CV Key Expert: Team Leader / Wastewater Engineer

FORM TECH-6B
CURRICULUM VITAE (CV)

1. Proposed Position: KE 1 – Team Leader/Wastewater Engineer


2. Name of Firm: JV IRD - SWECO - ENCON
3. Name of Expert: Mr. Hugh Donald George MCLACHLAN
4. Current Residential Ukraine 58000, Chernivtsi region, City of Chernivtsi, Pozharsky Dmytriy str., building 18, apartment
Address: 27
Telephone No.: +380 95 729 23 74
Fax No.: N/A
E-mail address: Hugh_mclachlan@hotmail.com
5. Date of Birth: 17/04/1963
Citizenship: British, Australian
6. Education: MA in Engineering Science, University of Cambridge, UK, 1982-1985
M.Sc. in Irrigation Engineering, University of Southampton, UK 1986-1987
7. Membership in Institiution of Australian Engineers
Professional Associations:
8. Other Trainings: N/A
9. Countries of work Thailand, Nepal, Pakistan, Uganda, Ukraine, Belgium, Netherlands, Zambia, Saudi Arabia,
experience: Montenegro, Germany, Canada, Russia, Morocco, Australia, UK, Algeria. Egypt, Qatar, Tunisia,
Turkey, Sri Lanka, Peru, Suriname, Bosnia & Herzegovina, Russia, Uzbekistan, Ghana.
10. Languages: Language Speaking Reading Writing
English Mother Tongue
French Excellent Excellent Excellent
Dutch Fair Fair Fair
Spanish Fair Poor Poor
Russian Medium Poor Poor
16. Employment Record: From: 02/2019 To: date
Employer: Balteau Sri Lanka
Position held: Team Leader
From: 03/2018 To: date
Employer: Ramboll Uganda Tunisia
Position held: Team Leader
From: 03/2017 To: 03/2019
Employer: GKW, Ukraine
Position held: Team Leader
From: 11/2016 To: 10/2017
Employer: Safège Nigeria
Position held: Team Leader
From: 12/2016 To: 06/2018
Employer: Suez Water
Position held: Site supervision, commissioning, wastewater treatment, project management
From: 08/2016 To: 03/2018
Employer: Egis Uganda
Position held: Water Treatment Expert
From: 11/2015 To: 07/2016
Employer: Rodeco Zambia
Position held: Investment Programme Manager
From: 12/2006 To: 03/2015
Employer: Waterleau Belgium & overseas
Position held: Construction Project Manager, Senior Mechanical Engineer
From: 06/2004 To: 07/2006
Employer: Tenix Australia
Position held: Senior Design / Process Engineer
From: 01/2003 To: 05/2004
Employer: SKM Australia
Position held: Senior Project Manager – Environmental Engineering Dept.
From: 01/1993 To: 08/2002
Employer: Tractebel Belgium & Overseas
Position held: Project Manager – Wastewater, Water Supply & Irrigation Dept.
From: 01/1990 To: 12/1992
Employer: Mott Mac UK & Overseas
Position held: Project Engineer - Irrigation Department
IRD Engineering S.r.l. Page 1 of 8
CV Key Expert: Team Leader / Wastewater Engineer

From: 06/1987 To: 08/1989


Employer: Halcrow UK & Overseas
Position held: Project Engineer - Irrigation Department
From: 09/1985 To: 08/1986
Employer: Aim Tech UK
Position held: Electronics Engineer

