Professional Documents
Culture Documents
PT Gaya Baru Energi: Drill Pipe Inspection Tally Sheet
PT Gaya Baru Energi: Drill Pipe Inspection Tally Sheet
Hardband
Condition
Condition
Condition
Thickness
Slip/Upse
Diameter
Diameter
Diameter
Tong
Shoulder
Pipe Final
Coating
Gauge
Width
Width
Plastic
Length Pin Tong CB
EMI 1
Remarks
Bevel
(mm)
Bevel
Bent
Wall
Seal
MPI
Body
OD
CB
Number ID OD OD Class
t
( Length Space Depth.
Space
Feet )
1,1122 31,82 8 SVC 3-5/16" 6-9/16" 8-3/4" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
2,1122 31,78 8,7 SVC 3-1/4" 6-7/16" 9-1/4" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
3,1122 31,33 8,5 SVC 3-5/16" 6-9/16" 9" 4-1/2" SVC 6-7/16" 8-3/4" 5-5/16" 5/8" SVC P
4,1122 31,45 8,8 SVC 3-1/4" 6-9/16" 8-1/2" 4-1/2" SVC 6-9/16" 9" 5-5/16" 5/8" SVC P
5,1122 31,55 8,6 SVC 3-5/16" 6-9/16" 8-1/2" 4-1/2" SVC 6-3/8" 8-1/2" 5-5/16" 5/8" SVC P
6,1122 31,83 8,5 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
7,1122 31,98 8,8 SVC 3-1/4" 6-3/8" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
8,1122 31,76 8,1 SVC 3-1/4" 6-9/16" 9" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
9,1122 32 8,4 SVC 3-5/16" 6-9/16" 8-7/8" 4-1/2" SVC 6-7/16" 8-3/4" 5-5/16" 5/8" SVC P
10,1122 31,48 8,4 SVC 3-5/16" 6-7/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
11,1122 31,43 8,4 SVC 3-1/4" 6-3/8" 7" 4-1/2" SVC 6-3/8" 8-3/4" 5-5/16" 5/8" SVC P
12,1122 31,89 9,1 SVC 3-1/4" 6-3/8" 9" 4-1/2" SVC 6-9/16" 8-5/8" 5-5/16" 5/8" SVC P
13,1122 31,26 8,8 SVC 3-1/4" 6-3/8" 8-1/4" 4-1/2" SVC 6-9/16" 9-1/2" 5-5/16" 5/8" SVC P
14,1122 31,68 8.6 SVC 3-1/4" 6-7/16" 8-1/4" 4-1/2" SVC 6-9/16" 8-1/2" 5-5/16" 5/8" SVC P
15,1122 31,83 8,3 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-9/16" 9-1/2" 5-5/16" 5/8" SVC P
16,1122 31,62 8,8 SVC 3-1/4" 6-3/16" 9" 4-1/2" SVC 6-3/8" 9-1/4" 5-5/16" 5/8" SVC P
17,1122 31,55 8,3 SVC 3-1/4" 6-9/16" 8" 4-1/2" SVC 6-3/8" 9-1/2" 5-5/16" 5/8" SVC P
18,1122 31,75 9,3 SVC 3-1/4" 6-7/16" 9" 4-1/2" SVC 6-7/16" 8-3/8" 5-5/16" 5/8" SVC P
19,1122 31,98 8,9 SVC 3-1/4" 6-9/16" 9" 4-1/2" SVC 6-7/16" 9-1/2" 5-5/16" 5/8" SVC P
20,1122 31,9 8,5 SVC 3-1/4" 6-9/16" 7-3/4" 4-1/2" SVC 6-7/16" 8-1/2" 5-5/16" 5/8" SVC P
REMARK / COMMENT: 20 Jts Drill pipe bove were full inspection As per DS 1 CAT 3 and were marked or identifiead as per each result of inspection ( white paint band on tool joint of connection servicable , Yellow paint band on
Tool joint of connection reject , 1 white band on center pipe of pipe bent and green paint band of tool joint for tool joint need to hard band )and all pipe were separated .
RESULT S : PREMIUM CLASS = 20 JTS 20 JTS READY TO USE JTS BOX REJECT JTS PIN REJECT JTS BOX X PIN REJECT JTS RECOMMENDED FOR HARDBAND JTS PIPE BENT /NEED TO STRIGHTENING
CLASS 2 = JTS JTS READY TO USE JTS BOX REJECT JTS PIN REJECT
JTS BOX X PIN REJECT JTS RECOMMENDED FOR HARDBAND JTS PIPE BENT /NEED TO STRIGHTENING
SCRAP/ JUNK = JT ENDS PIN CONNECTION REFACE ENDS BOX CONNECTION REFACE
Code Abbreviation
CR = Crack E = Elonggation TD = Thread Damage INSPECTOR'S
EP = external Pittinr RH = Recommended hardband TE = Thread Elongation
IP = Internal Pitting CB = Counter Bore GT = Galled Thread
SD = Shoulder Damage TPO = Thread Profile Out SB = Swollen Box
ECC = Eccentric PT = Pitting Thhread M = Mash
P = Premium PS = Pitting Seal 2 = Class Two