Name of assignment or project: Uganda Kampala South WatSan Feasibility Study
Month and Year: 03/2018 – Present
Location: Uganda
Client: DANIDA
Main project features: The project comprised of a 62,500 m³/d water treatment plant (WTP), and
400 m³/day Faecal Sludge Treatment Plant (WWTP), for a total project population at the horizon
of 2 million equivalent habitants in 2040. Demand modelling, Water supply network modelling,
water treatment design, lake intakes, fecal sludge treatment plant design, feasibility study
including ESIA, resettlement, economic and financial analysis, public water points for urban poor.
Planned.
Position held: Team Leader
Cost of works: EUR 130 million
Activities performed: Design of WWTP, network modelling, QGIS demand modelling and mapping.
Preparation of tender documents according to FIDIC Yellow Book. Monitoring of ESIA preparation.
Overall project management incl. management of technical parts, financial management and
management of project team. Project reporting.
Name of assignment or project: Chernivitsi Municipal Water Infrastructure Project, Phase 1
Month and Year: 03/2017 – Present
Location: Ukraine
Client: KfW
Main project features: Water supply project for a city using WTP (50,000 m³/d) Institutional
Development, Capacity Building. Investment budget: EUR 22 million.
Position held: Team Leader / Chief Resident Engineer
Cost of works: EUR 22 million
Activities performed: Conceptual and detailed design, preparation of tender documents
according to FIDIC 1 Red Book and 2 Yellow Book Lots. Assistance during tendering and
contracting. Construction supervision. Overall project management incl. management of technical
parts, contractual and financial management. Management of project team. Progress Reporting.
Name of assignment or project: Pharmaceutical Wastewater at Genzyme (Geel MBR), Zinc
production wastewater at Nystar (Balen DAF), La CILE Water Treatment Plant
Month and Year: 12/2016 – 06/2018
Location: Belgium, Netherlands
Client: Suez (Dégremont)
Main project features: Nitrate and pesticide removal from drinking water (36 000 m³/d), EcoFlow
The Netherlands, expertise on aeration (Industrial septage treatment) and installation of a
centrifuge on a 3500 kg BOD/day plant.
Position held: Senior Expert support for construction supervision, project management,
troubleshooting
Cost of works: WTP : 15 million €, Centrifuge 0.3 m€.
Activities performed: Construction supervision, hydraulic gradeline troubleshooting, design and
installation of centrifuge and sludge pumping installation. Troubleshooting at La Cile for nitrogen
removal.
Name of assignment or project: Bushenyi Water Treatment Plant
Month and Year: 08/2016 – 03/2018 (
Location: Uganda
Client: NWSC/ World Bank
Main project features: The project comprises of a 6,300 m³/d WTP for a population of approx.
74,000. Humic waters polluted with cadmium are treated using aeration, flash-mixing coagulation
flocculation, pH change to precipitate cadmium, rapid sand filtration pH adjustment and
chlorination.
Position held: Water Treatment Plant Expert (during construction supervision)
Cost of works: 12 million €
Activities performed: Construction supervision according to FIDIC Pink Book. Site supervision for
all process matters, hydraulic gradeline and layout. Redesign of lamellar decantation, intake works
and process review for the water treatment plant.
Name of assignment or project: TA to the Zambia Water and Sanitation Project (Mulonga water -
MWSC)
Month and Year: 11/2015 – 07/2016
Location: Zambia
Client: EIB
Main project features: Feasibility study and procurement, 267,000 m³/d water supply for a
population of approx. 450,000 and rehabilitation and extension of existing 5 lagoon WWTP treating
the sewage from the 3 towns. Investment budget: EUR 150 million.
Position held: Investment Program Manager & Deputy Team Leader
Cost of civil works: EUR 150 million
Activities performed: Institutional strengthening. Guidance and capacity building on investment
planning and procurement according to FIDIC Red Book and for the disbursement of the loan with
EUR 150 million for the 3 towns. Programme Management and monitoring. Improvement of
business procedures and processes. Feasibility studies incl. hydraulic modelling. Investment
planning and identification of infrastructure projects for peri-urban areas extending and improving
water supply and sanitation networks, decoupling the mine water business, 7 WTP (rehabilitation
and upgrading FIDIC Yellow Book). Asset management database, integration of GIS.
Name of assignment or project: Al Shamal Wastewater Treatment Plant (WWTP)
Month and Year: 03/2015
Location: Qatar
Client: Qatari Govt
Main project features: 172 000 m³/day (7,512 m³/h) wastewater treatment plant (WWTP).
Position held: Hydraulics Specialist
Cost of works: forecast at 130 million €
Activities performed: Hydraulic grade line of major municipal plant.
Name of assignment or project: Ultra-filtration & reverse osmosis water reuse project
Month and Year: 10/2013 – 03/2015
Location: Ghana
Client: Vlisco GTP
Main project features: Design and construct project based on FIDIC Yellow book for industrial
wastewater treatment and reuse project of 1040 m³/d & 975 kgCOD/d, Refractory wastewater. 30
m³/h reuse stream.
Position held: Team Leader
Cost of Works: 1
Activities performed: Overall Project Management. Preparation of detailed design, E&M
procurement, SCADA system, civil supervision, electrical & mechanical fit out and commissioning of
a process train consisting of pre-treatment, activated sludge, UF and RO. Construction
Management, technical quality control, time and cost control. Supervision of sub-contractors and
civil works contractor. Contract management.
