2016-Albania-ConnectivityProject-Tirana-Durres-Summary-Sheet-8-May-2018
2016-Albania-ConnectivityProject-Tirana-Durres-Summary-Sheet-8-May-2018
Estimated Start Date: The project is now at detailed design Yugoslav Republic of Macedonia and
x Late 2018 stage, with feasibility and Montenegro, as well further transport
environmental impact assessment links with Greece and Bulgaria, along
studies completed with previous WBIF the Mediterranean Corridor.
Estimated End Date: financial assistance. The detailed
x End of 2021 designs were approved by MTI in early Benefits
2017, and the draft pre-qualification
documents for works are under review x More than 1,375 new jobs created
Estimated Loan with the EBRD. The new development during construction as well as
Repayment Period: will not have significant social or en- operation and maintenance
x 15 years vironmental impacts as most of the periods.
facilities will be built on the route of the x Direct access to modern means of
existing rail track, while the new sec- transport for more than 1 million
tion passes mostly through people living along the Tirana -
agricultural areas. Detailed Durrës railway route.
environmental impact mitigation x Reduced operational and
measures have been planned for during maintenance costs for railway
construction, including a noise operators active in Albania,
monitoring programme. estimated at more than €60 million.
x Savings in cost of travel time,
The project complements two other
estimated at more than €55 million.
planned improvements on CVIII and
x Improved environmental conditions
R2 sections on the Mediterranean
by reducing freight and passenger
Corridor, as follows:
transport by road.
x R2 Durrës – Vora – Shkodra – x Improved trade flows with countries
Hani Hotit/border with Montenegro in the region and thus a positive
section (140 km) impact on the broader economy of
Albania.
x CVIII Durrës – Vlore –
Pogradec/border with the former
Transport