approval of the
Office of the President (OP) to trigger the use and release of funds.
12.3 For CY 2014, the Department of National Defense was provided with an
appropriation of P352,500,000.00 and continuing allotment of P95,350,307.82 for
QRF.
12.4 During the year, DND transferred the aggregate amount of P129,327,257.00for
capital outlay of three implementing agencies as shown below.
24
Agency Purpose of Fund Transfer Capital Outlay (CO)
Repair of concrete pier in
Philippine Navy P39,426,450.00
Caballo Island
Construction of various
Office of Civil Defense 88,665,000.00
RDRRMCs
Sub-total P128,091,450.00
Acquisition of Collapsed
Philippine Military
Structure Search and rescue 1,235,807.00
Academy
Equipment
Total P129,327,257.00
12.5 It was observed that fund transfers to the Philippine Navy (PN) and the Office of
Civil Defense (OCD) for construction, repairs, renovation amounting to
P128,091,450.00do not fall under the intended purpose of the QRF.
12.6 We recommended that the concerned officials of DND strictly implement the
provisions of the GAA on the utilization of the QRF.
Utilization of Donations
13.1 Tabulated below are the donations received and utilized by OCD and DSWD.
13.2 The donated funds received by the Office of Civil Defense were used for payment
of financial assistance to calamity victims as authorized under DND
Memorandum Order No. 1 and NDCC Memorandum Order No. 13. The balance
of P384,950,260.65 which is 82.60 percent of the total donations were not utilized
for the period ranging from one to six years. While for DSWD, the unutilized
balance ofP382,078,372.84 constituted 33 percent of the total donations for
Yolanda victims of P1,151,238,883.76.
13.3 There was no information or proof that the purposes for said donations were
already served or completed by OCD and DSWD. However, considering the
lapse of time since the donations were received indicates that the purposes may
have already been served in which case the unutilized balances should have been
remitted to the BTr pursuant to COA Circular 2014-002 dated April 15,
2014which require that all unutilized cash donations after the purpose had been
served shall either be:
25
a. remitted to the Bureau of the Treasury (BTr), if no condition to return any
unused amount to the donor, or
13.4 The management of OCD stated that the unutilized balance was due to low
utilization in view of the absence of the rulings and guidelines on its usage and
the delay in the submission of requirements by the victims.
13.5 On the other hand, the Managementof DSWD commented that the utilization of
the balances is still being considered in the Work and Financial Plan prepared.
They further commented that as of June 15, 2015, the unutilized amount has been
reduced to P338,857,856.10 (P150,831,930.86 for the CO and P188,025,925.24
for the FOs). The remaining unutilized funds in the amount of P150,831,930.86
were included in the Work and Financial Plan for typhoon Yolanda.
14. The procurement and acceptance by DSWD of relief goods was made without
considering the absorptive capacity and condition of the warehousing facilities
and personnel, available stocks, shelf life or expiry dates and the actual needs of
Field Offices (FOs) resulting in undistributed and expired or about to expire
relief goods amounting to P5,115,200.00.
26
14.1 As of December 31, 2014, DSWD has about P141.084 million expired or near
expiry relief goods which have not been distributed which are stored in storage
facilities in the Central Office and in various Field Offices.
14.2 This was brought about by some lapses in the procurement, acceptance of the
relief goods, as well as, in the storage and distribution procedures, details of
which are tabulated below.
27
Undistributed, Expired or Soon to Expire as of
Office/FO 12/31/14 Remarks
Items Qty Amount
The warehouse can be easily accessed by
unauthorized person/thieves because its padlock
can be unlocked easily by using any card.
VI Rice 3,197 sacks 5,115,200.00
14.3 It was recommended and the Secretary agreed to direct the concerned
DSWD officials to:
prioritize and fast track the distribution of the remaining relief goods
especially those food items soon to expire, otherwise, these will be
damaged/spoiled that would result to wastage of government funds;
transfer immediately the relief food items to any other storage area
suitable for storing perishable goods in order to avoid early deterioration
and spoilage of the food items that may likewise result in wastage of
government funds;
28
15. There was uncertainty as to actual receipt of Family Food Pack (FFPs) by
victims of Typhoon Ruby/Hagupit in FOs IV-A, IV-B, VI and XI because the
distribution made by DSWD of the 144,444 FFPs was not supported with the
Relief Distribution Sheets (RDS).
