Hazard Identification & Risk Assessment (HIRA) Register


Name of the Job Site: HYDRABAD Date: 05/02/2019
Activity: Operation of Hand Tools Ref. No: HIRA_NARSI_17_034-R0

Severity
No medical treatment or
Illness requiring Medical Illness requiring hospital Illness in permanent
measurable physical Fatality
Treatment admission impairment
effects
Injury requiring Medical
Serious Injury requiring Single or multiple
First aid treatment only Treatment but not Lost Lost Time Accident
hospitalization Fatality
Time

Likelihood 1 2 3 4 5

Most Unlikely Never heard of in construction industry. 1  Low


Known to occur in the other ICs &
Unlikely
construction industry
2

Likely Incident occurred in our IC. 3 Medium

Most Likely Happens several times per year in our IC 4 High


Inevitable Happens several times per year in a site. 5

Job Sequence: Assessment Team:


Usage of Hand tools 1. Head – Operations

2. Construction Manager (Activity In-charge)


List of Type of Workmen, Materials / Tools / Tackles / Equipment etc.,
involved in the activity: 3. Site Engineer
Hand tools
4. EHSO/M

Pre-Requisite for the job / Activities / Sub-Activities If any:


PEP Talk
Sl Sub Hazard Hazard Populatio Existing Control Risk Additiona Action By

Residu
al Risk
N activit Event Possible n at risk* Measure Level l Control

PR

SR
o y Outcom Measures
e
1 Un Un Major Operator, 1. Deploy only trained List of the 2*4=8(M)
authorized authorize injury, people near personal for operating authorized P&M
operation d property to the power tools. 2 4 2*4=8(M) persons
operation damages. working 2. A proper system to be should be
area implemented so that the displayed.
tools shall not be issued to
any un-authorized persons.

2 1. Operate the tool as per


the rated voltage only.
2. Give regular training to
the operators. PM/
Electricity Contact Shock, 3. Use good quality and 1.
with Burn Operator properly rated power cables 3 5 3*5=(H) GROUND 3*5=(H)
Planning/
electricity injury, without any cut, damages. or double P&M
Fatality. 4. The tool must not be insulate all
lifted by the cable which the power
may damage the tools.
connection inside the tool
else shall be lifted by the
handle provided.
5. When not in use unplug
the tool from the source of
supply.
6. Ensure the DB is
provided with ELCB of 30
mA.
37. Do not operate power
tools standing on a wet
surface.
8. Do monthly inspection of
the Power tool by a
competent electrician and
keep record.
On / off switch must be
maintained properly.
3 Use ladders Planning /Site
Working at Operator Provide proper and only for 3*4=12(M Engineer
height Fall from Fatality, adequate working platform 3 4 3*4=12(M short period )
height Major when portable power tools ) jobs & a
injury is operated at heights person
should hold
the ladder.
4 Operator,
Inhalation Inhalation Lung people near Use mask to avoid dust
of Dust of Dust disorders to the inhalation. 3 2
working 3*2=6(L)
area
5 1. Ensure adequate Shift
Poor Adapting Back Operator workplace for the job to be rotation and 3*2=6(L
ergonomic poor Pain, performed. 3 2 3*2=6(L) extension PM/Planning/
s posture muscle 2. Use work bench with of interval Admin
cramp proper vice. time
3. Don’t bend and hold the
material between the legs
and operate the power tool.
4. Don’t over stretch while
working on ladder.
6 Operator, In addition
Rotating Contact Fatality, people near Guard shall be fitted with to goggles 4*4=16(H)
Parts with Major to the the tool and in no instance, face visor PM/Planning/P&M
rotating injury working shall be removed. 4 4 4*4=16(H) shall be
parts area used to
avoid flying
particles
hitting the
face.