Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

Project No.

: 3311-024C
Contract Name : CON STRUCTION OF 4-STOREY BUILDIN G AT SPED CEN TER
C/ O CBAO
Contract Location : MILITARY CUT-OFF

CONSTRUCTION SCHEDULE

DAYS
Description
5 10 15 20 25 30 35 40 45

EXCAVATION WORKS, DEMOLITION AND HAULING WORKS


CONCRETE WORKS
REINFORCING WORKS
PLASTERING WORKS
TILING WORKS
PAINTING WORKS
GRAVEL BEDDING
12MM THK FIBER CEMENT BOARD ROOF COVER
STAINLESS STEEL RAILINGS
DRAINAGE GRATINGS AND MANHOLE
FIRE ALARM SYSTEM
STORM DRAIN RC PIPE & HALLWAY FLOOR DRAINS

Submitted By:
NORRIS B. ANOYAN
General Manager
NORBANO BUILDERS
Project No. : 3311-024C
Contract Name : CON STRUCTION OF 4-STOREY BUILDIN G AT SPED CEN TER
C/ O CBAO
Contract Location : MILITARY CUT-OFF

DAYS
EQUIPMENTS
5 10 15 20 25 30 35 40 45
1 JACKHAMMER
1 PLATE COMPACTOR
1 BAR CUTTER
1 CONCRETE VIBRATOR
1 ONE BAGGER MIXER
1 ELECTRIC DRILL
1 WELDING MACHINE
1 SPEED CUTTER
1 ANGLE GRINDER

EQUIPMENT UTILIZATION SCHEDULE

NORRIS B. ANOYAN
General Manager
NORBANO BUILDERS
Project: ONE STOREY W/ ROOF DECK AND TWO BASEMENT DUPLEX RESIDENTIAL BUILDING
Location: BAYABAS, PICO, LA TRINIDAD, BENGUET

MANPOWER UTILIZATION SCHEDULE


DAYS
DISCRIPTION
30 60 90 120 150 180 210 240 270 300 330 360
FOREMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SKILLED 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
LABOR / HELPER 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Prepared By:
RAM-GIB A. OTINGGUEY
( Project Architect)

Conforme:
AGUEDA A. PAL-IWEN
(Authorized Owner Representative)

You might also like