Download as pdf
Download as pdf
You are on page 1of 6
PRIMA WAHYU SDN BHD METHOD STATEMENT CADANGAN MENAIKTARAF DAN MEMBINA BARU YOUTH CENTRE MUAR DI ATAS LOT 3265 GRN 96572 STADIUM ‘SULTAN IBRAHIM, DAERAH MUAR, JOHOR. CONTRACT NO.; KBS.KEW.S4-14/52(T.09/2020) Conereting Works CONTROLLED DOCUMENT Reviewed by: ‘Approved Dy: Tord bhi) ‘SHINURAMIRAN BINIT [MOHD HARLFSHANBIN | Jofiy C7P5¢) ‘wvQc Eonar Projet ee constr Status: Tosed for Approval [esos ———[etecive vate 20 ne 2038 | ‘CADANGAN WENAIKTARAF DAN MEMBINA BARU YOUTH CENTRE MUAR DI ATAS LOT 3265 GRN 95572 | oocuanreerenect STADIUM SULTAN IBRAHIM, DAERAH MUAR, JOHOR, = TETHOD STATEMENT PRIMA WAHYU SDN, BHD, (Concreting Works pas 1.9 omECTIVE “To provide work ndrucions by whch the concrete is suppl placed and cured for ceastinplace structal members. 20 score Feral structural watson the projet 3.0 DEFINATIONS NA 4.0 MATER 1 Ready Conecte 5.0 HANDLING AND STORAGE OF MATERIALS a. Handing: Transot ready mix concrete to leation of pour by mer teks. Pace concrete by using machinery and equpmet tines belo b. Storage: WA 2. Mote Canes 1. Tower Cranes ©) Concrete Pump . Concesng Buches f. Viaters FE Wheebarrons, a apateale “CADANGAN HENATKTARAF DAN MEMBINA BARU YOUTH CENTRE MUAR DIATAS LOT 3265 GRN 96572 | oocivenrnerenncr STADIUM SULTAN IBRAHIM, DAERAH MUAR, JOHOR. ‘METHOD STATEMENT ‘PRIMA WAHYU SDN. BHD: (Conereting Works 7.0 PREPARATORY WORKS 2. Concrete Supety Request fer design ms based en the concrete grades speed on structural tranings fem te Ready Noed Concrete Supple). submit the propoeal design moc rom suppl) to the deny constant and seek for april. ‘Upon scceyance of design mix by cent consultant range fra ial mat “pplerstaeting plot with the presence ofthe cent) eansutant. Conduct slump te determine Water coment rato and take sample cibes for fompresne suengh test. Request the aporoved ready mbed concete suppers to submit est resus to cent constant fr reve. Pace ender from the approved ready med suppii(s) for required aunt Of eonerte a ent ene Gay before the atl peu b. reconretng inspection Prior to comeing works, cany out int inspection with cer constant on udural menbers-and.veriy the forms. and. steal relnforcement In fomplance vith the cinstucton cravings and etl Inthe PreConeretng Cheah yt subcontractor to organi the inspection. Check the ater, vertaly, levels ad supports ofthe erected forms Check the cleanness ofl forms and ensixe thatthe forms are fe fom fst mud other dees. Check ste renforcement for number of bars, erangement, spac, ance cove, space Des, appar rere Check the postion, openings, sleeves and requltements fer the MAE serves are prove ‘CADANGAN MENAIKTARAF DAR MEMBINA BARU YOUTH CENTRE MUAR DT ATAS LOT 3265 GRN 96572 | oocmevr nerenence STADIUM SULTAN IBRAHIM, DAERAH 'MUAR, JOHOR. ae HETHOD STATEMENT ‘PRIMA WAHYU SDN, BHD, Goncreting Works er Work METHODOLOGY Recevng of Cancrte Cary cut recsving inspection of ready mbied concrete 2s per Project Inspection & Test Pan. Use Reaching Inepecton ‘Chelle ~ Ready-Mix ‘Concrete ding inspection, erty the cede and quant of concrete resived. Cary out sup test weh the prose of Resident Engineer or Gerk of Work and encure that the terete slanp meets the eta defini Tale 2 or a8 speed the spetietns ‘Grade ofConerete [Fini (om) a0 and Lovee I 30 Take concrete cube samples for every 190 cuble ‘Table 3 or per spectators, (Grade of Concrete 0-ad Lover ack the fraton of pour of concrete cecived on the delety docket and heck orteferece and entation, b. Pacing of Conaete Provide sdequate equipment, machinery and manpower to carry at the ccreting wars. Proce canente on dsignated locations using concrete pumps andlor erane assisted comets Buckets or ushg other acceptable method by cle! fentan, Start conerng ffom a frech locaton oF from predetermined canstution foint and cantinue pour uninieruptedy up to the next predenined ‘emsivction ont oro compton. ‘CADANGAN MERRIKTARAF BAN MEMBINA BARU YOUTH CENTRE [MUAR DI ATAS LOT 3265 GRN 96572 | nocunenrnerenexce: ‘STADIUM SULTAN IBRAHIM, DAERAN [MUAR, JOHOR. METHOD STATEMENT PRIMA WAHYUSDN. BHD, ‘Conereting Works Iv. I conereting Isto commence from a contraction Jot, roughen the joint before ping the concrete whan wre ish n not aval vw. Discharge concrete with fess than 1.5 meters of vercal drop to avoid stgregaton of concrete. Pace conte fom the lowest pint to the final ‘once leven one peat a harantal yes compact conte by and tamging an mechanical vibrators, Ensue thatthe ‘concen worked io the comers ofthe srutral menbes. Caring of Concrete 1. After the concrete has set, cay out caring works by eppiyng curing ampound or oer acceptable cing method. 4. Post-concetng Inspection | Upon renova! of forms, catty out joint inspection wih cent consutant on complete structures, 1 Check the structural members for acuacy on dimensions and concrete finhed vel, Inspect the concrete surface for any haneyeambing, cacks and vit of renforement bars, 1 Obtain seceptance fam the clent/ constant thatthe structural members fae satistactory and meet the specications and construction drawings. For suspended lbs and beams, back propping is required

You might also like