REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS

OPERADOR : JUAN CASTILLO


EQUIPO: EXCAVADORA
N° FECHA nº PARTE H.INGRESO H.FINAL HORAS DIA
1 1/11/2022 000 1123 9382.1 9382.7 0.6
2 1/12/2022 000 1124 9382.7 9383.3 0.6
3 1/13/2022 000 1125 9383.3 9383.3 0
4 1/14/2022 000 1126 9383.3 9386.5 3.2
5 1/15/2022 000 1127 9386.5 9390.2 3.7
6 1/16/2022 0
7 1/17/2022 000 1128 9390.2 9393.2 3
8 1/25/2022 000 1130 9393.2 9401.6 8.4
9 1/26/2022 000 1131 9401.6 9410 8.4
10 1/27/2022 000 1132 9410 9418.5 8.5
11 1/28/2022 000 1134 9418.5 9426.9 8.4
12 1/29/2022 000 1135 9426.9 9430.9 4
13 1/31/2022 000 1136 9430.9 9438.4 7.5
14 2/1/2022 000 1138 9438.4 9443.5 5.1
15 2/2/2022 000 1139 9443.5 9450.4 6.9
16 2/3/2022 000 1140 9450.4 9457.9 7.5
17 2/4/2022 000 1141 9457.9 9465.5 7.6
18 2/7/2022 000 1142 9465.5 9471.4 5.9
19 2/8/2022 000 1143 9471.4 9477.2 5.8
20 2/9/2022 000 1144 9477.2 9484.6 7.4
21 2/10/2022 000 1145 9484.6 9486.8 2.2
22 2/11/2022 000 1146 9486.8 9492.3 5.5
12-Feb 000 1147 9492.3 9498 5.7
9498 9498.6 0.6
14-Feb 000 1251
9498.6 9505.6 7
9505.6 9506.1 0.5
15-Feb 000 1252
9506.1 9510.9 4.8
9510.9 9513.2 2.3
9513.2 9513.9 0.7
16-Feb 000 1253
9513.9 9514.9 1
9514.9 9518.8 3.9
9518.8 9522.1 3.3
17-Feb 000 1254 9522.1 9524 1.9
9524 9524.8 0.8
9524.8 9525.8 1
9525.8 9528.9 3.1
18-Feb 000 1255 9528.9 9530.2 1.3
9530.2 9530.7 0.5
9530.7 9531.8 1.1
9531.8 9532.2 0.4
9532.2 9535 2.8
19-Feb 000 1256 9535 9535.6 0.6
9535.6 9535.9 0.3
9535.9 9536.3 0.4
9536.3 9543.4 7.1
21-Feb 000 1257 9543.4 9544.1 0.7
9544.1 9544.5 0.4
22-Feb 000 1258 9544.5 9551.7 7.2
9551.7 9552.7 1
23-Feb 000 1259 9552.7 9553.8 1.1
9553.8 9557.7 3.9
24-Feb 000 1260 9557.7 9559.5 1.8
26-Feb 000 1261 9559.5 9562.4 2.9
27-Feb 000 1262 9562.4 9565.1 2.7
28-Feb 000 1263 9565.1 9567.9 2.8
1-Mar 000 1264 9567.9 9570.4 2.5
9570.4 9571.4 1
2-Mar 000 1265 9571.4 9572.9 1.5
9572.9 9573.2 0.3
3-Mar 000 1266 9573.2 9575.7 2.5
9575.7 9576.8 1.1
4-Mar 000 1267
9576.8 9577.4 0.6
5-Mar 000 1268 9577.4 9579.7 2.3
7-Mar 000 1269 9579.7 9581.3 1.6
8-Mar 000 1270 9581.3 9585.1 3.8
9585.1 9587.2 2.1
9-Mar 000 1271
9587.2 9590.2 3
11-Mar 000 1272 9590.2 9592.1 1.9
9592.1 9593.2 1.1
9593.2 9594.3 1.1
9594.3 9595 0.7
9595 9596.5 1.5
12-Mar 000 1273
9596.5 9596.7 0.2
9596.7 9597.4 0.7
9597.4 9597.8 0.4
9597.8 9599 1.2
13-Mar 000 1274 9599 9600.9 1.9
9600.9 9602 1.1
9602 9603.1 1.1
9603.1 9603.4 0.3
14-Mar 000 1275
9603.4 9604 0.6
9604 9607.8 3.8
9607.8 9608.1 0.3
9608.1 9610.2 2.1
15-Mar 000 1276
15-Mar 000 1276 9610.2 9611 0.8
9611 9611.2 0.2
23-Mar 000 1277 9611.2 9612.2 1
9612.2 9612.5 0.3
24-Mar 000 1278
9612.5 9614.8 2.3
9614.8 9616.2 1.4
25-Mar 000 1279
9616.2 9617.1 0.9
9617.1 9618.3 1.2
9618.3 9618.4 0.1
26-Mar 000 1280 9618.4 9618.9 0.5
9618.9 9620 1.1
9620 9620.8 0.8
9620.8 9621.3 0.5
9621.3 9622.9 1.6
27-Mar 000 1281
9622.9 9623.2 0.3
9623.2 9623.5 0.3
9623.5 9624.7 1.2
28-Mar 000 1282
9624.7 9625.6 0.9
9625.6 9627.4 1.8
29-Mar 000 1283
9627.4 9628.5 1.1
9628.5 9628.9 0.4
9628.9 9629.4 0.5
30-Mar 000 1284
9629.4 9630.2 0.8
9630.2 9630.9 0.7
9630.9 9631.8 0.9
2-Apr 000 1285
9631.8 9634.6 2.8
9634.6 9636.3 1.7
4-Apr 000 1286
9636.3 9637 0.7
9637 9637.7 0.7
5-Apr 000 1287
9637.7 9638.8 1.1
9638.8 9641.3 2.5
6-Apr 000 1288 9641.3 9643.8 2.5
9643.8 9645.4 1.6
9645.4 9648.5 3.1
7-Apr 000 1289
9648.5 9651.6 3.1
9651.6 9654 2.4
8-Apr 000 1290
9654 9658.6 4.6
9-Apr 000 1291 9658.6 9662 3.4
9662 9664.2 2.2
10-Apr 000 1292
9664.2 9664.8 0.6
9664.8 9665.3 0.5
11-Apr 000 1293 9665.4 9667.4 2
9667.4 9669.6 2.2
9669.6 9672.3 2.7
12-Apr 000 1294
9672.3 9674.6 2.3
9674.6 9678 3.4
14-Apr 000 1295 9678 9678.8 0.8
9678.8 9681.4 2.6
9681.4 9682.1 0.7
15-Apr 000 1296
9682.1 9684.4 2.3
9684.4 9686.4 2
18-Apr 000 1297
9686.4 9688.5 2.1
9688.5 9690.1 1.6
19-Apr 000 1298
9690.1 9691.8 1.7
9691.8 9692.9 1.1
20-Apr 000 1299
9692.9 9698.2 5.3
9698.2 9699.5 1.3
21-Apr 0000 601 9699.5 9703 3.5
9703 9706.7 3.7
9706.7 9708.3 1.6
22-Apr 0000 602
9708.3 9714.5 6.2
23-Apr 0000 603 9714.5 9716.4 1.9
26-Apr 0000 604 9716.4 9721.7 5.3
9721.7 9724 2.3
27-Apr 0000 605 9724 9725.2 1.2
9725.2 9725.7 0.5
9725.7 9728.3 2.6
28-Apr 0000 606
9725.3 9729.3 4
29-Apr 0000 607 9729.3 9734.8 5.5
9734.8 9735.3 0.5
30-Apr 0000 608 9735.3 9737.5 2.2
9737.5 9737.9 0.4
0000 609 9737.9 9738.8 0.9
2-May
9738.8 9740.5 1.7
0000 610 9740.6 9741.9 1.3
3-May
9741.9 9744.6 2.7
0000 611 9744.6 9746.2 1.6
9746.2 9747.2 1
5-May
9747.2 9749.6 2.4
9749.6 9753.4 3.8
0000 612 9753.4 9753.6 0.2
6-May
9753.6 9754 0.4
0000 613 9754 9754.8 0.8
9754.8 9755.3 0.5
8-May 9755.3 9756.4 1.1
9756.4 9757.2 0.8
9757.2 9758.2 1
9-May 0000 614 9758.2 9761 2.8
0000 615 9761 9761.4 0.4
9761.4 9761.8 0.4
10-May
10-May
9761.8 9762.5 0.7
9762.5 9763.5 1
11-May 0000 616 9763.5 9763.5 0
14-May 0000 617 9763.5 9764.9 1.4
0000 618 9764.9 9767.6 2.7
16-May 9767.6 9768.9 1.3
9768.9 9770 1.1
0000 619 9770 9772.3 2.3
17-May
9772.3 9776.3 4
0000 620 9776.3 9777.1 0.8
18-May 9777.1 9778.5 1.4
9778.5 9779.6 1.1
0000 621 9779.6 9780.9 1.3
19-May 9780.9 9781.9 1
9781.9 9784.9 3
0000 622 9784.9 9785.8 0.9
20-May
9785.8 9786.3 0.5
21-May 0000 623 9786.3 9788.6 2.3
22-May 0000 624 9788.5 9789.1 0.6
23-May 0000 625 9789.1 9791.8 2.7
0000 626 9791.8 9792.4 0.6
24-May 9792.4 9793.5 1.1
9793.5 9794.1 0.6
0000 627 9794.1 9794.8 0.7
25-May 9794.8 9796.2 1.4
9796.2 9799.5 3.3
0000 628 9799.5 9800.5 1
26-May
9800.5 9801.7 1.2
0000 629 9801.7 9802.6 0.9
9802.6 9803 0.4
27-May
9803 9806 3
9806 9807.9 1.9
28-May 0000 630 9807.9 9811.4 3.5
0000 631 9811.4 9812.1 0.7
30-May 9812.1 9814.6 2.5
9814.6 9815 0.4
31-May 0000 632 9815

