I. DIRECT COST A MATERIALS a.1 Payments for Permits &Clearances l/s 1.00 30,000.00 30,000.00
B LABOR NO. OF DAYS QTY UNIT RATE AMOUNT
b.1 Liason 30.00 1.00 351.00 10,530.00
C EQUIPMENT c.1
D TOTAL DIRECT COST (TDC) 40,530.00
II. INDIRECT COST E OCM ( _5_ % of D) 0.00 F Profit ( _10_ % of D) 0.00 G TOTAL (E + F) 0.00 H ADD: 12% VAT OF (D + G) 4,863.60 I TOTAL INDIRECT COST (G + H) 4,863.60 J TOTAL ESTIMATED COST (D+I) 45,393.60 UNIT COST OF ITEM, a.3 45,393.60 "SAY" 45,393.60