15.1 The distribution of 144,444 FFPs to various LGUs in FOs IV-A, IV-B, VI and
XIas of December 31, 2014 provide no proofs if the relief goods were actually
received by typhoon victims, as follows:
SOURCE/PACKING NO. OF RIS NO. OF FFPs NO. OF
CENTER RELEASED RECIPIENT LGUs
FO IVB:
Regional Office 2 1,500 2
SWAD Office-Marinduque 7 3,036 7
SWAD Office-Occ. Mindoro 5 1,000 5
SWAD Office-Or. Mindoro 16 3,100 16
SWAD Office-Palawan 10 2,300 10
SWAD Office-Romblon 15 5,364 15
Sub-Total FO IV-B 55 16,300 55
FO VI:
Juantong Warehouse 24 24,967 21
Barotac Viejo, Iloilo 3 3,787 3
SWAD Office-Antique 10 1,666 8
SWAD Office-Aklan 10 2,470 10
SWAD Office-Capiz 7 1,850 7
SWAD Office-Negros Occ. 4 3,609 3
Sub-total FO VI 58 38,349 52
FO IV-A 23,880
FO XI 65,915
Total 113 144,444 107
15.2 It is required in the absence of RD, the Agency’s Disaster Relief Operation Matrix
and the Flow of Relief Goods Distribution that LGUs are to use and accomplish
the RDS showing, in particular, the names and signatures of the Typhoon Ruby
victims who received FFPs. To date, no LGU accomplished RDS was submitted;
hence, it cannot be ascertained if the FFPs actually reached the typhoon
victims/affected families. Management commented that letters have been sent to
concern LGUs requesting submission of the RDS.
15.3 It further showed that the following documentary requirements prescribed under
COA Circular No. 2014-002 dated April 15, 2014 were not complied with by the
Warehouse Management and Donation Facilitation Division (WMDFD), Disaster
Risk Reduction and Response Operations Office (DRRROO):
29
Inventory List of Procured Items for DRRM
Inventory List of Donated Items for DRRM
Property/Stock Cards
15.4 Instead of the above required documents, the WMDFD, DRRROO presented the
following report/records: (a) Status of Family Foods Packs; (b) Status of Relief
Augmentation or Summary of Releases; (c) Status of Delivery; (d)
Acknowledgment Receipt for In-Kind Donations for DRRM; (e) Volunteer
Mobilization Report; and (f) Tally Out Sheet (TOS), which caused the difficulty
in tracking the goods purchased until it reaches the beneficiaries.
15.5 We recommended and the DSWD Secretary agreed to direct the FOs IVB,
VI and XI Management to require the immediate submission of the RDS
from the concerned LGUs as proof of actual receipt of FFPs by Typhoon
Ruby/Hagupit affected families.
30
Local Government Sector
16. The importance of the local government units (LGUs) during disasters cannot be
overlooked. They play a vital role by taking the lead in preparing for, responding to
and recovering from the effects of any disaster. The LGUs are in the frontline being
the agency primarily responsible in responding to disasters. RA 10121 sets the
following coordination mechanisms during emergencies:
17. Thus, it is important that the officials have sufficient capability to act and respond in
time of emergencies and to have sufficient funds for this purpose.
18. RA 10121 strengthens the capacity of the National Government and LGUs for
disaster risk reduction and management through decentralized powers,
responsibilities and resources. More particularly, the following sources of funds are
available for the LGUs:
Not less than 5% of the estimated revenue from the regular sources are set
aside as the LDRRMF;
The balance of the current year LDRRMF are recognized as Special trust
Fund to be spent by LGUs in the succeeding five years;
LGUs can also receive funds from the NDRRMF upon approval of the
President, from other LGUs and other sources.
19. The failure of LGUs to make available the above resources for its disaster risk
reduction and management activities and to utilize DRRM funds in accordance with
existing rules and regulations on its utilization, accounting and reporting, will prevent
it from performing properly its mandated responsibilities under RA 10121.
20. The audit conducted on the LDRRM funds disclosed various observations as
consolidated by the Local Government Sector, and summarized below:
21.1 Twelve (12) LGUs did not appropriate funds for DRRM contrary to Section
21 of Republic Act (RA) No. 10121.
“The present Local Calamity Fund shall henceforth be known as the Local Disaster
Risk Reduction and Management Fund (LDRRMF). Not less than five percent (5%)
31
of the estimated revenue from regular sources shall be set aside as the LDRRMF to
support disaster risk management activities such as, but not limited to, pre-disaster
preparedness programs including training, purchasing life-saving rescue equipment,
supplies and medicines, for post-disaster activities, and for the payment of premiums
on calamity insurance. The LDRRMC shall monitor and evaluate the use and
disbursement of the LDRRMF based on the. LDRRMP as incorporated in the local
development plans and annual work and financial plan.Upon the recommendation of
the LDRRMO and approval of the sanggunian concerned, the LDRRMC may
transfer the said fund to support disaster risk reduction work of other LDRRMCs
which are declared under state of calamity.
xxx.
