Professional Documents
Culture Documents
Inspection Report For The Month
Inspection Report For The Month
Date-
Session- 2020-2022
With Designation :
Date of Inspection :
1. Attendance :-
Total Strength – 100 Present-74 Absent- 26
2. Academic Progress :-
(a) Theory (Less on tough on data of Inspection)
Magnetic materials & Properties
(b) Practical (Exercise/job completed on date of
Inspection )
25 Exercise Completed
(c) Engg. Drawing Less on taught on date of inspection)
(d) W/S Cal & Sc (Exercise Completed on data of
Inspection)
Fraction Ratio & Proportion Percentage, Properties of
metal
3. Monthly Test
(a) Carried out Regular or not
(b) Theory (Nos. of poor Performer) 17 nos
(c) Practical (Nos. of poor Performer) 14 nos
(d) W/S Cal & Sc (Nos. of poor Performer)
(e) Engg. Drawing (Nos. of Performer)