BILL NO.

B - BUILDING WORKS

ITEM DESCRIPTION PAGE NO. AMOUNT (RM)

SUMMARY OF BUILDING

B1 BLOK PENTADBIRAN PPK ELEKTRIKAL (A1) SUM/B1/1 7,949,252.70

B2 BLOK MAKMAL DAN BENGKEL PPK ELEKTRIK (A2) SUM/B2/1 595,873.00

B3 BLOK MAKMAL DAN BENGKEL PPK ELEKTRIK (A3) SUM/B3/1 1,176,556.30

B4 BLOK PENTADBIRAN PPK MAHAN (B1) SUM/B4/1 2,836,912.90

B5 BLOK MAKMAL DAN BENGKEL PPK BAHAN (B2) SUM/B5/1 1,371,357.05

B6 BLOK MAKMAL DAN BENGKEL PPK BAHAN (B3) SUM/B6/1 727,189.50

B7 BLOK MAKMAL DAN BENGKEL PPK BAHAN (B4) SUM/B7/1 1,073,745.00

B8 BLOK GUNASAMA (C) SUM/B8/1 5,305,982.55

B9 PENCAWANG ELEKTRIK (D1) SUM/B9/1 56,424.00

B10 PENCAWANG ELEKTRIK (D2) SUM/B10/1 52,419.00

B11 RUMAH PAM DAN TANGKI CEGAH KEBAKARAN (E1) SUM/B11/1 31,730.60

B12 RUMAH PAM,TANGKI SUDUT DAN TANGKI CEGAH KEBAKARAN (E2) SUM/B12/1 32,276.00

B13 RUMAH PAM DAN TANGKI SEDUT (E3) SUM/B13/1 11,894.00

B14 DEPO SAMPAH BESAR (F) SUM/B14/1 12,771.00

TO SUMMARY OF TENDER 18,617,087,10