Download as pdf
Download as pdf
You are on page 1of 22
DAELIM ENGINEERING CO.,LTD. ‘SEOUL, KOREA JOB TITLE New Gathering Centre GC-25 CONTRACNO. — 97G038 North Kuwait JOB NO 11550 eer Kuwait Oil Company (K.S.C) DOC. NO 11550-E-114 CALCULATION FOR DEPRESSURING CALCULATION CONSIST OF: DESIGN BASIS OF DEPRESSURING SYSTEM 1 SHEET DEPRESSURING LINE SUMMARY 1 SHEET LINE SIZE CALCULATION 2 SHEETS DEPRESSURING LOAD SUMMARY 1 SHEET SIMULATION RESULT FOR NETWORK. —— 4SHEETS SIMULATION RESULT FOR VENT RATE, SETTLE OUT PRESSURE CALCULATION DEPRESSURING VOLUME ESTIMATION 4 SHEETS 2 SHEETS 4 SHEETS A__| Feb28, 00 As Built HC. Jung | 1.CHan | 1Y.Kwon APP"D & DATE REV | DATE DESCRIPTION PREP'D | REV'D| APP’D | aPPD orien DAELIM ENGINEERING CO., LTD. ; ‘SEOUL, KOREA Job No. : 11550 PAGE: 1/1 Project: New Gathering Centre GC-25 DATE: 08-Aug-98 Client: KUWAIT Oil Company REV. A Locatio_: KUWAIT (North) PREP.BY: H.C. JUNG PRE: YSTEM_ A APPLICATION CODE 4. KOC SPEC NO. 015-YH-1004 Specification for Emergency Shutdown and Depressurising System Requirements Paragraph §.5 Location of Depressurising Facilities " Automatic depressurising facilities for equioment containing hydrocarbons and having a design pressure in excess of 7 berg(100 psig) shall be provided. The depressurising system shall be designed to reduce the pressure contained within the equipment to one half of the equipment design pressure or 7 bara (100 psig) whichever is the lower, within 15 minutes * 2, API 521, Paragraph 3.19.1 C " Some operating companies limit the application of vapor depressuring to facilities that operate at 250 pounds pet squete inch gauge (1724 kllopascals gauge) and above, where the size of the equipment land the volume of the contents are significant. Other companies provide depressuring on all equipment that processes light hydrocarbons and they set the depressured level at 100 pounds per square inch gauge (690 kilopascals) or 50 percent of the vessel design pressure, whichever is lower," 3. Applied Equipment Equipment to be applied : C—1011, C-1012, C-1021, 0-102, C1031, C-1901, C~1818, C-1701, K=1811B and K-13110. But K~1311A is not applied. Because, the design pressure of the related equipment is lower than that of application code. = Design pressure of K-1811A : 4 bara ~ Basis of AP] 521 code & Company's spec. : 7 bara B DESIGN BASIS Design Basis.of Depressuring System a. Depressuring Time 15 minutes: b. Depreseured Level 7 barg or 50% of the vessel design pressure, whichever is lower 2, Line Sizing Design Guide : General P&ID Spec.