Professional Documents
Culture Documents
Mgc-rl2-Sds-cvl-022 Rev.00 - Glass Balustrade Handrail at First Floor - Th43
Mgc-rl2-Sds-cvl-022 Rev.00 - Glass Balustrade Handrail at First Floor - Th43
40700 C
A-11-001
4600 4500 4500 4500 4500 4500 4500 4500 4600
PLOT LIMIT
Y7
> >
>
D 00
Y6 46
A
O
R
< < 00
Y5 45
<
PLOT LIMIT
GLASS BALUSTRADE HANDRAIL
00
Y4
27
2 00 45 (REF-MS-5196-TH43-SD-GB-002)
X1
00
Y3 45
OPEN TO OPEN TO OPEN TO OPEN TO OPEN TO
OPEN TO OPEN TO
BELOW BELOW BELOW BELOW BELOW
BELOW BELOW
>>>
TO
EN F.F.L +3.550
ISSUED FOR
7880
OP LOW BEDROOM F.F.L +3.550 S.S.L +3.450
GLASS BALUSTRADE HANDRAIL BE
RA
IL
F.F.L +3.550
S.S.L +3.450
F.F.L +3.550
S.S.L +3.450
F.F.L +3.550 F.F.L +3.550 F.F.L +3.550
ND APPROVAL FINAL SUBMISSION
150
0
(REF-MS-5196-TH43-SD-GB-002) HA .45
S.S.L +3.450 S.S.L +3.450 S.S.L +3.450 S.S.L +3.450
0
+3 50
.L +3.3 DN DN
Y1 00 .F
F .L
46
ROAD
S.S TENDER CONSTRUCTION
TO OM
EN RO
OP LOW D
BE BE MAID ROOM
PLOT LIMIT MAID ROOM
RAIL
ND DN DN DN DN DN
HA
X2
16360
O M
RO DN
TO ED 0
EN B .45 DN DN DN DN DN
OP LOW +3 50
E .L 3.3
B F.F .L +
S.S MAID ROOM
<<<
R AIL
ND
HA
DN
TO M DN
EN OO F.F.L +3.550 F.F.L +3.550 F.F.L +3.550
OP LOW DR S.S.L +3.450 S.S.L +3.450
1500 BE BE S.S.L +3.450
50
8480
3.4 0 BEDROOM BEDROOM
F .L + 3.35 DN F.F.L +3.550 F.F.L +3.550 BEDROOM
A IL F. .L + BEDROOM BEDROOM BEDROOM 13-01-2023 ISSUED FOR APPROVAL
DR S.S S.S.L +3.450 S.S.L +3.450
HAN HANDRAIL
HANDRAIL
OM BEDROOM
RO HANDRAIL OWNER:
TO ED DN 50
EN
B 3.4 0 F.F.L +3.550
HANDRAIL HANDRAIL HANDRAIL
OP LOW F .L + 3.35
BE F. .L + S.S.L +3.450
S.S
OM OPEN TO OPEN TO
DN DR
O
AIL BE BELOW BELOW OPEN TO
DR BALCONY OPEN TO OPEN TO OPEN TO
N AIL BALCONY BELOW
HA 50 N DR F.F.L +3.550 F.F.L +3.550 BELOW BELOW BELOW
3.4 0 HA
F . L + 3.35 S.S.L +3.450 S.S.L +3.450
F. .L +
EN
TO
RO
OM S.S X3
OP LOW D TO PROJECT:
B E BE OM EN
0 RO
PLOT LIMIT .45
+3 .350 DN BED OP LOW
BE RUKAN DEVELOPMENT
IL . L 3 DN
D RA F.F .L +
HAN S.S ROOF LINE (G+1 VILLAS) (TH-43) (WADI
AIL
OM DR
D RO HA
N AL SAFA 7 DUBAI,U.A.E)
BE DN PLOT NO:6654257
0
.45
+3 50 TO
. F .L +3.3 EN
F .L OP LOW
S.S B E CONSULTANT:-
50 OM
X1 F .
3.4 0
L + 3.35 BE
DR
O
F. .L +
S.S IL
PLOT LIMIT
M RA
DN O O
ND
270
D R
BE HA
2
DN
LC
+
ON
BA .450
3
.L 3.3
50
GLASS BALUSTRADE HANDRAIL
80
M F.F .L +
OO
(REF-MS-5196-TH43-SD-GB-002)
81
DR S.S
BE TO
EN
OP LOW
BE
IL
RA
ND
HA
PLOT LIMIT
.
50
3.4 0
L + 3.35 TO
<<< OPEN SPACE >>>
F
F. .L + EN MAIN CONTRACTOR:-
S.S OP LOW
BE
0
M
OO
36
DR
BE
16
<
X2
15
<
Y
ON .450
<
LC
BA .L +3 3.350
F
F. .L +
S.S
(REF-MS-5196-TH43-SD-GB-002)
MODUN GULF BUILDING
R
80
CONTRACTING L.L.C
O
81
A
D
1500
ALUMINIUM SUB CONTRACTOR:-
>
>
>
X3
DRAWING TITLE:-
BALUSTRADE HANDRAIL
500
R10
AT FIRST FLOOR
PLOT LIMIT
DRAWN BY: KM SCALE: N.T.S
DESIGNED BY: KM DATE: 13-01-2023
CHECKED BY: WD SHEET: A1
APPROVED BY: CLIENT JOB NO: 1
DRAWING NO:- REV :-
MS- 1 -TH43-SD-GB-001 00
A
DETAIL-01
INSIDE OUTSIDE
ISSUED FOR
APPROVAL FINAL SUBMISSION
TENDER CONSTRUCTION
PART ELEVATION OF GLASS BALUSTRADE HANDRAIL
AT FIRST FLOOR BALCONY & INTERNAL TERRACE
A F.F.L
DETAIL-02
+3.450
13-01-2023 ISSUED FOR APPROVAL
OWNER:
PROJECT:
+3.450 CONSULTANT:-
SECTION AT.A-A
MAIN CONTRACTOR:-
DRAWING TITLE:-
MS- 1 -TH43-SD-GB-002 00