Professional Documents
Culture Documents
BOQ For Softscape and Hardscape Bendungan Karian-3
BOQ For Softscape and Hardscape Bendungan Karian-3
1 Pekerjaan Persiapan
3 Pekerjaan Shrubs
4 Pekerjaan Rumput
1 Pekerjaan Persiapan
- Keamanan Ls 1.00 -
2 Peralatan K3
- Rambu K3 Ls 1.00 -
3 Pekerjaan Engineering
- Supervisor OH 120.00 -
- Pek. Pembuatan Planter Pohon (bata merah) Finishing Batu Andesit pcs 6.00 -
- Pek. Paving Block Polos Segi Empat k 300 Length. 40cm, Widht. 10cm, Thickness. 6cm Sq.m 233.58 -
- Pek. Paving Block Warna (Cat) Hexagonal k 300 Thickness 6cm Sq.m 394.69 -
- Beton Pondasi Pedestal K-175 Besi 400 Kg/m3 Length. 50cm, Widht. 50cm, Thickness. 50cm Cu.m 5.28 -
- Beton Sloof K-175 Besi 300 Kg/m3 Heigt. 20cm, Widht. 15cm Cu.m 2.52 -
- Pek. Kolom Gabion Height. 40cm, Widht. 20cm, Lenght. 150cm Cu.m 5.07 -
- Pek. Railing Kayu Fin. Cat Kayu + Rangka Besi Siku & Baut (Kayu Kaso 15 x 2 x 300) Sq.m 101.20 -
a. Pek. ACP
b. Pek. Railing
c. Pola Lantai
d. Lantai Balkon