Unexpended LDRRMF shall accrue to a special trust fund solely for the purpose of
supporting disaster risk reduction and management activities of the LDRRMCs within
the next five (5) years. x x x .”
21.1.2 Tabulated below are the LGUs which failed to appropriate LDRRM funds.
Region LGU
1. Cavinti
IV-A
2. Santa Cruz
ARMM 3. Buldon
4. Buluan
5. DatuPaglas
6. H. PanglimaTahil
7. Maguing
ARMM 8. Omar
9. P Estino
10. Parang
11. South Upi
12. Tapul
21.2 Eighty-seven LGUs in various regions (details in Annex D) did not transfer
to Special Trust Funds (STF) unexpended/unutilized/unobligated LDRRMF
balances in the total amount of P1,327,797,094.05 contrary to the above-
quoted regulation, tabulated below.
Region Amount
IV A P391,554,756.31
IV B 198,983,410.27
V 30,851,540.61
VI 21,398,644.08
VII 5,668,726.52
VIII 3,802,756.12
XII 25,694,665.78
32
Region Amount
XIII 38,924,029.46
NCR 579,232,000.00
ARMM 31,686,564.90
TOTAL P1,327,797,094.05
21.3.1 In view of the failure by the above LGUs to appropriate funds for LDRRMF, to
transfer their unobligated/unexpended LDRRMF balances to STF, and to fully
maximize utilization of the fund, there was noassurance that the disaster risk
management activities for their respective communities were carried out and the
objectives of RA 10121 were attained.
21.4 Fifteen LGUs have no approved LDRRM Plan and the corresponding Work
and Financial Plan in accordance with Rule 5, Section 4 (1) and Rule 6,
Section 4 (7) of the Implementing Rules and Regulations of RA 10121; thus,
timeframes, sources of funding, and expected output was not explicitly
defined.
33
21.4.2 In addition, Section 4(7), Rule 6 of the IRR of RA 10121 also provides for the
functions of the provincial, city and municipal DRRMOs or BDRRMCs, in
coordination with concerned national agencies and instrumentalities, one of
which is to formulate and implement a comprehensive and integrated
LDRRMP in accordance with the national, regional and provincial framework
and policies on disaster risk reduction in close coordination with the local
development councils.
21.4.3 Tabulated below are the LGUs per region which do not have approved
LDRRM Plan and the corresponding Work and Financial Plan:
Region LGU
NCR 1. Caloocan
IV-A 2. BAY
3. Calauan
IV-B 4. Linapacan
V 5. Calabanga
6. Irosin
7. Gubat
VI 8. San Miguel
9. Cabatuan
10. Calatrava
XIII 11. Buenavista
12. Nasipit
13. Carmen
14. Remedios T. Romauldez
ARMM 15. City of Isabela
21.4.4 The formulation of individual LDRRM Plan and the Work and Financial Plan
are crucial in the management by LGUs of the risks during disasters.
22. Seven LGUs failed to organize a Local Disaster Risk Reduction and
Management Council as required under Section 11 of RA No. 10121.
“Organization at the Local Government Level. - The existing Provincial, City, and
Municipal Disaster Coordinating Councils shall henceforth be known as the
Provincial, City, and Municipal Disaster Risk Reduction and Management Councils.
The Barangay Disaster Coordinating Councils shall cease to exist and its powers
and functions shall henceforth be assumed by the existing Barangay Development
Councils (BDCs) which shall serve as the LDRRMCs in every barangay. x x x”
34
22.2 The following LGUs did not organize their respective Local Disaster Risk
Reduction and Management Councils which will be responsible for ensuring the
protection and welfare of the communities during disasters and emergencies:
Region LGU
1. Cavinti, Laguna
2. Lumban, Laguna
IV-A 3. Sampaloc, Quezon
4. Santa Cruz, Laguna
5. Siniloan, Laguna
6. Romblon Province
IV-B
7. Taytay, Palawan
23. Expenses not related to disaster risk management and charges out of QRF not
supported with SB Resolution
23.1 DILG Memorandum Circular No. 2012-73 dated April 17, 2012 provides that the
LDRRMF shall be used for disaster risk management activities, support to other
affected LGUs and quick response fund or stand-by fund for relief recovery.
23.2 Ten LGUs, tabulated below, spent their LDRRMF for activities which are not
disaster risk management related, in the total amount of P8,425,679.87, instead of
charging the same against their regular appropriation, inconsistent with the
provisions of the DILG Memorandum Circular.
