Welcome

Mill Creek Road and Stoney Batter Road


Drainage Improvements
Project Need:
The existing drainage conveyance
mechanisms at the intersection of Mill Creek
Road and Stoney Batter Road are
inadequate, resulting in water accumulation
and undermining of the existing traveled
way which creates safety hazards for the
traveling public.
Project Purpose:
• Perform preventative maintenance:
• Correct undermining of the road and drainage
system
• Correct and armor slope failures
• Correct drainage deficiencies:
• Correct water from bypassing the existing
drainage system
• Correct water accumulation in the roadway
• Relocate stream which is meandering toward
road
• Reduce roadside exposure:
• Correct roadside drop-offs
• Correct slope failures
IMPROVE DRAINAGE PATTERNS AND REMEDIATE EXISTING DEFICIENCIES
IMPROVE DRAINAGE PATTERNS AND REMEDIATE EXISTING DEFICIENCIES
IMPROVE DRAINAGE PATTERNS AND REMEDIATE EXISTING DEFICIENCIES
IMPROVE DRAINAGE PATTERNS AND REMEDIATE EXISTING DEFICIENCIES
IMPROVE DRAINAGE PATTERNS AND REMEDIATE EXISTING DEFICIENCIES

Install new pipe

Install ditch Clean inlet Regrade ditch


Replace inlet

Mill Creek Road

Install closed
drainage system
Extend pipe Remove curb
PROPOSED
Stoney Batter Road

IMPROVEMENTS

Install new pipe


Tentative Project Schedule:
• Begin Right-of-Way Acquisition
Fall 2022

• Contract Advertisement
Spring 2023

Summer
• Begin Construction
2023

• Construction Complete
Fall 2023