17. Detailed Tasks Assigned 18. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
Name of assignment or project: Uganda Kampala South WatSan Feasibility Study
Month and Year: 03/2018 – Present
Location: Uganda
Client: DANIDA
Main project features: The project comprised of a 62,500 m³/d water treatment plant (WTP), and
400 m³/day Faecal Sludge Treatment Plant (WWTP), for a total project population at the horizon
of 2 million equivalent habitants in 2040. Demand modelling, Water supply network modelling,
water treatment design, lake intakes, fecal sludge treatment plant design, feasibility study
including ESIA, resettlement, economic and financial analysis, public water points for urban poor.
Planned.
Position held: Team Leader
Cost of works: EUR 130 million
Activities performed: Design of WWTP, network modelling, QGIS demand modelling and mapping.
Preparation of tender documents according to FIDIC Yellow Book. Monitoring of ESIA preparation.
Overall project management incl. management of technical parts, financial management and
management of project team. Project reporting.
Name of assignment or project: Chernivitsi Municipal Water Infrastructure Project, Phase 1
Month and Year: 03/2017 – Present
Location: Ukraine
Client: KfW
Main project features: Water supply project for a city using WTP (50,000 m³/d) Institutional
Development, Capacity Building. Investment budget: EUR 22 million.
Position held: Team Leader / Chief Resident Engineer
Cost of works: EUR 22 million
Activities performed: Conceptual and detailed design, preparation of tender documents
according to FIDIC 1 Red Book and 2 Yellow Book Lots. Assistance during tendering and
contracting. Construction supervision. Overall project management incl. management of technical
parts, contractual and financial management. Management of project team. Progress Reporting.
Name of assignment or project: Pharmaceutical Wastewater at Genzyme (Geel MBR), Zinc
production wastewater at Nystar (Balen DAF), La CILE Water Treatment Plant
Month and Year: 12/2016 – 06/2018
Location: Belgium, Netherlands
Client: Suez (Dégremont)
Main project features: Nitrate and pesticide removal from drinking water (36 000 m³/d), EcoFlow
The Netherlands, expertise on aeration (Industrial septage treatment) and installation of a
centrifuge on a 3500 kg BOD/day plant.
Position held: Senior Expert support for construction supervision, project management,
troubleshooting
Cost of works: WTP : 15 million €, Centrifuge 0.3 m€.
Activities performed: Construction supervision, hydraulic gradeline troubleshooting, design and
installation of centrifuge and sludge pumping installation. Troubleshooting at La Cile for nitrogen
removal.
Name of assignment or project: Bushenyi Water Treatment Plant
Month and Year: 08/2016 – 03/2018 (
Location: Uganda
Client: NWSC/ World Bank
Main project features: The project comprises of a 6,300 m³/d WTP for a population of approx.
74,000. Humic waters polluted with cadmium are treated using aeration, flash-mixing coagulation
flocculation, pH change to precipitate cadmium, rapid sand filtration pH adjustment and
chlorination.
Position held: Water Treatment Plant Expert (during construction supervision)
Cost of works: 12 million €
Activities performed: Construction supervision according to FIDIC Pink Book. Site supervision for
all process matters, hydraulic gradeline and layout. Redesign of lamellar decantation, intake works
and process review for the water treatment plant.
Name of assignment or project: TA to the Zambia Water and Sanitation Project (Mulonga water -