23.3 On the other hand, 21 LGUsutilized their Quick Response Fund despite the
absence of a Resolution of the Sangguniang Bayan (SB) or Presidential
declaration of state of calamity which is not consistent with Section 5.1.3 of COA
35
Circular 2012-002, which provides that the release and use of the LDRRMF shall
be supported by Local Sanggunian resolution and the declaration of state of
calamity for the QRF. They are as follows:
24. Non-adherence to COA Circular No. 2012-002 on the accounting and reporting of
LDRRM funds
24.1 Section 5.1.1 of COA Circular No. 2012-002 provides that the appropriation for
the LDRRMF shall be included in the General Fund Budget. The existing
program category “Budgetary Reserve” (9998) and “Outlays for Disaster and
other Calamities” (9991) shall be changed to “Disaster Risk Reduction and
Management” (DRRM)” (9940). The QRF which is a lump sum appropriation
shall be under the functional classification “Other Purposes”. The preparedness
and mitigation projects as identified in the LDRRMFFIP shall be classified under
the program for DRRM and under the functional classification of the
implementing office.
24.2 Accounting and reporting of the LDDRMF were not properly adhered to by 47
LGUs, tabulated below, violating Section 5.1.1 of COA Circular No. 2012-002.
24.3 Failure of the above LGUs to strictly adhere to the above regulation resulted in
the difficulty in determining the accurate unexpended/unobligated yearly balances
of the fund while clouding pertinent transactions with questions of their validity
and legality.
36
24.4 On the other hand, 155 LGUs, tabulated below, were not able to prepare the
required fund utilization reports with the supporting documents and submit the
same to the Audit Team contrary to Section 5.1.5 of COA Circular Nos. 2012-002
dated September 12, 2012.
24.5 Section 5.1.5 of COA Circular No. 2012-002, dated September 12, 2012 provides
that a Report on Sources and Utilization of DRRMF shall be prepared and
certified correct by the Local Accountant. The Local Disaster Risk Reduction and
Management Officer (LDRRMO) shall submit the report on or before the 15th day
after the end of each month through the LDRRMC and Local Development
Council (LDC) to the COA auditor of the LGU.
24.6 The failure of the LGUs to submit the required fund utilization reports is not
consistent with the principle on transparency and accountability and rendered
doubtful the reliability of the financial data on disaster funds.
Region LGU
IV-A 1. Cavite City
2. Ajuy
3. Balasan
VI
4. Banate
5. Barotac Nuevo
37
Region LGU
6. Barotac Viejo
7. Carles
8. Concepcion
9. Dionisio
10. Dumangas
VI 11. Estancia
12. Hamtic
13. Lemery
14. San Rafael
15. Sara
16. Tobias Fornier
25.2 COA Circular 2014-002 dated April 15, 2014 provides for the following
guidelines on the procurement of relief goods out of DRRM funds:
a. Supplies, materials, equipment and relief goods procured out of the fund shall
be taken up in the books under the appropriate Inventory and/or Property,
Plant and Equipment (PPE) account. Except for PPE, issuances for
distribution to end-users/beneficiaries shall be supported with Requisition
Issue Slip (RIS) and taken up under the appropriate expense account.
b. The Accounting Unit shall prepare and maintain PPE Ledger Cards and
Supplies Ledger Cards for all PPE and relief goods, respectively, procured out
of appropriations. For check and balance, the Property and Supply Unit shall
maintain Property Cards and Stock Cards. The formats prescribed in
Appendices 8, 9, 38 and 39, Volume II, MNGAS shall be used.
26.2 Section 4 (6) of PD 1445 states that “Claims against government funds shall be
supported with complete documentation.”
26.3 The table below shows the amount of cash advances granted to 23 LGUs in
various regions which are not supported with complete documentation.
38
Region Number of LGUs Amount
XIII 3 10,735,233.90
TOTAL 23 P102,608,322.70
*See Annex I for the list of LGUs
26.4 On the other hand, the municipalities of Bato-Region V and Jamindan and
Mambusao of Region VI distributed relief goods for the victims of typhoon using
the CY 2014 LDRRMF but were not supported with the list of
beneficiaries/recipients, contrary to Section C. 2 of COA Circular no. 2014-002
dated April 15, 2014, which provides that: “Issuances of donated relief goods for
distribution to intended beneficiaries/end-users shall be supported with Issuance Form
for In-kind Donations DRRM.”
26.5 Due to lack of sufficient documentation, the regularity and propriety of the
expenditures could not be determined.
26.6 The Local Chief Executives of the concerned LGUs are recommended to
undertake the following activities:
39
organize a LDRRMC as required under Section 11 of RA No. 10121;
40
Status of Implementation of Prior Years’ Audit Recommendations
Since this is the initial Consolidated Report prepared for the audit of DRRM
funds, the status of prior years’ audit recommendations was not presented. However, the
status of PY audit recommendations on DRRM are contained and can be verified from
the individual Annual Audit Reports of various agencies receiving and utilizing DRRM
Funds.