10/01/2022 traslado de excavadora de Heroica a Cascas en cama baja


INARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DESCRIPCION OBSERVACION HORAS MENSUAL


ANIVELACION EN PLANTA
ANIVELACION EN PLANTA
MANGUERA ROTA
DEMOLECION COLEGUIO
DEMOLECION COLEGUIO
demolecion y eliminacion domigo no se trabajo
demolecion y eliminacion
demolecion y eliminacion
demolecion y eliminacion
demolecion y eliminacion
demolecion y eliminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
demolicion y elminacion
izaje de columnas mod 1
demolicion
izaje de columnas mod 1
demolicion y elminacion
demolicion y elminacion
izaje de columnas mod 1
izaje de columnas mod 1
demolicion y elminacion
izaje de columnas mod 1
demolicion y elminacion
izaje de columnas mod 1
demolicion y elminacion
izaje de columnas mod 1
demolicion y elminacion
izaje de columnas mod 1
demolicion y elminacion
9.1
izaje de columnas mod 1
demolicion mod 5
izaje de columnas mod 1
demolicion mod 5

229.1
izaje de columnas mod 1
excavacion zapatas mod 5 (JV&JF)
izaje de columnas mod 1
excavacion zapatas mod 5 (JV&JF)
excavacion zapatas mod 5 (JV&JF)
excavacion zapatas mod 5 (JV&JF)
eliminacion de excava JV&JF
exca. zanja muro de contencion mod 5 (JV&JF)
habilitacion de accesos para vacear SSHH (JV&JF)
excavacion y eliminacion de muro contencion mo1
excavacion y eliminacion de muro contencion mo1
excavacion y eliminacion para escalera mod 1
excavacion y eliminacion para escalera mod 1
excavacion y eliminacion para escalera mod 1
descarga de bomba de concreto y fierro otingsa canter
izaje de columnas mod 1
descarga de fierro JV&JF
izaje de columnas escalera mod 1
descarga de fierro otingsa
izaje de columnas escalera mod 1
izaje de columnas escalera mod 1
Demolicion de cerco perimetrico
vaceado de sobrecimiento mod 1
excavacion y eliminacion de cerco
vaceado de columnas escalera mod 1
llenado de afirmado mod 1
demolicion y eliminacion de cerco
excavacion y eliminacion de cerco JV&JF
excavacion para muro de contencion mod 1
descarga de fierro
demolicion y eliminacion de cerco
excavacion de cerco JV&JF
demolicion y eliminacion de cerco
excavacion y eliminacion mod 1 cerco
excavacion y eliminacion de cerco JV&JF
demolicion de desmonte
excavacion y eliminacion de cerco JV&JF
eliminacion y demiolicion
excavacion y eliminacion de cerco JV&JF
excavacion y eliminacion de cerco JV&JF
excavacion y eliminacion mod 1 cerco
demolicion y eliminacion de cerco
excavacion y eliminacion de cerco JV&JF
eliminacion de desmonte
eliminacion de desmonte
traslado de afirmado para pisos de aulas
excavacion para canal de riego
traslado de afirmado para pisos de aulas
eliminacion de desmonte para canal
excavacion y cargio de muro de contencion (JV&JF)
demolicion y excavacion muro cerco (JV&JF)
Excavacion para muro de contencion (JV&JF)
demolicion y excavacion muro cerco (JV&JF)
eliminacion para canal de riego
demolicion y excavacion muro cerco (JV&JF)
acopio de desmonte costado modulo 1
demolicion y excavacion muro cerco (JV&JF)
excavacion de cerco JV&JF
excavacion de canal otingsa
eliminacion de excavacion canal otingsa
traslado de canaletas prefabricadas
eliminacion de excavacion canal otingsa
excavacion de cerco JV&JF
eliminacion de excavacion canal otingsa
eliminacion de desmonte canal otingsa
eliminacion de desmonte canal otingsa
excavacion de cerco JV&JF
excavacion de eliminacion JV&JF
eliminacion de desmonte canal otingsa
eliminacion de desmonte corte JV&JF
traslado de bloques canal otingsa
eliminacion y excavacion muro JV&JF
demolicion y eliminacion muro JV&JF / OTINGSA
excavacion y eliminacion de cerco JV&JF
excavacion corte de muro JV&JF
demolicion y eliminacion de cerco JV&JF / OTINGSA
excavacion y eliminacion canal de regadio
demolicion y eliminacion de cerco JV&JF / OTINGSA
excavacion para base mod 2 OTINGSA
excavacion y eliminacion mod 2 OTINGSA
relleno y nivelacion mod 5 JV&JF
nivelacion y excavacion mod 5 JV&JF
Vaciado de columnas mod 1
excavacion y eliminacion muro cerco JV&JF
excavacion y eliminacion cerco JV&JF
excavacion para canal regadio, traslado de canaletas
excavacion y eliminacion , traslado de bloques otingsa
excavacion y eliminacion muro JV&JF
excavacion rampa Otingsa
eliminacion de desmonte otingsa
demolicion de casa vieja (JV&JF / OTINGSA)
nivelacion de losa y eliminacion desmonte JV&JF
excavacion rampa Otingsa
eliminacion de desmonte otingsa
excavacion y eliminacion rampa otingsa
descarga de fierro otingsa
excavacion rampa y eliminacion otingsa
movimiento de tierra JV&JF
isamiento de columnas mod 2 otingsa
excavacion y eliminacion muro cerco JV&JF
excavacion y eliminacion muro cerco JV&JF
excavacion rampa y eliminacion otingsa
traslado de bloques prefabricados para canal Otingsa
excavacion y eliminacion mod 4
excavacion y eliminacion mod 4
relleno con afirmado mod 2
excavacion y eliminacion mod 4
excavacion y eliminacion mod 4
descarga de fierro
excavacion y eliminacion mod 4
isamiento de columnas JV&JF
descarga de fierro de JV&JF
isamiento de columnas JV&JF
descarga de fierro otingsa
eliminacion desmonte otingsa mod 5
eliminacion desmonte costado mod 5 otingsa
excavacion mod 4 otingsa
excavacion y eliminacion muro ingreso otingsa
excavacion y eliminacion costado baños mod 6 JV&JF
excavacion y eliminacion muro ingreso otingsa
vaceado de columnas mod 4 otingsa
izamiento de cable otingsa
ordenamiento de fierro de JV&JF
Conformacion de patio mod 2 otingsa
relleno afirmado mod 5 JV&JF
vaceado de pantalla mod 4 otingsa
relleno afirmado mod 5 JV&JF
descarga de fierro otingsa
demolicion de losa otingsa mod 4
demolicion y excavacion de losa mod 4 otingsa
Relleno con afirmado mod 5 JV&JF
eliminacion desmonte frente a comisaria JV&JF
vaceado de pantalla mod 4 otingsa
abastecimiento d combustible
descarga de fierro otingsa
batido de afirmado y relleno mod 4 otingsa
eliminacion de afirmado (piedras) JV&JF
vaceado de pantalla mod 4 otingsa
batido y relleno afirmado mod 4 otingsa
excavacion y eliminacion canal de agua otingsa
colocacion de bloques a canal otingsa
colocacion de bloques de canal de riego JV&JF
vaceado de columnas mod 3 2do piso otingsa
descarga de fierro otingsa
relleno con afirmado mod 5 JV&JF
vaceado de pantalla mod 4 otingsa
eliminacion de desmonte otingsa
carguio de afirmado JV&JF
vaceado de pantalla mod 4 otingsa
batido afirmado y eliminacion de desmonte
descarga de fierro y vaceado pantalla mo d4
relleno con afirmado JV&JF
batido de afirmado y traslado de columnas otingsa
batido de afirmado mod 5 JV&JF
batido de afirmado y relleno mod 5 JV&JF
batido de afirmado y relleno mod 4 otingsa
vaceado de pantalla rampa mod 4 otingsa
relleno con afirmado y muro 4 otingsa
vaceado de pantalla rampa mod 4 otingsa
relleno con afirmado mod 4 otingsa
relleno con afirmado mod 5 JV&JF
excavacion para zapata mod 4 y eliminacion
vaceado de pantalla en rampa mod 4
relleno con afirmado rampa mod 4 otingsa
relleno con afirmado mod 5 JV&JF
demolicion y eliminacion rampa mod 4 JV&JF
relleno con afirmado rampa mod 4 otingsa
carguio de afirmado en terreno
1.9 hrs jv
4.9 hrs jv
6.7 hrs jv
3 hrs jv
3.6 hrs jv
3 hrs jv

7.6

5.3

7.9

6
REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIM

OPERADOR : RUBEN ROJAS ESPINOZA


EQUIPO: MINICARGADOR
N° FECHA nº PARTE H.INGRESO H.FINAL HORAS DIA
1 2/1/2022 0000 501 5599.6 5600.9 1.3
2 2/1/2022 0000 502 5600.9 5602.3 1.4
3 2/2/2022 0000 503 5602.3 5607.9 5.6
4 2/3/2022 0000 504 5607.9 5609.1 1.2
5 2/4/2022 0000 505 5609.1 5612.5 3.4
6 2/5/2022 0000 506 5612.6 5615.3 2.7
7 2/7/2022 0000 507 5615.3 5617 1.7
8 2/8/2022 0000 508 5617 5618.7 1.7
9 2/9/2022 0000 512 5620.3 5621.3 1
10 2/9/2022 0000 513 5621.3 5623.8
11 2/9/2022 0000 514 5623.8 5624.2 0.4
12 2/10/2022 0000 515 5624.2 5628.4 4.2
13 2/11/2022 0000 516 5628.4 5631.8 3.4
5631.8 5633 1.2
14 12-Feb 0000 517
5633 5634.1 1.1
5634.1 5634.4 0.3
15 14-Feb 0000 518 5634.4 5634.8 0.4
5634.8 5637.1 2.3
5637.2 5637.9 0.7
5637.9 5638.5 0.6
16 15-Feb 0000 519
5638.5 5642 3.5
5642 5642.9 0.9
5642.9 5643.4 0.5
17 16-Feb 0000 520
5643.4 5645.6 2.2
5646.6 5649 2.4
18 17-Feb 0000 521
5649 5649.2 0.2
5649.2 5650.9 1.7
19 18-Feb 0000 522 5650.9 5651.3 0.4
5651.3 5654.3 3
5654.3 5655.1 0.8
20 19-Feb 0000 523 5655.1 5656.4 1.3
5656.4 5657.2 0.8
5657.2 5657.4 0.2
21 21-Feb 0000 524
5657.4 5659.5 2.1
5659.5 5660 0.5
5660 5660.1 0.1
22 22-Feb 0000 525
5660.1 5662.9 2.8
5662.9 5663.2 0.3
5663.2 5663.6 0.4

