Formation Day 2
Formation Day 2
Formation Day 2
IDENTIFY HAZARD
SEVERITY
Environment
Reputation
Never Heard of in Has Has Has
People
heard of in the Industry happened in happened at happened
Assets
the Industry the the Location more than
Organisation or more than once per
Reputation)
or more than once per year at the
once per year in the Location
year in the Organisation
Industry
No injury or No No effect No
Consequence controls);
3 or health damage effect impact
effect
PTD or up Major Major Major
4 to 3 damage effect impact
determination
5 3 fatalities damage effect impact
Blue risks are assumed to be at ALARP, if the facility or business has a properly functioning HSSE MS (as
assessed by external audit).
Red and
Red risks:
Yellow Risks in LPG
Yellow risks:
• 1 Slip/trip/fall in LPG office or plant
• 2 Customer site engineering
• 1 Bulk truck loading • 3 Cylinder handling
• 4 Vehicle colliding with staff
• 2 Product receipt
• 5 Cylinders falling from pallets in transit
• 3 Bulk delivery to customers • 6 Chemical products (solvent, paint…)
• 7 Cylinder filling
• 4 Road transport • 8 Use of hand tools
• 9 Personnel at height
• 5 Marine transfer • 10 Equipment falling from height
• 11 Low voltage electricity
• 6 Assault • 12 Cleaning products
• 13 Electrostatic electricity
• 7 Filling hall – equipment with rotating parts
• 14 Flares
• 8 Structural integrity of storage • 15 Confined space
vessels/tanks • 16 Unstenched LPG
• 17 Sabotage outside plants
• 9 Delivery to packed customers • 18 Personnel below grade
• 19 Bottled gases under pressure
• 20 Cylinder/tank maintenance
• 21 Air under high pressure
• 22 Railcar loading
Step 5 - Identification of Barriers (the
Control and Recovery Measures)
• CONTROLS prevent the threat from releasing the hazard to cause the Top
Event.
• RECOVERY MEASURES reduce or mitigate the risk that the top event leads to
the consequences
T C
H C R O
H O E N
R S
A N C
Z
E E
T TOP EVENT O
A A Q
R V
R T O E U
D L R E
S Y N
C
E
Step 5 – Identification of Barriers
Documentation of Yellow RAM Risks in a Hazard Control Sheet
Hazard Con trol S heet - W orkin g at Heig ht
1.4 M aintenance Activities and C ritical Business HSE Critical Activity/
Processes Responsible Position
H AZ AR D C O N T R O L SH E ET N o: 4 •These M aintenance Activities support the barriers • Vehicle planned m aintenance
H azard G roup: P ersonnel w orking at height H azard C o n seq u en ce: P ersonal injury/fata lity above (I.e Preventative M aintenance and Inspection) program m e /Fleet M anager
as a consequence of a fall from height •Use of approved
Location /Hazard So u rce/Descrip tio n: D uring w ork by staff or contractor or at cu stom er Applicable Critical Business Processes include: contractors/M aintenance M anager
location •Use of inspected ladders/scaffold
Com petency etc./ O perations
A ssessm ent of haza rd /top even t: Loss of C ontrol/F all from height while w orking on asset or Contractor M anagem ent
fall from height while d elivering to custom er tank causing serious injury or fatality - P4 B Perm it to W ork
(m inim um for Shell- your experience m ight m ake this a C or a D likelihood)
T hreats: References:
W orking on heig ht for cleaning, painting or m aintenan ce on storage tanks with
im proper protection (tie-off, w orking platform s etc.) Local R egulatory Standards:
Loading trucks or rail cars Business /C ustom er Standards and Procedures
Shell Standards ( DEP's, D EM 's), HSE C F requirem ents if applicable ( AD D SPE CIFIC
D elivery to custom er tanks REFER EN CES)
U nsecured or substandard lad ders, handrails, pla tform s, scaffolds etc.
