Problem 5

Recommendations for increasing


the capacity of the process

Capacity can be increased by double of


available time like 2400 to 4800 hrs
per week .it will double quantity of
beds per week from 24
1
to 48 beds per week .but it will also
double the cost .when we will
increasing available time . but it will
also double the cost
available time in
2minute 60
week 2400workers
capacity can be increased by
available time in
2 combining step 6 stain and step 7 batch 63
polyurethane week 4800hours 40
bed 4 batch 405
batch 121
capacity 4800 10.256 41 batch 63
468

Hence the capacity increased from 24


to 41 beds per week but it will cause
load balancing issue

3
capacity 4800 11.851851851852 47
405

capcity 2400 13 52

184

Hence capacity
increased from 24
to 47 Beds per
week .