EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 1 of 6
1. Objective
To ensure uniformity in the implementation of sanctions issued to sub-contracting companies
for unsafe acts committed within MDC projects sites by their workers.
2. Scope
All Non- MDC personnel regardless of rank, level and status of employment present inside
MDC facilities and project sites including MDC provided barracks, staff house for use of Non-
MDC personnel whether on-site or off-site at the time of the commission of offense.
Infractions by MDC employees shall be governed by the requirements in prevailing MDC Code
of Discipline.
3. Definition
3.1. Final Written Warning - A written notice served to the sub-contracting company informing
them that an unsafe act had been committed or a repeat thereof by their personnel as
prerogative of the company. This serves as warning that a repeat of the unsafe act may
result to temporary or permanent barring of the vendor personnel.
3.2. Temporary Barred – The offending sub-contract worker is prohibited from entry in any
MDC premises by reason of an unsafe act committed and that the sub contract worker is
being processed for disciplinary action by his/her company.
3.3. Permanent Barring – The act of banning or prohibiting entry in any MDC premises of a
sub-contract worker by reason of an unsafe act that is considered gross or grave or is a
repeat/habitual offender.
The prohibited acts committed by the non MDC Personnel and the administration of
disciplinary action by their respective subcontractors, shall be without prejudice to the filing
of a criminal or civil case in the regular courts, as the case may be and without prejudice to
fines imposable as required by other procedures, processes and/or involved/affected parties.
4. Procedure Details
This procedure provides lists of unsafe acts prohibited within MDC premises. MDC in its
prerogative may perform acts which in its discretion is proper to preserve a safe working
environment to its employee and sub-contract workers. Depending on the nature and
severity of the unsafe act, MDC may bar the sub-contract worker temporarily or
Printing of this document is automatically categorized as UNCONTROLLED COPY
Doc. no. FR-01-ISO-DC-004 Effectivity Date: 01/09/2020
Rev no. 0
DocuSign Envelope ID: FA55C9E2-35B5-4F6A-985C-0FD0A7D40586
EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 2 of 6
permanently. Further, MDC may impose fines and other penalties to the sub-contracting
company should the unsafe act committed by its workers result in damage to MDC owned
properties.
Ignorance of the existing approved policies, procedures, rules and regulations and other
information disseminated through various forms of communication shall excuse no one
from compliance therewith.
ITEM
ACTIVITY RESPONSIBILITY
NO.
Upon discovery and validation of reported unsafe acts and
violation of procedures, rules and regulation, a Notice of EHS
EHS Personnel
1 Violation (FR-01-EHS-039) shall be prepared and forwarded to
Project Document Controller/ PHR
Notice of Violation Memo (FR-01-EHS-040) addressed to
Subcontractors PM / PIC shall be prepared describing the
2 MDC PHR
unsafe act and the corresponding action of the company for
signature of MDC PIC/PM
Issue the signed Notice of Violation Memo to Subcontractor
3 PM/ PIC and forward copy to Subcontractor head office/ MDC PHR
Principal
Enforce specified sanction to the subcontractor and provide Subcontractor PM/
4
proof of action. PIC
Consolidate EHS violation and submit report to MDC Head
5 Office ER/ LR on a monthly basis for reference and appropriate EHS Personnel
action
Sanction;
EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 3 of 6
GOLDEN RULES
No. Particular
Affected
1 Working without EHS Orientation, Induction. 2
Failure to deploy First Aider with valid I.D./ Certification from
2 2
Philippine Red Cross (PRC).
Failure to provide Fire Protection and Control (Fire Extinguisher,
3 Smoke Detector, Illuminated EXIT signage, etc.) (to specify, temfacil/ 4
warehouse/ office).
Failure to attend Toolbox Meeting while inside the project site
4 4
without valid reason.
Riding on heavy equipment/vehicle not designed/designated to
5 4
transport personnel.
Failure to provide adequate and required Construction Safety
6 4
Signage.
7 Rendering more than 24 hrs duty. 2
Failure to avoid / limit unnecessary noise and/or dust, illumination
8 within the construction site. (Non-conformance to noise/dust 4
controls required before operation starts).
Failure to act / respond to issued Safety Observation Report (SOR)
9 4
within agreed time.
10 Failure to participate in the emergency drill. 4
11 Horse playing inside the project site. 4
Deliberately not attending scheduled EHS related meeting, trainings
12 8
and orientation without a valid reason.
Sanction;
GOLDEN RULES
No. Particular
Affected
1 Allow workers to work without EHS Orientation, Induction. 2
Allow workers to work on critical activities without valid and
2 8
certified skills certificate (National Certificate).
3 Submitting falsified EHS related documents. 2
Failure to maintain and perform proper Housekeeping,
4 12
Maintenance and LINIS BAGO ALIS.
EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 4 of 6
Sanction;
EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 5 of 6
GOLDEN RULES
No. Particular
Affected
1 Performing High Risk Activity without Approved WAS and WAT. 4
2 Not wearing prescribed PPE for high risk activity. 9
Failure to secure high-risk activity permit before commencement
3 3
of activities.
4 Using unsafe working platform / un approved working platform 7
Allowing to operate Construction Heavy Equipment without valid
5 8
3rd Party Certificate.
Operate Construction Heavy Equipment without valid 3rd Party
6 8
Certificate.
Unauthorized alteration, modification of safety devices of
7 4
Construction Heavy Equipment, Tools, Machine and Equipment.
8 Unauthorized entry to restricted area. 3
9 Moving the suspended load over the top of workers. 4
Allowing workers to hook up and unhook the lifting gear load to
10 4
the lifting equipment (Tower Crane, Mobile Crane, etc.).
Unauthorized use/operation of electrical and/or mechanical
11 3
equipment.
Tampering / illegal electrical wiring connections to circuit
12 breakers/electrical panel boxes and etc., Unsafe wiring 4
installation / connections.
Failure to provide fall protection when working at heights
13 5
(protection Panel, Barricade with toe board, Inverted Umbrella,
14 Failure to perform Lock-Out/Tag-out rule (LOTO). 5
Unauthorized removal/ tampering of safety signs / traffic signs /
15 4
barricades or barriers / protective coverings.
Failure to get approved permit before removing safety protection
16 and failing to reinstall safety protection after completion of 7
works if required.
Wilful violation of EHS Procedure, Guidelines and Policy that
17 4
resulted to injury and damage to property.
18 Smoking on prohibited, undesignated areas / locations. 2
19 Unauthorized cooking / Cooking on undesignated area 2
Forcing workers to perform activities in an imminent danger
20 1
situation.
Failure to disclose during medical examination any pre-existing
21 10
.medical condition that contributed to the cause of accident.
Improper disposal of wastes (solid, liquid or emissions) which
22 2
may contaminate or pollute the environment.
EHS PROCEDURE
Section ENVIRONMENTAL HEALTH AND SAFETY
Doc No. PR-01-EHS-015 Subject EHS Violation
Revision No. 1 Effectivity Date: September 27,2021 Page 6 of 6
5. Retention Period
6. Annex