H um an Error R evision: 0 Authorized by: Asset M anager, Responsible
M anager; HS SE M anager
B arriers and H SE C ritical Activities:
1.1 C ontrol in design H SE C ritical Activity/
R esp o n sib le Po sitio n
D esign and operational use requirem ents for
• •N ot to use ladders for w ork at ADDITION AL R IS K REDU CTIO N IS T HE M EASUR E ARE
Ladders, Scaffoldin g , Platform s height > 1 .5 m etres/ D rivers- M EASUR E FO R CO NSID ER ATION CREDIBLE / DISPRO PO RTIO NATE
V eh icles fitted w ith su ita ble ladders for delivery O perators PRAC TICABLE? RESO UR CE S
needs •U se of approved ladders/ R eseller (Yes / N o) REQ U IR ED TO
B ottom loading a t depots/term inals M anager a nd C ontracts IM PLEM ENT?
m anagem ent (Yes / N o)
•Apply S hell D E P/D E M for Bottom 1. All working at heights > 1.5 m etres Yes No
Loading design / S hell E ng ineering scaffolds or platform s to be used
2. R eview of contracts for HSSE content Yes No
3. Introduce Ladder checks Yes No
4. Proactively encourage custom ers to Yes No
1.2 C ontrol in operation H SE C ritical Activity/ provide safe access to storage tanks
R esp o n sib le Po sitio n 5. Ban the use of portable ladders in the No Yes
•Signs to be placed during work at heig ht with •D rivers/opera tors aw are of ha zard organisation
scaffolding instructed in safe use of la dders
•Follow Loading / delivery procedures for working on and w ork on top of trucks/rail cars Is the Risk AL ARP? – Y /N No
Loading Racks and o n to p of trucks and rail cars /D rivers/O perators
•D river applies D e livery and
loa din g Procedure/D river Com m ents:
•D river T rainin g a nd C om petency/ Based on the exam ples of addition control m easures above item s 1-4 are achievable and
Shell Business rep would represent ALARP once im plem ented. Item 5 is currently not practicable due to the
widespread use of portable ladders during m aintenance / delivery.
1.3 Recovery M easu res: H SE C ritical Activity/
R esp o n sib le Po sitio n
Initiate response to em ergency •Em ergency response plans and TEAM M EM BERS
M ETHO D USED
V eh icles fitted w ith first a id kits training /S hell. C arriers/Resellers Expertise Nam e
•Staff and contractor to use x Experience/Judgm ent HSE:
incid ent case m anagem ent/ B ulk Cost-Benefit Engineering:
Fuels m anager/C RT ST L/R esellers Q uant. Assessm ent O perations:
O ther Other:
Control Examples:
Design Controls (e.g. guards, level alarms, automatic trips etc.)
Operation Intervention Controls (e.g. Operating within defined process envelop
etc.)
Management System Processes are not barriers (e.g. Management Of Change, Technical
Integrity Management etc.) They are Critical Business Processes in HSE MS. Following these
processes can be a barrier; These are typically shown as supporting Activities /Processes to
a design or operations barrier on the bowtie.
RECOVERY MEASURE (RM) Escalation
Left Hand Side: Right Hand Side:
Escalation
PREVENT MITIGATE
Factor Factor
Consequence
RM Examples:
Design (e.g. Spill containment, dikes, automatic water spray, ignition control,
etc.)
Operations (e.g. Operations intervention, rescue team response)
Management System Processes are not barriers (e.g. Emergency Response Management
etc.) They are Critical Business Processes in HSE MS. Following these processes can be a
barrier; These are typically shown as supporting Activities /Processes to a design or
operations barrier on the bowtie.
ESCALATION FACTOR
Left Hand Side: Right Hand Side:
Escalation Escalation
PREVENT MITIGATE
Factor Factor
Escalation Escalation
Factor Hazard Factor
Control Control
& Consequence
Hazard Source 1
Threat
1
Threat Consequence
Top Event 2
2
Recovery Measures).
RM 3
Emergency
Design Standards Load Plan Response
Community
Relations
Planning
Blast Resistant
Modules
Access Control Antilock Braking
System
BARRIER HIERARCHY
Controls and Recovery Measures hierarchy, in order of preference:
– Isolation / Separation
– Procedures
• List all actions in a Remedial Action Plan that are System: Implement Emergency
Response
required to achieve ALARP.
BowTie DEVELOPMENT –STEP BY STEP
Identify
• Hazards Evaluate and document
Inspection
Loss
Slippery Personnel Injury
Work
of
Fatality
Surfaces Non -Slip Control P4D
Boots
(Fall) Design - Fall Arrest First aid;
Non -Slip Platforms; equip ERP
Warning Surfaces
signs
Work Planning
process
Follow Permit
Poor Work requirements
(tie -off, stop
Platform
work in bad
weather)
Design;
Scaffolds