23 23-Feb 0000 526


5663.6 5663.9 0.3
5663.9 5664.5 0.6
23 23-Feb 0000 526
5664.5 5666 1.5
5666 5666.3 0.3
5666.3 5666.4 0.1
24 24-Feb 0000 527 5666.4 5667.1 0.7
5667.1 5667.3 0.2
25-Feb 0000 528
5667.3 5667.8 0.5
5667.8 5668 0.2
26-Feb 0000 529 5668 5668.5 0.5
5668.5 5669.7 1.2
27-Feb 0000 530 5669.7 5672.9 3.2
28-Feb 0000 531 5672.9 5679.7 6.8
1-Mar 0000 532 5679.7 5686.1 6.4
2-Mar 0000 533 5686.1 5689.7 3.6
5689.7 5689.9 0.2
5689.9 5690.1 0.2
5690.1 5692 1.9
3-Mar 0000 534 5692 5693 1
5693 5693.4 0.4
5693.4 5695.8 2.4
5695.8 5696 0.2
4-Mar 0000 535 5696 5698.5 2.5
5698.5 5699 0.5
5-Mar 0000 536
5699 5699.2 0.2
5699.2 5700.9 1.7
7-Mar 0000 537
5700.9 5702.4 1.5
5702.4 5702.8 0.4
5702.8 5703.7 0.9
8-Mar 0000 538 5703.7 5704 0.3
5704 5704.4 0.4
5704.4 5705.4 1
5705.4 5706.4 1
9-Mar 0000 539 5706.4 5708.1 1.7
5708.1 5708.4 0.3
5708.4 5708.8 0.4
5708.8 5709.2 0.4
10-Mar 0000 540
5709.2 5709.9 0.7
5709.9 5710.4 0.5
5710.4 5711 0.6
11-Mar 0000 541 5711 5711.6 0.6
5711.6 5714.5 2.9
5714.5 5715.4 0.9
5715.4 5716.8 1.4
12-Mar 0000 542 5716.8 5717 0.2
12-Mar 0000 542
5717 5719.1 2.1
5719.1 5719.4 0.3
5719.4 5719.9 0.5
13-Mar 0000 543 5719.9 5720.3 0.4
5720.3 5723.3 3
5723.3 5724.4 1.1
5724.4 5725.2 0.8
14-Mar 0000 544
5725.2 5726 0.8
5726 5727.9 1.9
5727.9 5728.4 0.5
5728.4 5729.5 1.1
15-Mar 0000 545
5729.5 5730 0.5
5730 5730.5 0.5
17-Mar 0000 546 5730.5 5731.4 0.9
21-Mar 0000 547 5731.4 5734 2.6
23-Mar 0000 548 5734 5741.2 7.2
24-Mar 0000 549 5741.2 5747.1 5.9
25-Mar 0000 601 5747.1 5752.9 5.8
26-Mar 0000 602 5752.9 5758.9 6
27-Mar 0000 603 5758.9 5762.5 3.6
28-Mar 0000 604 5762.5 5768.1 5.6
29-Mar 0000 605 5768.1 5774.9 6.8
30-Mar 0000 606 5774.9 5782.1 7.2
5782.1 5787.3 5.2
31-Mar
0000 607 5787.3 5791 3.7
1-Apr 0000 608 5791 5793.3 2.3
2-Apr 0000 609 5793.3 5796.2 2.9
4-Apr 0000 610 5796.2 5799.5 3.3
5-Apr 0000 611 5799.5 5806.2 6.7
5806.4 5807.4 1
5807.4 5808.4 1
5808.4 5809.8 1.4
5809.8 5810 0.2
6-Apr 0000 612
5810 5810.4 0.4
5810.4 5810.5 0.1
5810.5 5812 1.5
5812 5813.4 1.4
5813.4 5813.7 0.3
5813.7 5816.9 3.2
7-Apr 0000 613
5816.9 5818.5 1.6
5818.5 5821.6 3.1
5821.6 5821.9 0.3
5821.9 5823 1.1
5823 5823.4 0.4
8-Apr 0000 614
5823.4 5825.2 1.8
8-Apr 0000 614

5825.2 5827 1.8


5827 5827.5 0.5
5827.5 5829.4 1.9
5829.4 5829.8 0.4
5829.8 5831.9 2.1
9-Apr 0000 615
5831.9 5832.7 0.8
5832.7 5833.8 1.1
5833.8 5835.3 1.5
5835.3 5836 0.7
5836 5836.4 0.4
5836.4 5836.9 0.5
10-Apr 0000 616
5836.9 5837.2 0.3
5837.2 5839.6 2.4
5839.6 5840.3 0.7
11-Apr 0000 617 5840.3 5845.9 5.6
5845.9 5851 5.1
12-Apr 0000 618 5851 5851.1 0.1
5851.1 5851.9 0.8
5851.9 5856.8 4.9
13-Apr 0000 619 5856.8 5859 2.2
5859 5859.6 0.6
14-Apr 0000 620 5859.6 5863 3.4
18-Apr 0000 621 5863 5869.8 6.8
5869.8 5873.7 3.9
19-Apr 0000 622 5873.7 5874.3 0.6
5874.3 5876.7 2.4
5876.7 5877.1 0.4
5877.1 5877.6 0.5
5877.6 5880.9 3.3
20-Apr 0000 623
5880.9 5882.1 1.2
5882.1 5883.7 1.6
5883.7 5885.2 1.5
5885.2 5886.3 1.1
5886.3 5886.7 0.4
21-Apr 0000 624 5886.7 5887.4 0.7
5887.4 5889.9 2.5
5889.9 5892.8 2.9
5892.8 5893.4 0.6
5893.4 5896.5 3.1
5896.5 5896.7 0.2
22-Apr 0000 625 5896.7 5897.3 0.6
5897.3 5898 0.7
5898 5899.1 1.1
5899.1 5899.9 0.8
23-Apr 0000 626 5899.9 5902.1 2.2
24-Apr 0000 627 5902.1 5902.5 0.4
25-Apr 0000 628 5902.5 5909.8 7.3
5909.8 5911.9 2.1
26-Apr 0000 629 5911.9 5912.7 0.8
5912.7 5916.7 4
5916.7 5922.9 6.2
27-Apr 0000 630 5922.9 5923.4 0.5
5923.4 5923.7 0.3
28-Apr 0000 631 5923.7 5928 4.3
29-Apr 0000 632 5928 5936.2 8.2
30-Apr 0000 633 5936.2 5939.2 3
2-May 0000 634 5939.2 5946.7 7.5
3-May 0000 635 5946.7 5954.5 7.8
4-May 0000 636 5954.5 5960.8 6.3
5-May 0000 637 5960.8 5967.8 7
6-May 0000 638 5967.8 5976.1 8.3
7-May 0000 639 5976.1 5981 4.9
9-May 0000 640 5981 5987.4 6.4
10-May 0000 641 5987.4 5994.7 7.3
11-May 0000 642 5994.7 6002.6 7.9
12-May 0000 643 6002.6 6006.9 4.3
13-May 0000 644 6006.9 6014.6 7.7
14-May 0000 645 6014.6 6019.2 4.6
16-May 0000 646 6019.2 6027.7 8.5
17-May 0000 647 6027.7 6034.2 6.5
18-May 0000 648 6034.2 6041 6.8
19-May 0000 649 6041 6048.7 7.7
20-May 0000 650 6048.7 6056.3 7.6
21-May 0000 651 6056.3 6065.7 9.4
22-May 0000 652 6065.7 6069.4 3.7
23-May 0000 653 6069.4 6077.3 7.9
24-May 0000 654 6077.3 6085.5 8.2
25-May 0000 655 6085.5 6096.2 10.7
26-May 0000 656 6096.2 6105.5 9.3
27-May 0000 657 6105.5 6113.9 8.4
28-May 0000 658 6113.9 6119.9 6
30-May 0000 659 6119.9 6128.5 8.6
31-May 0000 660 6128.5
10/01/2022 traslado de excavadora de Heroica a Cascas en cama baja
MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DESCRIPCION OBSERVACION
Demolicion con martillo
Limpieza, acumjlacion, nivelacion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
Nivelacion de terreno, demolicion
maquina alquilada a colegio 2.5 hrs

