This document provides a cost estimate for embankment work from structure excavation totaling 632.25 cubic meters. It estimates the total cost at 148,591.40 Philippine pesos or approximately 235.02 pesos per cubic meter. The direct costs include 30,000 pesos for equipment rental and 87,000 pesos for manpower. Indirect costs such as overhead, contractor profit, and VAT bring the total estimated cost to 148,591.40 pesos.
This document provides a cost estimate for embankment work from structure excavation totaling 632.25 cubic meters. It estimates the total cost at 148,591.40 Philippine pesos or approximately 235.02 pesos per cubic meter. The direct costs include 30,000 pesos for equipment rental and 87,000 pesos for manpower. Indirect costs such as overhead, contractor profit, and VAT bring the total estimated cost to 148,591.40 pesos.
This document provides a cost estimate for embankment work from structure excavation totaling 632.25 cubic meters. It estimates the total cost at 148,591.40 Philippine pesos or approximately 235.02 pesos per cubic meter. The direct costs include 30,000 pesos for equipment rental and 87,000 pesos for manpower. Indirect costs such as overhead, contractor profit, and VAT bring the total estimated cost to 148,591.40 pesos.
This document provides a cost estimate for embankment work from structure excavation totaling 632.25 cubic meters. It estimates the total cost at 148,591.40 Philippine pesos or approximately 235.02 pesos per cubic meter. The direct costs include 30,000 pesos for equipment rental and 87,000 pesos for manpower. Indirect costs such as overhead, contractor profit, and VAT bring the total estimated cost to 148,591.40 pesos.