Name of assignment or project: 2 UASB plants in Cuzco and Motupe
Month and Year: 10/2012 – 01/2015
Location: Peru
Client: SAB Miller Backus
Main project features: Detailed design and construction project based on FIDIC Yellow book for
industrial brewery wastewater project for the Backus brewerys in Cuzco: 1,390 m³/d & 6,400
kgCOD/d, in Motupe: 4,080 m³/d & 18,700 kgCOD/d.
Position held: Team Leader
Cost of works: 3 million €
Activities performed: Overall Project Management. Preparation of Design, E&M procurement, civil
supervision, supervision of electrical & mechanical fit out and commissioning of UASB plant for
brewery wastewater. Upflow Anaerobic Sludge Blanket, SBR, aerated lagoon, sludge thickening,
flare, methane re-use warm water boiler. Construction Management, technical quality control, time
and cost control. Supervision of sub-contractors and civil works contractor. Contractual
management. Management of project team. Work planning and progress reporting.
Name of assignment or project: Four (4) WWTP in Kursk, Ivanovo, Saransk & Novocheboksarsk
Month and Year: 10/2010 – 06/2012
Location: Russia
Client: SunInBev Breweries
Main project features: Design and construct project based on FIDIC Yellow book. 4 brewery
effluent industrial treatment projects of 2,664 m³/d and 9,600 kgCOD/d.
Position held: Team Leader / Design Manager / Chief Construction Manager
Cost of works: E&M 8 million €, Civil 8 million €
Activities performed: Project Management. Preparation of detailed design, E&M procurement of 4
brewery wastewater treatment plants, SCADA systems, SBR plants, sludge treatment (lime).
Construction Management, technical quality control, time and cost control. Supervision of sub-
contractors and civil works contractor. Contractual management. Management of project team.
FIDIC Red Book for well field and trunk mains. FIDIC Yellow Book for Desalination Plants.
Name of assignment or project: Harscamp pumping station and vortex
Month and Year: 09/1999 – 07/ 2000 (
Location: Belgium
Client: INASEP
Main project features: Design of combined vortex storm-water treatment reservoir and
wastewater pumping station for 2000 equivalent inhabitants.
Position held: Team Leader / Hydraulics Engineer
Cost of works: 2 million €
Activities performed: Detailed design of combined vortex storm-water treatment reservoir and
wastewater pumping station for 2000 equivalent inhabitants. Including sewer rehabilitation, pipe-
jacked tunnel, slurry wall construction and complex interaction with building works.
Name of assignment or project: Namur Pumping Stations Project
Month and Year: 01/to 11/1998
Location: Belgium
Client: INASEP
Main project features: Feasibility design of low-pressure wastewater collector network and
pumping stations.
Position held: Team Leader
Cost of civil works: 50 million €
Activities performed: Design of 56 pumping stations with vortex stormwater treatment (civil,
electromechanical and control). Design of odour prevention including mathematical modelling and
review of technologies.
Name of assignment or project: Korle Lagoon Ecological Restoration Project
Month and Year: 05/1997 – 10/1998 (9 mm)
Location: Ghana
Client: Govt of Ghana; financing AfDB
Main project features: Wastewater (200,000 PE), flooding (Q50,180 m³/s), solid waste and
dredging project for the City of Accra. Restoration of the lagoon by wastewater collectors linking to
a sea outfall, removal of solid waste dumps, improvements of slum areas around the lagoon and
dredging of the lagoon to assist with reducing flooding.
Position held: Team Leader
Cost of civil works: 25 million €
Activities performed: Review of outdated feasibility report and detailed design. Design of pre-
treatment works, offtake, pump stations and network. Surge analysis and septicity analysis.
Integration of solid waste, community appraisal and dredging expert reports into overall feasibility
and design reports. Preparation of Tender Documents FIDIC Yellow Book.
Name of assignment or project: Namur - Catchments of the Sambre
Month and Year: 02/1995 – 03/1997
Location: Belgium
Client: INASEP
Main project features: Extension of Pilot study for wastewater collectors to create a master plan
for Namur (pop 100 000). 5,180 m³/d. 67,000 PE. 4,020 kgBOD/d.
Position held: Project Manager
Cost of civil works:3 million €
Activities performed: Preparation of innovative solution of replacing gravity collectors with
pumping main and numerous small pump stations reduces project costs by one half. Incorporated
modelling of the Sambre and Meuse rivers to evaluate the impact of the wastewater project on
receiving water quality using HydroWorks. Wastewater quality analysis including modelling.
Name of assignment or project: Antalya Environment Master Plan
Month and Year: 10/1996 – 07/ 1997
Location: Turkey
Client: City of Antalya, World Bank
Main project features: Solid waste, water supply and wastewater master plan for 400 000 people
(60 000 m³/d water, 48 000 m³/d wastewater 2 880 kgBOD/d).
Position held: Wastewater Engineer
Cost of civil works: No longer known
Activities performed: Design of wastewater treatment plant and sea outfall for FIDIC Red Book.
Name of assignment or project: Eastern Seaboard Development Project Phase II
Month and Year: 1996-1997 (9 mm)
Location: Thailand
Client: Govt Thailand/Belgian Cooperation
Main project features: The project components included water supply, water resources,
wastewater, solid waste, and industrial waste management.
Position held: Team Leader Environmental Engineering
20. Certification:
(vii) I, as the authorized representative of the firm submitting this Proposal for the “Construction Supervision (CAREC/C1&3/QCBS/CSC)", certify that I
have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the
implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date:
Paolo Orsini