relleno con over mod 1


demolicion de zapata JV&JF
traslado de cemento en costal JV&JF
traslado madera mod1
mod1
demolicion de zapata JV&JF
acumulacion de materiales
relleno y nivelacion
traslado de agregado
traslado de trompo y dados
limpieza mod 1
traslado de concreto
cambio de cuchillas
limpieza mod JV&JF
limpieza de calle
demolicion de patio JV&JF
demolicion de estructura mod 5 (JV&JF)
traslado de concreto mod 1
demolicion de estructura mod 5 (JV&JF)
traslado de estribos mod 1
demolicion de estructura mod 5 (JV&JF)
demolicion de estructura mod 5 (JV&JF)
llantero
demolicion de estructura mod 5 (JV&JF)
acumulacion de desmonte (limpieza)
limpieza de planta
limpieza y nivelacion mod 3 (JV&JF)
limpieza y nivelacion de rampa de acceso
demolicion de estructura mod 5 (JV&JF)
demolicion de estructura mod 5 (JV&JF)
mini en taller
nivelacion de rampa de acceso
traslado de bomba de taller a planta
limpieza y acumulacion de tierra material corte muro mod 1
Abastecimiento de mixer en planta
Limpieza en planta
Acumulacion de material corte de muro mod 1
Acumulacion de material corte de muro mod 1
Acumulacion de desmonte muro mod 1
Traslado de afirmado y nivelacion mod 1
Nivelacion de afirmado mod 1
traslado de gravilla mod 1
traslado de bomba para JV&JF
Traslado de concreto en escalera mod 1
Traslado de concreto en escalera mod 1
traslado de afirmado de muro de mod 1
traslado de concreto en cerco de obra
traslado de arena gruesa mod 1
Traslado de materiales y concreto en mod1
Traslado de over JV&JF
Traslado de malla de obra a planta
Traslado de agregados de planta a mod 1
traslado de concreto trompo a mod 1
acumulacion de desmonte mod 1
demolicion de muro JV&JF
traslado de agregados JV&JF
traslado de concreto trompo a mod 1
traslado de agregados mod 1
demolicion de muro JV&JF
traslado de concreto trompo a mod 1
acumulacion de piedras
acumulacion de afirmado mod 1
nivelacion de terreno rampa
acumulacion de afirmado mod 1
limpieza de calle
acumulacion de afirmado mod 1
acumulacion de desmonte otingsa
acumulacion de afirmado mod 1
acumulacion de afirmado mod 1
demolicion de cerco perimetrico
acumulacion de afirmado mod 1
demolicion de cerco perimetrico
traslado de afirmado mod baños JV&JF
acumulacion de afirmado mod 1
traslado de afirmado mod baños JV&JF
acumulacion de afirmado mod 1
demolicion de muro y veredas
acumulacion de desmonte mod 3
demolicion de muro y veredas
traslado de concreto escaletas mod 1
acumulacion de afirmado mod 1
limpieza de pistas
demolicion de veredas y muro
acumulacion de afirmado mod 1
Traslado de motobomba a planta obra
Acumulacion y traslado de agregados afirmado planta
Traslado de afirmado y desmonte + traslado de saltarin a taller
traslado de piedras mod 1 + traslado de agregados otingsa
Acumulacion de afirmado + traslado de canguro
Acumulacion de afirmado, alambre, nivelacion de terreno zapata cerco
nivelacion de terrenos mod 3 otingsa cerco
Nivelacion de terreno + vaceado de concreto + limpieza calle
Traslado de mezcla, concreto, ladrillos para otingsa
Traslado de mezcla, concreto, ladrillos para otingsa
Traslado de mezcla, concreto, ladrillos para otingsa
Nivelacion de terreno en ESTADIO (ambos)
Traslado de concreto para columnas - otingsa
Traslado de mezcla, concreto, ladrillos para otingsa
limpieza de losa otingsa
traslado de mezcla, ladrillo otingsa
limpieza en planta acumulacion de agregados
nivelacion de terreno mod 3
demolicion de muro con demoledor JV / OTI
cambio de martillo hidraulico a cucharon
rellenado de afirmado en JV/JF
traslado de alambres otingsa
rellenado de afirmado en JV/JF
demolicion de muro con demoledor JV / OTI
demolicion de muro con demoledor JV / OTI
traslado de concreto en columnas de cerco otingsa
rellenado de afirmado en JV/JF
demolicion de muro con demoledor JV / OTI
traslado de generador a planta
demolicion de muro con demoledor JV / OTI
limpieza frontis pista (JV /OTI)
nivelacion con afirmado otingsa
demolicion de muro con demoledor JV / OTI
limpieza frontis pista (JV /OTI)
rellenado de afirmado en JV/JF
traslado de arena gruesa baños JV
rellenado de afirmado en JV/JF
traslado de mezcla para ladrilleros otingsa
Nivelacion de terreno en estadio (JV/OTI)
traslado de concreto muro otingsa
traslado de mezcla para ladrilleros otingsa
traslado de agua para ladrilleros
traslado de mezcla para ladrilleros otingsa
traslado de estructuras (JV/OTI)
traslado de ladrillos de JV a OTI
traslado de concreto muro otingsa
trabajos en ceba subcafae (JV/OTI)
nivelacion de terreno sub cafae (JV/OTI)
regreso a obra
traslado de ladrillos de pared otingsa
nivelacion de terreno en ceba caffe…(JV&JF/OTINGSA)
Traslado de afirmado para relleno y nivelacion Otingsa
nivelacion de terreno en ceba caffe…(JV&JF/OTINGSA)
relleno y nivelacion de terreno con afirmado otingsa
traslado de afirmado y nivelacion de terreno otingsa
traslado de ladrillos para muro, mezcla y agregados Otingsa
traslado de agregados, cemento para JV&JF
traslado de ladrillos y mezcla para Otingsa
limpieza de frontis pista (JV&JF / OTINGSA)
traslado y nivelacion con afirmado JV&JF
traslado de mezcla y ladrillos para Otingsa
traslado de agregados y cemento para JV&JF
traslado y nivelacion con afirmado JV&JF
traslado de concreto en trompo para Otingsa..trabajo noche
traslado de mezcla para asentar ladrillo
trabajos en ceba subcafae (JV/OTI)
traslado de probetas
limpieza de obra otingsa
trabajos en ceba subcafae (JV/OTI)
traslado de agregado otingsa
traslado de concreto ceba caffe (JV&JF / OTINGSA)
traslado de plancha compactadora ( ambos)
limpieza y regado de pista
trabajos en estadio nivelacion ( ambos)
traslado de agregados Otingsa
limpieza y traslado de desmonte para su eliminacion (JV&JF)
traalado de agregados otingsa
a taller para lavado de tanque de petroleo
Traslado de ladrillos, mezcla y agregados
traslado de ladrillos y mezcla para Otingsa
demolicion de piso con rotomartillo (JV&JF / OTINGSA)
limpieza mod 3
traslado de mezcla y agregados
traslado de afirmado estadio (JV&JF / OTINGSA)
traslado de afirmado
acumulacion de afirmado, regado de rampa
Traslado de ladrillos, mezcla y agregados
Traslado de ladrillos, mezcla y agregados
traslado de afirmado a escalera otingsa
traslado de afirmado relleno otingsa
traslado de pie derechos, nivelacion de rampa otingsa
traslado de laderillos y mezcla otingsa
traslado de mezcla, arena fina ..otingsa
traslado de arena fina, de mezcla, madera para otingsa
traslado de arena fina, de mezcla, madera para otingsa
traslado de ladrillos de pared otingsa
acumulacion de afirmado, relleno para otingsa
traslado de arena fina, ladrillos de techo y acumulacion de piedras
traslado de arena fina, ladrillos de techo y acumulacion de piedras
traslado de laderillos y mezcla otingsa
traslado de 1m3 de arena gruesa, traslado de afirmado zarandeado
traslado de desmonte a planta, acumulacion de piedras,y de afirmado
Nivelacion de terreno relleno con afirmado
acumulacion de piedras, afirmado y rampa acceso
traslado de arena fina y rellenado con afirmado
traslado de madera, relleno y nivelacion de afirmado
rellenado y nivelacion con afirmado otingsa
acumulacion de piedras, traslado de agregados
acumulacion de piedras en planta
traslado de tablas, rellenado con afirmado, traslado de ladrillos
acumulacion con afirmado, rellenado y nivelacion
acumulacion con afirmado, rellenado y nivelacion
acumulacion de piedras en botadero, acumulacion con afirmado
traslazo de concreto, ladrillos y arena gruesa
HORAS MENSUAL
125.599999999999
REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS E