Acknowledgement
We wish to express our appreciation to the Auditors of various national and local
government agencies that provided the financial data and observations on DRRM
management in their respective audited agencies and to the management and staff of the
Office of Civil Defense for their cooperation and assistance.
CYNTHIA B. FERRER
Audit Team Leader
LUCENA D. GANA
Supervising Auditor
41
ANNEX A
4. DILG 1,844,836,728.62 4,562,045,518.00 3,133,991.35 4,565,179,509.35 6,410,016,237.97 4,335,531,567.68 12,814,600.00 4,348,346,167.68 2,061,670,070.29
8. DSWD 1,403,192,037.26 3,765,755,856.00 149,799,882.00 3,915,555,738.00 5,318,747,775.26 3,149,484,107.66 65,430,129.00 3,214,914,236.66 2,103,833,538.60
11. OCD 791,869,153.50 530,000,000.00 95,549,453.85 625,549,453.85 1,417,418,607.35 66,090,738.21 13,709,609.78 79,800,347.99 1,337,618,259.36
MAJOR ACCOMPLISHMENTS
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
GOAL: DRRM and CCA mainstreamed and integrated in National, Sectoral and local development policies,
plans and budget.
Identified public
facilities as safe
Shelter Centers in
disaster prone
municipalities for
resilient design and
redundancy to also be
used as emergency
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
command center and
evacuation facility
Completed design of
one storey resilient
school building as well
as two storey multi-
purpose building
Upgraded engineering
design standards for
flood control, drainage
and slope protection
works
Upgraded National
code to include DRRM
and CCA
GOAL: Community based and scientific DRRM and CCA assessment, mapping, analysis and monitoring
5. DRRM and CCA assessment Conduct vulnerability DEPED, DPWH Approved DepEd
and mapping tools assessment on a order on the annual
regular basis (every 1st conduct of student-led
quarter on election risk assessment in
year – per existing schools
DILG policy) as the
need arises a) National Conducted
Level; b) Local Level vulnerability
assessment prior to
construction of
infrastructures. If
existing infrastructures
are found vulnerable,
interventions such as
retro fitting measures
are done
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
6. Readily usable and accessible Conduct hazards DPWH Used Geo-hazard
knowledge product as DRRM mapping and maps as one tool for
and CCA planning tools assessment at planning for climate
town/city to barangay resilient infrastructure
levels (a. National
Level; b. Local Level)
7. Collection of various DRRM Establishment of a DPWH Conducted training for
and CCA products for sharing knowledge all 16 Regional offices
management center for CCA and DRRM
within the OCD at the end of 2014
Information
dissemination through
partnership with
various media partners
GOAL: End-to-end monitoring forecasting and early warning systems are established and/or improved
9. Enhanced monitoring Develop and PAGASA, DILG, Provided weather
forecasting and hazard warning institutionalize EWS LGUs, OCD hazard monitoring and
information sharing timely, accurate and
and communication reliable weather
systems between forecasts, advisories
LGUs communities and warnings.
and national PAGASA provided a
government wide range forecasts
and warnings as
distinguished by the
Standard for CBEWS type of end-user (ie
aviation, shipping and
public
forecasts/warnings,
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
gale, special weather
forecasts for Mayon
and Bulusan
Volcanoes). Provided
Flood
Advisory/Bulletin,
Establishment and
replication of
Thunderstorm and
color-coded Heavy
Rainfall Warning
System in other
PAGASA regional
offices (PRSD) and
provided storm surge
forecast and warning.
Conducted public
education and
awareness to enhance
the capability of
various stakeholders to
respond to hydro-
meteorological
disasters
Used a variety of
available media (radio,
tv, internet and social
media (SMS, facebook
and twitter) in a
variety of format
(textual, graphics,
color-coded and audio)
to disseminate
information.
Organized Training
Workshop, IEC and
Flood Drill to orient
Volunteers Observers,
Disaster Managers,
other LGU authorities
and the general public
on the established
system, trained on
basic rainfall and
water level
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
monitoring, analysis
and communication
protocols. Conducted
actual flood drills for
stakeholders to
appropriately respond
to disaster.
Used indigenous
materials like
batingaw and drum as
a means of comms.