IRD Engineering S.r.l. Page 2 of 8


CV Key Expert: Team Leader / Wastewater Engineer

MWSC)
Month and Year: 11/2015 – 07/2016
Location: Zambia
Client: EIB
Main project features: Feasibility study and procurement, 267,000 m³/d water supply for a
population of approx. 450,000 and rehabilitation and extension of existing 5 lagoon WWTP treating
the sewage from the 3 towns. Investment budget: EUR 150 million.
Position held: Investment Program Manager & Deputy Team Leader
Cost of civil works: EUR 150 million
Activities performed: Institutional strengthening. Guidance and capacity building on investment
planning and procurement according to FIDIC Red Book and for the disbursement of the loan with
EUR 150 million for the 3 towns. Programme Management and monitoring. Improvement of
business procedures and processes. Feasibility studies incl. hydraulic modelling. Investment
planning and identification of infrastructure projects for peri-urban areas extending and improving
water supply and sanitation networks, decoupling the mine water business, 7 WTP (rehabilitation
and upgrading FIDIC Yellow Book). Asset management database, integration of GIS.
Name of assignment or project: Al Shamal Wastewater Treatment Plant (WWTP)
Month and Year: 03/2015
Location: Qatar
Client: Qatari Govt
Main project features: 172 000 m³/day (7,512 m³/h) wastewater treatment plant (WWTP).
Position held: Hydraulics Specialist
Cost of works: forecast at 130 million €
Activities performed: Hydraulic grade line of major municipal plant.
Name of assignment or project: Ultra-filtration & reverse osmosis water reuse project
Month and Year: 10/2013 – 03/2015
Location: Ghana
Client: Vlisco GTP
Main project features: Design and construct project based on FIDIC Yellow book for industrial
wastewater treatment and reuse project of 1040 m³/d & 975 kgCOD/d, Refractory wastewater. 30
m³/h reuse stream.
Position held: Team Leader
Cost of Works: 1
Activities performed: Overall Project Management. Preparation of detailed design, E&M
procurement, SCADA system, civil supervision, electrical & mechanical fit out and commissioning of
a process train consisting of pre-treatment, activated sludge, UF and RO. Construction
Management, technical quality control, time and cost control. Supervision of sub-contractors and
civil works contractor. Contract management.
Name of assignment or project: 2 UASB plants in Cuzco and Motupe
Month and Year: 10/2012 – 01/2015
Location: Peru
Client: SAB Miller Backus
Main project features: Detailed design and construction project based on FIDIC Yellow book for
industrial brewery wastewater project for the Backus brewerys in Cuzco: 1,390 m³/d & 6,400
kgCOD/d, in Motupe: 4,080 m³/d & 18,700 kgCOD/d.
Position held: Team Leader
Cost of works: 3 million €
Activities performed: Overall Project Management. Preparation of Design, E&M procurement, civil
supervision, supervision of electrical & mechanical fit out and commissioning of UASB plant for
brewery wastewater. Upflow Anaerobic Sludge Blanket, SBR, aerated lagoon, sludge thickening,
flare, methane re-use warm water boiler. Construction Management, technical quality control, time
and cost control. Supervision of sub-contractors and civil works contractor. Contractual
management. Management of project team. Work planning and progress reporting.
Name of assignment or project: Four (4) WWTP in Kursk, Ivanovo, Saransk & Novocheboksarsk
Month and Year: 10/2010 – 06/2012
Location: Russia
Client: SunInBev Breweries
Main project features: Design and construct project based on FIDIC Yellow book. 4 brewery
effluent industrial treatment projects of 2,664 m³/d and 9,600 kgCOD/d.
Position held: Team Leader / Design Manager / Chief Construction Manager
Cost of works: E&M 8 million €, Civil 8 million €
Activities performed: Project Management. Preparation of detailed design, E&M procurement of 4
brewery wastewater treatment plants, SCADA systems, SBR plants, sludge treatment (lime).
Construction Management, technical quality control, time and cost control. Supervision of sub-
contractors and civil works contractor. Contractual management. Management of project team.

IRD Engineering S.r.l. Page 3 of 8


CV Key Expert: Team Leader / Wastewater Engineer

Work planning and progress reporting.