OPERADOR : MIXAR CHACON


EQUIPO: VOLQUETET5U-805
N° FECHA nº PARTE H.INGRESO H.FINAL HORAS DIA
1 1/13/2022 00 13948 10482 10484 2
2 1/14/2022 00 13950 10488 10490 2
3 1/15/2022 000 2004 10492 10496 4
4 1/17/2022 000 2005 10496 10499 3
5 1/25/2022 000 2022 10538 10547 9
6 1/26/2022 000 2023 10547 10555 8
7 1/27/2022 000 2024 10555 10564 9
8 1/28/2022 000 2025 10564 10572 8
9 1/29/2022 000 2027 10572 10575 3
10 1/31/2022 000 2029 10577 10583 6
11 2/1/2022 000 2030 10583 10588 5
12 2/2/2022 000 2031 10588 10594 6
13 2/2/2022 000 2032 10594 10596 2
14 2/3/2022 000 2033 10596 10604 8
15 2/4/2022 000 2035 10604 10611 7
16 2/7/2022 000 2037 10613 10621 8
17 2/8/2022 000 2038 10621 10624 3
18 2/9/2022 000 2039 10624 10628 4
19 2/10/2022 000 2044 10631 10634 3
20 1/10/1900 000 2045 10634 10638 4
21 2/12/2022 000 2046 10638 10642 4
22 2/14/2022 000 2047 10642 10645 3
23 2/14/2022 000 2048 10645 10645 0
24 2/15/2022 000 2049 10645 10649 4
25 2/16/2022 000 2050 10649 10655 6
26 2/17/2022 000 2101 10655 10658 3
27 2/17/2022 000 2102 10658 10661 3
28 2/18/2022 000 2103 10661 10664 3
29 2/19/2022 000 2104 10664 10666 2
30 2/21/2022 000 2105 10666 10666 0
31 2/21/2022 000 2106 10666 10670 4
32 2/22/2022 000 2107 10670 10670 0
33 2/22/2022 000 2108 10670 10674 4
34 2/22/2022 000 2109 10674 10677 3
35 2/23/2022 000 2110 10677 10679 2
36 2/23/2022 000 2111 10679 10683 4
37 2/24/2022 000 2112 10683 10686 3
38 2/24/2022 000 2113 10686 10688 2
39 2/25/2022 000 2114 10688 10688 0
40 2/25/2022 000 2115 10688 10692 4
41 2/25/2022 000 2116 10692 10695 3
42 2/26/2022 000 2118 10698 10700 2
43 2/27/2022 000 2119 10700 10702 2
44 2/28/2022 000 2120 10702 10702 0
45 2/26/2022 000 2121 10695 10698 3
46 2/28/2022 000 2122 10702 10704 2
47 3/1/2022 000 2123 10704 10706 2
48 3/2/2022 000 2124 10706 10707 1
49 3/2/2022 000 2125 10707 10710 3
50 3/3/2022 000 2127 10713 10716 3
51 3/3/2022 000 2129 10716 10719 3
52 3/4/2022 000 2130 10719 10719 0
53 3/4/2022 000 2131 10719 10722 3
54 3/4/2022 000 2132 10722 10725 3
3/11/2022 000 2134 10725 10727 2
3/11/2022 000 2135 10727 10729 2
3/12/2022 000 2136 10729 10729 0
3/12/2022 000 2137 10729 10732 3
3/12/2022 000 2138 10732 10733 1
3/12/2022 000 2139 10733 10736 3
3/14/2022 000 2140 10736 10742 6
3/15/2022 000 2141 10742 10743 1
3/15/2022 000 2142 10743 10746 3
3/15/2022 000 2143 10746 10746 0
3/15/2022 000 2144 10746 10750 4
3/23/2022 00 14551 10760 10763 3
3/23/2022 00 14552 10763 10766 3
3/23/2022 00 14553 10766 10768 2
3/23/2022 00 14554 10768 10768 0
3/24/2022 00 14555 10768 10769 1
3/24/2022 00 14556 10769 10770 1
3/24/2022 00 14557 10770 10772 2
3/24/2022 00 14558 10772 10775 3
3/25/2022 00 14559 10775 10776 1
3/25/2022 00 14560 10776 10779 3
3/25/2022 00 14561 10779 10782 3
3/25/2022 00 14562 10782 10783 1
3/26/2022 00 14563 10783 10784 1
3/26/2022 00 14564 10784 10784 0
3/26/2022 00 14565 10784 10786 2
3/26/2022 00 14566 10786 10788 2
3/27/2022 00 14567 10788 10791 3
27-Mar 00 14568 10791 10794 3
28-Mar 00 14569 10794 10798 4
28-Mar 00 14571 10798 10801 3
28-Mar 00 14572 10801 10802 1
29-Mar 00 14573 10802 10803 1
29-Mar 00 14574 10803 10806 3
29-Mar 00 14575 10806 10809 3
29-Mar 00 14576 10809 10809 0
30-Mar 00 14577 10809 10814 5
30-Mar 00 14578 10814 10815 1
30-Mar 00 14579 10815 10817 2
31-Mar 00 14580 10817 10820 3
31-Mar 00 14581 10820 10820 0
8-Apr 00 14501 10861 10867 6
9-Apr 00 14502 10867 10867 0
9-Apr 00 14503 10867 10869 2
11-Apr 00 14504 10869 10871 2
11-Apr 00 14505 10877
18-Apr 00 14506 10877 10877 0
18-Apr 00 14507 10877 10882 5
18-Apr 00 14508 10882 10885 3
19-Apr 00 14509 10885 10888 3
19-Apr 00 14510 10888 10891 3
20-Apr 00 14511 10891 10891 0
20-Apr 00 14512 10891 10897 6
21-Apr 00 14513 10897 10899 2
21-Apr 00 14514 10899 10904 5
22-Apr 00 14515 10904 10905 1
22-Apr 00 14516 10905 10912 7
23-Apr 00 14517 10912 10912 0
23-Apr 00 14518 10912 10914 2
25-Apr 00 14519 10914 10918 4
25-Apr 00 14520 10918 10920 2
26-Apr 00 14521 10920 10927 7
27-Apr 00 14522 10927 10927 0
27-Apr 00 14523 10927 10930 3
27-Apr 00 14524 10930 10931 1
27-Apr 00 14525 10931 10933 2
28-Apr 00 14526 10933 10938 5
28-Apr 00 14527 10938 10940 2
29-Apr 00 14528 10940 10940 0
29-Apr 00 14529 10940 10943 3
29-Apr 00 14530 10943 10946 3
30-Apr 00 14531 10946 10946 0
30-Apr 00 14532 10946 10948 2
30-Apr 00 14533 10948 10951 3
3-May 00 14534 10951 10956 5
3-May 00 14535 10956 10959 3
4-May 00 14536 10959 10962 3
4-May 00 14537 10962 10965 3
5-May 00 14538 10965 10965 0
5-May 00 14539 10965 10970 5
6-May 00 14540 10970 10973 3
6-May 00 14541 10973 10976 3
7-May 00 14542 10976 10980 4
9-May 00 14543 10980 10984 4
10-May 00 14544 10984 10991 7
11-May 00 14545 10991 10991 0
11-May 00 14546 10991 10994 3
12-May 00 14547 10994 10997 3
12-May 00 14548 10997 11000 3
13-May 00 14549 11000 11003 3
14-May 00 14550 11003 11006 3
16-May 00 14601 11006 11010 4
17-May 00 14602 11010 11013 3
17-May 00 14603 11013 11014 1
18-May 00 14604 11014 11018 4
19-May 00 14605 11018 11022 4
20-May 00 14606 11022 11023 1
20-May 00 14607 11023 11023 0
20-May 00 14608 11023 11026 3
20-May 00 14609 11026 11029 3
20-May 00 14610 11029 11030 1
21-May 00 14611 11030 11031 1
21-May 00 14612 11031 11033 2
21-May 00 14613 11033 11035 2
23-May 00 14614 11035 11035 0
23-May 00 14615 11035 11039 4
23-May 00 14616 11039 11042 3
24-May 00 14617 11042 11045 3
24-May 00 14618 11045 11048 3
25-May 00 14619 11048 11051 3
25-May 00 14620 11051 11053 2
26-May 00 14621 11053 11057 4
26-May 00 14622 11057 11057 0
11057 11058 1
27-May 00 14623
11058 11059 1
28-May 00 14624 11063 11066 3
28-May 00 14625 11066 11069 3
30-May 00 14626 11069 11069 0
30-May 00 14627 11069 11074 5
30-May 00 14628 11074 11076 2
31-May 00 14629 11076 11077 1
31-May 00 14630 11077 11079 2
31-May 00 14631 11079 11082 3

piedra 120 75 45
arena 120 75 45
DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DISCRIPCION CANTIDAD M3 OBSERVACION


eliminacion coleguio al botadero 45
eliminacion coleguio al botadero 30
eliminacion coleguio al botadero 45
eliminacion coleguio al botadero 90
eliminacion coleguio al botadero 300 llanta picada y parchada
eliminacion coleguio al botadero 195
eliminacion coleguio al botadero 330
eliminacion coleguio al botadero 180
eliminacion coleguio al botadero 75
eliminacion coleguio al botadero 135
eliminacion coleguio al botadero 105
eliminacion coleguio al botadero 135
eliminacion coleguio al botadero 60
eliminacion coleguio al botadero 180
eliminacion coleguio al botadero 135
eliminacion coleguio al botadero 165
eliminacion coleguio al botadero 75
eliminacion coleguio al botadero 60
eliminacion coleguio al botadero 45
15m3 de hormigon de cantera
eliminacion coleguio al botadero 75
15m3 de hormigon de cantera
abastecimiento de combustible 0
eliminacion coleguio al botadero 45
eliminacion coleguio al botadero 135
15m3 de piedra zarandeada de cantera
eliminacion coleguio al botadero 90
eliminacion coleguio al botadero 75
eliminacion coleguio al botadero 45
abastecimiento de combustible
15m3 de arena gruesa de cantera
abastecimiento de combustible
15m3 de arena gruesa de cantera
15m3 de arena gruesa de cantera
eliminacion coleguio al botadero 45
15m3 de arena gruesa de cantera
15m3 de piedra zarandeada de cantera
15m3 de arena gruesa de cantera
abastecimiento de combustible
15m3 de arena gruesa de cantera
15m3 de arena gruesa de cantera
eliminacion coleguio al botadero 45
eliminacion coleguio al botadero 105
abastecimiento de combustible
15 m3 de piedra de 1/2 de cantera
eliminacion coleguio al botadero 60
eliminacion coleguio al botadero 30
eliminacion coleguio al botadero 30
15m3 de arena gruesa de cantera
15m3 de arena gruesa de cantera
15m3 de arena gruesa de cantera
abastecimiento de combustible
15m3 de arena gruesa de cantera
15m3 de arena gruesa de cantera
15m3 de afirmado palo santo
15m3 de afirmado palo santo JV&JF
abastecimiento de combustible
eliminacion de cerco perimetrico + acarreo de afirmado 45
15m3 de afirmado de palo santo
eliminacion de demolicion de cerco 60
eliminacion de corte cerco JV&JF 165
15m3 de afirmado
eliminacion de desmonte de cerco 60
abastecimiento de combustible
regreso a trujillo con 6 bolsones ms
Traslado de Heroica a Cascas
eliminacion de obra a botadero 60
15 de piedra zarandeada de puente morena
abastecimiento de combustible
eliminacion de desmonte de cerco a botadero 15
15 de afirmado de cantera palo santo
15m3 de afirmado zarandeado de palo santo (JV&JF)
15 de piedra de puente morena
1 viaje de afirmado zarandeado (JV&JF)
15 de arena gruesa de cantera puente moreno
15 m3 de piedra de cantera puente morena
15m3 de afirmado zarandeado de palo santo (JV&JF)
1 viaje de afirmado + eliminacion excavacion (JV&JF)
abastecimiento de combustible
15m3 de arena gruesa de cantera puente morena
eliminacion de exvavacion (JV&JF) 60
eliminacion de excavacion (JV&JF) 45
Traslado de Cascas a Heroica
Traslado de 7 bolsones MS de heroica a cascas
15m3 de hormigon de cantera puente moreno JV&JF
15m3 de afirmado de palo santo (JV&JF)
eliminacion de desmonte a botadero 30
15m3 de arena gruesa puente moreno
15m3 de piedra zarandeada de cantera
abastecimiento de combustible
15m3 de arena gruesa de puente moreno
eliminacion de desmonte a botadero 30
15m3 de arena gruesa de puente moreno
Traslado de volquete de Cascas a Moche
abastecimiento de combustible
Eliminacion de excavacion JV&JF 120
traslado de material afirmado (JV&JF)
15m3 de piedra zarandeada de cantera
15m3 de piedra zarandeada de cantera
15 de piedra zarandeada de cantera san martin a heroica
abastecimiento de combustible moche
15m3 de arena fina de calderon a cascas
eliminacion de desmonte (JV&JF) y otingsa 60 1.5 horas para JV&JF
15m3 de hormigon cantera puente moreno
eliminacion de desmonte otingsa 45
abastecimiento de combustible
eliminacion de desmonte otingsa 75
15m3 de arena gruesa de cantera puente morena
eliminacion de desmonte (JV&JF) 90
eliminacion de desmonte (JV&JF) 45
eliminacion de desmonte excavacion otingsa 210
abastecimiento de combustible
15m3 de piedra zarandeada de cantera puente morena
15m3 de arena gruesa de puente moreno
15m3 de piedra zarandeada de puente moreno
eliminacion de excavacion otingsa 120
abastecimiento de combustible
15m3 de piedra zarandeada de puente moreno
eliminacion de excavacion otingsa 45
15m3 de arena gruesa de puente moreno
eliminacion de excavacion otingsa
15m3 de piedra zarandeada de puente moreno
abastecimiento de combustible
15m3 de piedra zarandeada de puente moreno
eliminacion de excavacion otingsa
abastecimiento de petroleo
15m3 de piedra zarandeada de puente moreno
Traslado de unidad a cascas de moche
15m3 de arena fina de calderon a cascas
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
abastecimiento de combustible
eliminacion de excavacion otingsa 105
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
traslado de afirmado zarandeado de planta a obra (JV&JF) 105
eliminacion de demolicion de losa a botadero OTINGSA 60
traslado de afirmado zarandeado a obra Otingsa + eliminacion de JV&JF 15 1.5 hrs para JV&JF
abastecimiento de combustible
traslado de afirmado a obra + traslado de zaranda metalica a obra
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
traslado de afirmado de colegio a obra JV&JF
eliminacion de material excavadso + traslado de afirmado para JV&JF 45 1.5 hrs para JV&JF
eliminacion de material a botadero + traslado de adirmado 45
eliminacion de material a botadero para JV&JF
traslado de afirmado, eliminacion y traslado de arena fina a obra
eliminacion de material a botadero otingsa 45
traslado de afirmado de planta a obra otingsa y JV&JF 0.3 hrs para JV&JF
abastecimiento de combustible
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
traslado de adirmado de planta a obra JV&JF
traslado de afirmado de planta a obra
15m3 de `piedra zarandeada de cantera punta moreno
eliminacion de material otingsa 30
abastecimiento de combustible
15m3 de piedra zarandeada de cantera punta moreno
15m3 de piedra zarandeada de cantera punta moreno
traslado de afirmado para JV&JF
eliminacion de material de planta a botadero
2 viajes de afirmado a obra (JV&JF) …1 viaje de eliminacion 15 1hr JV&JF
2 viajes de eliminacion de planta a botadero 30
traslado de afirmado de obra a planta para zandear 90
abastecimiento de combustible
traslado de afirmado zarandeado a obra y material de excavacion a botade 75
2 viajes de afirmado a obra (JV&JF) 30
traslado de afirmado a obra 90
traslado de unidad de cascas a moche
abastecimiento de combustible
15m3 de arena fina de cantera calderon a cascas
3 viajes de material afirmado a planta (JV&JF) 45
traslado de afirmado para zarandear a planta 45
15m3 de over de cantera rio a obra
traslado de afirmado para zarandear a planta 135
HORAS MENSUAL TOTAL M3

