TUTORIAL QUESTION

1. List all the drilling rig components labelled in Figure 1 and the function of each component.

2. Outline the important information contained in the proposal for drilling


3. Enumerate the information contained in drilling program submitted by drilling engineer.
4. Differentiate between the day rate and turnkey contract for drilling operations.
5. List the functions of drillstring
6. Enumerate the steps and/or procedures required for pulling the drillstring from the hole.
7. Explain the step-by-step installation process for casing.
8. With the aid of a diagram, explain in details the flow line of drilling fluid in the circulating system.
9. Describe the process of completing a well.
10. Enumerate 4 advantages of reciprocating positive displacement pumps
11. Outline the differences between duplex pumps and triplex pumps.
12. Explain the importance of well control system in drilling operation
13. Differentiate between the 2 major well control methods
14. Explain the signs that a driller will become aware of when a kick has taken place
15. Describe the steps involved in circulating out a kick.
16. Differentiate between the 2 blowout preventor used in well control operations.
17. Describe the function(s) of the following tools during drilling operation.
i. Stabilisers ii. Roller Reamers iii. Shock subs iv. Drilling Jars v. Subs

18. Explain the concept of failure of a drillstring with respect to the following:
i. High stresses ii. Corrosion.
19. List the four basic requirements which must be met when designing drillstring
20. Outline the functions of drill collars.