Name of assignment or project: El Mehalla Industrial WWTP
Month and Year: 12/2009 – 02/2015
Location: Egypt
Client: Misr Spinning and Weaving
Main project features: Design and construct project based on FIDIC Yellow book. 53,000m³/day
26,500 kgCOD/d, industrial WWTP design and build. Investment budget: EUR 27 million.
Position held: Team Leader / Chief Resident Engineer
Cost of civil works: EUR 27 million
Activities performed: Overall Project Management. Preparation of design, E&M procurement.
Construction supervision, electrical & mechanical fit out, SCADA system and commissioning of a
WWTP for, wastewater polished with sand filters, sludge treatment. Construction Management,
technical quality control, time and cost control.
Name of assignment or project: Fez WWTP
Month and Year: 08/2009 – 12/2009
Location: Morocco
Client: RADEEF
Main project features: 30,000 m³/h. 58,100 kgBOD/d WWTP for a population of approx. 1 million.
Investment budget: EUR 27 million. The plant included stormwater treatment, pretreatment,
oxidation ditch, clarification, sludge extraction (flotation), digestion, thickening, septage treatment.
Position held: Senior Mechanical Engineer
Cost of works: EUR 27 million
Activities performed: Preparation of design for a sludge treatment and digestion plant.
Name of assignment or project: Godine, Bernissart & Blaton Wastewater Treatment Plants
Month and Year: 11/2007 – 07/2009
Location: Belgium
Client: INASEP/IPALLE
Main project features: Design and Construct project using Walloon Region modified Yellow Book.
Detailed design and construct project based on modified FIDIC Yellow book. 1,960 m³/d. 1,300
kgCOD/d. wastewater treatment plan (design and build) for a population of approx. 9,800.
Position held: Team Leader
Cost of works: 4 million €
Activities performed: Overall Project Management. Preparation of design, E&M procurement, civil
guidelines, electrical & mechanical fit out and commissioning of municipal treatment plant using
oxidation ditch technology. Sludge treatment train. Construction Management, technical quality
control, time and cost control. Contractual management. Construction supervision of civil works.
Management of project team. Work planning and progress reporting.
Name of assignment or project: Sclessin WWTP
Month and Year: 12/2006 – 11/2007
Location: Belgium
Client: AIDE
Main project features: Design and build municipal WWTP 40,712 m³/d. 8,243 kgCOD/d. 200,000
PE.
Position held: Senior Mechanical Engineer
Cost of works: 16 million €
Activities performed: Mechanical fit-out, turbo blower specification and purchasing, lamella
decantation specification.
Name of assignment or project: Hat Head WWTP (Kempsey Shire Council), (b) Mirani WWTP
(Mackay Regional Council) (c) Canungra SBR for Canungra Military Area (d) Point lookout WWTP
(Redland City Council, (e) Lilydale, brushy creek gravity filter (Yarra Valley Water), (f) Mackay
Wastewater Treatment Project (Mackay Regional Council)
Month and Year: 04/2004 - 07/2005
Location: Australia
Client: Various
Main project features: (a) 470,000 AUD$ design and construction of wastewater treatment plant,
Defects problems solving. (b) Design and construct SBR wastewater treatment plant, Defects
problems solving. (c) 1,200 m³/d. 42 kg BOD/d. 800 PE design and construction of WWTP project,
Design & Construct bid process & design. (d) 760 m³/d. 135 kgCOD/d. municipal WWTP, SBR
process & hydraulic design, civil drawings, electromechanical requests for quotations, clarifications
and exclusions. (e) 53 000 EH, 15 500 m³/d WWTP, water recycling filter design and build project,
Commissioning for Yarra Valley Water - troubleshooting control system, valves, pumps & VSDs. (f)
Design and construct project based on modified FIDIC Yellow book. 22.3 ML/d. 16,600 kgCOD/d.
for a population of approx. 97,000, wastewater treatment and recycling plant and sugar cane
irrigation. (g) Design and build of Bega Valley Wastewater Treatment and Recycling project (8
village Membrane Bioreactors and sewer networks.