4 viajes jv 2 hrs
12 viajes jv 8 hrs
9 viajes jv 7 hrs
9 viajes jv 6hrs
5 viajes jv 3 hrs
3 viajes jv 3 hrs
3495
213
9 viajes JV 1.5 hrs

2 viajes JV 1.5 hrs


REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

OPERADOR : JAVIER SALIRROSAS


EQUIPO: VOLQUETE T4Y-858
N° FECHA Nº DE PARTE H.INGRESO H.FINAL HORAS DIA
1 1/13/2022 12753 12754.1 1.1
2 1/14/2022 12763 12763.7 0.7
3 1/15/2022 12767.3 12769.8 2.5
4 1/17/2022 12769.8 12772.9 3.1
5 1/25/2022 12810.9 12817.9 7
6 1/26/2022 12817.9 12826.5 8.6
7 1/27/2022 12826.5 12834.9 8.4
8 1/28/2022 12834.9 12843.6 8.7
9 1/29/2022 12843.6 12845.6 2
10 1/31/2022 12847.8 12855.3 7.5
11 2/1/2022 12855.3 12860.3 5
12 2/2/2022 12860.3 12862.6 2.3
13 2/2/2022 12862.6 12864.3 1.7
14 2/3/2022 12864.3 12873.1 8.8
15 2/4/2022 12873.1 12880.9 7.8
16 2/7/2022 12883.4 12891.2 7.8
17 2/8/2022 12891.3 12898 6.7
18 2/9/2022 12898 12903.2 5.2
19 2/10/2022 12906.8 12909.2 2.4
20 2/11/2022 000 1958 12909.2 12913.5 4.3
21 2/12/2022 000 1959 12913.5 12918.2 4.7
22 2/14/2022 000 1960 12918.2 12921.1 2.9
23 2/14/2022 000 1961 12921.1 12921.1 0
24 2/15/2022 000 1962 12921.1 12924.8 3.7
25 2/16/2022 000 1963 12924.8 12931.5 6.7
26 2/17/2022 000 1964 12931.5 12934.6 3.1
27 2/17/2022 000 1965 12934.6 12938 3.4
28 2/18/2022 000 1966 12938.8 12942.3 3.5
29 2/19/2022 000 1967 12942.3 12945.4 3.1
30 2/21/2022 000 1968 12945.4 12948.3 2.9
31 2/21/2022 000 1969 12948.3 12951.4 3.1
32 2/22/2022 000 1970 12951.4 12951.4 0
33 2/22/2022 000 1971 12951.4 12954.9 3.5
34 2/22/2022 000 1972 12954.9 12958.1 3.2
35 2/23/2022 000 1973 12958.1 12960.8 2.7
36 2/23/2022 000 1974 12960.8 12963.9 3.1
37 2/24/2022 000 1975 12963.9 12966.7 2.8
38 2/24/2022 000 1976 12966.7 12969.4 2.7
39 2/25/2022 000 1977 12969.4 12969.4 0
40 2/25/2022 000 1978 12969.4 12972.5 3.1
2/25/2022 000 1979 12972.5 12976.2 3.7
2/26/2022 000 1980 12976.2 12978.9 2.7
2/26/2022 000 1981 0
2/27/2022 000 1982 0
2/28/2022 000 1983 0
2/28/2022 000 1984 12984.3 12985.6 1.3
2/28/2022 000 1985 12985.6 12989 3.4
3/1/2022 000 1986 12989 12992.3 3.3
3/2/2022 000 1987 12992.3 12993.1 0.8
3/2/2022 000 1988 12993.1 12996 2.9
3/2/2022 000 1989 12995 12998.7 3.7
3/3/2022 000 1990 12998.7 12998.7 0
3/3/2022 000 1991 12998.7 13001.5 2.8
3/3/2022 000 1992 13001.5 13004.3 2.8
3/4/2022 000 1993 13004.3 13007.6 3.3
3/4/2022 000 1994 13007.6 13010.8 3.2
3/5/2022 000 1995 13010.8 13010.8 0
3/7/2022 0000 651 13012.4 13014.3 1.9
3/8/2022 0000 652 13014.3 13014.3 0
3/8/2022 0000 653 13014.4 13015 0.6
3/8/2022 0000 654 13015 13016.4 1.4
3/9/2022 0000 655 13016.4 13023.4 7
3/9/2022 0000 656 13016.4 13017.4 1
3/9/2022 0000 657 13019 13020.4 1.4
3/9/2022 0000 658 13020.4 13022.9 2.5
3/10/2022 0000 659 13023.4 13024.6 1.2
3/11/2022 0000 660 13024.6 13025.4 0.8
3/11/2022 0000 661 13025.4 13026.4 1
3/11/2022 0000 662 13026.4 13027.4 1
3/12/2022 0000 663 13027.4 13027.4 0
3/12/2022 0000 664 13027.4 13029.6 2.2
3/12/2022 0000 665 13029.6 13032.2 2.6
3/12/2022 0000 667 13031.1 13035.3 4.2
3/13/2022 0000 668 13035.3 13037.9 2.6
3/14/2022 0000 669 13037.9 13043.8 5.9
3/15/2022 0000 670 13043.8 13045.3 1.5
3/15/2022 0000 671 13045.3 13048 2.7
3/15/2022 0000 672 13048 13051.5 3.5
5/2/2022 0000 756 13269.3 13273.7 4.4
5/2/2022 0000 757 13273.7 13277.4 3.7
5/3/2022 0000 758 13277.7 13283.9 6.2
5/4/2022 0000 759 13283.9 13287 3.1
5/4/2022 0000 760 13287 13289.8 2.8
5/4/2022 0000 761 13289.8 13290.7 0.9
5/5/2022 0000 762 13290.7 13290.7 0
5/5/2022 0000 763 13290.7 13295.5 4.8
5/6/2022 0000 764 13295.5 13298.7 3.2
5/6/2022 0000 765 13298.7 13301.7 3
5/7/2022 0000 766 13301.7 13304.9 3.2
5/7/2022 0000 767 13304.9 13304.9 0
5/7/2022 0000 768 13304.9 13309.8 4.9
5/9/2022 0000 769 13309 13314.7 5.7
5/10/2022 0000 770 13314.7 13317.4 2.7
5/10/2022 0000 771 13317.4 13320.5 3.1
5/11/2022 0000 772 13320.5 13324.1 3.6
5/11/2022 0000 773 13324.1 13326.9 2.8
5/12/2022 0000 774 13326.9 13326.9 0
5/12/2022 0000 775 13326.9 13327.5 0.6
5/12/2022 0000 776 13327.5 13330.1 2.6
5/12/2022 0000 777 13330.1 13331.3 1.2
5/13/2022 0000 778 13331.3 13334.2 2.9
5/13/2022 0000 779 13334.2 13336 1.8
5/13/2022 0000 780 13336 13342 6
5/14/2022 0000 781 13342 13344.5 2.5
5/16/2022 0000 783 13344.5 13347.8 3.3
5/17/2022 0000 784 13347.8 13352.5 4.7
5/18/2022 0000 785 13352.5 13355.2 2.7
5/19/2022 0000 786 13355.2 13358.6 3.4
5/20/2022 0000 787 13358.6 13359.7 1.1
5/20/2022 0000 788 13359.7 13359.7 0
5/20/2022 0000 789 13359.7 13362.3 2.6
5/20/2022 0000 790 13362.3 13365.6 3.3
5/20/2022 0000 791 13365.6 13366.3 0.7
5/21/2022 0000 792 13366.3 13367.4 1.1
5/21/2022 0000 793 13367.4 13370 2.6
5/21/2022 0000 794 13370.1 13371.3 1.2
5/22/2022 0000 795 13371.3 13373.3 2
5/23/2022 0000 796 13373.3 13376.9 3.6
5/23/2022 0000 797 13376.9 13377.3 0.4
5/23/2022 0000 798 13377.3 13380 2.7
5/24/2022 0000 799 13380 13380 0
5/24/2022 0000 800 13380 13382.1 2.1
5/24/2022 0000 701 13382.1 13384.5 2.4
5/25/2022 0000 702 13384.5 13387 2.5
5/25/2022 0000 703 13387 13388.3 1.3
5/26/2022 0000 704 13388.3 13390.5 2.2
5/27/2022 0000 705 13390.5 13396.6 6.1
5/28/2022 0000 706 13396.6 13396.6 0
5/28/2022 0000 707 13396.6 13399.8 3.2
5/28/2022 0000 708 13399.8 13402.4 2.6
5/30/2022 0000 709 13402.4 13402.4 0
5/30/2022 0000 710 13402.4 13407.8 5.4
5/30/2022 0000 711 13407.8 13410.9 3.1
5/31/2022 0000 712 13410.9 13412.2 1.3
5/31/2022 0000 714 13412.2 13414.6 2.4
5/31/2022 0000 715 13414.6 13418.2 3.6
S CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DISCRIPCION CANTIDAD M3
eliminacion en planta 45
eliminacion del coleguio 30
eliminacion del coleguio 45
eliminacion del coleguio 90
eliminacion del coleguio 315
eliminacion del coleguio 210
eliminacion del coleguio 330
eliminacion del coleguio 180
eliminacion del coleguio 30
eliminacion del coleguio 165
eliminacion del coleguio 105
eliminacion del coleguio 90
eliminacion del coleguio 45 3 viajes jv 1.7
eliminacion del coleguio 195 13 viajes jv 8.8
eliminacion del coleguio 135 9 viajes jv 7.8
eliminacion del coleguio 150 2 viajes jv 2
eliminacion del coleguio 135 5 viajes jv 3 hrs
eliminacion del coleguio 105 4 viajes jv 4
eliminacion del coleguio 30
15m3 de hormigon de cantera
eliminacion de colegio 75
15m3 de hormigon de cantera
abastecimiento de combustible 0
eliminacion de colegio 45
eliminacion de colegio 135
15m3 de piedra zarandeada
15m3 de piedra zarandeada
eliminacion de colegio 90
eliminacion de desmonte 45
15m3 de piedra zarandeada
15m3 de piedra zarandeada
abastecimiento de combustible
15m3 de piedra zarandeada
15m3 de piedra zarandeada
eliminacion de desmonte 45
15m3 de arena gruesa
15m3 de piedra zarandeada
15m3 de piedra zarandeada
abastecimiento de combustible
15m3 de piedra zarandeada
15m3 de piera zarandeada de cantera
15m3 de piedra zarandeada

