This document provides a cost estimate for construction survey and staking. It includes the materials, equipment, and manpower needed and calculates the total direct cost, indirect costs, profit, VAT, and grand total. The grand total cost for the construction survey and staking is 16,898 Philippine pesos.
This document provides a cost estimate for construction survey and staking. It includes the materials, equipment, and manpower needed and calculates the total direct cost, indirect costs, profit, VAT, and grand total. The grand total cost for the construction survey and staking is 16,898 Philippine pesos.
This document provides a cost estimate for construction survey and staking. It includes the materials, equipment, and manpower needed and calculates the total direct cost, indirect costs, profit, VAT, and grand total. The grand total cost for the construction survey and staking is 16,898 Philippine pesos.