IRD Engineering S.r.l. Page 4 of 8


CV Key Expert: Team Leader / Wastewater Engineer

Position held: Design Manager & Senior Process Engineer


Cost of works:110 million AUD for (f) Mackay Wastewater Recycling Project (g) 16 million AUD
Activities performed: Plan and manage the design of large water and wastewater projects, incl.
elaboration of various feasibility studies; coordinate project budget of the design stage and closely
collaborate with the project manager of the subsequent phases for a successful project
implementation.
Name of assignment or project: (a) Craigieburn Sewage Treatment Plant - Peak Wet Weather
Flows Storage Facility (Yarra Valley Water); (b) Ballarat North WWTP Boot Reuse Scheme for
Central Highlands Water
Month and Year: 01/2003 – 05/2004
Location: Australia
Client: Various
Main project features: Detailed design of wet weather mixed wastewater and stormwater flows
storage facility.
Position held: Team Leader
Cost of works: 0.8 million USD
Activities performed: Overall project management. Preparation of design and Construction
supervision. Overall financial and contractual management of several projects, incl. tendering and
awarding; review of WWTP design and manage construction supervision; closely liaise with
involved stakeholders particularly respective water and sewerage utilities; formulate bulk water
trading compliance strategy for water resources; relevant project selection.
Name of assignment or project: Namur Wastewater Master Plan including design (INASEP)
Month and Year: 06/2001 – 08/2002
Location: Belgium
Client: INASEP
Main project features: 160 m³/d. 2,800 kgCOD/d. for a population of approx. 72,000.
Position held: Team Leader
Cost of civil works: EUR 40 million
Activities performed: Overall project management. Preparation of master plan. Detailed design of
low-pressure wastewater network comprising over 50 vortex/pump stations and 13 km of
collectors, complex non-linear network requiring innovative hydraulic solution. Stormwater
treatment by vortex storage requiring careful selection of stormwater by-passes. Design of septicity
prevention including modelling. Water hammer protection. Innovative control system.
Name of assignment or project: Gafarsa and Keranyo Water Supply Project
Month and Year: 01/2001 – 05/2002 (12 mm)
Location: Ethiopia
Client: EU
Main project features: Rehabilitation and extension of the water supply network from Gafarsa dam
to Keranyo district including rehabilitation of the water treatment plant (30 000m³/d) and the
dam. Investment budget: EUR 19 million.
Position held: Team Leader
Cost of civil works: EUR 19 million
Activities performed: Project management. Prepared detailed design and tender documents
according to FIDIC. Assistance during tendering and contracting.
Name of assignment or project: Sudoche Wetlands Project
Month and Year: 12/2000 – 11/2001 (2 mm)
Location: Uzbekistan
Client: World Bank
Main project features: As part of the efforts of the International Fund to Save the Aral Sea a
number of major drainage canals are being constructed to improve the through flow of water into
the Sudoche wetlands south of the Aral Sea.
Position held: Team Leader
Cost of works: 2 million €
Activities performed: Preparation of Contract Documents and evaluation of contractor’s offers.
Name of assignment or project: Riyadh Water Resources Project
Month and Year: 01/2000 – 12/2000 (9 mm)
Location: Saudi Arabia
Client: Water & Energy Co.
Main project features: 200,000 m³/d. 500,000 PE. €15 million water resources project for the city
of Riyadh.
Position held: Team Leader
Cost of civil works: EUR 15 million
Activities performed: Feasibility to detailed design of a major water resources project supplying
200 000 m³/day to Riyadh from the Nissah and Al-Bakri well field. Hydrogeological modelling and
well design, two trunk mains, two major desalination plants, in conjunction with local partners.