(#11550-0000-1001) Paragraoh 7.4 € a. Restriction Orifice Upstream Line 7 Design Guide dV%2 <= 15000 where, d=density in kg/m, V=velocity in m/sec Equivalent Length 30 m . Restriction Orifice Downstream Line Design Guide : The velocity is limited to 0.8 mach Equivalent Length By Plot Plan a d TOVULNOO JO Sais INT IH NIVASG SM WIAIMON dads ONTENSSaadTO GaNdd¥ LON S300 VEEL» ASNVO3S SIV! SAOHV FHL NO NMOHS LON 3YV $,960~-O4 JO S3ZIS INIT LITLNO/ISINI HL + agiorta ‘ypeU 4°09 OF PoUUM| 91 AUDOJen OU, — OUT] ONO, a a Y 08 908/UU UI AYOO}AA=A. “EUI/H UI AUSUOP~p O104M 90S) => ZAP oury yo1ut . . || SISva ONIZIS ANT + Ziet—av wo 08ST OEOvT a KD OVO OU] eve-AGHS_|_OvieT— ver-av 100 wee er a Tx BEO-O8 | Vez= AGES | TET TOLT= a7 tT wes TEST a TS0-O8 | “eoe=AGAS | TOLI=T oI | eo ar26 Sore v obe—ASS oreo zoeT— Iv 960 GE BFT 1199 bee—ACHS Torta teor= av ee 0 O0'SZ ears EX || 2r0-AaES i) e01=a E00 ag WE 2X2 | ¥00-Aaas|—zeor=o Te01-sW oro or ver ~ 6229 XD ‘0e0-ACES 0-5 | rola 80 2006 eas RE e20-AGES | erOT=T TrOI=av wo BOOT Tazo T aX || 610-ACaS | T1or=o \ ON UENO SIT ae Neen Str ino : Suva ON aled° YOSHO-ANT TS ESTINO: 2218 NTT ON 3AIWA | “ROINuaS a Z os Es | ~ aq ae ONT On AW dana THON) Livan = Vv “Aa ‘AuedwoD 10 _LIVAANS! 86-Ony—R0 : Alva SZ-99 onued OULEED MeN poolorg bre a0vd Ossi: ON Gor vauoM “Inoss ‘a. "03 DNRISENIDNA Wnava 90°00 . ansensrurose ners any 3 olen meee HON Tee SOHO ITLTW == RO OU HEH = ABORA OOS THRO | Tero - ~“wOBT Td e800 doug ameseid eet “noo sad | iH100 ‘ops.s ous oosaest — [aovaze'e serv soo arr sree zi e100 i280 5602 jeser) pares'eiey mols | spe SursB1en0 ser de veur oie 0.3 - eee nein ee OG) aoe ya Suro enn | sorsv0 sovsvo — |z/zaz0 szzov0 uw | eas “jase —— loa ave fae fan foes foe qos oe foe toe fo | | ais as ais ais ais i SSVIOZOIAHIS Nala | 3 8 5 OL e (Qn) azisannt yorsve —~jorve'y 2021 dove suz'b 269) 09 ves ves odex y_s0dex 1aMdH___|__AUG dN. _.. AWN GINS forod [SUVs alt ai ou | boro __|__ 200-08 wo) | enino Fam uno io zonuas nese geass ee seen eee NN HINON S205 MN OO¥ i ONE OH “Ag da (HRION) 2-09 HALNAO ONRIHLVO MAN :103°ONd [) ANvawoo To Livmmt — :ANaNO osatt = “ON sor NOILVINOT"'9 AZIS ANT ‘QL7'09 ONIYSANIONA_Wava i nah feesueere |e | | _ BION “66 ry S612 im) zune SOHO aNFTLEINI | zo sco ro ING “OU WOEHN | s086e voely — RBOIBA 2068 TING | jiseoo"Yz8000 Tiere" —Teea00" woorida | 800'0 |zooo 60°0 tooo doig omssoie, 260's bet siete - looe't _ ROD ‘sse1e 68100 92100 56100 69100 rri00 J0}8.4 34 sora9e2 sors sore —|soraso _|sosagee sorseo's — [ooraee 8 \26s'ro use 6x9 r2e01 jvor'0s en's 00z's1 A lee Shr0 jaizo e200 vivo srt £200 Mold TOA . leo fi lost 907 18 ig'8e Wh zt zs ert zt ze e100 z100 z100 zi00 2100 z100 660 