Establish community- DILG, LGUs, Established
based EWS for various PAGASA, OCD Community-based
hazards flood early warning
system in various areas
of the country. The
CBFEWS for flood
were completed in the
following provinces:
Conducted Training on
Understanding the
Multi-Hazard Maps,
their Usage and
Application in Local
Development Planning
for LGUs
Conducted
Flood/Swift Water
First Responder
Training
Formulated the
National Disaster
Preparedness Plan
Formulated the
Minimum
Preparedness
Standards
Formulated the
Critical Preparedness
for LCEs
Formulated the
Checklist of Minimum
Actions for MLGOOs,
COPs, and FMs
Formed Regional,
division, district and
school DRRM
teams/committees
Inventoried DRRM
materials available in
DepEd
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
GOAL: Developed and implemented comprehensive national and local preparedness and response policies,
plans, and systems
12. Enhanced preparedness and Develop and/or DepEd Conducted simulation
response strategies, including enhance and simulate exercises in the
coordination mechanisms and scenario-based nationwide DRRM
infrastructure. preparedness and Orientation and
response plans Planning Workshop to
a) National Level check the immediate
b) Local Level responses of field
officials before and
during calamities
Set up of coordination
and information
management protocols
Provided disaster
preparedness measures
to schools through
DepEd Order No. 83,
s. 2011
DA Activated the DA –
Disaster Quick
Response Center
Ensured
communications and
EWS are in place
Conducted situation
assessment
Coordinated response
operations and
resources mobilization
Formulated
Compendium of
Disaster Preparedness
and Response
Protocols in 2012
Mainstreamed DRRM
and CCA in
Comprehensive
Development Plan
Guidelines in
mainstreaming being
finalized. National
Orientation on 11
December 2014
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
GOAL: Strengthened partnership and coordination among all key players and stakeholders
13. Partnership arrangements Creation, maintenance DepEd Developed a directory
among stakeholders established and update of a of all regional and
directory or database of division DRRM focal
key players and
persons
stakeholders
DILG CSO-Managed/Co-
Managed trainings
And projects:
- CBDRRM with
CDP
- DRRM Volunteer
Management
Seminar with VSO
Bahaginan
Foundation
- Flood/swift Water
First Responder
Training with
Disaster Emergency
Search and Rescue
- Project Encore with
Save the Children
CSO-prepared
modules /guidebooks/
manuals
- Guidebook for
LGUs on how to
prepare LCCAP –
Local Climate
Change Adaptation
Development
(LCCAD)
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
- Modules for
Training on
Formulation of
LCCAP – Up Los
Baños
- CBDRRM Manual
(Kontra Disaster)
and Handbook on
Documenting Good
Practices on DRRM
– CDP
BLGS engaged 5
CSOs with DRRM
Projects:
16. Established functioning system Logistical support DPWH Provided 520 trucks
for coordinated and efficient Immediate deployment and heavy equipment
relief operations of SAR and 1220 personnel for
clearing operations
and relief distribution
after typhoon Yolanda.
Constructed a 2- storey
building for the Coast
Guard District Bicol
from the portion of the
Regional Government
Site at Rawis, Legaspi
City that was offered
by National Economic
Development
Authority.
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
Participated in the
procurement of
Disaster Response
Equipment worth
PhP521,664,500.00.
The equipment are as
follows:
50 units Combat
Rubber Boats
with OBM
81 units RHIB
300 units
Aluminium V-
Shape Bow
862 units VHF
Handheld Marine
Type Radio
862 units Life
Vest
2,598 units
common Life
vest
431 units
Megaphone
1,905 units Flare
6 units Jet Ski
GOAL: Adequate and prompt assessment of needs and damages at all levels
17. Timely and appropriate and Activation of OCD Deployed inter-agency
consolidated needs assessment assessment teams at all DANA Team
reports levels, as needed
DepEd Submitted RADAR
through SMS, email or
facsimile (school-
level)
Mobilized volunteers
in the consolidation of
RaDARs
Prepared situation
reports for DepEd
management and
oversight agencies for
the appropriation of
necessary intervention
GOALS: Integrated and coordinated Search, Rescue and Retrieval (SRR) capacity
18. Communities found, retrieved Develop and NBI Formed 4 Disaster
and reconnected with their implement a system Victim Identification
families for SRR and proper (DVI) Teams, each are
disposal with assigned for a
concerned agencies particular quadrant of
Metro Manila. Each
team is composed of
two team leaders; both
are doctors who are
tasked to respond
depending on the
quadrant involved. The
DVI team concerned
shall be the one
joining the RDANA
team to be initially
deployed in the
disaster area for pre-
operational phase as
suggested in the
previous meetings.
