Professional Documents
Culture Documents
Operation of Psa Unit 5
Operation of Psa Unit 5
At feed gas flow rates within the minimum and maximum capacity (35%-100%), all PSA
parameters are adjusted automatically by the CAPACITY & TIMING CONTROL in order to
maintain the product purity and hydrogen recovery rate. No intervention by operator is
necessary. Beyond these limits, adsorbent material can be damaged and product purity and H 2-
recovery are affected.
OpFac < 1 For increased content of impurities in feed gas or for low product purity; results in:
- shorted up PSA timing
- shorter adsorption time
- increasing the product purity
The sequence control on PSA unit is executed by the control system and does not require any
operator access. In general at design feed gas composition results in design product purity.
The timing of the PSA unit must be adjusted manually, whenever the product purity is out of the
target range.