This document provides a cost estimate for the mobilization and demobilization of equipment and labor. It includes direct costs for materials, labor of a foreman and laborers, and equipment rental. The total direct cost is $84,620. Indirect costs include overhead, contingency and profit fees totaling $24,370.56. The total estimated cost is $108,990.56.
This document provides a cost estimate for the mobilization and demobilization of equipment and labor. It includes direct costs for materials, labor of a foreman and laborers, and equipment rental. The total direct cost is $84,620. Indirect costs include overhead, contingency and profit fees totaling $24,370.56. The total estimated cost is $108,990.56.
This document provides a cost estimate for the mobilization and demobilization of equipment and labor. It includes direct costs for materials, labor of a foreman and laborers, and equipment rental. The total direct cost is $84,620. Indirect costs include overhead, contingency and profit fees totaling $24,370.56. The total estimated cost is $108,990.56.
II. INDIRECT COST E OCM ( _5_ % of D) 4,231.00 F Profit ( _10_ % of D) 8,462.00 G TOTAL (E + F) 12,693.00 H ADD: 12% VAT OF (D + G) 11,677.56 I TOTAL INDIRECT COST (G + H) 24,370.56 J TOTAL ESTIMATED COST (D+I) 108,990.56 UNIT COST OF ITEM, a.1 108,990.56 "SAY" 108,990.56