There will be an extra
team on standby in the
main office. The
operation will be
supervised by the
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
Chief of MLD and the
Executive Officer,
with the Chief as the
overall operation
leader. The
development of these
teams enabled a quick
response for the
disaster and carry out
immediately the DVI
process. This also
hastened coordination
between other
agencies since there
will only be a point
team leaders to be
contacted depending
on the quadrant
involved. The
operational budget
allotted for the MLD
varies depending on
the need of the
division.
GOAL: Basic health services provided to affected population whether inside or outside ECs
22. Database of hospitals and other Determination if there DSWD Conducted NDRRMC
health care providers is enough clinics and Meeting re
hospitals to address the Enhancement of the
casualties Provision of Health
Services During
Disaster
GOAL: Psychosocial well-being promoted and mental health problems and risks reduced
23. Disaster-affected population are Conduct of traumatic DepEd Mobilized external
in good mental and and/or psychological partners for the
psychological state stress debriefings provision of
psychosocial support
GOAL: Coordinated, Integrated System for Early Recovery implemented on the national and local levels
24. Mechanisms for coordinated Conduct of post- OCD Conducted:
and integrated early recovery DANA - PDNA for TY
established and essential Yolanda on 08
services restored January-28
February 2014
- National Writeshop
of PDNA on 5-7
March 2014
Presented PDNA
Report to the President
– 15 May 2014
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
DepEd Conducted detailed
damage assessment of
schools by DepEd
engineers
Mobilized donations
through social media
(Twitter and facebook)
Uploaded K-12
learning materials for
easier access and
reproduction of such
TS Sendong (2011):
NROs VII and X
assisted OCD in field
assessment and data
analysis, particularly in
macro/governance
sectors, on
damages/loss and
needs.
TY Pablo (2012):
NROs XI and XIII
participated in the
preparation of Work
and Financial Plan for
the conduct of the
PDNA, field
assessment and
validation of
damages/loss and
needs, and the drafting
of the final PDNA
document. The final
PDNA report of Davao
Oriental and
Compostela Valley was
released in June 2013
and served as reference
in the preparation of the
Pablo Rehabilitation
Plan.
Central Visayas
Earthquake (Bohol
2013): NRO VII
organized a technical
working group
IMPLEMENTING
PLANS ACTIVITIES ACCOMPLISHMENT
AGENCY
composed of 13
Regional Line Agencies
to assess damages and
validate preliminary
data gathered.
Zamboanga Siege
(2013): NRO IX
participated in the
crafting of the Post
Conflict Needs
Assessment (PCNA)
particularly in the
macroeconomic impact
assessment,
consolidation and field
validation of data on
damages and loss.
TY Yolanda (2013):
NEDA-CO and NROs
IV-B, VI, VII and VIII
participated in the
macroeconomic impact
assessment, field
validations, writeshops
and drafting of final
document.
TD Agaton (2014):
NRO XIII conducted
Damage and Needs
Assessment (DANA)
in all provinces of
CARAGA region.
Joined Representatives
from the Department in
the conduct of PDNA
for Typhoon Yolanda
on January – March
2014.
GOAL: DRRM/CCA elements incorporated in human settlement
26. Safe relocation sites Identify and provide DPWH Assisted the DILG in
suitable relocation the determination of
sites for the affected the feasibility and
population suitability of
relocation sites.
Implemented disaster-
resilient school design
from 2014 onwards
30. Development permits approved Close monitoring DPWH Established the Project
within prescribed timeline and/or tracking of Monitoring System
approval of (PMS) for the
infrastructure projects monitoring of all
and permit infrastructure projects
including
rehabilitation projects
for damaged
infrastructure.