IRD Engineering S.r.l. Page 5 of 8


CV Key Expert: Team Leader / Wastewater Engineer

FIDIC Red Book for well field and trunk mains. FIDIC Yellow Book for Desalination Plants.
Name of assignment or project: Harscamp pumping station and vortex
Month and Year: 09/1999 – 07/ 2000 (
Location: Belgium
Client: INASEP
Main project features: Design of combined vortex storm-water treatment reservoir and
wastewater pumping station for 2000 equivalent inhabitants.
Position held: Team Leader / Hydraulics Engineer
Cost of works: 2 million €
Activities performed: Detailed design of combined vortex storm-water treatment reservoir and
wastewater pumping station for 2000 equivalent inhabitants. Including sewer rehabilitation, pipe-
jacked tunnel, slurry wall construction and complex interaction with building works.
Name of assignment or project: Namur Pumping Stations Project
Month and Year: 01/to 11/1998
Location: Belgium
Client: INASEP
Main project features: Feasibility design of low-pressure wastewater collector network and
pumping stations.
Position held: Team Leader
Cost of civil works: 50 million €
Activities performed: Design of 56 pumping stations with vortex stormwater treatment (civil,
electromechanical and control). Design of odour prevention including mathematical modelling and
review of technologies.
Name of assignment or project: Korle Lagoon Ecological Restoration Project
Month and Year: 05/1997 – 10/1998 (9 mm)
Location: Ghana
Client: Govt of Ghana; financing AfDB
Main project features: Wastewater (200,000 PE), flooding (Q50,180 m³/s), solid waste and
dredging project for the City of Accra. Restoration of the lagoon by wastewater collectors linking to
a sea outfall, removal of solid waste dumps, improvements of slum areas around the lagoon and
dredging of the lagoon to assist with reducing flooding.
Position held: Team Leader
Cost of civil works: 25 million €
Activities performed: Review of outdated feasibility report and detailed design. Design of pre-
treatment works, offtake, pump stations and network. Surge analysis and septicity analysis.
Integration of solid waste, community appraisal and dredging expert reports into overall feasibility
and design reports. Preparation of Tender Documents FIDIC Yellow Book.
Name of assignment or project: Namur - Catchments of the Sambre
Month and Year: 02/1995 – 03/1997
Location: Belgium
Client: INASEP
Main project features: Extension of Pilot study for wastewater collectors to create a master plan
for Namur (pop 100 000). 5,180 m³/d. 67,000 PE. 4,020 kgBOD/d.
Position held: Project Manager
Cost of civil works:3 million €
Activities performed: Preparation of innovative solution of replacing gravity collectors with
pumping main and numerous small pump stations reduces project costs by one half. Incorporated
modelling of the Sambre and Meuse rivers to evaluate the impact of the wastewater project on
receiving water quality using HydroWorks. Wastewater quality analysis including modelling.
Name of assignment or project: Antalya Environment Master Plan
Month and Year: 10/1996 – 07/ 1997
Location: Turkey
Client: City of Antalya, World Bank
Main project features: Solid waste, water supply and wastewater master plan for 400 000 people
(60 000 m³/d water, 48 000 m³/d wastewater 2 880 kgBOD/d).
Position held: Wastewater Engineer
Cost of civil works: No longer known
Activities performed: Design of wastewater treatment plant and sea outfall for FIDIC Red Book.
Name of assignment or project: Eastern Seaboard Development Project Phase II
Month and Year: 1996-1997 (9 mm)
Location: Thailand
Client: Govt Thailand/Belgian Cooperation
Main project features: The project components included water supply, water resources,
wastewater, solid waste, and industrial waste management.
Position held: Team Leader Environmental Engineering