eliminacion de desmonte a botadero 45


abasteciminento de petroleo
eliminacion de excavacion mod 1 45
15m3 de hormigon de cantera
15m3 de hormigon de cantera
eliminacion de excavacion mod 1 15
15m3 de piedra zarandeada
15m3 de piedra zarandeada
abastecimiento de combustible
15m3 de piedra zarandeada
15m3 de piedra zarandeada
15m3 de piedra zarandeada
15m3 de piedra zarandeada
cambio de llantas posteriores
traslado de agtregados para subcontrata
abastecimiento de combustible
traslado de afirmado zarandeado en obra
eliminacion de demolicion de cerco 15
eliminacion de demolicion de cerco 45
traslado de afirmado JV&JF
traslado de afirmado JV&JF
traslado de afirmado a obra
traslado de afirmado JV&JF
traslado de afirmado JV&JF
traslado de afirmado mod 1
15m3 de afirmado palo santo JV
abastecimiento de combustible
Traslado de afirmado mod 1
15m3 de afirmado palo santo JV
eliminacion de cerco 90 1 viaje JV 1 hr
eliminacion de cerco 60
eliminacion de demolicion de cerco 90 3 viajes JV 3 hrs
15m3 de afirmado para otingsa
eliminacion de demolicion de cerco 30 1 viaje JV 1 hrs
traslado de bolsones ms a trujillo
traslado de 15m3 de cantera calderon a cascas
eliminacion de desmonte otingsa 90
eliminacion de material mod 4 105
15m3 de arena gruesa de cantera punta moreno
15m3 de arena gruesa de cantera punta moreno
eliminacion de material de ugel a botadero 15
abastecimiento de combustible
eliminacion de desmonte 105 1 viaje JV 1hrs
15m3 de arena gruesa de cantera punta moreno
15m3 de arena gruesa de cantera punta moreno
traslado de volquete a trujillo de cascas
abastecimiento de combustible
traslado de materiales de trujillo a cascas
eliminacion de losa otingsa 60
15m3 de arena gruesa de cantera punta moreno
15m3 de arena gruesa de cantera punta moreno
15m3 de piedra zarandeada de punta moreno
15m3 de arena gruesa de cantera punta moreno
abastecimiento de combustible
eliminacion de desmonte a botadero 15
15m3 de arena gruesa de cantera punta moreno
eliminacion de desmonte a botadero
15m3 de piedra zarandeada de punta moreno
traslado de volquete a trujillo de cascas
traslado de arena fina y fierro de trujillo a obra
eliminacion desmonte y traslado de afirmado 15
eliminacion desmonte y traslado de afirmado JV&JF 75 3 viajes JV 2.5 hrs
eliminacion desmonte y traslado de afirmado JV&JF 90 1 viaje JV 1 hrs
eliminacion desmonte y traslado de afirmado JV&JF 45 1 viaje JV 0.8 hrs
eliminacion desmonte y traslado de afirmado JV&JF 45 2 viajes JV 2 hrs
traslado de afirmado otingsa
abastecimiento de combustible
15m3 de arena gruesa de cantera punta moreno
15m3 de arena gruesa de cantera punta moreno
eliminacion de desmonte JV&JF 30
traslado de afirmado a planta JV&JF 2 viajes 0.8 hrs
15m3 de arena gruesa de cantera punta moreno
traslado de afirmado JV&JF 1 viaje 0.6 hrs
trasladode afirmado y eliminacion desmonte 30
15m3 de arena gruesa de cantera punta moreno
traslado de afirmado JV&JF
15m3 de arena gruesa de cantera punta moreno
abastecimiento de combustible
traslado y eliminacion de afirmado JV&JF
traslado y eliminacion de afirmado 30
traslado y eliminacion de afirmado JV&JF 30
traslado de afirmado
traslado y eliminacion de afirmado 15
traslado y eliminacion de afirmado 75
abastecimiento de combustible
traslado de afirmado
traslado de volquete a trujillo de cascas
abastecimiento de combustible
15m3 de arena fina de cantera calderon a cascas
traslado y eliminacion de afirmado JV&JF 15
traslado de afirmado para zarandear
15m3 de over de cantera rio
traslado de afirmado de terreno a obra 180
REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU C

OPERADOR : LUCIA AVILA ASMAT


EQUIPO: RETROEXCAVADORA
N° FECHA nº PARTE H.INGRESO H.FINAL HORAS DIA
1 2/17/2022 000 1951 10741.3 10744.9 3.6
2 2/18/2022 000 1952 10744.9 10750.7 5.8
3 2/19/2022 000 1953 10750.7 10752.7 2
4 2/21/2022 000 1954 10752.7 10757.8 5.1
5 2/22/2022 000 1955 10757.8 10763.7 5.9
6 2/23/2022 000 1956 10763.7 10767.5 3.8
7 2/24/2022 000 1957 10767.5 10771.1 3.6
8 2/25/2022 000 1958 10771.1 10778.9 7.8
9 2/26/2022 000 1959 10778.9 10780 1.1
10 2/28/2022 000 1960 10780 10782.4 2.4
11 3/1/2022 000 1961 10782.4 10785.1 2.7
12 3/2/2022 000 1962 10785.1 10788.2 3.1
13 3/3/2022 000 1963 10788.2 10788.2 0
3/4/2022 000 1964 10788.2 10791.9 3.7
3/5/2022 000 1965 10791.9 10796.1 4.2
3/7/2022 000 1966 10796.1 10800.6 4.5
3/8/2022 000 1967 10800.6 10802.9 2.3
3/9/2022 000 1968 10802.9 10807.2 4.3
3/10/2022 000 1969 10807.2 10814.6 7.4
3/11/2022 000 1970 10814.6 10824.1 9.5
3/12/2022 000 1971 10824.1 10829.3 5.2
3/13/2022 000 1972 10829.3 10830.5 1.2
3/14/2022 000 1973 10831.3 10833.5 2.2
3/15/2022 000 1974 10833.5 10839.1 5.6
3/17/2022 000 1975 10839.1 10848.1 9
3/18/2022 000 1976 10848.1 10853.7 5.6
3/21/2022 000 1977 10853.7 10858 4.3
3/24/2022 000 1978 10858 10865 7
3/25/2022 000 1979 10865 10868.4 3.4
3/26/2022 000 1980 10868.4 10878.1 9.7
3/27/2022 000 1981 10873.1 10878.5 5.4
3/28/2022 000 1982 10878.5 10883.5 5
3/29/2022 000 1983 10883.5 10891.5 8
3/30/2022 000 1984 10891.5 10898.5 7
3/31/2022 000 1985 10898.5 10905.5 7
4/1/2022 000 1986 10905.5 10914.2 8.7
2-Apr 000 1987 10914.2 10918.2 4
4-Apr 000 1988 10918.2 10926.3 8.1
10926.3 10926.6 0.3
5-Apr 000 1989 10926.6 10933.6 7
6-Apr 000 1990 10933.6 10939.6 6
7-Apr 000 1991 10939.6 10948.3 8.7
8-Apr 000 1992 10948.3 10952.3 4
9-Apr 000 1993 10952.3 10960.3 8
10-Apr 000 1994 10960.3 10965 4.7
11-Apr 000 1995 10965 10972.5 7.5
12-Apr 000 1996 10972.5 10978 5.5
13-Apr 000 1997 10978 10983.8 5.8
14-Apr 000 1998 10983.8 10986.2 2.4
18-Apr 000 1999 10986.2 10990.8 4.6
26-Apr 000 2309 11038.7 11045.5 6.8
27-Apr 000 2310 11045.5 11052 6.5
28-Apr 000 2311 11052 11057.5 5.5
29-Apr 000 2312 11057.5 11062 4.5
30-Apr 000 2313 11062 11064.6 2.6
2-May 000 2314 11064.6 11069.4 4.8
3-May 000 2315 11069.4 11077 7.6
4-May 000 2316 11077 11081.3 4.3
5-May 000 2317 11081.3 11087.3 6
6-May 000 2318 11087.3 11089.3 2
7-May 000 2319 11089.3 11092.9 3.6
9-May 000 2320 11092.9 11097.6 4.7
10-May 000 2321 11097.6 11105.6 8
11-May 000 2322 11105.6 11113 7.4
12-May 000 2323 11113 11121 8
13-May 000 2324 11121 11128.8 7.8
14-May 000 2325 11128.8 11133.7 4.9
16-May 000 2326 11133.7 11141.7 8
17-May 000 2327 11141.7 11150.9 9.2
18-May 000 2328 11150.9 11159.3 8.4
19-May 000 2329 11159.3 11167.3 8
20-May 000 2330 11167.3 11175.3 8
21-May 000 2331 11175.3 11184 8.7
22-May 000 2332 11184 11189 5
23-May 000 2333 11189 11198.5 9.5
24-May 000 2334 11198.5 11206.8 8.3
25-May 000 2335 11206.8 11218.4 11.6
26-May 000 2336 11218.4 11229.4 11
26-May 000 2337 11229.4 11238.2 8.8
27-May 000 2338 11238.2 11243.7 5.5
29-May 000 2339 11243.7 11250.7 7
30-May 000 2340 11250.7 11259.7 9
MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DESCRIPCION OBSERVACION
Traslado de material
Zarandeado de material acumulado piedra
Zarandeado de material acumulado piedra
Zarandeado de material acumulado piedra
Zarandeado de material acumulado piedra
Zarandeado de material acumulado piedra
Zarandeado de material acumulado piedra
Abastecimiento de material para vaceado
Abastecimiento de material para vaceado
perfilamiento de muro contencion mod 1
perfilamiento de muro contencion mod 1
Abastecimiento de material para vaceado
no se trabajo en maq. Otingsa
Abastecimiento de material para vaceado
Abastecimiento de material para vaceado
Zarandeado de material afirmado acumulado
Abastecimiento de material para vaceado
Abastecimiento de material para vaceado
Abastecimiento de material para vaceado
abstecimiento de planta + vaceado columnas
zarandeado de mayterial afirmado abasteciiento
zarandeado de afirmado
zarandeado de afirmado
zarandeado de afirmado
Zarandeo de afirmado planta
zarandeo de afirmado con retro en planta
zarandeo de afirmado
abastecimiento en planta concreto
abastecimiento en planta concreto
abastecimiento en planta concreto
abastecimiento en planta concreto
Traslado de material + descarga de bolsones
Traslado de ladrillo para techo
Traslado de ladrillo para techo
Traslado de mezcla vaceado
abastecimiento en planta concreto
Pesar concreto, abastecer mixer
abastecimiento de ladrillos a otingsa
abastecimiento de mixer para JV&JF
traslado de ladrillos en 2do piso otingsa
abastecimiento de mezcla y ladrillo
abastecimiento a ladrilleros 2do piso
abastecimiento a ladrilleros 2do piso
abastecimiento en planta concreto
abastecimiento en planta concreto
descargo de bolsones
traslados de ladrillos, abastecimiento planta
traslado de ladrillos
traslado de madera a estadio
abastecimiento en planta concreto
traslado de materiales y ladrillos
pesar cemento
abastecimiento en planta concreto
traslado de ladrillos
abastecimiento en planta concreto
traslado de afirmado de planta a obra
traslado de afirmado, de agua de rio a colegio
traslado de arena gruesa a colegio
traslado de arena gruesa, nivelar afirmado, abaste a mixer
abastecimiento en planta concreto
abastecimiento en planta concreto
traslado de materiales, abastecimiento a mixer
zarandeado de afirmado y carguio en planta
zarandeado de afirmado, carguo de mixer
carguio de mixer, zarandeado de afirmado
pesar cemento, carguio de mixer
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
zarandeado de afirmado y eliminacion de desmonte
carguio de mixer, zarandeado de afirmado
carguio de afirmado y zarandeado
zarandeado de afirmado
zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de mixer, zarandeado de afirmado
carguio de afirmado en volquetes
abastecimiento a mixer y carguio de afirmado en volquetes
abastecimiento a mixer y carguio de afirmado en volquetes
97.0000000000018

