Professional Documents
Culture Documents
Annexure To Precommissioning Check List For Fans
Annexure To Precommissioning Check List For Fans
Location / Area :
Verification Sign off
S. No. Activities / Items to be Inspected
Engineer QC
Check the installed fans for any damages and make
1.
good as required.
Check the installation as per approved drawings and
2.
manufacturer’s instructions.
Ensure the method statement and test report formats
3.
are approved prior to testing and commissioning.
Check availability for access to all components for
4.
testing and balancing.
7. Check all nuts, bolts, screws etc., are tight and secure.
Location / Area :
Verification Sign off
S. No. Activities / Items to be Inspected
Engineer QC
Check Electrical Prior to Start-up
Signature
Name
Date