IRD Engineering S.r.l. Page 6 of 8


CV Key Expert: Team Leader / Wastewater Engineer

Cost of investment programme:300 million €


Activities performed: Conduct planning for water supply, water resources, wastewater, solid waste,
industrial waste investment projects; formulate respective recommendations for institutional and
regulatory approaches. Prepared structure plan for 6 million people over the next ten years.
Name of assignment or project: Wastewater Master Plans for (a) Tangiers and Asilah, (b)
Khemisset and Tiflet, (c) Greater Casablanca
Month and Year: 01/1993 – 11/1995 (22 mm)
Location: Morocco
Client: World Bank
Main project features: Feasibility study including several technical options and modelling of
wastewater & sewer network.
Position held: Wastewater Engineer / Project Engineer
Cost of civil works: No longer known
Activities performed: (a) Conceptual and detailed design of the pre-treatment works for Tangiers
WWTP (1 000 000 PE, 120 000 m³/d, 7 200 kgBOD/d) and stormwater drainage. Design of a lagoon
system for the wastewater of Asilah. (b) measurement survey of the networks: consumption, flows
metering by insertion, pressures, and sectorisation. Planning of operations to improve the
efficiency of the networks of Khemisset and Tiflet (2 x 20 000 PE, 2 x 3 000 m³/d, 2 x 180 kgBOD/d).
(c) Modelling of engineering options. Determination of unit costs and feasibility study of selected
engineering option. Development of investment plan.
Name of assignment or project: Amibara Irrigation and Drainage Project
Month and Year: 12/1991 – 12/1992 (12 mm)
Location: Ethiopia
Client: World Bank
Main project features: Irrigation and drainage project Investment costs 12 m USD.
Position held: Assistant Resident Engineer
Cost of civil works: 12 m USD
Activities performed: Construction supervision: installation of sub-surface drainage, earthworks
and construction of hydraulic structures over an area of 4 200 ha. Preparation of a programme of
remediation of saline soils, a programme of clearing abandoned land and a programme of
rehabilitation of irrigation canals. Labour intensive construction methods.
Name of assignment or project: Bas Chéliff irrigation and agriculture development project and
Mitidja plain irrigation and agriculture Development Project
Month and Year: 01/1990 – 11/1991 (21 mm)
Location: Algeria
Client: World Bank
Main project features: Irrigation project covering 16 000 ha + 22 000 ha including: 30 km of unlined
canals and 64 km of prefabricated canals, a low-pressure distribution network, storage basins and
subsurface drainage for saline soils, flood protection works and the optimization of water
distribution.
Position held: Irrigation Engineer
Cost of civil works: No longer known
Activities performed: Design and supervision of irrigation infrastructure; mapping of irrigation
network; manage inventories of wells and boreholes.
Name of assignment or project: (a) Royal docks urban drainage scheme, UK; (b) Baluchistan
Irrigation and Agriculture Development Project, Pakistan; (c) Mahakali Irrigation Project, Nepal
(WB)
Month and Year: 07/1987 to 12/1988 (28 mm)
Location: Nepal/Pakistan/UK
Client: World Bank
Main project features: Various drainage project.
Position held: Assistant Resident Engineer / Design Engineer
Cost of civil works:
Activities performed: (a) Construction supervision according to modified FIDIC Red Book of 5 km
of 2 m diameter pipe jacked tunnels for a foul and storm water drainage scheme for the Royal
Docks Development. Checking the Contractor's surveying and approving the Contractor's
temporary works such as coffer dams and grouting works to stabilise gravels. (b) Full design of five
minor irrigation projects. Catchment hydrology, soils, land tenure, farmer’s systems and complete
system design for weir abstraction, channel lining and protection. Construction supervision of
works. (c) FIDIC Red Book construction supervision of the Phase II development of the irrigation
project and flood protection using labour intensive construction. Secondary and tertiary canal
design review, design and construction of precast concrete outlet structures review of water
management at farmer level.

20. Certification:

IRD Engineering S.r.l. Page 7 of 8


CV Key Expert: Team Leader / Wastewater Engineer

I, the undersigned, certify to the best of my knowledge and belief that


(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH 6
provided team mobilization takes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development banks;
(vi) I certify that I have been informed by the firm that it is including my CV in the Proposal for the “ Construction Supervision (CAREC/C1&3/QCBS/CSC)". I
confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and
schedule set out in the Proposal.

If CV is signed by the firm’s authorized representative, insert:

(vii) I, as the authorized representative of the firm submitting this Proposal for the “Construction Supervision (CAREC/C1&3/QCBS/CSC)", certify that I
have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the
implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date:

Signature of Expert or authorized representative of the firm

Paolo Orsini

Full name of authorized representative

IRD Engineering S.r.l. Page 8 of 8

You might also like