Professional Documents
Culture Documents
Risk Assessment Block Work-Revised 13.12.2022
Risk Assessment Block Work-Revised 13.12.2022
Probability Rating
Residual
Severity Rating
Risk / Risk /
Sl. Source / People at Existing Control Measures (give Additional Control
Activity Hazard Concern Impact Impact & Action By
No. Situation / Act Risk document no. of Safe Work Method) Measures
Level Final Risk
Rating
Briefing of MS and
imparted to Site
Safety induction prior to the
Engg./Supervisor/
General Education commencement of work. Execution
Personal Workmen. Strict
1 and Training before Conduction of job specific training. Engineer/
1.Ignorance of Injury Monitoring should Low
commencing any Training to Routine Inspection to check site Safety
worker Injury to 2 2 4 be done to avoid 2
activity Workmen conditions every day. Personnel
Others unsafe
’s
Activities.
Page 1 of 4
Daily tool box meeting would be
ensured prior to start the work.
Trained workers would be deployed.
Tools would be checked prior to start
the work.
Height phobia test would be carried
out of all personal prior to start the
work. All operations
Staircase shall be fixed adjacent to should be done
the pier for access. under supervision
Execution
Fall material protection should of trained engineer.
2 Working at height Engineer
Slip - trip and fall provide of fish net and safety net. No person will be
Manual / Site In
Falling hazards Physical Work to permit system shall have allowed in casting Medium
Operation 2 4 8 Charge
Injury(Staff/ followed. area. 4
Workers) Additional Catch net provision shall
have followed. Ensure the fixing
arrangement.
Appropriate PPE's or FBH would be
ensured.
Ensure the anchoring arrangement
for the FBH. Also ensure the standard
lifeline arrangement.
Height permit shall be followed.
Winch Machine and lifting tools used
for block shifting should be certified
by Third party. All operations
Trained manpower should be should be done
Crush/cut deployed. under close
injury, Ensure the stacking of blocks shall supervision of
Shifting of block by Slip, Trip, Falling Site in
By Winch and Personal be in proper manner. trained engineer. Medium
3 manual or hazard, slings/rope 2 4 8 charge &
Manual injury, Ensure the access shall be free from No person will be 4
mechanical Broke. Engineer
Property obstacle. allowed in block
damage Safe work procedures have been shifting area.
briefed to workers.
Ensure all worker shall wear PPE, s.
Job specific training shall be imparted
to workers.
Page 4 of 4