ses 660 1980 60 660 e6%0 esto u0'se s6r'er sore orsre 82012 8z0'Vz mwno } 1d@ Aisuog cous eze ozs tech 08 ede ove 89rL pojes'e}ex mo} 201084 Gurzsiono eousy eousy leze beze oz oz ex08 ez08 are leone __d0 reuse Wo sro avo roo aro ooo aro0 aro v0.0 3600 zvzozo —|sovave sabato zzozo ——| ses jezzovo —|eszzvo—Jsezeeo © eesz0'0 O0L ove ooo ove Yio over oor0e ove oaroe 0008 0, oe oe os a ie Joe Joc ais ais ais ais ais ais ais ais ais 8 8 ig eee eeeaaees | deeeensees | ee |e e oe oer cost be ea6o's ie evierefeaeet sora ~~ Josee'r Like bez sez Vs 9be't wie sov't ze'91 2961 we dn@ emnssaig leue e208 698 Lor Le 6s es 108 Los _aimieduiey jo faa __ fee a NOWIGNOS ONILvei340 vedo “ade see ee Tod “ede rode, sedeiR MOU 40 3dAL |ugoatias_|1no suas |1no suas |1no 31138, | sv Tans svodW | svodn | svodh | svodt INVA an auvisaH |" oor | auviddt | sou | SuVvid dl aavidH | 6-08 | Sava |” eco-ou ow-ou | one 260°0) alicia | "160-04 ecoou | siei-o | zeoow | echo wo no. Ni no NI ino Ano Ino NI f __ a0IAuas OF ee ee ee 6 a __L = ae 2. fe Ua@WAN INI, | ‘onar OFF ‘AGATE ( \3N 900 inn) ‘ONAP OH “Aa dud y ‘ONARY (HON) 52-09 BYINIO ONRISHLVO MIN -19arOud a6-6ny-00 ava i -INaITO zie sovd ‘On aor NOWLWINSTY) 3Zis AN yon|seduioa (889 s8uluins) SeB jony Ue: -uoj|soduioo eunung gooz Aq pelidde 81 ye0—AGSS *vEO~AGAS 1de0xe SACKS ITP Pelidde st uoNIso | I | Suynsseidep s9ye wershs pereje: oun Jo eunyeiadue) oly suBeW “ANAL “S3UdaG “e Suunasedep 19)Je waysAs paypal Bly Jo sunsso.d au) supeu Saud “SaHda0 *Z | Oe'1-Xa UO posed pareinoft duioo reuilung 666} “YORRIN»e9 BuuNsseidep 10.4 0 8] Z9B—AAS PUE | sal0N Taos] Tiel | ool | oe To Wee TST] BONA | BETO | EOS) | EFE-AGES] OTE saua ino muias+| piei-av | 6'vs | 698 rz so ost | Yoava | 20's wah vez-acas | arier-» sep ions} vort-sv | zor | cor 69 oe ost | uoava | sever | sz: | zoe-aaas | sozi-9 siei-av | oes | oes oe oor ost | uoava | ovs'ez |ezole J ave-naas} sie1-9 zoer-av | ver | wes ee ove ost | uoava | szoiz feor — |eze-acas| toer-o eso yse1 ua dH] teot-av | zy | 0°09 69 ove cosy | woava | zvarct |ecaiz | zvo-aaas| te01-9 aseo owns gooz| zzor~av | rvs | Yes ro oor ost | Hoava | tso'ee | esi) veo-aaas | 2201-9 wor-sv | cor | O09 oz ove ost | soava | arsroz | scqz —|oeo-naas| 1201-9 zr-av | vs | vos eo oer ost | oava | ziorez |rogs —fezo-aaas | zto1-9 fior=av_ er | os; | HOavA | Zse'02 | 6seIrr | erO=AGSE | “s1OI=S (ON ales: jawarrsaeeso): ONT OH Vv 96—-Ony-80 bre Tag daud "Agu :3Lva avd vauox “Inoas “ain “o3 DNINASNIONA WhaWvd (HON LIVANTN AueAdwod 110 LIV 9z-09 antigo BuyoMieD MON | OSGI: TOHESOT UoHD yaefoid “ON gor, 140 4 eed 008 wou ih OL ‘ou Stots934NO| sont *sa0na1 wi aan aunt svoIL9anvoo xan018 2401 NsTsOXd I dL1+9_96-08-9 _sNo"saNda6 | | canasau siiord 1V “ont $394 T98 ROLAV IIS cl ay #86) 26st "eek ‘066s *ebeh aah Foor snosanaos (o> ont saoNaras NOLES 40 | yawaaval ¥ sr ANVTANE Cu NT S3QN1198 NOLLWINWIS 40 WN IOTANIS Vv il > 3} ALz-£66-2-05 Mus i teor-28 vave E01 01301 To*e"RoTsaaK 2 oN ow yo vom auw Pome yw yy aww 1 MON ww 1 aN W TOWN Wy fad WN tow “vy Toad now ‘Sox laaroxd Ton Wy 14g Maw joulvinwls await a NY Taga ow Toe NOIsHaA NGOS “JAOMLAN DNIYNSS_adad 9 40 2 260g _ dui:8_96-0¢-9 _spo'sauasa 00:0 8ses gggeee | wots aon 110 TOW NOLL: onne3°H wu via'igun = vid 131 swywing viva saniones “iow Jor inaina swig a sIAaa 3 an WE AVN NTT a1n3a di48 96-08-9 1n0"saud30 shen ‘nov 24019 He ox} ‘82003198 HOt To" NOLSMaR 4 49 4 9804. senate i BS"uSENT eraser 2 Az se:eso0s f a> ie 3 ails fon 8 :@ 3 ae tee ez a ae ae az GED) orarn, a GP oe. ae ere oz GED owas, ee GP eee, ae Ore obveer ez a3 wee Be 2 EP a3 ase “a: DP a3 we os ae GD Sais 8 Ee OE 2 ED ssno/13 ee eT soa seod ‘ena yea 203 zea Ssoa 20a 0203 loa 2s0d ‘loa 2103 Soa bgoa sod itoa loa Osos 2tog tos Sioa 20d ‘soba ‘2003 dood ena 9008 S003 ‘ood dsoa Se00 5204 oa S04 200d tooa GEE a a2 Oreck 965 g-a0og2- S-as"e- eid ads Suloc. Tyna Sika aie ate auSSR cauporsiit asa aa ont zanses “gran” intra alge sani aaa Sly ne Awvins siinsau sev v8 sv ava a Thoaay gionian ""fgote aig aaleted a as ac] Tha $63 Barat | omnr-ary Fd | Soquel i vom ‘sang aos | MS a “amt ‘saona1og nf i Me Wes | ut i I PID U i 2) 7 404 9804 60:44 916-96 lino*sa4d30 wRew 4 $0 2 2804 60:1 _91-6-86 | no-says30 ‘oo9-sa var SoH soa om 2yyre0se 51a Bodo woave a sau WIL dave “a ‘Sad AML 3 iat Raving ONTINSSEUET ny yeongass = caAIOS LIN tins) use9dga 6s Doo" 00° ‘018 1 woruvino wa aro Lory NOTS¥aN THo¥a sex gatos y “OME SaQN3I3S NOLLVINNIS eas Sox ‘009-su wer eH a0vd ‘basede iv a saad A ait, avis OHTANSSzAEIO yoy Bagrarers iN snaowd seo. 133r0ud sont saonan5s ROLLINS gpormes Lez"zeme 79S Sheree 2e0-ovor gr95 fasrsss§ aedcsoey 96 Gaia aa Sa aL AnWMNS ONTANSS TA ee s. * ih 3 vada a aval sau MLL AS OMTNSSINAAO ae nina sss Che-g 0) Ore . : : eieroont age geeeoe Gagrisel 9°85 e603 rer Dox nottvino'y9 wargows ‘ono9-sa war Lory nOIsuaR TT/oud goo aarowa SH aod " sont saanat3s OLAV INNIS odava ‘Saud BNL aie i aX SUVA Ugh Ove-Ades UE an ike é Spe: 292 beeese 1 $0 280d 60H) 915-96 90"s3¥430 39VSs2N OW BALL Ht SBT OW Gpusinta SUOMI OH ‘Laws SLIVIS HR wen SLINN aOaWiD T1/0¥4 00°S2 $1 MBTHONE STHL YOd ALTWAON TOSHIS xan HOVBHNOILNIOS,NaTEONE we THN, ser" 8919091 mean eee ggg notavinatya warigowa sao garoud Lory NOISMaR TI/oud a