HORAS MENSUAL
REPORTE DE MAQUINARIA Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELI

OPERADOR : SEGUNDO HARO


EQUIPO: VOLQUETE T4K-887
N° FECHA nº PARTE H.INGRESO H.FINAL HORAS DIA
1 1/27/2022 000 3164 321767 321775 8
3/26/2022 000 3301 14615 14617.6 2.6
3/26/2022 000 3302 14617.6 14620.3 2.7
3/26/2022 000 3303 14620.3 14622.5 2.2
3/27/2022 000 3304 14622.5 14624.8 2.3
3/27/2022 000 3305 14624.8 14625.2 0.4
3/31/2022 000 3317 14649.5 14653.2 3.7
3/31/2022 000 3318 14653.2 14653.2 0
3/31/2022 000 3319 14653.2 14655.6 2.4
3/31/2022 000 3320 14655.6 14658.5 2.9
4/1/2022 000 3321 14658.5 14661.4 2.9
4/1/2022 000 3322 0
4/1/2022 000 3323 14661.4 14664 2.6
4/2/2022 000 3324 14664 14664.9 0.9
4/2/2022 000 3325 14664.9 14667.3 2.4
4/4/2022 000 3326 14667.3 14667.3 0
4/4/2022 000 3327 14667.5 14670.7 3.2
4/4/2022 000 3328 14670.7 14673 2.3
4/5/2022 000 3329 14673 14674.1 1.1
4/5/2022 000 3330 14674.1 14676.6 2.5
4/5/2022 000 3331 14676.6 14679.6 3
4/6/2022 000 3332 14679.6 14686.5 6.9
4/6/2022 000 3333 14686.5 14686.5 0
4/7/2022 000 3335 14686.5 14694.1 7.6
4/8/2022 000 3336 14694.1 14697.6 3.5
4/8/2022 000 3337 14697.6 14700.3 2.7
4/9/2022 000 3338 14700.3 14700.7 0.4
4/9/2022 000 3339 14700.7 14700.7 0
4/9/2022 000 3340 14700.7 14703.1 2.4
4/9/2022 000 3341 14703.1 14706.7 3.6
4/10/2022 000 3342 14706.7 14709.7 3
4/11/2022 000 3343 14709.7 14711 1.3
4/11/2022 000 3344 14711 14713.4 2.4
4/11/2022 000 3345 14713.4 14715.8 2.4
4/18/2022 000 3501 14729.4 14729.4 0
4/18/2022 000 3502 ANULADA
4/18/2022 000 3503 14729.4 14733.6 4.2
4/18/2022 000 3504 14733.6 14735.5 1.9
4/19/2022 000 3505 14735.5 14738.4 2.9
4/19/2022 000 3506 14738.4 14741.1 2.7
4/20/2022 000 3507 14741.1 14743 1.9
4/20/2022 000 3508 14743 14744.8 1.8
4/20/2022 000 3509 14744.8 14747.7 2.9
4/21/2022 000 3510 14747.7 14750 2.3
4/21/2022 000 3511 14750 14753.4 3.4
4/22/2022 000 3512 14753.4 14755.8 2.4
4/22/2022 000 3513 14755.8 14761.8 6
4/23/2022 000 3514 14761.8 14764.3 2.5
4/26/2022 000 3515 14777.6 14781 3.4
4/26/2022 000 3516 14781 14785.6 4.6
4/26/2022 000 3517 en blanco
4/27/2022 000 3518 14785.6 14788.2 2.6
4/27/2022 000 3519 14788.2 14789 0.8
4/27/2022 000 3520 14789 14790.8 1.8
4/28/2022 000 3521 14790.8 14795.6 4.8
4/28/2022 000 3522 14795.6 14797.8 2.2
4/29/2022 000 3523 14795.6 14800 4.4
4/29/2022 000 3524 anulada
4/29/2022 000 3525 14800 14802.6 2.6
4/30/2022 000 3526 14802.6 14804.9 2.3
0
A Y VOLQUETES CONSORCIO GRAN CHIMU CASCAS ELIMINACION

DISCRIPCION CANTIDAD M3 OBSERVACIO


HORAS MENSUAL
TOTAL M3
eliminacion en planta 300 8 435
traslado de heroica a cascas
15m3 de piedra de cantera puente moreno
eliminacion de desmonte en planta 75
eliminacion de desmonte en planta 45
eliminacion de excavacion (JV&JF) 15
Traslado de 7 bolsones de T1 de moche a cascas
Abastecimiento de petrolo
15m3 de arena gruesa de puente moreno
15m3 de arena gruesa de puente moreno
15m3 de arena gruesa de puente moreno

15m3 de piedra de cantera puente moreno


eliminacion de desmonte 15
15m3 de arena gruesa de puente moreno
Abastecimiento de petrolo
eliminacion a botadero 60
15m3 de piedra zarandeada de puente moreno
eliminacion de desmonte 15
15m3 de arena gruesa de cantera puente moreno
15m3 de arena gruesa de cantera puente moreno
eliminacion de excavacion (JV&JF) 75
Abastecimiento de petroleo
eliminacion de excavacion (JV&JF) 135
15m3 de arena gruesa de cantera puente moreno
15m3 de piedra zarandeada de puente moreno
traslado de 6m3 de piedra zandeda a JV de planta
abastecimiento de petroleo
15m3 de arega gruesa de cantera puente moreno
eliminacion de excavacion otingsa 105
eliminacion de excavacion otingsa 60
eliminacion de desmonte otingsa 15
15m3 de piedra zarandeada de puente moreno
15m3 de piedra zarandeada de puente moreno
abastecimiento de petroleo

traslado de arena fina de trujillo a cascas


2 viajes de eliminacion 30
15m3 de hormigon de cantera puente morena
eliminacion de desmonte 30
eliminacion de desmonte 30
15m3 de arena gruesa cantera puente moreno
eliminacion de desmonte 60
15m3 de arena gruesa de puente moreno
eliminacion de excavacion cerco (JV&JF) 90
eliminacion de excavacion cerco (JV&JF) 60
eliminacion de excavacion rampa Otingsa 195
15m3 de arena gruesa de puente moreno
traslado de 15m3 de arena fina de trujillo a cascas
eliminacion de excavacion otingsa 75

15m3 de arena gruesa de puente moreno


eliminacion de excavacion otingsa 30
15m3 de arena gruesa de puente moreno
eliminacion de excavacion otingsa 75
15m3 de arena gruesa de puente moreno
15m3 de arena gruesa de puente moreno

eliminacion de JV&JF 30
15m3 de arena gruesa de puente moreno

r4ee