Sample-B O Q
Sample-B O Q
RESIDENTIAL BUILDINGS
AMOUNT
(PHP)
2 SITE CONSTRUCTION 991,477.77
4 MASONRY 3,389,152.05
9 FINISHES 17,039,605.08
10 SPECIALITIES 19,149.00
15 MECHANICAL 8,414,291.55
16 ELECTRICAL 7,557,359.07
1 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
02 SITE CONSTRUCTION
02300 EXCAVATION
02300 FILLING
02 SITE CONSTRUCTION
To Building Summary S.R 991,477.77
2 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
03 CONCRETE WORK
To Collection 1,728,538.99
3 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 37,014,455.79
4 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 169,518.73
5 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 490,081.83
COLLECTION
Page 1 1,728,538.99
Page 2 37,014,455.79
Page 3 169,518.73
Page 4 490,081.83
03 CONCRETE WORK
To Building Summary S.R. 39,402,595.34
6 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
04 MASONRY
04 MASONRY
To Building Summary S.R. 3,389,152.05
7 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
05 METALS
To Collection 946,402.50
8 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 1,075,290.00
COLLECTION
Page 1 946,402.50
Page 2 1,075,290.00
05 METALS
To T6 Building Summary S.R. 2,021,692.50
9 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Cold-fluid-applied; membrane-forming
rubberized bitumen-based emulsion
waterproofing; including skirtings; to
To Collection 612,738.54
10 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
07551 APP-MODIFIED
BITUMINOUS MEMBRANE
ROOFING
APP-modified bituminous
waterproofing membrane, including
fixing; as Drg. A/024, detail 1; to
11 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 1,166,026.80
12 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 246,285.60
COLLECTION
Page 1 612,738.54
Page 2 1,166,026.80
Page 3 246,285.60
13 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 785,109.00
14 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 4,346,823.00
15 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 3,631,092.30
16 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 74,828.40
COLLECTION
Page 1 785,109.00
Page 2 4,346,823.00
Page 3 3,631,092.30
Page 4 74,828.40
17 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
09 FINISHES
To Collection 4,826,785.32
18 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
09511/09512 ACOUSTICAL
PANEL/TILE CEILINGS
19 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
09911 PAINTING
To Collection 5,538,450.54
20 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 522,325.80
COLLECTION
Page 1 4,826,785.32
Page 2 6,152,043.42
Page 3 5,538,450.54
Page 4 522,325.80
09 FINISHES
To Building Summary S.R. 17,039,605.08
21 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
10 SPECIALITIES
10 SPECIALITIES
To Building Summary S.R. 19,149.00
22 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
13 SPECIAL CONSTRUCTION
Standpipes
J 25 dn 41 m 147.30 6,039.30
K 50 dn 35 m 441.90 15,466.50
L 65 dn 84 m 662.85 55,679.40
To Collection 736,794.60
23 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Valves
Sprinklers
To Collection 1,251,166.20
24 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 4,043,090.40
COLLECTION
Page 1 736,794.60
Page 2 1,251,166.20
Page 3 4,043,090.40
13 SPECIAL CONSTRUCTION
To Building Summary S.R. 6,031,051.20
25 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
14 CONVEYING SYSTEMS
Passenger lifts
14 CONVEYING SYSTEMS
To Building Summary S.R. 6,849,450.00
26 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
15 MECHANICAL
E 40 dn 20 m 382.98 7,659.60
F 50 dn 55 m 441.9 24,304.50
Ball Valves
J 15 dn 1 Nr 2209.5 2,209.50
K 25 dn 50 Nr 3682.5 184,125.00
L 32 dn 59 Nr 4419 260,721.00
Gate Valves
M 80 dn 3 Nr 26514 79,542.00
To Collection 1,275,176.10
27 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Drain Valves
A 25 dn 12 Nr 3682.5 44,190.00
D 50 dn 16 m 441.9 7,070.40
E 82 dn 82 m 589.2 48,314.40
L 50 dn 38 m 441.9 16,792.20
M 65 dn 58 m 515.55 29,901.90
N 82 dn 13 m 589.2 7,659.60
To Collection 1,056,951.15
28 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
E 50 dn 62 m 441.9 27,397.80
F 82 dn 39 m 589.2 22,978.80
H Roof drains
Floor drains
Floor cleanouts
To Collection 994,275.00
29 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Air Vent
Inspection Chambers
F IC 4 Nr 2209.5 8,838.00
Water closets
Lavatories
Bidet
Shower Head
To Collection 2,376,096.30
30 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Bathtub
To Collection 2,291,988.00
31 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 419,805.00
COLLECTION
Page 1 1,275,176.10
Page 2 1,056,951.15
Page 3 994,275.00
Page 4 2,376,096.30
Page 5 2,291,988.00
Page 6 419,805.00
15 MECHANICAL
To Building Summary S.R. 8,414,291.55
32 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
16 ELECTRICAL WORK
To Collection 2,615,753.40
33 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
B 50 mm dn 85 mt 117.84 10,016.40
D 25 mm dn 32 mt 58.92 1,885.44
To Collection 659,432.64
34 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Switches
Socket Outlets
To Collection 1,004,806.95
35 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
Other Devices
Telephone system
T.V system
36 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
16442 PANELBOARDS
Distribution panelboard
Lighting Fixtures
To Collection 1,795,292.40
37 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
To Collection 1,072,638.60
COLLECTION
Page 1 2,615,753.40
Page 2 659,432.64
Page 3 1,004,806.95
Page 4 409,435.08
Page 5 1,795,292.40
Page 6 1,072,638.60
16 ELECTRICAL WORK
To Building Summary S.R. 7,557,359.07
38 of 39
EXHIBIT C - Part 2: LUMP SUM PRICE BREAKDOWN
10 SPECIALITIES
39 of 39