ont s3003138 NOLLVINAIS ‘009-8 war StH a5ve es" 056 986: 26995 Ste: Ssas. wee eee. eseessedg 262988 UL 9ES fi hy ys0°96¢ ; on"sEs oLees oversee Seb-a5¢ ‘i018 sora tory NOISHER THvoua SSSSSEEI seve cava Sas aN AIMS, ONTANSS3UEIO sey Se argos goo. 3aroug “ONL SaONRISS NOTLVINNTS SETTLE OUT PRESSURE CALCULATION ae GOB NO. 0 JOB TILTE : NEW GATHERING C DATE: 98-07-08 CLIENT KUWAIT OIL COMPANY REY. NO A C -SQCATION_: KUWAIT NORTH PREP. BY :_H.C. JUNG ITEM NO. : K-1311A (TANK VAPOR COMPRESSOR) INPUT DATA 1 Pressure at compressor suction condition (Ps) 1.080 Bara Pressure at compressor discharge condition (Pd) 4.900 Baré 2 Volume at compressor suction condition (Vs) 99.9 m3 Volume at compressor discharge condition (Vd) 6.5 m3 Total system volume (Vt) 106.4 m3 3 Compressibility at compressor suction condition (Zs) fl 0.985 Compressibility at compressor discharge condition (Zd) 0.968 4 Temperature at compressor suction condition in ‘C (Ts) 56.5 329.6 K Temperature at compressor discharge condition in 'C (Td) 116.9 390.0 K Settle out temperature in 'C (Tso) =(1/Vt)*(TsVs+TdeVd) 60.2 333.3 K CALCULATION 5 Settle out pressure (Pso) = (Tso/Vt){(Ps*Vs)/(Zs*Ts) + (PdeVd)/(Zs*Ta)] C 1.257 BarA ~ 0.244 Bars SELECTED SETTLE OUT PRESSURE d 1.0 BarG ITEM NO. : K-1811B (LP GAS COMPRESSOR) INPUT DATA 1 Pressure at compressor suction condition (Ps) f 4.900 BarA Pressure at compressor discharge condition (Pd) ‘ 19.000 BarA, 2 Volume at compressor suction condition (Vs) : 224.3 m3. Volume at compressor discharge condition (Vd) 10.1 m3 Total system volume (Vt) 234.4 m3 3 Compressibility at compressor suction condition (Zs) 0.980 0.965 scharge condition (Zd) 4 Temperature at compressor suction condition in ‘C (Ts) 53.2 326.3 K Temperature at compressor discharge condition in 'C (Td) 138.8 419K Settie out temperature in 'C (Tso) =(1/Vt)*(TsVs+TdaVd) 56.9 330.0 K CALCULATION 5 Settle aut pressure (Pso) = (Tso/Vt)*[(PaVs)/(Zs*Ts] + (Pd*Vd)/(Zs*Td)] 5.518 Bard 4,505 BarG ISELECTED SETTLE OUT PRESSURE : 5.0 BarG SETTLE OUT PRESSURE CALCULATION 212 OS NO. = 11650 JOB TILTE : NEW GATHERING CENTRE, GC-25, DATE : 98-07-08 CLIENT KUWAIT OIL COMPANY REV.NO: A (QCATION _: KUWAIT NORTH. PREP. BY :_H.C. JUNG ITEM NO. : K-1311C (MP GAS COMPRESSOR) INPUT DATA 4 Pressure at compressor suction condition (Ps) 19.000 Baré Pressure at compressor discharge condition (Pd) 49.013 Bara, 2 Volume at compressor suction condition (Vs) 168.0 m3. Volume at compressor discharge condition (Vd) 62.2 m3. Total system volume (Vt) 250.2 m3 3 Compressibility at compressor suction condition (Zs) 0.944 Compressibility at compressor