ANNEX C
REGION LGU
1. Cavinti
2. Luisiana
3. Lumban
4. Mabitac
IV-A 5. Pagbilao, Quezon
6. Sampaloc, Quezon
7. Santa Cruz
8. Santa Rosa City
9. Siniloan
1. Abra de Ilog: Looc
2. Bongabong
3. Bulalacao
4. Jose P. Rizal
IV-B
5. Kalayaan
6. Roxas
7. San Teodoro
8. Sta Cruz; Paluan
1. Bato
2. City of Sorsogon
3. Gubat
4. Guinobatan
V
5. Irosin
6. Palanas
7. Panganiban
8. Rapu-Rapu
VIII 1. La Paz, Leyte
1. Pilar
XIII 2. Sibagat
3. Surigao City
ANNEX F
List of LGUs that have expenditures under the LDRRMF which were improperly charged
to QRF
Region LGU
1. Kalayaan
IV-B
2. Puerto Princesa
1. Bacacay
2. Baleno
3. Bombon
4. City of Iriga
V 5. Dimasalang
6. Esperanza
7. Mandaon
8. Pio V. Corpuz
9. Placer
10. Sto. Domingo
1. Antique Province
VI
2. Passi City
1. Pres. Quirino
XII 2. South Cotabato
3. Surallah
1. Claver
2. Dapa
XIII
3. General Luna
4. Socorro
ANNEX G
List of LGUs that were not able to adhere properly to the accounting and reporting of the
LDDRMF
Region LGU
1. Rizal
IV-B
2. Santa Cruz, Laguna
1. Gainza
2. Goa
3. Jose Panganiban
4. Lagonoy
V 5. Pili
6. Prieto Diaz
7. Province of Albay
8. Siruma
9. Talisay
VI 1. Anilao
1. Buenavista
2. Butuan City
XIII
3. Province of Agusan del Norte
4. Surigao City
1. Bacolod Kalawi
2. Balabagan
3. Balindong
4. Bayang
5. Binidayan
6. Buadipuso Buntong
7. Butig
8. Calanogas
9. Ditsaan Ramain
10. Ganassi
11. Kapai
12. Kapatagan
13. Lumba Bayabao
14. Lumbaca Unayan
ARMM
15. Lumbanaque
16. Lumbatan
17. Madalum
18. Madamba
19. Malabang
20. Marawi
21. Marogong
22. Pagayawan
23. Piagapo
24. Picong
25. Poona Bayabao
26. Pualas
27. Sultan Domalundong
28. Tamparan
29. Taraka
ARMM 30. Tuburan
31. Tugaya
ANNEX H
List of LGUs that were not able to prepare the required fund utilization reports of
LDRRMF
Region LGU
1. Caloocan
NCR 2. Pateros
3. San Juan
1. Angono
2. Binangonan
3. Cardona
4. Carmona
5. Los Banos
6. Luisiana
7. Mabitac
IV-A 8. Magallanes
9. Maragondon
10. Morong
11. Paete
12. Province of Rizal
13. Santa Rosa City
14. Siniloan
15. Taytay
1. Agutaya
2. Araceli
3. Busuanga
4. Cagayancillo
5. Coron
6. Dumaran
7. El Nido
IV-B
8. Jose P. Rizal
9. Kalayaan
10. Linapacan
11. Magsaysay
12. Palawan
13. Romblon Province
14. Taytay
1. Barcelona
2. Batuan
3. Bombon
4. Buhi
5. Gainza
V
6. Guinobatan
7. Magallanes
8. Mandaon
9. Matnog
10. Monreal
11. Pili
12. Province of Sorsogon
V 13. Rapu-Rapu
14. San Fernando
15. San Jacinto
Region LGU
16. Sta. Elena
17. Sta. Magdalena
1. Ajuy
2. Anilao
3. Balasan/
4. Banate
5. Barotac Nuevo
6. Barotac Viejo
7. Bugasong
8. Calinog
9. Carles
10. City of Roxas
11. Concepcion
12. Dingle
13. Dionisio
14. Dueñas
15. Dumalag
16. Dumangas
17. E.B. Magalona
VI 18. Estancia
19. Lemery
20. Maayon
21. Mambusao
22. Mina
23. Murcia
24. Passi City
25. Pavia
26. Pilar
27. Pototan
28. Pres Roxas
29. San Enrique
30. San Miguel
31. San Rafael
32. Sapian
33. Sara
34. Tapaz
35. Victorias City
1. Larena
VII 2. Lazi
3. Siquijor
22 Municipalities of Eastern Samar
23 Borongan City
VIII 24 La Paz, Leyte
25 Matuguinao, Samar
26 Province of Eastern Samar
Region LGU
27 Province of Leyte
1. Banga
2. Esperanza
XII 3. Sarangani
4. Surallah
5. Tantangan
1. Bacuag
2. Buenavista
3. Bunawan
4. Carmen
5. Dapa
6. Del Carmen
7. Esperanza
8. Jabonga
XIII 9. Las Nieves
10. Nasipit
11. Remedios T. Romauldez
12. Rosario
13. San Luis
14. Santiago
15. Sta. Josefa
16. Surigao City
17. Tubay
1. Ampatuan
2. Buluan
3. Datu Abdullah Sangki
4. Datu Paglas
5. Datu Unsay
ARMM
6. Indanan
7. Jolo
8. Kabuntalan
9. Luuk
10. Marantao
11. Matanog
12. Pagalungan
13. Pandami
14. Pangutaran
ARMM 15. Parang
16. Patikul
17. Shariff Aguak
18. South Upi
19. Sultan Mastura
ANNEX I
List of LGUs that processes the granting and liquidation of Cash Advances with incomplete
documentations
1. Buenavista P2,261,378.38
2. Sibagat 700,000.00
XIII
3. Veruela 7,773,855.52
TOTAL P10,735,233.90