discharge condition (Zd) 0.916 4 Temperature at compressor suction condition in 'C (Ts) 57.9 331.0 K Temperature at compressor discharge condition in 'C (Td) 149.0 422.1 K Settle out temperature in 'C (Tso) =(1/Vt)*(TsVs+Tdavd) 87.8 360.9 K ICALCULATION 5 Settle out pressure (Pso) = (Tso/Vt)*[(Ps*Vs)/(Zs*Ts) + (Pd+Vd)/(Zs*Td)] 29.768 Bara, 28.755 BarG 29.0 BarG SELECTED SETTLE OUT PRESSURE 4 550 c Streom Noo Rerarks Come 2D Kee) 3050 12700 LY C102 BB00X 15800 194.7 co o C- loa! 4000x (6200 20.3 Cs c- 1022 4300x 18600 220.9 = Based on 20088 C-1031 2100 x 5500 21.5 aD pega ( C-{B0l 2i00x 2440 4BB > + Related PIPE KBB 234.4 & Fort se — BIC e 250.2 & C-IBI6 2iOOK2440 66. +Relsted Pree @ > 1920x 6050 & % All Moteried & "Cé Ghreams ore baseden 1822 Summer Sxcest Cicze 24. (550 DEC. 04, 27 H.C, SUNG ee | is p70. PE LAUNCHER. FROM sou 6 e162, >_< S031 QO ® L) G01 © Ectimoted Volume of Pipe from CH1Oll to CIRO (6"x 186% XL25C Sofety factor) = 22,0 m* @ SBI € 2:00 wrzD x 2LO mmTT) Volumes 0.2 92 ® Estimated Volune of Pipe from C-1B0! to Check Valve I6"'K 64m. x 1.25 (Safety factor Y= 0.497 34 _ sso § =SSURING VOLUME ESTIMATION. DEC. 04, 97 tC. SUNG x CIZI6 Toto! Voluse Estimation = 6-/ om? B ARLE FROM ° EE Gite ‘= © 8 CBI6 oz aos) © Eetimated Volume OF Pipe fon C-10l2 to CISIS - 12"x [24m X |. 25 ( Sokety Soctor) = /2. Km ® ClBlé (2100 mm IDX 2&0 TT) Nelume = 10.9 Wi @ Eskineted Voluine of Pipe from CIBIE to Check Valve 16°x 26401 x1. 25 ( Safety factor) = 42.8 mF A 550 iC DEPRESSURING VOLUME ESTIMATION FEB.I2, 28 H.C. SUNG ©0080 inn anda Gass 33385 ligko oreen 9 yay w ARGS oO x 3443. Bp — —= 8 a” @, 1 8 Q ogi 16% | C 2 B z 8 8Cele § GENE] NO’ OR DEP! IG C TIO} V. G) In response to the Company‘s review (KD/L/1144 dated Jun. 04, 98), we incorporate the most of comments and re-issue the Depressuring Calculation (Doc. No. 11550~E-114) And also, we have reply for Company's comments as follows. AA. Company’s Comment " Not clear wh inlet = out " for gas velocity f inlet and outlet point Contractor’s Reply ? It is very short line. The commented line ‘rom RO outlet thru connect to common line with PSV, not connecting to flare header line. So, there is no pressure difference between inlet point and outl t point. As a result of this, the velocity of inlet point and lutlet point is almost same. BB. Company's Comment ine calculation sheet has been revised by Daelim and the following conditions for RO outlet were shown in previous revision are missing in this revis’ 1) Piping service class, 2) Equvalent length, 3) Compressit header, Daelim Contractor's Reply As Noted

You might also like